24-8464_-_Exhibit_M_–_FUEL_TANK_PERMIT_SET_Rev.2.pdf
PDF 5 MB Posted
- Solicitation number
- 24-8284
- Issued by
- Collier County, Miami City, Florida
About this file
The document is a detailed fuel system replacement technical specification set prepared by Jenkins Maag Associates LLC for Collier County's Caxambas Marina located at 909 Collier Court, Marco Island, Florida. The project involves replacing the existing fuel system with a new 10,000-gallon above-ground fuel storage tank, dispensers, piping, monitoring systems, and associated infrastructure, designed to meet the 2023 Florida Building Code, Florida Plumbing Code, and various NFPA standards. The specifications cover comprehensive technical requirements for equipment installation, including storage tank placement, piping details, electrical systems, safety features, signage, emergency shutoffs, leak detection, and monitoring systems.
The project basis of design includes specific equipment manufacturers and models, such as a Highland Tank 10,000-gallon Fireguard tank, Wayne Select retail dispenser, Veeder Root TLS4 fuel monitoring controls, and OPW fueling containment systems for piping and sumps. Critical safety and regulatory compliance elements are emphasized, including minimum distances from property lines, fire prevention measures, electrical safety, overfill prevention, and comprehensive leak detection systems. The technical specifications provide extensive detailed requirements for installation, testing, and operational standards, ensuring a robust and compliant marina fuel system replacement that meets all current safety and environmental regulations.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
LL
IE
R C
O U
N T
Y C
A X A
M B A
S M
A R
IN
A
F U
EL
SY
ST
EM
R
EP
LA
C
EM
EN
T
C o ll ie r C t.
M ar co
I sl an d
FL
A ar o n F
M aa g
FL
P E
C O
RK
SC
RE
W
R D
SU
IT
E
ES
T
ER
O
FL
P:
-2
-5
F:
-2
-5
Fl o ri d a
C o A
JM
A
JE
N
K
IN
S M
A A
G A
SS
O C
IA
T
ES
LL
C
FUEL SYSTEM
TITLE SHEET
F-1
GENERAL NOTES
1. ALL WORK SHALL BE GOVERNED AND INSTALLED IN
COMPLIANCE WITH THE LATEST EDITION AND APPLICABLE
PROVISIONS OF THE FOLLOWING CODES AND STANDARDS:
1.1. FLORIDA BUILDING CODE - 2023 W/ ALL SUPPLEMENTS.
1.2. FLORIDA PLUMBING CODE - 2023 W/ ALL
SUPPLEMENTS.
1.3. FLORIDA ENERGY EFFICIENCY CODE - 2023 W/ ALL
SUPPLEMENTS.
1.4. FLORIDA FIRE PREVENTION CODE - 2023 W/ ALL
SUPPLEMENTS.
1.5. NATIONAL ELECTRICAL CODE (NEC)
1.6. NFPA 30 - FLAMMABLE AND COMBUSTIBLE LIQUIDS
CODE.
1.7. NFPA 30A - CODE FOR MOTOR FUEL DISPENSING
FACILITIES AND REPAIR GARAGES.
2. NOTE THAT THIS SHALL BE CONSIDERED AN "ATTENDED
FUELING STATION" PER SECTION 9.4 OF NFPA 30A.
3. THE STORAGE TANK SHALL HOLD REC 90 FUEL (100% TANK
CAPACITY).
4. DRAWINGS ARE GENERALLY DIAGRAMMATIC AND DO NOT
NECESSARILY SHOW EVERY FITTING AND DETAIL. INSTALL
PIPING AND EQUIPMENT IN A NEAT, WORKMANLIKE
MANNER AND IN ACCORDANCE WITH GOOD PRACTICE FOR
A COMPLETE, WORKABLE INSTALLATION. AVOID CONFLICTS
WITH OTHER TRADE'S WORK. MAKE ADEQUATE
PROVISIONS FOR PREVENTING NOISE AND VIBRATION.
5. PRIOR TO SUBMITTING A PROPOSAL, THE CONTRACTOR
SHALL VISIT THE SITE AND THOROUGHLY INSPECT ALL
EXISTING CONDITIONS TO INSURE THAT THE WORK
REPRESENTED ON THE DRAWINGS AND IN THESE
SPECIFICATIONS CAN BE INSTALLED AS INDICATED.
6. PROVIDE THE NECESSARY REQUIRED NUMBER OF
SUBMITTALS FOR ALL EQUIPMENT, PIPING AND MATERIALS
REQUIRED PER THESE PLANS AND SPECIFICATIONS.
7. ALL EQUIPMENT AND MATERIAL SHALL BE INSTALLED IN
ACCORDANCE WITH MANUFACTURER'S WRITTEN
INSTRUCTIONS. MANUFACTURER'S SERVICE CLEARANCE
FOR ALL EQUIPMENT SHALL BE MAINTAINED.
8. CONTRACTOR SHALL INCLUDE IN THE BID THE TRANSPORT
AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS
GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL
RULES, REGULATIONS AND GUIDELINES APPLICABLE.
9. VALVES AND FITTINGS SHALL BE OF SAME SIZE OF LINE ON
WHICH THEY ARE LOCATED, UNLESS OTHERWISE
INDICATED ON DRAWINGS.
10. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER
TRADES.
11. CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT
CONNECTIONS OF DISSIMILAR METALS.
