22-153 BD Dwgs.pdf
PDF 9 MB Posted
- Solicitation number
- 36C24924R0098
About this file
This document is a solicitation for a federal contract opportunity to provide infrastructure upgrades at the Albion Street VA Clinic in Nashville, Tennessee. The Department of Veterans Affairs is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) contractor to furnish all labor, material, equipment, transportation, and supervision necessary to prepare the site and complete the required construction work per the provided drawings and specifications. The solicitation is a Lowest Price Technically Acceptable (LPTA) procurement with an estimated construction value between $100,000 and $250,000. There will be a mandatory site visit, and proposals are due via email by the specified date and time. The contractor must have an active SAM registration and be listed in the SDVOSB registry at the time of offer and award.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE PROJECT IMAGE PROJECT IMAGE
/2
/2
:5
:2
A
M C
U s e rs \a c a b ra
\D o c u m e n ts
\A
-1
-A lb io n
E H
R M
-T N a c a b ra M
U
S
.r v t
G-001
COVER SHEET AND DRAWING INDEX
1 4LMB
EHRM A/E INFRASTRUCTURE
UPGRADES
ALBION ST. CBOC
1818 ALBION ST
SUITE 114
NASHVILLE, TN 37208 JULY 24, 2023
BID DOCUMENTS
626-22-705QA22-153
N/A
EHRM A/E INFRASTRUCTURE UPGRADES
ALBION ST. CBOC
1818 ALBION ST
SUITE 114
NASHVILLE, TN 37208
VA PROJECT #:
626-22-705QA
LCW
DRAWING LIST
GENERAL
G-001 COVER SHEET AND DRAWING INDEX 1 4
G-002 GENERAL INFORMATION 2 4
G-003 ICRA INFORMATION AND DETAILS 3 4
G-101 FIRST FLOOR OVERALL AND LIFE SAFETY PLAN 4 4
ARCHITECTURAL
A-101 GENERAL NOTES, ENLARGED PLANS, ABBREVIATIONS AND DOOR SCHEDULE AND DETAILS 1 1
MECHANICAL
M-101 FIRST FLOOR HVAC PLAN 1 1
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 7
E-002 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 7
ET101 FIRST FLOOR, OVERALL PLAN 3 7
ET401 ELECTRICAL ENLARGEMENTS 4 7
ET501 ELECTRICAL AND TECHNOLOGY DETAILS 5 7
ET502 ELECTRICAL AND TECHNOLOGY DETAILS 6 7
ET601 ELECTRICAL AND TECHNOLOGY SCHEDULES AND RISER DIAGRAMS 7 7
SITE LOCATION PROJECT LOCATION
D AE RR CE HT ITSI EG CE TR
AGRICULTURELA
W
RENCE C. WITKOW
SK
I
No. 106099
DocuSign Envelope ID: A423AD4A-C509-4425-9937-3ED0E97AD456
7/21/2023
WALL SECTION
SYMBOL INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS FACE
OF EXISTING WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
XX.X
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO
PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND
STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES
BELOW)
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC) 2021
• INTERNATIONAL MECHANICAL CODE (IMC) 2021
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
STANDARD (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH- RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00 OF
THE SPECIFICATIONS.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2019.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2019.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION
FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
TELECOM ROOM PHASING NOTES
A. WORK RELATED TO TELECOMMUNICATION ROOM CONSTRUCTION SHALL BE
PERFORMED SEQUENTIALLY BY FLOOR STARTING AT THE LOWEST FLOOR
LEVEL UNLESS ALTERNATE PLANS ARE APPROVED BY COR.
B. WORK HOURS AND SPECIAL CONSIDERATIONS WITHIN THE WORK
CONSTRAINT BY AREA MATRIX.
C. ANY DATA PORTS MOVED FROM OLD INFRASTRUCTURE TO NEW SHALL BE
OPERABLE AT THE END OF EACH SHIFT. NO AREA OF THE FACILITY IS TO LOSE
DATA SERVICE FOR MORE THAN ONE SHIFT.
D. COORDINATE WITH COR 2 WEEKS IN ADVANCE FOR ANY OUTAGE THAT WILL
AFFECT MORE THAN 6 ROOMS AT A TIME. OUTAGE MUST BE APPROVED IN
WRITING.
