_FACPR_RFP (11.12.26).pdf
PDF 627 KB Posted
- Solicitation number
- 2026-PTG-FACPR
- Issued by
-
Department of Energy
About this file
REQUEST FOR PROPOSAL SUMMARY
This is a Request for Proposal (RFP) issued by Lawrence Berkeley National Laboratory (LBNL), managed by the University of California, for design-build services to replace Fire Alarm Control Panels (FACPs) across four buildings. The RFP number is 2026-PTG-FACPR with a proposal due date of January 8, 2027 at 5:00 PM Pacific Time. The estimated subcontract value is $700,000–$1,400,000 for a firm-fixed-price design-build subcontract, fully funded at award, with performance continuing through March 7, 2028. The project covers Buildings 2, 26, 33, and 76 at LBNL's facility in Berkeley, California. The procurement is governed by the University's Prime Contract with the Department of Energy (Prime Contract No. DE-AC02-05CH11231) and is unrestricted competition with no small business set-aside, though small businesses may compete directly for award or participate as lower-tier subcontractors. The NAICS code is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of average annual receipts of $19.0 million or less.
The Design-Build Subcontractor must provide all professional design, engineering, procurement, installation, changeover, and commissioning services to replace obsolete Siemens System 3 fire alarm panels (designed in the 1960s, installed in the early 1990s, unsupported since the mid-2010s) with new Siemens Desigo fire alarm control panel equipment as LBNL's campus standard—no substitutions permitted. Required scope includes building inspections to verify existing conditions, delivery of PE-stamped design packages at 50%, 75%, 95%, and 100% completion, procurement and installation of equipment and components, removal and disposal of obsolete equipment and legacy backup batteries, reconnection to existing StarLink communication cabinets and central supervising station, reestablishment of connections to the Energy Management Control System and building lighting controls, coordination of fire alarm outages with LBNL-provided fire watch, and testing, commissioning, and delivery of record drawings. A mandatory pre-proposal conference and on-site inspection is required on December 3, 2026 from 9:30 AM to 11:30 AM Pacific Time; proposals from non-attending firms will not be evaluated. The evaluation uses a tradeoff best-value source selection approach with technical factors weighted more heavily than price; technical factors include Safety, Relevant Past Performance, Technical Approach/Schedule/Management, and Key Personnel/Organizational Capability (combined 20-page limit for technical volume plus resumes). Offerors must demonstrate a current active California contractor's license, access to a California-licensed Professional Engineer to serve as Engineer of Record and Responsible Design Professional (specifically a California-licensed Fire Protection Engineer to review, stamp, and approve fire alarm drawings), adequate insurance coverage, bonding capacity for performance and payment bonds, and compliance with federal and state requirements including Davis-Bacon wage rates (General Wage Decision No. CA20260018 Mod 8), Buy American Act requirements for construction materials, DOE Worker Safety and Health Program (10 CFR 851) with Cal-OSHA compliance, E-Verify enrollment, workplace substance abuse program requirements (10 CFR 707), and sustainable acquisition program compliance. Price proposals must include separate fixed-price line items for design, construction, and Siemens equipment costs for each building and identify all known lower-tier subcontractors; all federal, state, and local taxes, indirect expenses, and disposal costs must be included. The design schedule is fixed with deliverables due at 8, 12, 16, and 19 weeks after notice to proceed with final design, followed by design reconciliation 8 weeks after electrical product approvals and record drawings 4 weeks after receipt of field mark-ups.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
University of California Managing and Operating Lawrence Berkeley National Laboratory Request for Proposal: 2026-PTG-FACPR
REQUEST FOR PROPOSAL (RFP):
2026-PTG-FACPR
PROPOSAL DUE DATE:
01/08/2027
Fire Alarm Control Panel Replacement Project
North American Industry Classification System (NAICS) Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors within the Construction sector.
Procurement Point of Contact: Peter Gajda Telephone No: (510) 486-4240 510 Email: ptgajda@lbl.gov
Request for Proposal: 2026-PTG-FACPR
TABLE OF CONTENTS
1. GENERAL INFORMATION
1.1. Project Overview
1.2. Scope of Work
1.3. NAICS Code and Small Business Size Standard
1.4. Source Selection
1.5. Estimated Term and Value
1.6. Subcontract Type
1.7. Solicitation Process Schedule
1.8. Statement of Work and Reference Documents
1.9. Sample Subcontract and Incorporated Documents
1.10. Communications with the University
1.11. University Rights and Procurement Conditions
2. RFP SOLICITATION PROCESS
2.1. General
2.2. Mandatory Pre-Proposal Conference and On-Site Inspection
2.3. Offerors' Questions
2.4. Determination of Responsive and Responsible Offers
2.5. Evaluation of Technical and Non-Technical Factors
2.6. Additional Evaluation Considerations
2.7. Proposal Submittal Requirements
2.8. Evaluation Factors
2.9. Relative Importance
2.10. Cover Page
2.11. Non-Technical Volume
2.12. Technical Volume
2.13. Price Proposal
2.14. Rating of Evaluation Factors
2.15. Offeror’s Acceptance of Terms and Conditions
2.16. Financial Resources
2.17. Purchasing System
2.18. Payment and Performance Bonds
2.19. Availability of Project-Related Documents
2.20. Withdrawal of Offers
Request for Proposal: 2026-PTG-FACPR
3. SOLICITATION PROVISIONS
3.1. Offeror's Acceptance of Terms and Conditions
3.2. Restriction on Disclosure and Use of Proposal Data
3.3. Export Control Classification Information
3.4. E-Verify Program Enrollment Verification
3.5. Small Business Subcontracting Plan
3.6. Construction Wage Rate Requirements
3.7. Buy American Act Requirements – Construction Materials
3.8. Safety-Related Requirements
3.9. Sustainability Related Requirements
3.10. Hazardous Material Identification and Safety Data
3.11. Workplace Substance Abuse Program
3.12. Brand Name or Equal
3.13. Notice of Sherman Antitrust Act – Federal Antitrust Enforcement
4. ATTACHMENTS TO THIS RFP
Request for Proposal: 2026-PTG-FACPR
1. INTRODUCTION
The University of California, Lawrence Berkeley National Laboratory ("University" or "LBNL" or "the Lab") requests proposals for design-build services ("Design-Build" or "DB") for the design and construction of the Fire Alarm Control Panel Replacement Project ("FACPR" or "the Project").
