230713_duct_insulation.pdf

PDF 81 KB Posted

Attached to
Chicopee Armory Renovations General Contractor Bids
Solicitation number
S124834-vCurrent
Issued by
Hampden County, Massachusetts

About this file

This document is a technical specification for duct insulation for the Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. The project involves the rehabilitation of the Chicopee Armory and includes requirements for semi-rigid and flexible duct, plenum, and breeching insulation, insulating cements, field-applied jackets, accessories and attachments, and sealing compounds. The specification provides details on the insulation materials, accessories, and installation procedures. It also includes application schedules for the various duct systems, such as supply air ducts, return and relief air ducts, and outside air intake/combustion air ducts. The project is being bid under a state and local contract opportunity for a General Contractor to perform the Chicopee Armory Renovations.

The specification does not provide any information on pricing terms, set asides, incumbents, funding requirements or sources, or other salient commercial details. The focus of the document is on the technical requirements for the duct insulation work.

View the file

Other files

File Type Posted
AE121-10090.pdf PDF
ED101-10090.pdf PDF
Sub_Bid_Result_Chicopee_2011.xls XLS spreadsheet
AE102-10090.pdf PDF
Business_Reference_Form_GC_Chicopee2011.doc DOC document
230719_hvac_pipe_ins.pdf PDF
EP651-10090.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Electrical.doc DOC document
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Metal_Windows.doc DOC document
013200_FL-CONSTRUCTION_PROGRESS_DOCUMENTATION.pdf PDF
014000_FL-QUALITY_REQUIREMENTS.pdf PDF
236313_air_cooled_condensers.pdf PDF
AE311-10090.pdf PDF
020800_Asbestos_Technical_Specifications.pdf PDF
E-601-10090.pdf PDF
230001-HVAC_FSB.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Resilient_Floors.doc DOC document
017900_FL-DEMONSTRATION_AND_TRAINING.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Masonry.doc DOC document
AE401-10090.pdf PDF
SF502-10090.pdf PDF
070002-ROOFING_AND_FLASHING_FSB.pdf PDF
265100_Lighting_Fixtures.pdf PDF
030130_FL-MAINTENANCE_OF_CAST-IN-PLACE_CONCRETE.pdf PDF
220001-PLUMBING-FSB.pdf PDF
013100_FL-PROJECT_MANAGEMENT_AND_COORDINATION.pdf PDF
238900_Louvers_and_Vents.pdf PDF
SF101-10090.pdf PDF
016000_FL-PRODUCT_REQUIREMENTS.pdf PDF
M-651-10090.pdf PDF
GI001-10090.pdf PDF
Ch_149_FORM_FOR_GENERAL_BID_MIL_Chicopee2011.doc DOC document
093000_FL-TILING_v1.pdf PDF
088000_FL-GLAZING_v1.pdf PDF
081113_FL-HOLLOW_METAL_DOORS_AND_FRAMES_v1.pdf PDF
231123_fuel_gas_piping.pdf PDF
PL101-10090.pdf PDF
230900_hvac_instrumentation_controls.pdf PDF
224000_plumbing_fixtures_JPB.pdf PDF
061600_FL-SHEATHING_v1.pdf PDF
220100_plumbing_requirements_JPB.pdf PDF
232113_hydronic_piping.pdf PDF
EL101-10090.pdf PDF
232300_refrigerant_piping.pdf PDF
General_Bid_Tabulation_Chicopee_2011.xls XLS spreadsheet
220500_plumbing_materials_JPB.pdf PDF
262413_Switchboards.pdf PDF
092216_FL-NON-STRUCTURAL_META_FRAMING_v1.pdf PDF
X-100_SURVEY_CONTROL_PLAN.pdf PDF
AE611-10090.pdf PDF
Show 40 more

Latest 50 of 185 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101

CHICOPEE, MASSACHUSETTS ISSUED FOR BID - 05/20/11

10090 DUCT INSULATION 230713-1

SECTION 230713

DUCT INSULATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 1 Specification Sections, apply to this Section.

B. The requirements of Section 230100, “Basic Mechanical Requirements” apply to work defined by this Section.

C. The requirements of Section 230500, “Basic Mechanical Materials and Methods” apply to work defined by this Section.

1.2 SUMMARY

A. This Section includes semi-rigid and flexible duct, plenum, and breeching insulation; insulating cements; field-applied jackets; accessories and attachments; and sealing compounds.

B. Related Sections include the following:

1. Division 7 Section "Firestopping" for firestopping materials and requirements for penetrations through fire and smoke barriers.