E. DATA CABLING REPLACEMENT FOR AREAS SERVED BY A NEWLY
CONSTRUCTED TELECOMMUNICATIONS ROOM SHOULD BE INSTALLED IN THE
FOLLOWING MANNER:
E.1 CONSTRUCT CLOSET, INSTALL RACKS AND EQUIPMENT.
E.2 RUN CABLING TO EACH ROOM SERVED BY THE CLOSET DOWN THE
CORRIDORS AND COIL THE CABLES OUTSIDE EACH ROOM.
E.3 TERMINATE ALL CABLES AT THE PATCH PANELS WITHIN THE NEW
CLOSET.
E.4 PULL OUT OLD CABLES AT EACH ROOM AND TERMINATE NEW CABLES
AS SPECIFIED. A MAXIMUM OF 6 ROOMS CAN BE TAKEN OUT OF
SERVICE AT A TIME
E.5 BLANK ANY FACEPLATES NO LONGER USED UTILIZING STAINLESS
STEEL COVERS.
E.6 TEST AND CERTIFY ALL CABLES PER SPECIFICATION PRIOR TO MOVING
TO THE NEXT ROOM.
E.7 PLUG ALL EXISTING EQUIPMENT INTO NEW PORTS.
F. DATA CABLING REPLACEMENT FOR AREAS SERVED BY A MODIFIED
TELECOMMUNICATIONS ROOM
F.1 PERFORM ANY SPACE EXPANSION OF CLOSET REQUIRED BY
DOCUMENTS
F.2 BUILD ONE NEW RACK AT A TIME IF SPACE IS CONSTRAINED.
RUN CABLING TO EACH ROOM SERVED BY THE CLOSET DOWN THE
CORRIDORS AND COIL THE CABLES OUTSIDE EACH ROOM.
F.3 TERMINATE ALL CABLES AT THE PATCH PANELS WITHIN THE NEW
RACK.
F.4 PULL OUT OLD CABLES AT EACH ROOM AND TERMINATE NEW CABLES
AS SPECIFIED. A MAXIMUM OF 6 ROOMS CAN BE TAKEN OUT OF
SERVICE AT A TIME
F.5 BLANK ANY FACEPLATES NO LONGER USED UTILIZING STAINLESS
STEEL COVERS.
F.6 TEST AND CERTIFY ALL CABLES PER SPECIFICATION PRIOR TO MOVING
TO THE NEXT RACK
F.7 PLUG ALL EXISTING EQUIPMENT INTO NEW PORTS.
F.8 REPEAT FOR EACH RACK UNTIL ALL RACKS IN CLOSET ARE
COMPLETED.
G. REMOVE ALL EXISTING CABLING THAT HAS BEEN DISCONNECTED AS PART OF
THIS PROJECT. REMOVE CABLING BY FLOOR AFTER COMPLETION OF NEW
DATA CABLING ON EACH FLOOR.
H. CONTRACTOR TO PROVIDE A DRAFT PHASING PLAN DENOTING THE ORDER IN
WHICH THE TELECOM IMPROVEMENTS WILL BE COMPLETED WITHIN 30 DAYS
OF PROJECT AWARD.
I. CONTRACTOR SHOULD KEEP A ROLLING 2 WEEK LOOK AHEAD DENOTING
SCHEDULE FOR CABLING WORK IN EACH ROOM.
J. CONTRACTOR TO SCHEDULE WALKTHROUGH OF EACH DEPARTMENT AT
LEAST 2 WEEKS PRIOR TO STARTING WORK TO DISCUSS SEQUENCING AND
SPECIAL REQUIREMENTS OF DEPARTMENT.
K. ALL ICRA REQUIREMENTS TO BE VERIFIED WITH VA COR AND INFECTION
CONTROL PERSONNEL PRIOR TO BEGINNING WORK. ADJUSTMENTS TO THE
ICRA REQUIREMENTS LISTED IN THESE DOCUMENTS SHALL BE MADE
ACCORDING TO INFECTION CONTROL PERSONNEL DIRECTION.
L. NO WORK SHALL OCCUR IN A ROOM OCCUPIED BY A PATIENT OR VISITOR.
NOTE TO CONTRACTOR:
1. THIS PROJECT IS WITHIN THE CITY OF NASHVILLE. ALL PERMITS, CLEARANCE
AND CITY REGULATIONS CONFORMANCE IS THE RESPONSIBILITY OF THE
CONTRACTOR.