This solicitation is governed by procurement policies and procedures established under the University's Prime Contract No. DE-AC02-05CH11231 ("Prime Contract") with the U.S. Government, represented by the Department of Energy ("DOE"), for the management and operation of LBNL. Proposals submitted will be treated as offers, and any resulting award will be a subcontract under the University's Prime Contract.
This is a competitive, best-value source selection. Competition is unrestricted. Any responsible firm that meets the minimum requirements in Section 3.6 may submit a proposal. By submitting a proposal, the offeror acknowledges that it has carefully read the terms and conditions of this RFP and all attachments and addenda and agrees to be bound by them.
All proposals must be submitted in accordance with the instructions in this RFP.
1.1. Project Overview
LBNL uses Fire Alarm Control Panels ("FACPs") to detect fires and alert building occupants and the Fire Department. Most of the panels now in service are Siemens System 3 panels. That equipment was designed in the 1960s and installed at LBNL in the early 1990s. The manufacturer stopped supporting it and stopped making replacement parts in the mid-2010s. Because parts are no longer reliably available, the panels must be replaced to keep the buildings' life-safety systems dependable.
In August 2024, Enercon, an architecture and engineering firm under subcontract to LBNL, prepared a conceptual design report that evaluated existing conditions and recommended a replacement approach for each building. That work was preliminary planning only. It did not include final design or construction. The report is provided to offerors as reference information.
The purpose of this Project is to replace the FACPs and their backup battery systems while keeping fire protection available in occupied research buildings throughout the work.
1.2. Scope of Work
The Project covers Buildings 2, 26, 33, and 76. Under this subcontract, the Design-Build Subcontractor will provide all professional design, engineering, procurement, installation, changeover, and commissioning services needed to replace the fire alarm control panels and backup battery systems. In plain terms, the Subcontractor shall:
A. Inspect each building and verify what is actually installed, because drawings dating back to 1993 may not match current field conditions;
B. Serve as Engineer of Record and Responsible Design Professional, and produce PE-stamped design packages at 50%, 75%, 95%, and 100% completion for LBNL and Authority Having Jurisdiction ("AHJ") review and approval;
C. Purchase and install the new Siemens Desigo fire alarm control panel equipment, conduit, conductors, and related components;
D. Remove and dispose of the obsolete panel components and legacy backup batteries;
E. Reconnect the fire alarm system to the existing StarLink communication cabinets and the central supervising station, and reestablish the connections to the Energy Management Control System ("EMCS") and building lighting controls;
F. Coordinate and manage each fire alarm outage with the LBNL-provided fire watch.
Request for Proposal: 2026-PTG-FACPR
G. Test, commission, and document the completed systems to the satisfaction of the LBNL Fire Marshal and LBNL Facilities Engineering, and deliver record drawings.
The Siemens Desigo system has been selected as LBNL's campus-standard fire alarm platform for this Project, no substitutions will be considered. Using one common platform supports compatibility with the existing mix of field devices, loops, and conventional circuits, and simplifies maintenance, training, and future parts availability across the site.
The existing fire alarm wiring in the four buildings will generally remain in place. This Project replaces the central control equipment, not the complete building fire alarm systems. Fire alarm annunciation and notification devices and the StarLink cabinets themselves are not being replaced under this Project; StarLink cabinets will be relocated only as needed to follow the panels.
The detailed technical requirements are in Attachment A – Statement of Work for Subcontract 7889840, dated October 12, 2026. The summary above does not replace the SOW and is not comprehensive. In the event of a conflict between the SOW and the LBNL Permit Final Design package prepared by the Subcontractor, the design package takes precedence.
1.3. NAICS Code and Small Business Size Standard
The NAICS code for this acquisition is 238210, Electrical Contractors and Other Wiring Installation Contractors. The corresponding small business size standard is average annual receipts of $19.0 million or less, based on the average annual gross revenue for the past five fiscal years.
Offerors must complete the Small Business Program Representations clause in the attached Representations and Certifications form. Refer to FAR 19.1 – Size Standards for information on calculating average annual gross revenue.
This acquisition is not set aside for small business. Competition is unrestricted so that LBNL can evaluate the full range of qualified firms. Small businesses may compete directly for award and may participate as lower-tier subcontractors.
1.4. Source Selection
The University will select for award using a tradeoff Best Value Source Selection ("BVSS") process in accordance with LBNL Standard Practice ("SP") 15.4, Source Selection.
Best value means selecting the most advantageous proposal by comparing and evaluating technical factors together with price, to determine the best overall benefit to the University. This method permits an award to an offeror that is not the lowest priced.
