Attachment 6 - B2024 LPS Repair Questions and Answers.pdf

PDF 45 KB Posted

Attached to
Lightning Protection Systems Repair Building 2024 PSFB CO
Solicitation number
21CONSLPSSmith
Issued by

About this file

This document is a Questions and Answers (Q&A) file for a Lightning Protection Systems (LPS) Repair project for Building 2024, associated with a Department of the Air Force Space Command solicitation. The Q&A document addresses technical specifications and compliance requirements, including specific details about air terminals: a fiberglass 2"-3" diameter, 21" long with a 25' Class II Lightning Protection Conductor and 24" blunt tip air terminal. Key clarifications include that LPI (Lightning Protection Institute) certification can be submitted by a subcontractor, the 5-years' experience can be provided in the narrative, and the contractor is required to perform LPI lightning protection certification for the installed system but not lightning surge protection for the main panel.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B2024 LPS Repair Questions and Answers

Q: What size diameter and length do you want the new air terminals to be?

Q: What materials would you like the air terminals made from?

A: For mast air terminal, it shows the fiberglass 2” X 21” – 3” with 25’ #228 Class II Lightning Protection Conductor with 24” Blunt Tip air terminal.

Q: Can the LPI certification be submitted by a subcontractor?

A: Yes, the LPI certification can be submitted by a subcontractor.

Q: Can the 5-years’ experience be provided in the narrative or are you asking for past performance projects to be provided?

A: Yes, the 5-years’e experience can be provided in the narrative.

Q: 1- Would the contractor be required to do LPI Lightning Protection Certification

(Certification based upon current Standards as of bid date) and Lightning surge protection for the main panel as well?

A: The contractor would require doing a LPI lightning protection certification for the system installed but would not require for lightning surge protection of main panel.