This is a Questions and Answers document for RFP 2032H326R00010, a Group of Twenty (G20) Event Production Services solicitation issued by the U.S. Department of the Treasury for AV and production contractor services supporting two major international meetings in 2026.

The contract covers production services for the Finance and Central Bank Deputies Meeting (FCBD) in May 2026 at Omni Fort Lauderdale Hotel and the Finance Ministers and Central Bank Governors Meeting (FMCBG) in August-September 2026 at Omni Grove Park Inn Hotel. Key deliverables include plenary room setup with rigged audio speakers, projectors, screens, and lighting components; closed-circuit streaming to auxiliary rooms within hotels; simultaneous interpretation booth sourcing and equipment provision (with interpreters provided by delegations); AV/production design and graphics creation per government-provided brand guidelines; and setup/strike labor across multiple meeting spaces including lounges, bilateral meeting rooms, and drafting rooms. Load-in begins May 13, 2026 for FCBD (setup complete by 7:00 a.m. May 14; strike after May 15 conclusion) and August 29, 2026 for FMCBG (setup complete by 7:00 a.m. August 29; strike after September 1 conclusion). The contract is awarded on a Firm-Fixed Price basis with all costs (labor, travel, materials, equipment, freight, insurance) inclusive in the pricing template; Treasury pays certain Pinnacle vendor charges directly and these should not be proposed. The government declined to disclose budget amount, number of competing bidders, historical production standards, or past plenary photographs. This is a new contract with no incumbent performer. Offerors must provide a Key Person meeting or exceeding Technical Manager qualifications and may propose additional personnel captured in general labor costs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 2032H326R00010 - Group of Twenty (G20) Event Production Services Questions and Answers

1 Pricing: It indicated that attachment 2 should be inclusive of all work (labor, travel, materials, equipment, freight, insurance, etc.), understood in that attachment but in the SOW sections, how should we show labor and trucking costs for all applicable areas? As an allocation to each area ? As it’s own CLIN item?

– See updated PriceTemplate. Any additional clarifications shall be in the price narrative.

2 Please confirm that the charges from Pinnacle for rigging, internet and networking support will go to the hotel master and are being paid directly by Treasury?

– Confirmed charges from Pinnacle will be paid directly by Treasury and shall not be proposed.

3 Omni Fort Lauderdale Hotel Is the plenary being hosted in the Port Everglades Ballroom? If not, what room?

- Yes, see updated floor plans.

4 Omni Fort Lauderdale Hotel What date is the plenary room available for load-in/install?

– May 13, 2026

5 Omni Fort Lauderdale Hotel What date must the dismantle be completed by for the plenary room?

- To be provided after award.

6 Omni Fort Lauderdale Hotel What is the schedule of events for the meeting dates at this venue?

- To be provided after award.

7 Omni Grove Park Inn Hotel Is the plenary being hosted in the Grand Ballroom? If not, what room?

- Yes, see updated floor plans.

8 Omni Grove Park Inn Hotel What date is the plenary room available for load-in/install?

- To be provided after award.

9 Omni Grove Park Inn Hotel What date must the dismantle be completed by for the plenary room?

- To be provided after award.

10 Omni Grove Park Inn Hotel What is the schedule of events for the meeting dates at this venue?

- To be provided after award.

11 Omni Grove Park Inn Hotel Where is the main arrival area supposed to within or outside of the hotel?

– Main arrival area is within the hotel, similar to a lobby.

12 I see there is no setaside for this RFP. Did no other small business, WOSB, or EDWOSB respond to the RFI?

- The Government is not responding to this question as it is not relevant to the scope of the work or submission requirements.

13 Plenary Tables- We assume the venues can provide standard tables & linen/skirts to accommodate your Hollow Square layout. Is this an appropriate assumption or do you prefer us to bring in rental tables?

– The offeror is responsible for providing all items in the Statement of Work, unless otherwise specified (e.g. rigging, internet, etc.).

14 Are you able to provide any photos from past Plenaries to showcase the previous production values and branding designs executed?

– No.

15 Travel Expenses - Are we to forecast all necessary travel expenses based on GSA rates for the destination as a NTE flat fee in our proposal? Will receipts be required for reconciliation or reimbursement processes?

- The anticipated award is Firm-Fixed Price, receipts are not required.

16 Labor - In lieu of one requested Technical Manager, we provide two key personnel positions: a Project Manager and a Technical Director. Will this extra position be accepted in consideration?

- The Offeror shall provide a Key Person who meets or exceeds the minimum qualifications of the Technical Manager position. The Offeror may propose additional personnel, which would be captured in the general labor category of the pricing template.

17 Price Workbook Template (Attachment 2)

a. May we modify the workbook with additional line-items [clearly called out] to factor in miscellaneous costs that are not already included? This will allow us to properly showcase our grand total.

– No, changes shall not be made to the Price Template. Reference the answer #1 for additional context.

18 Price Workbook Template (Attachment 2) Additionally, do you prefer we use the ‘Insert Comment’ function or add another column to the right for notes and clarity of line-item inclusions? Updated template attached.

- See answer #1.

19 Price Workbook Template (Attachment 2) Venue Exclusive Services - Due to the quick turn submission deadline, we may not be able to obtain accurate rates for Pinnacle’s Rigging or Internet services. If this is the case, would you prefer we leave these line-items blank on the Price Template?

– See answer #2.

20 Creative - Confirming you are requesting the AV & Production Contractor to ideate, create, and finalize artwork/graphics for print & digital components?

a. If yes, are there already official event brand guidelines to follow?