A Lowest Price Technically Acceptable approach is not being used. Successful performance on this Project depends on more than meeting minimum requirements at the lowest price. The Subcontractor will design and build a life-safety system inside occupied buildings, must verify field conditions that may not match existing records, and must plan and execute fire alarm outages with minimal disruption. Past performance, technical approach, qualified personnel, and the ability to manage the work are therefore important considerations in addition to price.
1.5. Estimated Term and Value
The total estimated value of the resulting subcontract is approximately $700,000-1,400,000.
The estimated value is provided for planning purposes only. It is not a floor, a ceiling, or a commitment by the University.
The anticipated period of performance begins at subcontract award and continues through March 7, 2028 for the four buildings.
The subcontract will be fully funded at the time of award.
Request for Proposal: 2026-PTG-FACPR
The design schedule is fixed by the SOW and is summarized below. Offerors must build their proposed schedules around these durations.
Design Deliverable Due
50% Final Design submittal 8 weeks after notice to proceed with final design
75% Final Design submittal 12 weeks after notice to proceed with final design
95% Final Design submittal 16 weeks after notice to proceed with final design
100% Final Design submittal 19 weeks after notice to proceed with final design
100% Design Reconciliation submittal
8 weeks after electrical product submittals approved (see Spec. Section 013525)
Record Drawings (As-Builts) 4 weeks after receipt of Subcontractor field mark-ups
The Responsible Design Professional should allow two weeks for LBNL review of each design submittal.
LBNL EHS requires ten business days to review safety submittals, including the Site-Specific Safety Plan, Job Hazard Analyses, Work Plans, certifications, and Safety Data Sheets. This applies to every safety submittal throughout the Project, not only the initial package.
Occupants must receive written notice at least six months before any cutover. Final commissioning and cutover must proceed one building at a time, with a 7-day buffer.
1.6. Subcontract Type
The University intends to award one firm-fixed-price ("FFP"), design-build subcontract. The subcontract will include separate fixed-price line items for the design and the construction of each building (2, 26, 33, and 76).
An FFP subcontract is appropriate because the work and the expected results can be defined well enough for offerors to develop competitive prices. Under the design-build approach, one firm is responsible for completing the design, performing the construction, and demonstrating that the finished system works.
At the completion of the 95% Final Design documents, the Subcontractor will be allowed to submit a revised proposal capturing scope changes identified through the design process. If the revised proposal is validated against LBNL's independent cost estimate for the 95% Final Design documents, the University will issue a modification accounting for the updated scope or for differing site conditions.
Request for Proposal: 2026-PTG-FACPR
1.7. Solicitation Process Schedule
Activity Date
Issue RFP Friday, November 20, 2026
Mandatory Pre-Proposal Conference and On-Site Inspection Thursday, December 3, 2026
Deadline to register attendees for site access Monday, November 30, 2026
Offerors' Questions Due Thursday, December 10, 2026, 5:00 PM Pacific Time
University Response to Questions Thursday, December 17, 2026, 5:00 PM Pacific Time
Proposal Due Date Friday, January 8, 2027 5:00 PM Pacific Time
Initial review of proposals for completeness Monday, January 11, 2027
Evaluation Team review and determination of finalists Thursday, January 21, 2027
Notice to Selected Offeror Friday, January 22, 2027
Negotiations, discussions, or clarifications, if held Monday, January 25, 2027
Award Subcontract Friday February 12, 2027
The University may revise this schedule by addendum.
1.8. Statement of Work and Reference Documents
Attachment A of this RFP is the Statement of Work for Subcontract 7889840, dated October 12, 2026. The SOW describes the Project scope, design requirements, construction requirements, deliverables, and schedule.
All proposals must be consistent with the SOW.
The Subcontractor must perform all design activities in strict accordance with the LBNL Construction Details and Design Requirements ("CDDR") and the current LBNL Master Specifications. The fire alarm design must follow NFPA 72 (2025 edition) and the California Fire Code. Any exemption from a CDDR requirement must be approved by the responsible LBNL engineer before the design is submitted to LBNL.
The following reference documents are provided for the offeror's information:
A. Construction Details and Design Requirements (rev. 06.30.26);
B. Applicable Technical Specifications;
C. Design Deliverables Matrix (Version 2.0 – 06.30.26);
D. Fire Alarm Control Panel Replacement Conceptual Design Report (Enercon, August 2024); and E. Fire Alarm As-Builts for Buildings 2, 26, 33, and 76.
LBNL-provided records represent general baseline conditions. This data is provided for information only.
While it is considered representative, it is not guaranteed to be complete or accurate. The Subcontractor is responsible for verifying all physical dimensions, circuit loads, and field routing. Historical records dating to
Request for Proposal: 2026-PTG-FACPR
1993 show that device change-outs and zone re-allocations may have occurred over the panels' thirty-year service life without systematic drawing updates.
Oral statements made by University representatives are not binding unless the University Procurement Representative ("UPR") confirms the statement and issues it in writing as an addendum to this RFP.
In the event of a conflict between codes, industry standards, and the SOW, the most stringent requirement applies, and offerors must base their proposals on the most stringent requirement.
1.9. Sample Subcontract and Incorporated Documents
Attachment D of this RFP is the sample subcontract. Its incorporated documents include:
A. General Provisions for Fixed Price Design-Build, dated 10/9/26; and B. General Wage Decision No. CA20260018 Mod 8, dated 9/17/2026
1.10. Communications with the University
Offerors must prepare their proposals with professional integrity and free of lobbying activities. All communication with the University about this Project must be by email and directed to the UPR.