2. THIS PROJECT IS A MODIFICATION TO A LEASED FACILITY TO THE VA. THE
CONTRACTOR SHALL ADHERE TO ALL BUILDING REGULATIONS AND
REQUIREMENTS OF THE LEASOR.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:5
:1
A
M C
U s e rs \a c a b ra
\D o c u m e n ts
\A
-1
-A lb io n
E H
R M
-T N a c a b ra M
U
S
.r v t
G-002
GENERAL INFORMATION
2 4LMB
EHRM A/E INFRASTRUCTURE
UPGRADES
ALBION ST. CBOC
1818 ALBION ST
SUITE 114
NASHVILLE, TN 37208 JULY 24, 2023
BID DOCUMENTS
626-22-705QA22-153
N/A
LCW
GENERAL SYMBOL LEGEND
CODE STANDARDS AND EXECUTIVE ORDERS
W
RENCE C. WITKOW
SK
I
No. 106099
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
SIDE WALLS RETURN TO
SHAFT WALL AND SEAL.
EXISTING
CEILING
SYSTEM
TEMPORARY PREFABRICATED ICRA
WALL SYSTEM. BASIS OF DESIGN:
STARC WALL SYSTEM OR
EDGEGUARD SYSTEM OR EQUAL.
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
A'
SYSTEM TO HAVE
INTEGRATED
CEILING SEAL.
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR
EHRM A/E INFRASTRUCTURE UPGRADES - ALBION ST.
FIRST FLOOR, ROOM 150
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS PROJECT IS LEVEL 1 FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS
INTACT AND ACTIVE.
2. THIS PROJECT NEEDS BARRIER ENTRANCE. IT SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE
CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT
BARRIER.
3. PROVIDE STICKY MATS AND BLANKET AT THE BARRIER ENTRANCE AND CHANGE DAILY OR MORE OFTEN AS
NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS
SHALL BE FREE OF DEBRIS; ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION
AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN
ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING
TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
VENTILATION AND ENVIRONMENTAL CONTROLS (WHEN NEGATIVE AIR SYSTEM IS USED)
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED
BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-FLANGE HANGER HUNG
FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM OF 7'-2" A.F.F.
4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE VERIFIED DAILY.
5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
ICRA NOTES
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Bldg. ## Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD; AMCU;
- Respiratory Isolation Rooms
- Surgery
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:5
:1
A
M C
U s e rs \a c a b ra
\D o c u m e n ts
\A
-1
-A lb io n
E H
R M
-T N a c a b ra M
U
S
.r v t
G-003
ICRA INFORMATION AND DETAILS
3 4LMB
EHRM A/E INFRASTRUCTURE
UPGRADES
ALBION ST. CBOC
1818 ALBION ST
SUITE 114
NASHVILLE, TN 37208 JULY 24, 2023
BID DOCUMENTS
626-22-705QA22-153
N/A
LCW
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
A. REMOVE ALL TRASH DAILY FROM THE WORK AREA.
B. THESE DRAWINGS ARE BASED ON FIELD SURVEY AND EXISTING PLANS. VERIFY ALL FIELD CONDITIONS.
C. COORDINATE WITH VA COR FOR OFF-HOURS SCHEDULE AND TEMPORARY REROUTING ACCESS FOR HOSPITAL
STAFF AND VISITORS, PRIOR TO ERECTING TEMPORARY BARRIERS.
D. CONSULT WITH VA SAFETY DEPARTMENT TO MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND HALLWAYS.
E. EXISTING WINDOWS THAT NEED TO BE TEMPORARILY REMOVED TO ACCOMMODATE DISCHARGED AIR EXHAUST
DUCT, SHALL BE REINSTALLED AFTER CONSTRUCTION.
F. CONTRACTOR TO VERIFY AND COORDINATE FINAL AND APPROVED ICRA MEASURES WITH THE VA ICRA
PERSONNEL, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITY.
G. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, MEASURING EXISTING DIMENSIONS AND OBSERVING EXISTING CONDITIONS BEFORE BEGINNING WORK ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE CONDITION
PRIOR TO START OF WORK AND ORDERING OF MATERIALS.
H. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE DIVISION 1 SPECIFICATIONS.
I. CONTRACTOR TO PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES. IF DAMAGED, REPAIR, PATCH, REPLACE, OR SAND SMOOTH AND TO MATCH EXISTING ADJACENT
MATERIALS. REPORT ANY AND ALL DAMAGES TO COR.
J. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY WHEN DISCREPANCIES TO THE DRAWINGS ARE FOUND IN
THE FIELD.
K. CONTRACTOR TO INSTALL TEMPORARY DIGITAL MANOMETER TO MONITOR AND ENSURE PRESSURE LEVEL TO
MEET VA GUIDELINE WITHIN CONSTRUCTION AREA. WITH VA COR PRIOR TO INSTALLATION.
L. PROTECT AND COVER HVAC DIFFUSERS WITHIN ROOMS DURING CONSTRUCTION.
M. CONTRACTOR SHALL COVER ALL FURNITURE WITHIN ROOM WITH PLASTIC, PRIOR TO COMMENCING WORK IN A
SPACE AND REMOVE PRIOR TO POST-CONSTRUCTION TERMINAL CLEANING.
N. TEMPORARY BARRIERS SHALL BE INSPECTED BY VA LIFE SAFETY AND ICRA STAFF PRIOR TO START OF CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE PRESSURE VENTILATION IN CONSTRUCTION SPACE WHEN USED.
O. DOORS TO CORRIDORS FROM OCCUPIED ROOMS SHALL NOT BE BLOCKED DURING SHIFTS.
P. IF ABOVE CEILING WORK WILL BLOCK ENTIRE CORRIDOR (SUCH AS IN A 5'-0" WIDE NON-ACUTE CORRIDOR), WORK MUST OCCUR OUTSIDE NORMAL OPERATING HOURS FOR THAT AREA.
Q. USE OF MODULAR ICRA BARRIERS IN LIEU OF CONSTRUCTED BARRIERS DETAILED ON G-003 MUST BE SUBMITTED FOR COR APPROVAL PRIOR TO USE. MODULAR SYSTEMS MUST PROVIDE THE SAME INFECTION
CONTROL AND FIRE RATING PROTECTION SHOWN ON G-003.
R. USE OF MOBILE CONTAINMENT (ICRA) CART IS ACCEPTABLE FOR ABOVE CEILING WORK THAT CAN BE LIMITED TO
THE CONTAINMENT OF THE CART.
S. TEMPORARY BARRIER SHALL BE INSTALLED FOR EACH OF THE ROOMS OR CONSTRUCTION AREAS AS IDENTIFIED
WITHIN THE SCOPE OF WORK OF THE CONTRACT DOCUMENTS.
T. PLASTIC SHEET BARRIERS MAY NOT BE REUSED. CONTRACTOR SHALL TAKE CARE TO CONTAIN ANY DUST ON
PLASTIC SHEET BARRIERS DURING REMOVAL AND DISPOSAL.
U. CONSTRUCTED AND/OR MODULAR ICRA BARRIERS SHALL BE WIPED CLEAN BEFORE REMOVAL TO AVOID
SPREADING DUST.
V. NO MORE THAN 1 CEILING TILE PER 50 SQ.FT. SHALL BE REMOVED WITHOUT PROPER ICRA AND LIFE SAFETY
MEASURES IN PLACE.
TYPICAL ICRA CONDITIONS
W
RENCE C. WITKOW
SK
I
No. 106099
DN
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
EXISTING
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
NOT IN PROJECT SCOPE
EXIT SIGN
ICRA MAT
CA
DE
KB
XXX
XXX
XFEB
FEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
A
2 3 4 5 6
C
E
H
I
D
F
B
G
SOILED
HOLDING
EXAM ROOM 3A
TREATMENT
/PROCEDURE
CONSULT
RM 3
PASSAGE B
TR
CONSULT
RM. 2
ACC.
PAT. TLT.
EXAM RM 2A145
PASSAGE F
BREAK ROOM
EXAM RM. 5A
ACC.
PAT. TLT.
SUPPLY ROOM
REGISTRATION
WAITING
SUB. WAIT
P A
S S
A G
E A
EXAM RM 1A
CONSULT RM 1
EXAM RM 1B
RESIDENT
WORK
EXAM RM 2B
EXAM RM 3B
NURSE WORK
ACC.
PAT. TLT.
ACC. STAFF
TLT.
CLEAN LINEN
SUPPLY
AHU #2
CORRIDOR A
GROUP
CONSULT RM
EXAM RM 4B
EXAM RM 5B
EXAM RM 4A
P A
S S
A G
E E 1
PASSAGE
D
AHU #3
MALE
TLT.
