Attachement 6 - B2024 LPS Repair Questions and Answers.pdf

PDF 41 KB Posted

Attached to
Lightning Protection Systems Repair Building 2024 PSFB CO
Solicitation number
21CONSLPSSmith
Issued by

About this file

This document is a Questions and Answers (Q&A) file for a Lightning Protection Systems (LPS) Repair project for Building 2024, associated with a Department of the Air Force Space Command solicitation (21CONSLPSSmith). The Q&A addresses specific technical details about air terminal specifications, specifically detailing that the mast air terminal should be fiberglass, 2"-3" in diameter, 21" long, with a 25' #228 Class II Lightning Protection Conductor and a 24" Blunt Tip air terminal. The document provides direct responses to contractor inquiries about the material and dimensional requirements for the air terminals to be used in the repair project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B2024 LPS Repair Questions and Answers

Q: What size diameter and length do you want the new air terminals to be?

Q: What materials would you like the air terminals made from?

A: For mast air terminal, it shows the fiberglass 2” X 21” – 3” with 25’ #228 Class II Lightning Protection Conductor with 24” Blunt Tip air terminal.

File details come from the government source that posted it. Updated .