Do not communicate about the Project or this solicitation with any other University or Lab employee, representative, or consultant. Doing so may cause the offeror or its affiliates to be disqualified from this solicitation.
If an offeror intends to contact the general public regarding the Project, the nature and substance of that contact must be approved in writing by the UPR beforehand, in accordance with the Release of Information and Publication clause of the general provisions of the sample subcontract.
1.11. University Rights and Procurement Conditions
The University reserves, without limitation, and may exercise at its sole discretion, the following rights:
A. To revise the solicitation documents and schedule by addendum;
B. To reject any proposal that is incomplete, inadequate, or not responsive to the requirements of this
RFP;
C. To waive any minor (immaterial) submission irregularity, or to cancel this solicitation at any time before award without cost to the University;
D. To require confirmation of information furnished by an offeror and to request additional information or evidence of qualifications;
E. To provide clarifications, at any time, to all offerors;
F. To contact references not listed in the offeror's proposal and to investigate statements made in the proposal;
G. To make no award, a single award, or multiple awards if in the best interest of the University;
H. To take any action affecting this RFP process or the Project that is determined to be in the University's best interests; and I. To approve or disapprove the use of particular lower-tier subcontractors, sub-consultants, or key team members, and any substitution or change to those identified in the proposal. Such approval or disapproval will not be unreasonably exercised.
Request for Proposal: 2026-PTG-FACPR
2. RFP SOLICITATION PROCESS
2.1. General
The offeror must submit documentation illustrating their approach for satisfying the requirements of this solicitation. Failure to submit any of the information required by this solicitation may be cause for unfavorable consideration or exclusion from further consideration. Proposals must be written in English and be clear, coherent, and prepared in sufficient detail for effective evaluation.
Written proposals must be submitted by email (or other form of secure electronic submission) to the University Procurement Representative (ptgajda@lbl.gov) no later than 5:00 pm Pacific Time on Friday, January 8, 2027 To be responsive, an offeror must attend the mandatory pre-proposal conference and on-site inspection, meet the minimum requirements in Section 3.6, and submit a complete proposal in accordance with the instructions in this RFP.
The UPR will perform an initial review of each proposal to determine whether the submission is complete and provides the information the University's Evaluation Team ("UET") needs to evaluate it. The University is not responsible for locating or securing any information not included in the offeror's proposal, and has the right to reject any proposal not properly delivered.
2.2. Mandatory Pre-Proposal Conference and On-Site Inspection The University will host a Mandatory Pre-Proposal Conference and On-Site Inspection on Thursday, December 3, 2026 from 9:30AM to 11:30 AM Pacific Time.
Attendance is mandatory. Proposals from firms that did not attend will not be evaluated. Each offeror may send up to no more than three key team members.
The on-site inspection shall cover Buildings 2, 26, 33, and 76 so that all offerors can observe existing conditions and better understand the work. Offerors may ask questions about the work and physically observe the existing panels, cabinets, and pathways.
Offerors must inform Carlos Guerrero (cguerrero@lbl.gov) by the end of business on Monday, November 30, 2026 of the number of persons attending and their contact information, including name, email, and citizenship, including any lower-tier subcontractors and the company they represent, so that LBNL gate access can be arranged. Attendees will meet at Building-33 at 9:30AM Pacific Time. To gain access to the site, every individual must present a government-issued photo identification. Those attending must bring their own hard hat, safety glasses, high-visibility vest, and hard-toed footwear.
Statements made during the conference or site inspection are not binding unless confirmed in writing by the UPR as an addendum to this RFP.
2.3. Offerors' Questions
The University will respond to questions submitted by email to the UPR on or before 5:00 PM Pacific Time on Thursday, December 10, 2026. Questions submitted after this date may not be answered. Answers to questions submitted on time will be issued or made available to all offerors electronically, without identifying who asked.
2.4. Determination of Responsive and Responsible Offers
The University intends to select for award the responsive and responsible offeror(s) whose proposal demonstrates that the offeror(s) can satisfy the minimum technical requirements specified later in this RFP (if any minimum requirements are specified) and contain(s) the combination of price, performance features, and supplier attributes (described later in this RFP) offering the best overall value to the University.
Request for Proposal: 2026-PTG-FACPR
An initial review of offers will be performed by the Procurement Specialist to determine if the offer is complete and provides all the required information to enable the University to evaluate the offer to determine if it is responsive.
Offerors may be contacted only for clarification purposes during the initial review. Incomplete offers may be considered non-responsive and may be excluded from further consideration if the omissions are substantive (e.g., one or more required documents not submitted, one or more evaluation factors not addressed). Offerors will be notified when appropriate in the interest of fair business practice and professional courtesy if their offer was determined non-responsive and/or not meeting minimum requirements and the reasons for rejection will be provided if a debrief is requested.
A responsive offeror is one whose proposal satisfies the requirements of this RFP including those listed in Section 2.8, and the requirements of the Sample Subcontract and its incorporated documents. A responsible offeror is one that has adequate financial resources, ability to comply with the performance schedule, has a satisfactory performance record, has the necessary technical skills to be considered capable of performing and is otherwise eligible and qualified to perform the proposed Subcontract at the time of award. An offeror cannot be determined as “responsible” if it is currently ineligible for receiving new federal government prime contracts or subcontracts. The determination of responsiveness and responsibility of complete offers will be made by a team consisting of technical and procurement personnel and considering the evaluation factors described in Section 2.8, below.