2. Section 230730 "Pipe Insulation" for insulation for piping systems.

3. Section 233113 "Metal Ducts" for duct liner.

1.3 SUBMITTALS

A. General: See Division 1 for general submittal and product substitution requirements.

B. Pre-construction Shop Drawings: Show fabrication and installation details for metal ducts as follows prior to commencing with fabrication and installation:

1. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.

2. Shop Drawings: Show fabrication and installation details for the following:

a. Application of field-applied jackets.

b. Applications at linkages for control devices.

10090 DUCT INSULATION 230713-2

1.4 QUALITY ASSURANCE

A. Fire-Test-Response Characteristics: As determined by testing materials identical to those specified in this Section according to ASTM E 84, by a testing and inspecting agency acceptable to authorities having jurisdiction. Factory label insulation and jacket materials and sealer and cement material containers with appropriate markings of applicable testing and inspecting agency.

1. Insulation Installed Indoors: Flame-spread rating of 25 or less, and smoke-developed rating of 50 or less.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Packaging: Ship insulation materials in containers marked by manufacturer with appropriate

ASTM specification designation, type and grade, and maximum use temperature.

1.6 COORDINATION

A. Coordinate clearance requirements with duct installer for insulation application.

1.7 SCHEDULING

A. Schedule insulation application after testing duct systems. Insulation application may begin on segments of ducts that have satisfactory test results.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers listed below.

B. Fiber Glass Insulation:

1. CertainTeed Corp.

2. Knauf Insulation.

3. Owens Corning.

4. Schuller International, Inc. / Johns Manville Insulations

5. 3M.

2.2 INSULATION MATERIALS

A. Fiber Glass Board Thermal Insulation: Glass fibers bonded with a thermosetting resin. Comply with ASTM C 612, Type IB, without facing and with all-service jacket (FSK) manufactured http://www.specagent.com/LookUp/?uid=123456825842&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456825845&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456825847&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456825861&mf=04&src=wd

10090 DUCT INSULATION 230713-3

from kraft paper, reinforcing scrim, aluminum foil, and vinyl film. „K‟ value: 0.24

Btu*in/(hr*sqft*degree F) at 75 degree F. Based on Johns Manville 800 Series Spin-Glas.

B. Fiberglass Blanket Thermal Insulation: Glass fibers bonded with a thermosetting resin.

Comply with ASTM C 553, Type II, without facing and with all-service jacket (FSK) manufactured from kraft paper, reinforcing scrim, aluminum foil, and vinyl film. „K‟ value:

0.29 Btu*in/(hr*sqft*degree F) at 75 degree F. Based on Johns Manville Microlite.

C. Rigid Polyisocyanurate Insulation: Closed cell polyisocyanurate core bonded to a tri-lam foil facer on both sides. Comply with ASTM C 1289, Type I, Class 1. „K‟ value: 0.17

Btu*in/(hr*sqft*degree F) at 75 degree F. Based on Johns Manville ISO 3 Foil Face.

2.3 ACCESSORIES AND ATTACHMENTS

A. Glass Cloth and Tape: Comply with MIL-C-20079H, Type I for cloth and Type II for tape.

Woven glass-fiber fabrics, plain weave, presized a minimum of 8 oz./sq. yd..

1. Tape Width: 4 inches.

B. Bands: 3/4 inch wide, in one of the following materials compatible with jacket:

1. Stainless Steel: ASTM A 666, Type 304; 0.020 inch thick.

2. Galvanized Steel: 0.005 inch thick.

3. Aluminum: 0.007 inch thick.

4. Brass: 0.010 inch thick.

5. Nickel-Copper Alloy: 0.005 inch thick.

C. Wire: 0.080-inch, nickel-copper alloy; 0.062-inch, soft-annealed, stainless steel; or 0.062-inch, soft-annealed, galvanized steel.

D. Self-Adhesive Anchor Pins and Speed Washers: Galvanized steel plate, pin, and washer manufactured for attachment to duct and plenum with adhesive. Pin length sufficient for insulation thickness indicated.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions for compliance with requirements for installation and other conditions affecting performance of insulation application.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application.

10090 DUCT INSULATION 230713-4

3.3 GENERAL APPLICATION REQUIREMENTS

A. Apply insulation materials, accessories, and finishes according to the manufacturer's written instructions; with smooth, straight, and even surfaces; and free of voids throughout the length of ducts and fittings.