12. ENSURE PIPING HANDLING REC 90 FUEL IS ELECTRICALLY
ISOLATED FROM SHORE PIPING.
13. NO PIPING SHALL BE INSTALLED ON ANY PIER.
14. PROVIDE MEANS FOR FIRE EXTINGUISHERS TO BE
LOCATED AND INSTALLED IN ALL LOCATIONS REQUIRED BY
NFPA 10 9.2.5.2.2. THRU 9.2.5.2.5. THE MAXIMUM TRAVEL
DISTANCE FROM A (MINIMUM 20LB) ABC DRY CHEMICAL
EXTINGUISHER (MINIMUM 1 LB/SEC DISCHARGE RATE)
SHALL BE 100 FT. A FIRE EXTINGUISHER SHALL ALSO BE
LOCATED AT THE STORAGE TANK AREA.
15. BOLLARDS SHALL BE CONSTRUCTED OF STEEL FILLED
WITH CONCRETE WITH A MINIMUM DIAMETER OF 15 INCHES.
BOLLARDS SHALL BE NO LESS THAN 3 FEET DEEP IN
CONCRETE FOOTINGS. TOP OF BOLLARDS SHALL BE AT A
MINIMUM HEIGHT EQUAL TO BASE FLOOD ELEVATION (AE
10). GRADE IS AT APPROXIMATELY 4 FEET, THEREFORE
BOLLARDS SHALL EXTEND APPROXIMATELY 6 FEET ABOVE
GRADE TO PROVIDE ADDITIONAL PROTECTION FOR TANK
AND DISPENSERS FROM IMPACT DURING A FLOOD EVENT.
SIGNAGE
16. PROVIDE WARNING SIGNS CONSPICUOUSLY POSTED IN
THE DISPENSING AREA THAT INCORPORATE THE
FOLLOWING WORDING:
16.1. WARNING
16.1.1. IT IS UNLAWFUL AND DANGEROUS TO DISPENSE
GASOLINE INTO UNAPPROVED CONTAINERS.
16.1.2. NO SMOKING.
16.1.3. STOP MOTOR.
16.1.4. NO FILLING OF PORTABLE CONTAINERS IN OR ON
A MOTOR VEHICLE.
16.1.5. PLACE CONTAINER ON GROUND BEFORE
FILLING.
16.1.6. DISCHARGE YOUR STATIC ELECTRICITY BEFORE
FUELING BY TOUCHING A METAL SURFACE AWAY
FROM THE NOZZLE.
16.1.7. DO NOT RE-ENTER YOUR VEHICLE WHEN
GASOLINE IS PUMPING.
16.1.8. IF A FIRE STARTS, DO NO REMOVE NOZZLE -
BACK AWAY IMMEDIATELY.
16.1.9. DO NOT ALLOW INDIVIDUALS UNDER LICENSE
AGE TO PUMP.
17. A SIGN SHALL WITH THE FOLLOWING LEGENDS (PRINTED IN
2" RED LETTERS ON A WHITE BACKGROUND)
CONSPICUOUSLY POSTED IN THE DISPENSING AREA:
17.1. BEFORE FUELING:
17.1.1. STOP ALL ENGINES AND AUXILIARIES.
17.1.2. SHUT OFF ALL ELECTRICITY, OPEN FLAMES AND
HEAT SOURCES.
17.1.3. CHECK ALL BILGES FOR FUEL VAPORS
17.1.4. EXTINGUISH ALL SMOKING MATERIALS.
17.1.5. CLOSE ACCESS FITTINGS AND OPENINGS THAT
COULD ALLOW FUEL VAPORS TO ENTER
ENCLOSED SPACES OF THE VESSEL.
17.2. DURING FUELING:
17.2.1. MAINTAIN NOZZLE CONTACT WITH FILL PIPE.
17.2.2. WIPE UP SPILLS IMMEDIATELY.
17.2.3. AVOID OVERFILLING.
17.2.4. FUEL NOZZLE MUST BE ATTENDED AT ALL TIMES.
17.3. AFTER FUELING:
17.3.1. INSPECT BILGES FOR LEAKAGE AND FUEL
ODORS.
17.3.2. VENTILATE UNTIL ODORS ARE REMOVED.
VENTING
18. VENT PIPING SHALL DISCHARGE ONLY IN AN UPWARD
DIRECTION WITH A TERMINATION POINT A MINIMUM OF 12FT
ABOVE GRADE.
19. EMERGENCY VENT SHALL REMAIN FULL SIZE ENTIRE
LENGTH, REDUCTION IN SIZE NOT PERMITTED PER
NFPA30A 4.3.5.1.
DISPENSER
20. FIELD VERIFY THAT DISPENSER LOCATION IS A MINIMUM OF
10FT FROM ALL PROPERTY LINES AND A MINIMUM OF 10FT
FROM ANY BUILDING AND THAT THE NOZZLE (100FT HOSE)
CANNOT REACH TO WITHIN 5FT OF ANY BUILDING
OPENINGS.
21. DISPENSER SHALL BE PROVIDED WITH A CASH AND
GALLONS DISPENSED DISPLAY.
22. THE DISPENSER SHALL BE BOLTED TO CONCRETE PAD.
23. THE DISPENSER WILL BE PROVIDED WITH A LEAK SENSOR/
DETECTION DEVICE TIED TO THE SYSTEM AUDIBLE/VISIBLE
ALARM.
24. HOSE REELS SHALL BE STAINLESS STEEL WITH 100 FT
HOSES.