2.5. Evaluation of Technical and Non-Technical Factors
Once the University has determined offers are complete in the initial review. The University will go on to determine the best overall value by evaluating the desired performance features, supplier attributes, and non-technical factors including the price. The University Procurement Representative will make a determination for award to the successful offeror based on the results of the evaluation.
The University’s expectations for these evaluation factors are stated in Section 2.11 and 2.12. The University reserves the right to award to other than the lowest price. Offerors should therefore strive to be persuasive in describing the value of their proposed performance features, supplier attributes, and other factors, including how they would enhance the likelihood of successful performance and achievement of the University’s objectives.
2.6. Additional Evaluation Considerations
The University’s evaluation will be based on the information provided by the offeror(s), the University’s own experience with the offeror(s), and/or information obtained from the offeror’s references and other sources.
In its evaluation, the University will consider the degree of substantiation of the proposed approaches in the proposal volumes and in response to any discussions, if held. The University is not responsible for locating or securing any information which is not included in the proposal. To ensure sufficient information is available, offerors must furnish as part of their proposal all descriptive material (such as manuals, drawings, technical specifications, or other information) necessary for the University’s evaluation.
Offerors are advised that, although negotiations may follow receipt of proposals, award may be made without discussions on proposals received. If the University determines that revised proposals are necessary, the University may solicit them from only those offerors deemed to have a reasonable chance to be selected for award. An offeror is identified as having a reasonable chance of award based on the evaluation indicating they are responsive and responsible; their offer satisfies the minimum requirements of the solicitation; they have presented acceptable or strong performance features and supplier attributes; they have sufficient bandwidth to take on new work; and their proposed pricing is considered fair and reasonable. The University reserves the right to make no awards, a single award, or multiple awards as a result of this solicitation, if it is in the best interest of the University.
Request for Proposal: 2026-PTG-FACPR
2.7. Proposal Submittal Requirements
Offerors must submit the technical and price proposals electronically. Hard-copy submittals will not be accepted. Submissions must be emailed or electronically transmitted to the UPR via a file transfer site, such as Dropbox, no later than Friday, January 8, 2027 5:00 PM Pacific Time. The submittal email must include the RFP number and document title in the subject line. The technical and price proposals must be submitted as separate files, clearly labeled "Technical Proposal" and "Price Proposal." Offerors are responsible for ensuring timely delivery. The University will confirm receipt of the electronic submission but is not responsible for an offeror's technical difficulties in submitting electronically.
Proposal formatting requirements:
A. Formatted in searchable .pdf format;
B. Include the RFP number, volume title, and page number in the margin of all pages;
C. Company name and proprietary information notices marked in accordance with Section 4.2 of this
RFP; and D. Proposals must not be supplemented by reference documents not expressly required in this RFP.
2.8. Evaluation Factors
Proposals must include information on the following evaluation factors. Attachment B – Factor Response Requirements describes the information required for each factor. The technical factors are listed in descending order of importance to the University.
Volume Factor Page Count Limit
Cover Page See Section 3.4 2 pages
Non-technical Volume
Offeror’s Acceptance of the Terms, Conditions, General Provisions, and Other Incorporated Documents of the Sample Subcontract
No Limit
Active State of California Contractor's License
California-licensed Fire Protection Engineer
Representations & Certifications
Certificate of Insurance
Verification of Bonding
Attendance at Mandatory Pre-Proposal Conference
Technical Volume (Attachment B – Factor Response Requirements)
Factor 1 – Safety 20 pages total and resumes no longer than a single page, excluding the proposed schedule, certifications, licenses, and required forms
Factor 2 – Relevant Past Performance
Factor 3 – Technical Approach, Schedule, and Management
Factor 4 – Key Personnel and Organizational Capability
Price Proposal Attachment C – Price Proposal Form No Limit
Request for Proposal: 2026-PTG-FACPR
2.9. Relative Importance
The technical factors, when combined, are more important than the evaluated price. The University values a technically superior proposal more highly than the lowest evaluated price for this acquisition. However, the University will not make an award at a price premium it considers disproportionate to the benefits of one proposal's technical superiority over another. The University will consider the technical and price factors in combination. If the selected offeror is not the lowest priced, the benefits supporting the additional cost will be documented in the source selection decision.
2.10. Cover Page
The Cover Page must identify the offeror's name and address; the RFP number and title; and the names, titles, telephone numbers, and email addresses of the individuals in the offeror's organization who have commitment authority and will be responsible for binding contractual negotiations and administration. It must also identify each proposed key team member and the firm each is affiliated with.
2.11. Non-Technical Volume
Each item below is evaluated on a pass/fail basis to determine whether the offeror is responsive and responsible. An offeror that does not meet every item will not be evaluated further.
# Requirement Support
Acceptance of the terms, conditions, General Provisions, and incorporated documents of the sample subcontract
Statement of acceptance, or exceptions submitted in accordance with Section 4.1
2 Current and active State of California contractor's license in good standing
License number, classification, and expiration date.
Access to a California-licensed Professional Engineer able to serve as Engineer of Record and Responsible Design Professional.
A California-licensed Fire Protection Engineer must review, stamp, and approve all fire alarm drawings.
Name of firm or in-house group, and the California PE license number of the individual who will stamp the drawings.
5 Ability to meet the required insurance coverage Certificate of insurance or broker letter
6 Bonding capacity for performance and payment bonds
Surety letter from a company listed in U.S.