B. Refer to schedules at the end of this Section for materials, forms, jackets, and thicknesses required for each duct system.

C. Use accessories compatible with insulation materials and suitable for the service. Use accessories that do not corrode, soften, or otherwise attack insulation or jacket in either wet or dry state.

D. Apply multiple layers of insulation with longitudinal and end seams staggered.

E. Seal joints and seams with vapor-retarder mastic on insulation indicated to receive a vapor retarder.

F. Keep insulation materials dry during application and finishing.

G. Apply insulation with tight longitudinal seams and end joints. Bond seams and joints with adhesive recommended by the insulation material manufacturer.

H. Apply insulation with the least number of joints practical.

I. Apply insulation over fittings and specialties, with continuous thermal and vapor-retarder integrity, unless otherwise indicated.

J. Hangers and Anchors: Where vapor retarder is indicated, seal penetrations in insulation at hangers, supports, anchors, and other projections with vapor-retarder mastic. Apply insulation continuously through hangers and around anchor attachments.

K. Insulation Terminations: For insulation application where vapor retarders are indicated, seal ends with a compound recommended by the insulation material manufacturer to maintain vapor retarder.

L. Apply insulation with integral jackets as follows:

1. Pull jacket tight and smooth.

2. Joints and Seams: Cover with tape and vapor retarder as recommended by insulation material manufacturer to maintain vapor seal.

3. Vapor-Retarder Mastics: Where vapor retarders are indicated, apply mastic on seams and joints and at ends adjacent to duct flanges and fittings.

M. Cut insulation according to manufacturer's written instructions to prevent compressing insulation to less than 75 percent of its nominal thickness.

N. Install vapor-retarder mastic on ducts and plenums scheduled to receive vapor retarders.

10090 DUCT INSULATION 230713-5

1. Ducts with Vapor Retarders: Overlap insulation facing at seams and seal with vapor-retarder mastic and pressure-sensitive tape having same facing as insulation. Repair punctures, tears, and penetrations with tape or mastic to maintain vapor-retarder seal.

2. Ducts without Vapor Retarders: Overlap insulation facing at seams and secure with outward clinching staples and pressure-sensitive tape having same facing as insulation.

O. Roof Penetrations: Apply insulation for interior applications to a point even with top of roof flashing.

1. Seal penetrations with vapor-retarder mastic.

2. Apply insulation for exterior applications tightly joined to interior insulation ends.

3. Seal insulation to roof flashing with vapor-retarder mastic.

P. Interior Wall and Partition Penetrations: Apply insulation continuously through walls and partitions, except fire-rated walls and partitions.

Q. Fire-Rated Wall and Partition Penetrations: Terminate insulation at fire/smoke damper sleeves for fire-rated wall and partition penetrations.

R. Floor Penetrations: Terminate insulation at underside of floor assembly and at floor support at top of floor.

1. For insulation indicated to have vapor retarders, taper termination and seal insulation ends with vapor-retarder mastic.

3.4 FIBER GLASS INSULATION APPLICATION

A. Blanket Applications for Ducts and Plenums: Secure blanket insulation with adhesive and anchor pins and speed washers.

1. Install anchor pins and speed washers on sides and bottom of horizontal ducts and sides of vertical ducts as follows:

a. On duct sides with dimensions larger than 24 inches. Space 16 inches o.c. each way, and 3 inches maximum from insulation joints. Apply additional pins and clips to hold insulation tightly against surface at cross bracing.

b. Anchor pins may be omitted from top surface of horizontal, rectangular ducts and plenums.

c. Do not overcompress insulation during installation.

2. Impale insulation over anchors and attach speed washers.

3. Cut excess portion of pins extending beyond speed washers or bend parallel with insulation surface. Cover exposed pins and washers with tape matching insulation facing.

4. Create a facing lap for longitudinal seams and end joints with insulation by removing 2 inches from one edge and one end of insulation segment. Secure laps to adjacent insulation segment with 1/2-inch staples, 1 inch o.c., and cover with pressure-sensitive tape having same facing as insulation.

5. Overlap unfaced blankets a minimum of 2 inches on longitudinal seams and end joints.

Secure with steel band at end joints and spaced a maximum of 18 inches o.c.

10090 DUCT INSULATION 230713-6

6. Apply insulation on rectangular duct elbows and transitions with a full insulation segment for each surface. Apply insulation on round and flat-oval duct elbows with individually mitered gores cut to fit the elbow.