25. HOSE REEL SHALL HAVE A MAX FLOW RATE OF 23 GPM.
26. HOSE REELS TO INCLUDE A BREAK AWAY DEVICE THAT
WILL RETAIN LIQUID ON BOTH SIDES OF THE BREAKAWAY
POINT.
27. NOT USED.
ELECTRICAL (COORDINATE WITH ELECTRICAL CONTRACTOR THE
FOLLOWING ITEMS:
28. PROVIDE A CLEARLY IDENTIFIED EMERGENCY SHUTOFF
DEVICE OR DISCONNECT BETWEEN 20FT AND 100FT FROM
THE DISPENSING DEVICE SERVED. PROVIDE LABEL AT
DEVICE, "EMERGENCY FUEL SHUTOFF". ELECTRICAL SHUT
OFF DEVICES SHALL BE INSTALLED AND CAPABLE OF
MEETING ALL REQUIREMENTS OF NFPA 30A SECTION 6.7.
29. A SECONDARY EMERGENCY STOP FOR THE SYSTEM WILL
BE REQUIRED INSIDE THE BUILDING. COORDINATE WITH
OWNER FOR EXACT LOCATION.
30. REFER TO NFPA 30A FIGURE 8.3.3 AND TABLE 8.3.3 FOR
AVAILABLE INSTALL LOCATIONS OF ELECTRICAL WIRING
AND EQUIPMENT.
31. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED AND
USED IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70.
32. ALL ELECTRICAL WIRING FOR POWER AND LIGHTING SHALL
BE PROTECTED FROM A RELEASE FROM THE FUEL PIPING
SYSTEM.
33. CONTRACTOR SHALL PROVIDE 120V POWER FOR HIGHLINK
MONITORING SYSTEM AT STORAGE TANK.
ABOVE GROUND STORAGE TANK
34. ASSOCIATED COMPONENTS SHALL INCLUDE:
34.1. SUBMERSIBLE PUMP
34.2. ATMOSPHERIC VENT
34.3. EMERGENCY VENTS
34.4. AUDIBLE/VISUAL OVERFILL AND LEAK DETECTION
ALARM. ALARM SHALL BE ABLE TO NOTIFY USER OF
OVERFILL OR LEAK.
34.5. REMOTE FILL
34.5.1. REMOTE FILL SHALL HAVE A QUICK CONNECTION
WITH BALL VALVE, CHECK VALE AND HAND PUMP
(W/ VALVE) FOR SPILLS WITHIN THE
CONTAINMENT DEVICE.
35. FIELD VERIFY/MEASURE THAT TANK IS INSTALLED ATLEAST
15' FROM NEAREST BUILDING AND 25' FROM LOT LINE OR
PUBLIC WAY.
36. TANKS SHALL BE FILLED VIA LIQUID TIGHT CONNECTIONS.
37. THE ABOVE GROUND STORAGE TANK SHALL BE PROVIDED
WITH A FOUNDATION DESIGNED TO SUPPORT THE FULL
WEIGHT OF A FILLED TANK. THE FOUNDATION MAY BE
CONSTRUCTED OF CONCRETE. THIS CONCRETE PAD SHALL
BE DESIGNED AND CONSTRUCTED SO THAT THE SURFACE
SHALL DRAIN WATER AWAY TO MINIMIZE ANY CORROSION
TO THE TANK. THE TANK SHALL THEN BE WELDED TO
SUPPORTS AND BOLTED TO HOLD-DOWN PAD TO PREVENT
FLOTATION.
38. THE TANK SHALL BE PROVIDED WITH A LEAK SENSOR FOR
THE INTERSTITIAL SPACE BETWEEN TWO TANK WALLS.
39. THE CONTRACTOR SHALL VERIFY THAT THERE ARE NO
BELOW GRADE UTILITIES UNDERNEATH THE PROPOSED
TANK LOCATION AND THAT THERE ARE ALSO NO
OVERHEAD POWER LINES.
40. CONTRACTOR SHALL CONSULT MANUFACTURER
INSTALLATION GUIDELINES FOR ALL INSTALLATION,
HANDLING AND PLACEMENT REQUIREMENTS.
PIPING:
41. PIPING BETWEEN TANK AND DISPENSER(S) SHALL BE
DOUBLE WALL PIPING EQUAL TO C20A BY FLEX WORKS BY
OPW FUELING CONTAINMENT SYSTEMS (OPW-FCS) OR
EQUIVALENT. PROVIDE PIPING LEAK DETECTION FROM THE
VEEDER ROOT SYSTEM. SIGNAL SHALL BE SENT TO
AUDIBLE/VISUAL ALARM UPON LEAK DETECTION.
42. 2" I.D. PIPING SHALL BE USED FOR THE REC 90 FUEL.
43. WHEN INSTALLING THE FLEXIBLE DOUBLE WALL PIPE,
PROVIDE WITHIN OPW-FCS ACCESS PIPE (A LARGE
DIAMETER CORRUGATE FLEXIBLE PIPE THAT ADDS
ADDITIONAL PROTECTION TO THE FUEL PIPING).
44. PROVIDE FLEX PIPING CONNECTIONS BY OPW-FCS FOR ALL
CONNECTIONS ASSOCIATED WITH THE FLEXIBLE PIPING.
45. INSTALLING CONTRACTOR SHALL FOLLOW THE
MANUFACTURER'S RECOMMENDATIONS FOR PIPING TURNS
(REQUIRED RADIUS), PIPING CROSSOVERS, ETC.