Treasury Department Circular 570
7 Attendance at the mandatory pre-proposal conference and on-site inspection University attendance record
Not debarred, suspended, or proposed for debarment, and eligible to receive federal contracts and subcontracts
Representations and Certifications
The following enclosures are provided for informational purposes and do not need to be returned:
• Sample Subcontract
• General Provisions for Fixed Price Design-Build, dated 10/9/26
• Insurance Certificate Form and Instructions
Request for Proposal: 2026-PTG-FACPR
• General Wage Decision No. CA20260018 Mod 8, dated 9/17/2026
2.12. Technical Volume
Evaluation of the technical volume will be based on the information provided in response to the evaluation factors listed in Attachment B and on information provided by references.
The technical volume may not exceed 20 pages and resumes no longer than a single page, not including the proposed schedule, certifications, licenses, and required forms, which do not count against the page limit. A table of contents must be provided listing the major headings and their page numbers, along with lists of tables, graphics, figures, photos, and appendices.
Technical volume must focus on the information requested in this RFP and must not contain standard marketing or general materials. Content beyond a stated page limit will not be read or evaluated.
Each response narrative must be clearly identifiable to its associated evaluation factor.
2.13. Price Proposal
Price, while being an important factor, is not in and of itself the determining factor in the selection of the successful offeror for award of the Subcontract contemplated by this solicitation. Price is not weighted; rather, each offeror’s price will be evaluated for realism, reasonableness, and completeness of the proposed Subcontract price.
The price proposal must include a completed Attachment C – Price Proposal Form, with separate fixed-price line items for the design, the construction, and Siemens price of each building (2, 26, 33, and 76).
The price proposal must also identify the name of each known lower-tier subcontractor who will perform work or labor at the worksite or who will specially fabricate and install a portion of the work.
Offerors must only propose lower-tier subcontractors that are equipped, experienced, and appropriately licensed to do the work in their particular field. No portion of the work may be reserved by the offeror to itself unless it is so equipped, experienced, and licensed. Only one lower-tier subcontractor may be listed for the same portion of the work.
Offerors must include all applicable federal, state, and local taxes, duties and all other Subcontractor obligations under the resulting Subcontract, including all direct costs, indirect expenses and any fee or profit, and disposal of the materials the Subcontractor is responsible for removing under SOW Section 4.5.
Cost estimates prepared by the Responsible Design Professional are not required on this Project. LBNL will prepare its own independent estimates.
By submitting a price proposal, the offeror represents and warrants the following:
A. It has carefully examined this RFP and Attachment A, and has determined the nature, scope, and location of the work;
B. It will honor the prices proposed in the completed Attachment C;
C. It will enter into a subcontract based on the sample subcontract; and D. It has investigated and satisfied itself as to the general and local conditions that can affect the work, all existing site conditions data, and all Project-related documentation, addenda, and subcontract forms.
If the offeror fails to account for these requirements, the offeror is not relieved of responsibility for correctly estimating the difficulty and cost of the work, or for completing the work without additional cost to the University. The offeror must determine the methods, materials, labor, and equipment required, and reflect their estimated cost in the price proposal, knowing it will become the fixed price to complete the work.
Request for Proposal: 2026-PTG-FACPR
2.14. Rating of Evaluation Factors
The University will use the following adjectival ratings to rate the evaluation factors in the offeror's technical proposal:
Excellent: The offeror demonstrates an exceptional understanding of the requirements and an approach that exceeds them in ways that benefit LBNL. Its approach significantly exceeds the desired performance features and supplier attributes and is highly beneficial to the University. There are no evaluated weaknesses. The likelihood of success is very high.
Good: The offeror demonstrates a good understanding and satisfaction of the University's requirements. Its approach exceeds the desired performance features and supplier attributes and is beneficial to the University.
There are no significant evaluated weaknesses.
Acceptable: The offeror demonstrates an adequate understanding and satisfaction of the University's requirements. Its approach satisfies most desired performance features and supplier attributes and is beneficial to the University. There may be minor but correctable evaluated weaknesses.
Unacceptable: The offeror fails to demonstrate an adequate understanding of the University's requirements, or its approach fails to meet desired performance features or supplier attributes that are beneficial to the University. There are unacceptable weaknesses that can only be met with major changes to the proposed approach.
2.15. Offeror’s Acceptance of Terms and Conditions
Offeror’s Acceptance of the terms, conditions, general provisions, and other incorporated documents of the Sample Subcontract.
The offeror should accept the terms, conditions, general provisions, and other incorporated documents of the Sample Subcontract, including the requirement to include clauses in its lower-tier subcontracts at any tier, to the extent applicable. The terms and conditions of the Sample Subcontract have been approved by the DOE, and it is not the University’s intent to make material changes. While an offeror may identify “exceptions” to the Sample Subcontract, such exceptions may reflect unfavorably upon the offeror’s proposal. Exceptions make it difficult to compare competing offers, and the process of resolving exceptions may be time-consuming and result in unacceptable delays in the award of a Subcontract.
The offeror should include in its proposal a statement that the offeror takes no exceptions to the terms, conditions, general provisions, or the incorporated documents of the Sample Subcontract. The offeror should include in its request for consideration of exceptions a redlined version of the Sample Subcontract [with all proposed revisions indicated by tracked changes, or a separate sheet with all proposed revisions indicated by tracked changes, referencing the article or clause to which the proposed revision applies. The offeror must also include in its request for consideration of any exception, a business case for that exception, providing a justification for the requested change and an analysis of any increased risk to the University.
The University will attempt to resolve exceptions in a timely manner through an iterative process and with review, concurrence, and/or approval of both the University and DOE. However, offerors are advised that when exceptions cannot be resolved and agreement cannot be reached on terms and conditions, award will not be made to otherwise successful offerors.