7. Insulate duct stiffeners, hangers, and flanges that protrude beyond the insulation surface with 6-inch- wide strips of the same material used to insulate duct. Secure on alternating sides of stiffener, hanger, and flange with anchor pins spaced 6 inches o.c.

8. Apply vapor-retarder mastic to open joints, breaks, and punctures for insulation indicated to receive vapor retarder.

9. Terminate insulation around duct access doors and seal insulation edges.

B. Board Applications for Ducts and Plenums: Secure board insulation with adhesive and anchor pins and speed washers.

1. Apply adhesives according to manufacturer's recommended coverage rates per square foot, for 100 percent coverage of duct and plenum surfaces.

2. Apply adhesive to entire circumference of ducts and to all surfaces of fittings and transitions.

3. Space anchor pins as follows:

a. On duct sides with dimensions 18 inches and smaller, along longitudinal centerline of duct. Space 3 inches maximum from insulation end joints, and 16 inches o.c.

b. On duct sides with dimensions larger than 18 inches. Space 16 inches o.c. each way, and 3 inches maximum from insulation joints. Apply additional pins and clips to hold insulation tightly against surface at cross bracing.

c. Anchor pins may be omitted from top surface of horizontal, rectangular ducts and plenums.

d. Do not overcompress insulation during installation.

4. Cut excess portion of pins extending beyond speed washers or bend parallel with insulation surface. Cover exposed pins and washers with tape matching insulation facing.

5. Create a facing lap for longitudinal seams and end joints with insulation by removing 2 inches from one edge and one end of insulation segment. Secure laps to adjacent insulation segment with 1/2-inch staples, 1 inch o.c., and cover with pressure-sensitive tape having same facing as insulation.

6. Apply insulation on rectangular duct elbows and transitions with a full insulation segment for each surface. Groove and score insulation to fit as closely as possible to outside and inside radius of elbows. Apply insulation on round and flat-oval duct elbows with individually mitered gores cut to fit the elbow.

7. Insulate duct stiffeners, hangers, and flanges that protrude beyond the insulation surface with 6-inch- wide strips of the same material used to insulate duct. Secure on alternating sides of stiffener, hanger, and flange with anchor pins spaced 6 inches o.c.

8. Apply vapor-retarder mastic to open joints, breaks, and punctures for insulation indicated to receive vapor retarder.

9. Terminate insulation around duct access doors and seal insulation edges.

3.5 DUCT SYSTEM APPLICATIONS

A. Insulation materials and thicknesses are specified in schedules at the end of this Section.

10090 DUCT INSULATION 230713-7

B. Materials and thicknesses for systems listed below are specified in schedules at the end of this

Section.

C. Insulate the following plenums and duct systems:

1. Supply ductwork .

2. Return and relief ductwork in mechanical rooms and in unconditioned space.

3. Exhaust ductwork within 10 feet of exterior opening.

4. Outdoor air intake and combustion air ductwork.

D. Items Not Insulated: Unless otherwise indicated, do not apply insulation to the following systems, materials, and equipment:

1. Metal ducts with duct liner.

2. Factory-insulated flexible ducts.

3. Factory-insulated plenums, casings, terminal boxes, and filter boxes and sections.

4. Flexible connectors.

5. Vibration-control devices.

6. Testing agency labels and stamps.

7. Nameplates and data plates.

8. Access panels and doors in air-distribution systems.

3.6 INDOOR DUCT AND PLENUM APPLICATION SCHEDULE

A. Service: Rectangular and round, supply-air ducts, above ceilings, concealed, in mechanical rooms, and in unconditioned space.

1. Material: Fiberglass blanket or fiberglass board.

2. Thickness: 1 ½ inches.

3. Number of Layers: one.

4. Factory-Applied Jacket: FSK or vinyl-film. Vapor retarder required on ducts conveying air below ambient temperature.

B. Service: Rectangular and round, return-air and relief air ducts, in mechanical rooms and in unconditioned space. Exhaust ducts within 10‟ of exterior opening.

1. Material: Fiberglass blanket or fiberglass board.

2. Thickness: 1 inch.

3. Number of Layers: one.

4. Factory-Applied Jacket: FSK or vinyl-film.

C. Service: Rectangular and round, outside-air intake / combustion air ducts.

1. Material: Fiberglass blanket or fiberglass board.

2. Thickness: 2 inches.

3. Number of Layers: one.

4. Field-Applied Jacket: FSK or vinyl-film.

5. Vapor Retarder Required.

10090 DUCT INSULATION 230713-8

END OF SECTION 230713

File details come from the government source that posted it. Updated .