46. INSTALLING CONTRACTOR SHALL FOLLOW THE
MANUFACTURER'S RECOMMENDATIONS FOR PIPING
BURIAL REQUIREMENTS SUCH AS TRENCH SIZING,
BEDDING/BACKFILL MATERIALS, REQUIRED PIPE SLOPING,
ETC.
47. PROVIDE A RISER PIPE ASSEMBLY FROM THE DISPENSER
SUMP TO THE DISPENSER ITSELF. PROVIDE WITH A FUSIBLE
LINK SHUT OFF VALVE IN PIPING AT CONNECTION BENEATH
THE DISPENSER. VALVE SHALL CLOSE AUTOMATICALLY IN
THE EVENT OF SEVERE IMPACT OF FIRE EXPOSURE. ALSO
PROVIDE A NORMALLY CLOSED SOLENOID VALVE TO
PREVENT FLOW WHEN DISPENSER IS NOT IN USE.
48. ENSURE ANY SHUTOFF AND CHECK VALVES ARE EQUIPPED
WITH A PRESSURE RELIEVING DEVICE THAT WILL RELIEVE
ANY PRESSURE GENERATED BY THERMAL EXPANSION OF
THE CONTAINED LIQUID BACK TO THE STORAGE TANK.
SUMPS:
49. PROVIDE A GRADE LEVEL FIBERGLASS TRANSITION SUMP
AT ABOVE GROUND STORAGE TANK AS VERTICAL PIPING
ROUTES TO UNDERGROUND (TO HOUSE CONNECTION
BETWEEN STEEL PIPING FROM ABOVE TO BELOW GRADE
FLEXIBLE PIPING). SUMP SHALL BE EQUAL TO GSE BY OPW.
SUMP SHALL INCLUDE A FIBERGLASS BASE WITH A 14-GA
POWDER COATED STEEL TOP. THIS SUMP SHALL BE
INSTALLED SO THE RISER ACCESS PORT IS ABOVE GRADE
BY ~3" WHILE THE ACCESS PORT RISER IS ABOVE GRADE
BY ~6". INSTALL PER MANUFACTURERS INSTALLATION
INSTRUCTIONS (INCLUDING ASSOCIATED CONCRETE PAD
AT SUMP).
50. PROVIDE A ONE PIECE POLYETHYLENE DISPENSER SUMP
EQUAL TO FLEX WORKS BY OPW FUELING CONTAINMENT
SYSTEMS MODEL DS SERIES. COORDINATE EXACT SIZE
BETWEEN OPW AND DISPENSER PROVIDER. COORDINATE
OPENING SIZE WITH DISPENSER CONCRETE PAD.
51. SUMPS SHALL INCLUDE EMERGENCY SHEAR VALVES AND
UNDERGROUND PIPING CONNECTIONS.
52. SUMPS SHALL INCLUDE AN AUTOMATIC FIRE
EXTINGUISHER BUILT INTO SUMP.
53. FOR ABOVE GRADE CONNECTIONS AT SUMPS, UTILIZE FLEX
WORKS PIPE ENTRY FITTINGS ASSOCIATED WITH SUMP
ALONG WITH OPW UV-RESISTANT PROTECTION BOOTS.
FOR BELOW GRADE CONNECTIONS AT BOOTS, PROVIDE
OPW RIGID ENTRY FITTINGS.
54. SEND A SIGNAL TO AUDIBLE/VISUAL ALARM UPON ANY
LEAD DETECTION AT SUMPS.
TESTING
55. ALL PIPING AND SECONDARY CONTAINMENT PIPING SHALL
BE TESTED BEFORE BEING COVERED, ENCLOSED, OR
PLACED IN SERVICE IN ACCORDANCE WITH SECTION 27.7
OF NFPA 30 AND PER THE MANUFACTURERS
REQUIREMENTS.
56. THE SECONDARY CONTAINMENT TYPE PIPING SHAVE HAVE
AN INTERSTITIAL SPACE TESTED HYDROSTATICALLY OR
WITH AIR PRESSURE AT MINIMUM GAUGE PRESSURE OF 5
PSI OR SHALL BE TESTED IN ACCORDANCE WITH THE
MANUFACTURERS INSTRUCTIONS. THE PRESSURE SOURCE
SHALL BE CLOSED FROM THE SYSTEM BEING TESTED TO
ENSURE THAT THE TEST IS BEING CONDUCTED IN A
CLOSED SYSTEM.
57. CONTRACTOR SHALL CONSULT MANUFACTURER
INSTALLATION GUIDELINES OF ABOVE GROUND TANK FOR
AIR TEST PROCEDURE.
MONITORING SYSTEM
58. PROVIDE FUEL LEVEL MONITORING SYSTEM. THIS SYSTEM
USES A WEB BASED SOFTWARE SYSTEM ACCESSIBLE VIA
SMART PHONE, TABLET OR WEB BROWSER. THIS SYSTEM
ALLOWS THE USER TO MONITOR THE TANK LEVELS,
RECONCILE INVENTORY, MONITOR FOR WATER, CROSS
CHECK FUEL VENDOR BILLS, PREVENT THEFT AND
SUSPICIOUS ACTIVITY AND GENERATE E-MAIL OR SMS
ALERTS. SOFTWARE TRAINING AND SUPPORT SHALL BE
INCLUDED IN PACKAGE. COORDINATE INSTALLATION WITH
MANUFACTURER INSTALLATION GUIDELINES.