2.16. Financial Resources
The offeror should have adequate financial resources to perform the resulting Subcontract, or the ability to obtain them.
The proposal should describe the offeror’s current financial condition and its financial ability to fully support performance of the proposed Subcontract. The University reserves the right to request the offeror’s financial statements or additional financial information regarding the offeror’s financial resources. Information may include an independent CPA-audited or reviewed year-end financial statements for the last two fiscal years in
Request for Proposal: 2026-PTG-FACPR the form of balance sheets, income statements, and statements of cash flow, and include information on any commitments or explicit arrangements that will be relied on to acquire the needed facilities, equipment, other resources, or personnel.
2.17. Purchasing System
The selected offeror will be required to have a purchasing system that is adequate for the proposed type of Subcontract if the subcontract includes the proposed purchase of goods or services by the offeror that are anticipated to be >$50,000. If the offeror has had a federal agency approve its purchasing system, provide a copy of the government report and/or adequacy determination letter. Complete and submit the Pre-award Survey of Prospective Subcontractor’s Accounting System form enclosed with this RFP, including required supporting policies and procedures as indicated on the form.
2.18. Payment and Performance Bonds
The successful offeror shall furnish, after receipt of the resulting Subcontract, performance and payment bonds as specified in the Price Proposal for Lump Sum Construction Subcontract form [OR]General Provisions incorporated into the Sample Subcontract [OR]Sample Master Agreement. The cost for the required bonds must be included in the total proposed price.
A certified and dated copy of the power-of-attorney for the attorneys-in-fact who sign the performance and/or payment bonds must be provided with each bond. The bonds must be from a surety company listed in the latest published U.S. Treasury Department’s Listing of Approved Sureties (Department Circular 570), available at: http://www.fiscal.treasury.gov/fsreports/ref/suretyBnd/c570.htm.
2.19. Availability of Project-Related Documents
The University will provide the SOW, the CDDR, the Design Deliverables Matrix, the Conceptual Design Report, and the available fire alarm as-builts for Buildings 2, 26, 33, and 76 to each offeror. Documents may be obtained from LBNL via https://drive.google.com/drive/folders/1WF1EDfC6kRh4enh1Tp6CoKjdKZgsVDug?usp=drive_link.
The design and documentation package and all associated documents, drawings, and records are owned by DOE. Use of these documents for any purpose outside of responding to this solicitation is strictly prohibited.
No document may be distributed to others or otherwise reproduced or used without written permission from the UPR.
2.20. Withdrawal of Offers
Offerors may withdraw their proposals by written notice from an authorized representative at any time before award.
3. SOLICITATION PROVISIONS
3.1. Offeror's Acceptance of Terms and Conditions
The offeror should accept the terms, conditions, General Provisions, and other incorporated documents of the sample subcontract, including the requirement to include clauses in its lower-tier subcontracts at any tier, to the extent applicable. The terms and conditions of the sample subcontract have been approved by DOE, and it is not the University's intent to make material changes. While an offeror may identify exceptions, such exceptions may reflect unfavorably upon the offeror's proposal. Exceptions make it difficult to compare competing offers, and resolving them may be time-consuming and delay award.
The offeror should include in its proposal a statement that it takes no exceptions to the terms, conditions, General Provisions, or incorporated documents of the sample subcontract. Any request for consideration of an exception must include a redlined version of the sample subcontract with all proposed revisions shown as tracked changes, or a separate sheet with tracked changes referencing the article or clause. The offeror must http://www.fiscal.treasury.gov/fsreports/ref/suretyBnd/c570.htm https://drive.google.com/drive/folders/1WF1EDfC6kRh4enh1Tp6CoKjdKZgsVDug?usp=drive_link
Request for Proposal: 2026-PTG-FACPR also include a business case for each exception, providing a justification for the requested change and an analysis of any increased risk to the University.
The University will attempt to resolve exceptions in a timely manner through an iterative process, with the review, concurrence, and approval of both the University and DOE. However, when exceptions cannot be resolved and agreement cannot be reached on terms and conditions, an award will not be made to the otherwise successful offeror.
3.2. Restriction on Disclosure and Use of Proposal Data
The University will safeguard any commercial or financial data or information contained in proposals from disclosure, when marked in accordance with paragraph (e) of FAR 52.215-1, from dissemination outside the University or the Government. Such data includes trade secrets and commercial or financial information that is privileged or business confidential and developed at private expense.
The University will endeavor to maintain such data to the same degree as its own and not disclose it to individuals other than those working for the University or the Government on this procurement. University reviewers are bound by an obligation of confidentiality to use such data solely for evaluating the proposal.
Proposals received will be retained and disposed of in accordance with the requirements of the University's Prime Contract with DOE.
If the offeror intends to use a product or process for which there is a patent position or existing background intellectual property, the proposal should identify and list it, including patent applications and patents granted (with dates, numbers, and descriptions), and whether the Government has rights in that background intellectual property.
3.3. Export Control Classification Information
Before subcontract award, the offeror will provide export control classification information for all items as required by the Representations and Certifications form. Items may not be accepted without the export control information required by this Request for Proposal.
