24_-_AMNWR__Attachments_List__Crystal_Springs__01-08-2025_0002.pdf

PDF 210 KB Posted

Attached to
NV ASH MEADOWS NWR CRY SPRNGS RESTORE
Solicitation number
140FGA25R0003
Issued by

About this file

This is an attachments list document for the Crystal Springs Outflow Restoration and Associated Appurtenances Design/Build Services project at Ash Meadows National Wildlife Refuge (AMNWR). The document contains 24 primary attachments and 5 additional attachments from two amendments related to environmental assessment requirements.

The attachments cover a comprehensive range of project documentation including the proposal schedule, statement of work, technical requirements, multiple dam reports (Crystal Springs, Horseshoe, and Lower Crystal), safety documentation, construction permits and management guidelines, maps showing location and EC values, and environmental studies. Key technical documents include the Crystal Reservoir Rehabilitation Plan, Crystal Springs Restoration Plan, Re-vegetation Plan, and Construction Sequence. Amendment 2 adds Environmental Assessment (EA) guidance and templates that are 508-compliant and dated January 2025, along with an example EA to demonstrate the required level of effort.

View the file

Other files

File Type Posted
Sol_140FGA25R0003_Amd_0002.pdf PDF
FINAL__UCS__EA__8-15-2013__USFWS-Reviewed_0002.pdf PDF
EA__Template__508-Compliant__Jan2025_0002.pdf PDF
EA__Guidance__508-Compliant__Jan2025_0002.pdf PDF
FONSI__Template__508-Compliant__Jan2025_0002.pdf PDF
RFI-Questions_and_Responses__01-08-2025_0002.pdf PDF
B08_-_Solicitation_(140FGA25R0003_Sections_B-M)_0001.pdf PDF
Sol_140FGA25R0003_Amd_0001.pdf PDF
B08_-_Solicitation_Cover_Form_(140FGA25R0003)_0001.pdf PDF
21_-_2018__Dam_Safety_Inspection_Letter_for_Crystal_Springs.pdf PDF
13_-_Map_1__Location.pdf PDF
4_k__-_Crystal_Springs_Re-vegetation_Plan.pdf PDF
23_-_190102__Ash_Meadows_NWR__Inventory_Assessment_Memorandum.pdf PDF
B08_-_Solicitation_(140FGA25R0003).pdf PDF
3_-_AMNWR__Statement_of_Work__Crystal_Springs__06-12-2024.pdf PDF
4_j__-_Crystal_Springs_Restoration_Plan.pdf PDF
12_-_360_FW4__Construction_Management.pdf PDF
24_-_AMNWR__Attachments_List__Crystal_Springs.pdf PDF
25_-_Davis_Bacon_Wage_Determination.pdf PDF
26_-_Past_Performance_Questionnaire).pdf PDF
4_e__-_AMNWR__Lower_Crystal_Dam_Report.pdf PDF
17_-_Map_5__EC_Values_Community.pdf PDF
16_-_Map_4__EC_Values_Connectivity.pdf PDF
9_-_Pre-Work_Safety_Checklist.pdf PDF
10_-_Safety_and_Design_Checklists_v_1_1.pdf PDF
11_-_360_FW1__Summary_of_Construction_Permits.pdf PDF
19_-_Nevada_Dept__of_Wildlife__Letter_of_Support.pdf PDF
1_-_AMNWR__Proposal_Schedule__Crystal_Springs__06-12-2024.pdf PDF
2_-_AMNWR__Subcontract_List__Crystal_Springs__06-12-2024.pdf PDF
4_a__-_AMNWR__Project_Nomination__Crystal_Springs_Outflow__Edited.pdf PDF
22_-_191210__Ash_Meadows__H_H_Report.pdf PDF
4_c__-_AMNWR__Crystal_Springs_Dam_Report.pdf PDF
4_d__-_AMNWR__Horseshoe_Dam_Report.pdf PDF
4_g__-_PFAS_Summary.pdf PDF
Sol_140FGA25R0003.pdf PDF
4_l__-_Crystal_Springs_Construction_Sequence.pdf PDF
6_-_AMNWR__Technical_Requirements__06-12-2024.pdf PDF
18_-_Map_6__General_Overview.pdf PDF
4_i__-_Crystal_Reservoir_Rehabilitation_Plan_and_Construction_Sequence.pdf PDF
15_-_Map_3__EC_Values_Sustainability.pdf PDF
4_f__-_Crystal_Reservoir_Dust_Hazard_Analysis_1.pdf PDF
20_-_Crystal_Springs_Dam__Figure_4.pdf PDF
14_-_Map_2__Agency_Management_Area.pdf PDF
4_h__-_240322__Death-Valley__Output.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ash Meadows National Wildlife Refuge (AMNWR).

Design/Build Services For:

Crystal Springs Outflow Restoration and All Associated Appurtenances.

Attachments provided as Separate Files.

File Name File Extension

AMNWR – Project Documents.

1 - AMNWR. PPR Proposal Schedule. 06-12-2024. PDF, XLSX 2 - AMNWR. Subcontract List. Crystal Springs. 06-12-2024. DOCX 3 - AMNWR. Statement of Work. Crystal Springs. 06-12-2024. PDF 4.a. - AMNWR. Project Nomination. Crystal Springs Outflow Restoration. PDF 4.c. - AMNWR. Crystal Springs Dam Report. PDF 4.d. - AMNWR. Horseshoe Dam Report. PDF 4.e. - AMNWR. Lower Crystal Dam Report. PDF 4.f. - Crystal Reservoir Dust Hazard Analysis 1. PDF 4.g. - PFAS Summary. PDF / DOCX 4.h. - 240322. Death-Valley. Output. PDF / XLSX 4.i. - Crystal Reservoir Rehabilitation Plan and Construction Sequence. PDF 4.j. - Crystal Springs Restoration Plan. PDF 4.k. - Crystal Springs Re-vegetation Plan. PDF 4.l. - Crystal Springs Construction Sequence. PDF 6 - AMNWR. Technical Requirements. 06-12-2024. PDF 9 - Pre-Work Safety Checklist. PDF 10 - Safety and Design Checklists v.1.1. PDF 11 - 360 FW1. Summary of Construction Permits. PDF 12 - 360 FW4. Construction Management. PDF 13 - Map 1. Location. PDF 14 - Map 2. Agency Management Area. PDF 15 - Map 3. EC Values Sustainability. PDF 16 - Map 4. EC Values Connectivity. PDF 17 - Map 5. EC Values Community. PDF 18 - Map 6. General Overview. PDF 19 - Nevada Dept. of Wildlife. Letter of Support. PDF 20 - Crystal Springs Dam. Figure 4. PDF 21 - 2018. Dam Safety Inspection Letter for Crystal Springs. PDF 22 - 191210. Ash Meadows. H&H Report. PDF 23 - 190102. Ash Meadows NWR. Inventory Assessment Memo. PDF 24 - AMNWR. Attachments List. Crystal Springs. PDF

Amendment No. 1 to Solicitation.

Revise Project Solicitation attachments for File Access. No Attachments under The Amendment No. 1 Cover.

Amendment No. 2 to Solicitation.

Attachments.

EA. Guidance. 508-Compliant. Jan2025. DOCX / PDF EA. Template. 508-Compliant. Jan2025. DOCX / PDF FONSI. Template. 508-Compliant. Jan2025. DOCX / PDF Example Environmental Assessment (EA) to demonstrate level of effort.

FINAL. UCS. EA. 8-15-2013. USFWS-Reviewed. PDF

File details come from the government source that posted it. Updated .