59. CONTRACTOR SHALL PROVIDE/VERIFY THAT THERE IS A
MINIMUM 2-BAR VERIZON SIGNAL TYPICALLY AT THE SITE
FOR SYSTEM TO WORK, THAT 120V POWER IS AVAILABLE.
60. MONITORING REQUIRES ANNUAL FEES FOR DATA SERVICE
AND SOFTWARE LICENSES.
ADDITIONAL NOTES:
61. ALL EQUIPMENT, PIPING, SUMPS, ETC SHALL BE INSTALLED
PER MANUFACTURES INSTALLATION INSTRUCTIONS.
BASIS OF DESIGN
THE FOLLOWING SHALL BE CONSIDERED BASIS OF DESIGN. OTHER
MANUFACTURERS ARE ALLOWED TO BE SUBMITTED FOR PRIOR
APPROVAL DURING THE BIDDING PROCESS.
A. FUEL MONITORING CONTROLS PACKAGE: TLS4 BY VEEDER ROOT
B. POS SYSTEM: SQUARE REGISTER RETAIL KIT
C. FUEL STORAGE TANK: 10,000 GALLON (8FT DIAMETER) FIREGUARD
TANK BY HIGHLAND TANK CO. TANK SHALL BE SHIPPED TO SITE
UNDER VACUUM.
D. BELOW GRADE FUEL PIPING: BELOW GRADE FLEXIBLE FUEL PIPING
SHALL BE DOUBLE WALL PIPING EQUAL TO C20A (2" PIPE) BY FLEX
WORKS (OPW FUELING CONTAINMENT SYSTEMS).
E. TRANSITION SUMP: TRANSITION SUMP EQUAL TO GSE (GRADE LEVEL
TRANSITION SUMP) BY OPW.
F. DISPENSER SUMP: DISPENSER SUMP EQUAL TO DS SERIES SUMPS
BY FLEX WORKS (OPW FUELING CONTAINMENT SYSTEMS).
G. DISPENSER: WAYNE SELECT RETAIL DISPENSER
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A2
A2
A2
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
ISSUE:
AutoCAD SHX Text
ISSUE DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
PERMIT SET
AutoCAD SHX Text 05.06.2024
AutoCAD SHX Text
CCO23002
AutoCAD SHX Text
PERMIT SET
AutoCAD SHX Text 05.06.2024
AutoCAD SHX Text
KAP
AutoCAD SHX Text
AFM
AutoCAD SHX Text
ADDENDUM #1
AutoCAD SHX Text 07.16.2024
AutoCAD SHX Text A1
AutoCAD SHX Text
ADDENDUM #2
AutoCAD SHX Text 08.14.2024
AutoCAD SHX Text A2
LL
IE
R C
O U
N T
Y C
A X A
M B A
S M
A R
IN
A
F U
EL
SY
ST
EM
R
EP
LA
C
EM
EN
T
C o ll ie r C t.
M ar co
I sl an d
FL
A ar o n F
M aa g
FL
P E
C O
RK
SC
RE
W
R D
SU
IT
E
ES
T
ER
O
FL
P:
-2
-5
F:
-2
-5
Fl o ri d a
C o A
JM
A
JE
N
K
IN
S M
A A
G A
SS
O C
IA
T
ES
LL
C
FUEL SYSTEM
SPECIFICATIONS
F-2
ABOVE GROUND EQUIPMENT SPECIFICATIONS / NOTES
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A2
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
ISSUE:
AutoCAD SHX Text
ISSUE DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
PERMIT SET
AutoCAD SHX Text 05.06.2024
AutoCAD SHX Text
CCO23002
AutoCAD SHX Text
PERMIT SET
AutoCAD SHX Text 05.06.2024
AutoCAD SHX Text
KAP
AutoCAD SHX Text
AFM
AutoCAD SHX Text
ADDENDUM #1
AutoCAD SHX Text 07.16.2024
A1
LL
IE
R C
O U
N T
Y C
A X A
M B A
S M
A R
IN
A
F U
EL
SY
ST
EM
R
EP
LA
C
EM
EN
T
C o ll ie r C t.
M ar co
I sl an d
FL
A ar o n F
M aa g
FL
P E
C O
RK
SC
RE
W
R D
SU
IT
E
ES
T
ER
O
FL
P:
-2
-5
F:
-2
-5
Fl o ri d a
C o A
JM
A
JE
N
K
IN
S M
A A
G A
SS
O C
IA
T
ES
LL
C
FUEL SYSTEM
SPECIFICATIONS
F-3
SYSTEM CONTROLS SPECIFICATIONS / NOTES
A1
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
ISSUE:
AutoCAD SHX Text
ISSUE DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
PERMIT SET
AutoCAD SHX Text 05.06.2024
AutoCAD SHX Text
CCO23002
AutoCAD SHX Text
PERMIT SET
AutoCAD SHX Text 05.06.2024
AutoCAD SHX Text
KAP
AutoCAD SHX Text
AFM
AutoCAD SHX Text
ADDENDUM #1
AutoCAD SHX Text 07.16.2024
LL
IE
R C
O U
N T
Y C
A X A
M B A
S M
A R
IN
A
F U
EL
SY
ST
EM
R
EP
LA
C
EM
EN
T
C o ll ie r C t.