If any of the ordered items (including data, software, or services) are export controlled under the International Traffic in Arms Regulations (22 CFR Sections 120-130); the Export Administration Regulations (15 CFR Sections 730-774); the Nuclear Related Regulations (10 CFR 110 and 10 CFR 810); the Foreign Assets Control Regulations (31 CFR Sections 500-599); or if sourced internationally under a country's equivalent dual-use or military strategic goods list, the subcontractor agrees to provide the UPR with written notification of the export controlled status prior to shipment or transfer to the University. The notification must specifically identify the item and its export classification. The University reserves the right to cancel or modify any part of the subcontract that includes export-controlled items prior to accepting delivery. The subcontractor must indemnify the University and the Government for all export enforcement mitigation costs, fines, or penalties incurred by the University arising from the subcontractor's failure to comply with this provision.
3.4. E-Verify Program Enrollment Verification
The subcontract will include FAR 52.222-54 – Employment Eligibility Verification. The selected offeror will be required to:
A. Be enrolled in the Government's online E-Verify system at https://e-verify.uscis.gov/enroll and, if necessary, provide the University with written verification of enrollment;
B. Use E-Verify to verify the employment eligibility of all employees assigned to the subcontract and of all new hires working in the United States, except as otherwise permitted by the clause; and
C. Include the clause in lower-tier subcontracts for construction or services exceeding $3,500 and, if necessary, provide the University with written verification of the inclusion of the clause and the lower-tier subcontractors' enrollment in E-Verify.
https://e-verify.uscis.gov/enroll
Request for Proposal: 2026-PTG-FACPR
Additional information is available at https://www.uscis.gov/everify.
3.5. Small Business Subcontracting Plan
The anticipated value does not exceed the applicable threshold, and therefore, an offeror is not required to submit for approval a Small Business Subcontracting Plan. Offers are encouraged to submit a Small Business Contracting Plan, and the plan must include the total anticipated subcontracting amount and percentage goals and amounts for each small business category. Refer to FAR 52.219-9 – Small Business Subcontracting Plan and the attached Small Business Subcontracting Plan form.
Potential lower-tier opportunities on this Project include electrical installation, selective demolition and repair, firestopping, engineering support, hazardous material services, and system testing.
3.6. Construction Wage Rate Requirements
Any resulting Subcontract will be subject to the Construction Wage Rate Requirements (formerly known as the Davis-Bacon Act and related labor regulations) in Subpart 22.4 of the Federal Acquisition Regulation (FAR), which are identified in the Sample Subcontract [. Offers must be based on, and all laborers and mechanics performing work at the worksite under the Subcontract shall receive no less than the wages and benefits specified in the Wage Determination provided with this RFP.
Offerors shall immediately notify the University Procurement Representative if it intends to establish a secondary site specifically for the performance of a significant portion of the building or work for which the Wage Determination provided with this RFP is not applicable. The proposal due date will not be extended as a result of an offeror’s request for a wage determination for a secondary site.
3.7. Buy American Act Requirements – Construction Materials
The General Provisions of the Sample Subcontract include FAR Clause 52.225-9, Buy American Act - Construction Materials, which requires that only domestic construction materials be used in performing the Subcontract (i.e., construction material manufactured in the United States or unmanufactured construction material mined or produced in the United States), unless a specific exception applies. The offeror is to indicate in the Representations and Certifications form, to be submitted with the proposal, whether it proposes to furnish any foreign end construction material.
If the offeror proposes to furnish any foreign construction material, the offeror must request relief on the basis that domestic construction material is: (1) unreasonably priced, or (2) not commercially available in sufficient quantities of a satisfactory quality. Such requests should be submitted to the University’s Procurement Representative in time to allow a determination before submission of offers, if possible, or submitted with the offer, and should include all information and applicable supporting data required to evaluate the request. When an offer includes foreign construction material, the offeror should also submit an alternate offer based on use of equivalent domestic construction materials, if possible.
Domestic construction material (i.e., unmanufactured construction material mined or produced in the United States) will not be considered unreasonable unless its cost exceeds the cost of comparable foreign unmanufactured construction material, including any import duty, by more than twenty percent.
Refer to FAR Clause 52.225-9 for the definition of: construction material, domestic construction material, and foreign construction material.
3.8. Safety-Related Requirements
The selected offeror and its lower-tier subcontractors performing work at an LBNL worksite are subject to the DOE Worker Safety and Health Program regulation of Title 10, Part 851 of the U.S. Code of Federal Regulations (10 CFR 851), as amended by the variance to 10 CFR part 851, Worker Safety and Health Program, approved by DOE in August of 2019. The approved variance allows the selected offeror and lower tier subcontractors to follow applicable California Department of Labor Codes such as California Occupational Safety and Health Administration’s (Cal-OSHA) safety and health regulations in Title 8, https://www.uscis.gov/everify
Request for Proposal: 2026-PTG-FACPR including an Injury and Illness Prevention Program (IIPP), in lieu of specified provisions in 10 CFR part 851, Subparts B and C, and Appendix A. The Department of Energy retains enforcement authority per 10 CFR part 851, subpart A.
The selected offeror shall also perform the work in compliance with the LBNL Health and Safety Manual, available at: https://ehs.lbl.gov/resource/documents/esh-manual-pub-3000/, which implements the requirements of 10 CFR 851, as well as their Cal-OSHA mandated Injury and Illness Prevention Plan (IIPP) or equivalent and all other LBNL safety procedures and policies communicated to the Subcontractor. As part of this requirement, the Subcontractor and its lower-tier subcontractors shall inform their workers of their rights and responsibilities by appropriate means, including posting the DOE-designated 10 CFR 851 It's the Law Worker Protection Poster at its LBNL workplace where it is accessible to all workers. Provisions implementing the requirements of the regulation are included in the Sample Subcontract.
The selected offeror’s personnel working…
This is the start of the file's text. The full file is on GovTribe.