C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdf
PDF 230 KB Posted
- Solicitation number
- 2026-PTG-FACPR
- Issued by
-
Department of Energy
About this file
Price Proposal Form Summary
This is a Price Proposal Form (Attachment C) for Request for Proposal 2026-PTG-FACPR issued by Lawrence Berkeley National Laboratory, a University of California facility. The solicitation concerns a firm-fixed-price design-build subcontract for the Fire Alarm Control Panel Replacement Project covering four buildings (Buildings 2, 26, 33, and 76) at LBNL. Offerors must complete all pricing fields without exclusions, qualifications, or conditions; failure to acknowledge all addenda may render the offer non-responsive. Offer validity is 180 calendar days after the proposal due date. The offeror must hold active California Contractors State License Board licenses and furnish performance and payment bonds each at 100% of the subcontract price from a U.S. Treasury-listed surety within ten working days after award and before Notice to Proceed.
Pricing is submitted in Table A as a Total Fixed Price Lump Sum distributed across Design Price, Construction Price, and Siemens Price for each building, with general conditions, mobilization, bonds, insurance, overhead, and profit distributed across all four lines rather than shown separately. Table B provides a cost breakdown supporting price reasonableness review, including line items for direct labor, Siemens Desigo equipment and services, materials, subcontractors, design and engineering, equipment, general conditions, bonds and insurance, overhead, and profit. The offeror must specify design and construction completion schedules in calendar days after Notice to Proceed, with overall completion required by March 7, 2028, and identify all known lower-tier subcontractors with their scope, California license information, small business status, and approximate values. Prices must include bonds, insurance, permits, prevailing wages, after-hours work for impairment windows, LBNL safety training, material disposal, NETA testing of reused conductors and breakers, and commissioning with owner training and record drawings. A fixed daily rate for work suspension must also be specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
University of California Lawrence Berkeley National Laboratory Request for Proposal: 2026-PTG-FACPR
ATTACHMENT C - PRICE PROPOSAL FORM
Request for Proposal: 2026-PTG-FACPR Project: Fire Alarm Control Panel Replacement Project
Offeror Name:
Address:
Point of Contact:
Telephone:
Email Address:
Unique Entity Identifier (SAM.gov):
INSTRUCTIONS
1. Complete every blank cell. Enter "$0" rather than leaving a cell blank if no cost applies.
2. The Total Lump Sum Price in Table A is the evaluated price.
3. The total in Table B must equal the total in Table A.
4. Do not include exclusions, qualifications, or conditions in this form. An offer that conditions its price may be found non-responsive. Technical assumptions belong in the Technical Volume (Attachment B, Factor 3, item 7).
5. Do not include any pricing information in the Technical Volume.
OFFEROR REPRESENTATIONS
Offer. The Offeror submits this offer for a firm-fixed-price design-build subcontract for the work described in the RFP, including Attachment A – Statement of Work and all addenda.
Site conditions. The Offeror attended the mandatory pre-proposal conference and on-site inspection, has examined Buildings 2, 26, 33, and 76, and understands that LBNL-provided records may not reflect current field conditions.
Offer validity. This offer remains valid and will not be withdrawn for 180 calendar days after the proposal due date.
Addenda. The Offeror acknowledges receipt of the following addenda and has included their effect in the prices below. Failure to acknowledge all addenda may render the offer non-responsive.
Addendum No. Date
Request for Proposal: 2026-PTG-FACPR
Contractor licenses. The Offeror holds the following active California Contractors State License Board license(s):
Classification License No. Expiration Date
Bonds. The Offeror will furnish performance and payment bonds, each at 100% of the subcontract price, from a surety listed in U.S. Treasury Department Circular 570, within ten working days after award and before Notice to Proceed or the start of on-site work. The cost of the bonds is included in the prices below.
TABLE A: SCHEDULE OF PRICES
Line Description Design Price Construction Price Siemens Price Line Subtotal
1 Building 2 $ $ $ $
2 Building 26 $ $ $ $
3 Building 33 $ $ $ $
4 Building 76 $ $ $ $
Total Fixed Price Lump Sum (Lines 1-4)
Distribute general conditions, mobilization, bonds, insurance, overhead, and profit across Lines 1 through 4. Do not show them as separate lines.
Request for Proposal: 2026-PTG-FACPR
TABLE B: COST BREAKDOWN OF TOTAL LUMP SUM PRICE
This table supports the University's price reasonableness review. It is not evaluated separately.
Cost Element Subtotal
Direct labor (self-performed) $
Siemens Desigo equipment and services $
Other materials $
Other lower-tier subcontractors $
Design and engineering $
Equipment $
General conditions and site supervision $
Bonds and insurance $
Overhead $
Profit $
Total (must equal Table A) $
SCHEDULE
The Offeror will complete all Design work within ______ calendar days after Notice to Proceed.
The Offeror will complete all Construction work within ______ calendar days after Notice to Proceed.
This duration must allow completion no later than March 7, 2028.
SUSPENSION OF WORK
Any price adjustment resulting from a suspension of work for the University's convenience, under the Suspension of Work clause of the General Provisions (FAR 52.242-14), will be limited to the following fixed amount per calendar day. This amount is full compensation for the Offeror and all lower-tier subcontractors.
Suspension of Work, per calendar day $
Request for Proposal: 2026-PTG-FACPR
LOWER-TIER SUBCONTRACTORS
List each known lower-tier subcontractor that will perform work at the site or specially fabricate and install a portion of the work.
Firm Name Scope of Work CSLB License No.
and Classification
Small Business Status Approx. Value
PRICE INCLUDES
By signing below, the Offeror confirms that its prices include all of the following:
• Bonds, insurance, and permits
• Applicable prevailing wages (federal and California, whichever is higher)
• After-hours, weekend, and holiday work required to meet impairment windows
• LBNL-required site-specific safety and access training
• Disposal of the materials the Subcontractor is responsible for removing under SOW Section 4.5
• NETA testing of reused conductors and breakers
• Commissioning, owner training, and record drawings
SIGNATURE
Company Name
Authorized Representative (print)
Signature
Date
| INSTRUCTIONS |
| OFFEROR REPRESENTATIONS |
| TABLE A: SCHEDULE OF PRICES |
| TABLE B: COST BREAKDOWN OF TOTAL LUMP SUM PRICE |
| SCHEDULE |
| SUSPENSION OF WORK |
| LOWER-TIER SUBCONTRACTORS |
| PRICE INCLUDES |
| SIGNATURE |