WOMEN'S
TLT.
COMM.
RM.
JAN
ACC.
PUBLIC
TLT.
ELEV 1
ELEV 2
MGRS.
OFFICE
ADMIT
PASSAGE
C
TRAVEL DISTANCE = 139'-0"
TRAVEL DIST. = 139'-0"
TRAVEL DISTANCE = 213'-6"TRAVEL DISTANCE = 139'-0"
PATH OF COMMON
TRAVEL = 27'-5"
SPECIAL
SYSTEMS
RM
J
FEB
A-101
AHU #1
ELECTRICAL
ROOM
MECHANICAL
ROOM CONSTRUCTION ACCESS
ICRA BARRIER
TYPE A' & STICKY
MAT BOTH SIDES
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:5
:1
A
M C
U s e rs \a c a b ra
\D o c u m e n ts
\A
-1
-A lb io n
E H
R M
-T N a c a b ra M
U
S
.r v t
G-101
FIRST FLOOR OVERALL AND LIFE
SAFETY PLAN
4 4LMB
EHRM A/E INFRASTRUCTURE
UPGRADES
ALBION ST. CBOC
1818 ALBION ST
SUITE 114
NASHVILLE, TN 37208 JULY 24, 2023
BID DOCUMENTS
626-22-705QA22-153
N/A
LCW
N O
R T
H0 4 8 16
LIFE SAFETY LEGEND
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
FIRST FLOOR OVERALL AND LIFE SAFETY PLAN
W
RENCE C. WITKOW
SK
I
No. 106099
1 2
I
SPECIAL
SYSTEMS RM
AHU #1
ICRA BARRIER
TYPE A' & STICKY
MAT BOTH SIDES
3'-8" CLR.
1 2
I
SPECIAL
SYSTEMS RM
AHU #1
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
DEMOLISH WALL
DEMOLISH DOOR
DEMOLITION LEGEND
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
EXISTING WINDOW TO REMAIN
NEW WORK LEGEND
NEW WALL
NEW DOOR
NEW WINDOW
NOT IN PROJECT SCOPE
STICKY MAT
A. ALL EXISTING CONDITIONS ARE BASED ON BEST
AVAILABLE INFORMATION AT THE TIME OF
SURVEY AND VISUAL INSPECTION. CONTRACTOR
SHALL FIELD VERIFY EXISTING CONDITIONS.
B. ELEMENTS SHOWN WITH LIGHT, GRAY LINES ARE
EXISTING TO REMAIN. ELEMENTS SHOWN WITH
DARK DASHED LINES ARE EXISTING TO BE
DEMOLISHED. DEMOLITION SHALL INCLUDE, BUT
NOT BE LIMITED TO, THOSE ELEMENTS SHOWN.
C. ALL WORK SHALL BE COORDINATED BETWEEN
TRADES.
D. ALL WORK SHALL BE COORDINATED WITH THE
COR TO MINIMIZE DISRUPTION OF AREAS
OUTSIDE OF THE PROJECT LIMITS OF WORK.
E. PAINT WALLS DISTURBED BY CONSTRUCTION
FROM INSIDE CORNER TO INSIDE CORNER.
F. PATCH AND FILL ALL PENETRATIONS/HOLES IN
WALLS OF TR ROOMS TO MAINTAIN WALL
RATINGS.
G. PAINT SPECIFICATION AND COLOR PROVIDED BY
COR.
H. PREPARE ALL FLOOR AND WALL CONSTRUCTION,
NEW AND/OR EXISTING, TO RECEIVE NEW
FINISHES IN ACCORDANCE WITH
MANUFACTURER’S RECOMMENDED
INSTALLATION METHODS AND MATERIALS FOR
ALL FINISHES.
I. PRIOR TO INSTALLATION OF NEW FINISHES,
CONTRACTOR SHALL INSPECT ALL SUBSTRATES.
IF A SUBSTRATE IS DEEMED UNACCEPTABLE, THE
CONTRACTOR SHALL TAKE THE NECESSARY
STEPS TO RECTIFY THE SITUATION OR CONTACT
THE VA COR WITH THE CONCERN. PROCEEDING
WITH THE INSTALLATION OF FINISHES WILL BE
INDICATION THAT THE INSTALLER / FINISHER
ACCEPTS CONDITION OF SUBSTRATE.