M ar co
I sl an d
FL
A ar o n F
M aa g
FL
P E
C O
RK
SC
RE
W
R D
SU
IT
E
ES
T
ER
O
FL
P:
-2
-5
F:
-2
-5
Fl o ri d a
C o A
JM
A
JE
N
K
IN
S M
A A
G A
SS
O C
IA
T
ES
LL
C
FUEL SYSTEM
DETAILS
F-4
FILL GAUGE
CONTROL PANEL (x2): 1 FOR PUMP
PACKAGE AND ONE FOR OVERFILL
ALARM/LEAK DETECTION SYSTEM.
EACH REQUIRING 110 VAC.
REMOTE FILL WITH
SPILL CONTAINMENT
BALL VALVE
QUICK CONNECT
FILL CONNECTION
VAPOR RECOVERY
CHECK VALVE LINE
STRAINER (TYP)
OVERFILL
PREVENTION
VALVE
OPW EVR CERTIFIED
PRESSURE VACUUM
VENT
EMERGENCY
VENT
INTERSTITIAL
MONITOR
PIPE
SUBMERSIBLE
PUMP (TYP)
GATE
VALVE (TYP)
EXTERNAL
EMERGENCY
VALVE (TYP)
SOLENOID
VALVE (TYP)
ELECTRICAL
LINE TO
DISPENSERS
DISPENSER
(MINIMUM 25 FT
AWAY)
DISPENSER
SUMP
GRADE LEVEL
TRANSITION
SUMP
EMERGENCY SHUT
OFF VALVE
SCALE: NONE1
ABOVE GROUND STORAGE TANK ELEVATION
SCALE: NONE3
ABOVE GROUND STORAGE TANK PIPING DETAIL
HIGH-LINK LEVEL
SHIELD DETAIL
COMMUNICATION
BOX DETAIL
2"Ø HOLES TYP 4 TOTAL
5/8"Ø GROUNDING
HOLE IN SADDLE
(2) 102" x 6" HIGH
SADDLES
SEAL WELD TO TANK
SHIPMENT BANDING
HOLES (2) PER
SADDLE
4" INTERSTICE
THIS HEAD ONLY
3" LIGHTWEIGHT INSULATION MATERIAL WITHIN INTERSTICE
SEE HIGH-LINK LEVEL
MODULE DETAIL
NOTE: BOTTOM OF FILL COMPARTMENT,
OVERFILL ALARM AND ANY OTHER ALARM OR
CONTROL PANEL SHALL BE INSTALLED A
MINIMUM OF 54" ABOVE GRADE TO BE ABOVE
BASE FLOOD ELEVATION.
BOLT DOWN TO SLAB
(REFER TO FLOOR PLAN NOTES
FOR SPECIFICS)
SCALE: NONE2
STORAGE TANK STRAPPING DETAIL
3"x3/8" STAINLESS STEEL STRAPS WITH
NEOPRENE LINER (QTY OF 4 ACROSS TANK)
EPOXY FILLED DRILLED HOLE W/ 1-1/4", 3/16"
STAINLESS STEEL HEX HEAD ANCHOR BOLT.
TURNBUCKLE
THREADED TIE ROD TO HOLD TWO STRAPS
TOGETHER.
NOTE: AT EACH CONNECTION TO SLAB, DRILL AND
EPOXY 1-1/4" DIAMETER, 3/16" STAINLESS STEEL HEX
HEAD ANCHOR BOLT. PROVIDE 4" CLR DISTANCE FROM
EDGE OF PILE TO CENTER OF REBAR. PROVIDE A 10"
DEEP (MINIMUM) OPENING FOR EPOXY PROVIDING A
MINIMUM 37,000 LB HOLDING STRENGTH AT EACH SET
IN BOLT
A1
A1
LINE LEAK DETECTION FOR FUEL
PIPING (REQUIRED FOR ALL
PIPING IN CONTACT WITH SOIL)
SHALL BE INSTALLED IN
ACCORDANCE WITH
MANUFACTURES INSTRUCTIONS
PROVIDE AND INSTALL PRV AND
PRESSURE RELIEF TUBING
DOWNSTREAM OF SOLENOID
VALVE TO ROUTE FUEL BACK TO
TANK IN THE EVENT OF
OVERPRESSURIZATION OF
ABOVE GRADE PIPING. INSTALL
PER MANUFACTURES
INSTALLATION INSTRUCTIONS.