– Yes, a creative guide will be provided.

21 What are you looking to improve on since previous years’ productions?

- Not applicable.

22 What is the budget to support this AV & Production RFP?

– The budget is confidential.

23 Who else/how many are bidding on the program?

– Information is not available.

24 Finance and Central Bank Deputies Meeting (FCBD) All Venue room assignments - where does each SOW take place on property? E.g. “The Plenary is assigned to occur in the ____ Ballroom. Etc.”

– See updated floor plans.

25 Venue agreement meeting space hold grid Venue access: What is the earliest time we can load-in/setup all spaces?

– May 13, 2026.

26 Venue agreement meeting space hold grid Venue egress: What time must we be completed with strike & load-out by?

- Set up for all event spaces must be complete by 7:00am on May 14, 2026. Vendor should vacate all auxiliary staff and set up equipment by then. Strike and load out following the completion of meetings must be done ASAP at the conclusion of the meeting on May 15, 2026.

27 Schedule/Agenda How many load-in days do you historically have; e.g. 2 setup days?

- This is dependent on contractor/vendor.

28 Schedule/Agenda What are your expectations for technical rehearsals &/or Emcee//delegate rehearsals?

– Due to the shortened timeline, we can hold rehearsals as the plenary is being set or before meetings begin on May 14, 2026.

29 Schedule/Agenda Can you please confirm the overall start/end times of sessions per meeting date?

- To be provided after award. However, meetings will take place during business hours.

30 Schedule/Agenda - When can we start to strike/tear down?

- See answer #26.

31 Plenary - Confirming you require all audio speakers, projectors, screens, & lighting components to be flown (rigged)?

– Correct.

32 Plenary Broadcast/stream - Is the Contractor responsible for providing streaming equipment and/or the secure stream source (i.e. Zoom, Vimeo, YouTube, etc.)?

- Streaming will be closed circuit and available only in the viewing room and other auxiliary rooms within the Omni. A platform is not needed.

33 Plenary Broadcast/stream - Where does the stream land; Is this a G-20 provided platform?

– See answer #32.

34 Plenary Broadcast/stream - Does the stream only push to the satellite rooms on property or does it also push to an external online audience?

– See answer #32.

35 Plenary - Are screens primarily used to display IMAG? How often are content presentation decks and video playback required during sessions?

– Video playback will not be needed. Slide decks and presentations occur frequently during sessions.

36 Finance Ministers and Central Bank Governors Meeting (FMCBG) All Venue room assignments - where does each SOW take place on property? E.g. “The Plenary is assigned to occur in the ____ Ballroom. Etc.”

– See updated floor plan.

37 Venue agreement meeting space hold grid:

Venue access: What is the earliest time we can load-in/setup all spaces?

– This is flexible. There will be a storage option and set up can begin 3-4 days ahead of the meeting.

38 Venue agreement meeting space hold grid:

Venue egress: What time must we be completed with strike & load-out by?

- Set up for all event spaces must be complete by 7am on August 29, 2026. Vendor should vacate all auxiliary staff and set up equipment by then. Strike and load out following the completion of meetings must be done ASAP at the conclusion of the meeting on September 1, 2026.

39 Schedule/Agenda How many load-in days do you historically have; e.g. 2 setup days?

– This is dependent on contractor/vendor.

40 Schedule/Agenda What are your expectations for technical rehearsals &/or Emcee//delegate rehearsals?

– Ideally, a rehearsal will take place the day before meetings begin.

41 Schedule/Agenda Can you please confirm the overall start/end times of sessions per meeting date?

– To be provided after award. However, meetings will take place during business hours.

42 Schedule/Agenda When can we start to strike/tear down?

- See answer to #38.

43 19. Plenary - Confirming you require all audio speakers, projectors, screens, & lighting components to be flown (rigged)?

– Correct.

44 Plenary Broadcast/stream Is the Contractor responsible for providing streaming equipment and/or the secure stream source (i.e. Zoom, Teams, Vimeo, YouTube, etc.)?

- Streaming will be closed circuit and available only in the viewing room and other auxiliary rooms within the Omni. A platform is not needed.

45 Plenary Broadcast/stream Where does the stream land; Is this a G20 provided platform?

- G20 does not provide the platform. See answer #44.

46 Does the stream only push to the satellite rooms on property or does it also push to an external online audience?

- See answer #44.

47 Plenary - Simultaneous Interpretation Which is accurate: A) AV & Production Contractor needs to source/hire the SI vendor and provide booths with interpreters (to accommodate 4- 6 additional languages><English) with headsets for all attendees, or B) G20 is separately sourcing the SI vendor.

– Vendor will need to source SI vendor to provide booths and equipment. Interpreters will be provided by delegations.

48 Plenary - Are screens primarily used to display IMAG? How often are content presentation decks and video playback required during sessions?

- Video playback will not be needed. Slide decks and presentations occur frequently during sessions.

49 Labor - FMCBG SOW requests both a Plenary Audio Technician and an additional Communique Drafting Room Audio Technician. Confirming the Plenary & Communique Drafting Room are the same space; not two matching room setups?

– Correct.

50 Main Dining Room - Should this space have audio & video solutions for announcements, speeches, and/or content?

– No.

51 Lounges - Delegates Lounge spaces versus the Leaders Lounge: it’s mentioned that these should be separated by rigged pipe & drape. What is the approx. sq

ft. required of each separate space? How many lounge areas are required in each space?

– See updated floor plan.

52 Bilateral Meeting Rooms - Confirming these do not require any audio or video equipment?

– Correct.

53 We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services.

- New contract.