J. USE MANUFACTURE'S RECOMMENDED
INSTALLATION METHODS AND MATERIALS FOR
ALL FINISHES.
K. DOOR SELECTION BY COR.
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS
REQUIRED FOR COMPLETION OF THE WORK.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
13. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
14. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR
REINSTALLED FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.
15. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
16. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR
USE OF FREIGHT ELEVATOR (AS REQUIRED).
F
S E
E S
C H
E D
U L E
SEE SCHEDULE
2" 2"
SCHEDULE
SEE
S E
E S
C H
E D
U L E
DOOR AND FRAME -
SEE DOOR SCHEDULE
CAULK BOTH SIDES OF
DOOR - CONTINUOUS
(2) METAL STUDS TO
FORM HEADER
SEE DOOR
SCHEDULE
TYPES
SEE PARTITION
DOOR AND
FRAME - SEE
DOOR
SCHEDULE
CAULK BOTH
SIDES OF DOOR -
CONTINUOUS
METAL
STUDS TO
FORM JAMB
T Y
P E
S
S E
E P
A R
T
IT
IO
N
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:5
:1
A
M C
U s e rs \a c a b ra
\D o c u m e n ts
\A
-1
-A lb io n
E H
R M
-T N a c a b ra M
U
S
.r v t
A-101
GENERAL NOTES, ENLARGED PLANS,
ABBREVIATIONS AND DOOR SCHEDULE
AND DETAILS
1 1LMB
EHRM A/E INFRASTRUCTURE
UPGRADES
ALBION ST. CBOC
1818 ALBION ST
SUITE 114
NASHVILLE, TN 37208 JULY 24, 2023
BID DOCUMENTS
626-22-705QA22-153
N/A
LCW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
FIRST FLOOR PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR DEMOLITION PLAN
N O
R T
H0 4 8 16
N O
R T
H0 4 8 16
1 INSTALL NEW DOOR AND FRAME (SEE DOOR
SCHEDULE)
1 REMOVE EXISTING DOOR & FRAME.
2 REMOVE SECTION OF WALL FOR DOUBLE
DOOR AND FRAME INSTALLATION. PROVIDE
2-6" METAL STUD HEADER AND 2-4" METAL
STUD JAMB.
G_ABBREVIATIONS GENERAL NOTES
DEMOLITION NOTES
EXIST= EXISTING
HM= HOLLOW METAL
PF= PREFINISHED
PNT= PAINT
SCW= SOLID CORE WOOD
STN= STAIN
WD= WOOD
DOOR SCHEDULE - NEW
MARK
DOOR PANEL DOOR FRAME FIRE
RATING HEAD JAMB
HARDWARE
SET REMARKSWIDTH HEIGHT THICK MAT'L FINISH ELEV MAT'L FINISH ELEV
FIRST FLOOR
150 4' - 0" 7' - 0" 1 3/4" SCW PF 1 HM PF F H1 J1 HW-1A UNEQUAL LEAFS
DOOR FRAME & PANEL ELEVATIONS
Scale: 1 1/2" = 1'-0"
H1
HEAD DETAIL @ METAL STUD
Scale: 1 1/2" = 1'-0" J1
JAMB DETAIL @ METAL STUD
W
RENCE C. WITKOW
SK
I
No. 106099
11 2
I
I
SPECIAL
SYSTEMS
RM
AHU #1
AC-1
CU-1
ON ROOF
ABOVE.
EXISTING
FLOOR
DRAIN
T
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
4. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
6. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
7. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
8. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
9. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
10. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
11. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
12. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
13. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
14. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
15. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
16. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
17. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
21. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR.
22. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
23. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE
NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
24. INSTALL PIPING FREE OF SAGS AND BENDS.
25. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
26. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
27. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST
MECHANICAL GENERAL NOTES
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BHP BRAKE HORSEPOWER
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
D DAMPER - AUTOMATIC
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EX EXISTING
F FAHRENHEIT
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
HAC HOUSEKEEPING AID CLOSET
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HSTAT HUMIDISTAT
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IS INSECT SCREEN
IV INLET VANES
kW KILOWATT kWh KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
DIFFUSER TAG
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
EQUIPMENT TAG
ANNOTATION SYMBOLS
##-VAV-#
SD-## ###
1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY
GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO
COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION…
This is the start of the file's text. The full file is on GovTribe.