A1
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
ISSUE:
AutoCAD SHX Text
ISSUE DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
PERMIT SET
AutoCAD SHX Text 05.06.2024
AutoCAD SHX Text
CCO23002
AutoCAD SHX Text
PERMIT SET
AutoCAD SHX Text 05.06.2024
AutoCAD SHX Text
KAP
AutoCAD SHX Text
AFM
AutoCAD SHX Text
%%UDESIGN DATA
AutoCAD SHX Text
TANK MATERIAL -
AutoCAD SHX Text
THICKNESS -
AutoCAD SHX Text
THICKNESS -
AutoCAD SHX Text
EXT. FINISH -
AutoCAD SHX Text
INT. FINISH -
AutoCAD SHX Text
TANK TEST -
AutoCAD SHX Text
OUTER- HEADS: 5/16", SHELL: 1/4"
AutoCAD SHX Text
INNER- HEADS: 5/16", SHELL: 1/4"
AutoCAD SHX Text
OPERATING PRESSURE -
AutoCAD SHX Text
ATMOSPHERIC
AutoCAD SHX Text
SP-6 BLAST, FINISH PAINT WHITE
AutoCAD SHX Text
MILD CARBON STEEL
AutoCAD SHX Text
CAPACITY : 10,000 GALLON
AutoCAD SHX Text
MIN. GAUGE OR THICKNESS (PER U.L. 2085)
AutoCAD SHX Text
CONSTRUCTION - INNER - LAP WELD OUTSIDE ONLY
AutoCAD SHX Text
CONSTRUCTION - OUTER - LAP WELD OUTSIDE ONLY
AutoCAD SHX Text LABEL- UL 2085 AND FIREGUARD® PER sti PER sti
AutoCAD SHX Text
TYPE: DOUBLE WALL TANK
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text
%%UFITTING LEGEND
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
4" FEMALE FG COUPLING
AutoCAD SHX Text F
AutoCAD SHX Text
2" MONITOR PIPE WITH MALE NPT END
AutoCAD SHX Text 24" x 1/4" PLATE TIGHT BOLT MANWAY WITH 1/8" THICK FIBREFLEX GASKET
AutoCAD SHX Text
NONE
AutoCAD SHX Text
SPECIFIC GRAVITY = 1.0
AutoCAD SHX Text
8" FFSO 150# FLANGE - PRIMARY EMERGENCY VENT USE ONLY
AutoCAD SHX Text 8" FFSO 150# FLANGE THROUGH OUTER SHELL ONLY, MARK WITH SPECIAL WARNING LABEL INTERSTITIAL EMERGENCY VENT USE ONLY
AutoCAD SHX Text
2" FITTING THROUGH OUTER SHELL ONLY WITH CAST IRON PLUG- MFG USE ONLY
AutoCAD SHX Text
OVERFILL
AutoCAD SHX Text
BYPASS
AutoCAD SHX Text
HIGH-LINK
AutoCAD SHX Text
COMMUNICATION EQUIPMENT
AutoCAD SHX Text
SYSTEM CONFIGURED WITH
AutoCAD SHX Text
LEAK
AutoCAD SHX Text
MAG
AutoCAD SHX Text
SENSOR(S)
AutoCAD SHX Text
INNER - 5 PSIG
AutoCAD SHX Text
OUTER - 5 PSIG
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text B
AutoCAD SHX Text
ADDENDUM #1
AutoCAD SHX Text 07.16.2024
10,000 GALLON, ABOVE
GROUND FUEL TANK
2" GASOLINE FUEL LINE ROUTED
FROM TANK OVER TO SERVE FUEL
DISPENSER
PROVIDE GRAVEL (CLASS 5)
AROUND PERIMETER OF
PAD TO FENCE
16'
33'
3 4
HOSE REEL
DISPENSER
13'-6"
4'-6
HOSE REEL
9'- 6"
REMOVABLE BOLLARD
FOR USE OF 7' GATE
27'-8 1/8"
1617 16 16 16 17
C O
LL
IE
R C
O U
N T
Y C
A X A
M B A
S M
A R
IN
A
F U
EL
SY
ST
EM
R
EP
LA
C
EM
EN
T
C o ll ie r C t.
M ar co
I sl an d
FL
A ar o n F
M aa g
FL
P E
C O
RK
SC
RE
W
R D
SU
IT
E
ES
T
ER
O
FL
P:
-2
-5
F:
-2
-5
Fl o ri d a
C o A
JM
A
JE
N
K
IN
S M
A A
G A
SS
O C
IA
T
ES
LL
C
FUEL SYSTEM
SITE PLAN
F-5
SHEET KEYNOTES
1. PROVIDE A CONCRETE PAD.
2. CONCRETE PAD. PROVIDE OPENING IN PAD CENTERED ON DISPENSER FOR DISPENSER SUMP (COORDINATE DIMENSIONS
WITH DISPENSER SUMP OPENING DIMENSIONS).
3. PROVIDE ONE FUEL DISPENSER WITH TWO HOSE REELS.
4. FURNISH AND INSTALL DISPENSER SUMP BELOW CONCRETE PAD FOR CONNECTION OF FUEL SUPPLY PIPING TO DISPENSER.
5. FURNISH AND INSTALL TRANSITION SUMP BELOW GRADE FOR CONNECTION OF ABOVE GRADE STEEL FUEL PIPING TO
BELOW GRADE, FLEXIBLE PIPING.
6. PROVIDE FENCE AROUND ABOVE GROUND STORAGE TANK. FENCE SHALL BE A MINIMUM OF 6FT TALL AND 10FT FROM THE
STORAGE TANK ON ALL SIDES.
7. PROVIDE BOLLARDS AROUND PERIMETER OF FENCE, NO MORE THAN 4FT SPACING ON CENTER. REFER TO GENERAL NOTE
#15 ON F-1 FOR ADDITIONAL DETAILS ON BOLLARD CONSTRUCTION.
8. PROVIDE A LOCKABLE DOUBLE SWING GATE (7 FT & 3 FT SECTIONS) IN THE FENCE TO ALLOW SECURED ENTRY TO STORAGE
TANK AREA.
9. NOT USED.
10. NOT USED.
11. PROVIDE FOUR BOLLARDS AT DISPENSER AREA AS SHOWN. REFER TO GENERAL NOTE #15 ON F-1 FOR ADDITIONAL DETAILS
ON BOLLARD CONSTRUCTION.
