This document is a Questions and Answers (Q&A) file for a Lightning Protection Systems (LPS) Repair project for Building 2024, associated with the Department of the Air Force Space Command. The Q&A provides specific technical and procedural clarifications for potential contractors, including details about air terminal specifications (fiberglass 2"-3" X 21" with a 25' Class II Lightning Protection Conductor and 24" Blunt Tip air terminal) and submission requirements. Key clarifications include confirmation that the Lightning Protection Institute (LPI) certification can be submitted by a subcontractor and that the required 5-years' experience can be documented within the proposal's narrative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B2024 LPS Repair Questions and Answers
Q: What size diameter and length do you want the new air terminals to be?
Q: What materials would you like the air terminals made from?
A: For mast air terminal, it shows the fiberglass 2” X 21” – 3” with 25’ #228 Class II Lightning Protection Conductor with 24” Blunt Tip air terminal.
Q: Can the LPI certification be submitted by a subcontractor?
A: Yes, the LPI certification can be submitted by a subcontractor.
Q: Can the 5-years’ experience be provided in the narrative or are you asking for past performance projects to be provided?
A: Yes, the 5-years’e experience can be provided in the narrative.