12. REMOTE FILL STATION. COORDINATE EXACT PIPE ROUTING TO STORAGE TANK WITH PIPE CONNECTION OPENINGS ON TANK.
13. WITHIN EXISTING ELECTRICAL ROOM, DEMO EXISTING VEEDER-ROOT TLS-350 MONITORING SYSTEM AND REPLACE WITH
NEW. REFER TO F-3 FOR NEW SYSTEM SPECIFICATIONS.
14. LOCATION OF INTERIOR EMERGENCY STOP AS DESCRIBED IN SPECS AND GENERAL NOTES OF THESE PLANS.
15. LOCATION OF EXTERIOR EMERGENCY STOP AS DESCRIBED IN SPECS AND GENERAL NOTES OF THESE PLANS.
16. PROVIDE 4 SETS OF STAINLESS STEEL STRAPS (OPTIONAL ACCESSORY BY HIGHLAND TANKS) WITH NEOPRENE LINERS FOR ELECTRICAL ISOLATION AND TANK PROTECTION. SECURE THE STRAPS ON EACH END TO THE STRUCTURAL SLAB WITH TURNBUCKLES AND ANCHOR BOLTS. THE MINIMUM DIMENSION OF THE HOLD DOWN STRAP SHALL BE 3"x3/8". AT EACH CONNECTION DRILL AND EPOXY 1-1/4" DIAMETER, 3/16" STAINLESS STEEL HEX HEAD ANCHOR BOLT. PROVIDE 4" CLR DISTANCE FROM EDGE OF PILE TO CENTER OF REBAR. PROVIDE A 10" DEEP (MINIMUM) OPENING FOR EPOXY PROVIDING A
MINIMUM 37,000 LB HOLDING STRENGTH AT EACH SET IN BOLT.
17. SECURE SADDLE TO STRUCTURAL SLAB (TYPICAL, 2 SADDLES, 2 BOLT CONNECTIONS EACH). AT EACH CONNECTION DRILL AND EPOXY 1-1/4" DIAMETER, 3/16" STAINLESS STEEL HEX HEAD ANCHOR BOLT. PROVIDE 4" CLR DISTANCE FROM EDGE OF PILE TO CENTER OF REBAR. PROVIDE A 10" DEEP (MINIMUM) OPENING FOR EPOXY PROVIDING A MINIMUM 37,000 LB HOLDING
STRENGTH AT EACH SET IN BOLT.
18. ROUTE FUEL PIPING PARALLEL TO SEAWALL, A MINIMUM OF 12 FT FROM EDGE OF SEAWALL CAP. ROUTE PIPING TO DISPENSERS PERPENDICULAR TO SEAWALL TO MINIMIZE CONFLICT WITH SEAWALL INSTALLATION.
GENERAL SHEET NOTES
A. FIELD VERIFY EXACT ROUTING OF UNDERGROUND PIPING PRIOR
TO ORDERING MATERIAL AND ANY ON SITE DIGGING.
B. THE STORAGE TANK IS LOCATED AT 26 FT FROM THE NEAREST
PROPERTY LINE, 56 FT FROM THE SEA WALL AND 32 FT FROM THE
BUILDING ON PROPERTY. PER NFPA 30 TABLE 22.4.1.1(a), THE
MINIMUM DISTANCE FROM THE NEAREST PROPERTY LINE AND
NEAREST DISTANCE FROM ANY PUBLIC WAY CAN BE 50% OF THAT
LISTED IN TABLE 22.4.1.1(b). THEREFORE THE MINIMUM DISTANCE
FROM THE PROPERTY LINE IS 7.5 FT AND FROM THE NEAREST
PUBLIC WAY IS 2.5 FT.
C. SEAWALL ELEVATION AT 4.2' NAVD.
SCALE: 1" = 20' 0 20' 40'10'
NORTH
PROPERTY SITE PLAN
SCALE: 1/4" = 1'-0" 0 4' 8'2'
NORTH
ENLARGED PLAN (TANK)
SCALE: 1/4" = 1'-0" 0 4' 8'2'
NORTH
ENLARGED PLAN (DISPENSER)
A1
A1
A1
A1
A1
A2
A2
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
DESTROYED CONCRETE AREA (COVERED IN SHELL)
AutoCAD SHX Text
BOAT RAMP
AutoCAD SHX Text
EXIST. BUILDING
AutoCAD SHX Text
EXIST. SHED
AutoCAD SHX Text
SEAWALL
AutoCAD SHX Text
SEAWALL
AutoCAD SHX Text
SEAWALL
AutoCAD SHX Text
FUEL DOCK
AutoCAD SHX Text
DOCK
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
ISSUE:
AutoCAD SHX Text
ISSUE DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
PERMIT SET
AutoCAD SHX Text 05.06.2024
AutoCAD SHX Text
CCO23002
AutoCAD SHX Text
PERMIT SET
AutoCAD SHX Text 05.06.2024
AutoCAD SHX Text
KAP
AutoCAD SHX Text
AFM
AutoCAD SHX Text
ADDENDUM #1
AutoCAD SHX Text 07.16.2024
AutoCAD SHX Text A1
AutoCAD SHX Text
ADDENDUM #2
AutoCAD SHX Text 08.14.2024
A2
| Sheets and Views |
| F-1 |
| F-2 |
| F-3 |
| F-4 |
| F-5 |
| 2024-08-14T16:48:28-0400 | |
| Aaron F Maag |
File details come from the government source that posted it. Updated .