D_Subcontract_FACRP (11.12.26).pdf
PDF 637 KB Posted
- Solicitation number
- 2026-PTG-FACPR
- Issued by
-
Department of Energy
About this file
SUBCONTRACT SUMMARY
This is a Fixed Price Design-Build Subcontract (No. 7889840) issued by The Regents of the University of California on behalf of Lawrence Berkeley National Laboratory (LBNL) for the Fire Alarm Control Panel Replacement (FACPR) Project. The subcontractor must perform all design and construction work for FACPR across Buildings 2, 26, 33, and 76 at One Cyclotron Road, Berkeley, California 94720. The work is classified under NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of $19.0 million or less in average annual receipts. The subcontract is issued under Prime Contract No. DE-AC02-05CH11231 between the University and the U.S. Department of Energy for the management and operation of LBNL. The performance period commences upon execution and concludes on March 7, 2028, with a Notice to Proceed issued only after acceptable submission of required safety documentation, insurance certificates, performance bond, and payment bond.
The subcontract price is fixed at $x,xxx,xxx.xx with line-item breakdowns for design, construction, and Siemens pricing across each building. Progress payments are made monthly based on approved estimates, with 10 percent retention until final completion. Payment terms are Net 30 days (or 15 days for small businesses), and final payment occurs 35 days after County recording of the Notice of Completion, contingent upon final inspection acceptance and submission of an Assignment and Release form. The subcontractor must comply with Construction Wage Rate Requirements (Davis-Bacon Act), submit weekly payroll documentation via LCPTracker, maintain comprehensive insurance including Commercial General Liability ($1,000,000 per occurrence), Builders All Risk Insurance (for contracts exceeding $200,000), and Professional Liability Insurance ($1,000,000 per claim). Key personnel assignments include the Design-build Project Manager, Engineer of Record, Fire Protection Engineer, Electrical Engineer, Construction Superintendent, Lead Fire Alarm Technician, and Onsite Health and Safety Representative, all subject to University approval prior to reassignment. The subcontractor must comply with DOE Worker Safety and Health Program requirements (10 CFR 851), Cal-OSHA regulations, LBNL site access requirements including Real ID Act compliance, E-Verify enrollment, and sustainable procurement practices per FAR 52.223-23.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontract No. 7889840 Page 1
SUBCONTRACT
NO. 7889840
The Regents of the University of California Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA 94720
Subcontractor:
VENDOR NAME
Attention: REPRESENTATIVE NAME
ADDRESS
CITY, STATE ZIP CODE
Phone: ###-###-#### E-Mail: EMAIL ADDRESS
University Procurement Representative:
Name: Peter Gajda Phone: 510-486-4240 E-Mail: ptgajda@lbl.gov
Introduction This is a Fixed Price design-build subcontract (hereinafter "Subcontract") for the Fire Alarm Control Panel Replacement (FACPR) Project, as further described herein. The North American Industry Classification System (NAICS) for this acquisition is size standard 238210, Electrical Contractors and Other Wiring Installation Contractors. The corresponding small business size standard is average annual receipts of $19.0 million or less, based on the average annual gross revenue for the past three fiscal years.
This Subcontract is between The Regents of the University of California, (hereinafter "University") and the party identified above as the "Subcontractor".
This Subcontract is issued under Prime Contract No. DE-AC02-05CH11231 between the University and the United States Government (hereinafter "U.S. Government"), represented by the Department of Energy (hereinafter "DOE") for the management and operation of the Lawrence Berkeley National Laboratory (hereinafter "LBNL") and the performance of certain research and development work.
Agreement The parties agree to perform their respective obligations in accordance with the terms, conditions, and provisions of the attached SCHEDULE OF ARTICLES and the documents referenced or incorporated therein, which together with this Signature Page shall collectively constitute the entire Agreement and shall supersede all prior negotiations, representations, or agreements, whether verbal or written.
VENDOR NAME THE REGENTS OF THE
UNIVERSITY OF CALIFORNIA
By: By:
Name: Name:
Title: Title:
Date: Date:
Subcontract No. 7889840 Page 2
SCHEDULE OF ARTICLES
ARTICLE 1 SCOPE OF WORK
Description The Subcontractor must perform all work for design and construction of FACPR, in accordance with this Subcontract. The worksite is located in Buildings 2, 26, 33, and 76 at One Cyclotron Road Berkeley, CA 94720.
The work must conform to the following incorporated document(s):
• Statement of Work for Subcontract 7889840, dated October 12, 2026 The following documents will be incorporated by modification after the 100% design is approved:
• Drawing(s) entitled, “XXXXXXXXXXXXXXXX,” dated XX/XX/XXXX
• Specifications/Project Manual entitled, “XXXXXXXXXXXXXXX,” dated XX/XX/XXXX
The Subcontractor agrees to perform additional work arising from changes ordered by the University pursuant to the Changes clause of the General Provisions.
Required Documentation The following documents must be submitted to the University Procurement Representative no later than 10 days after the date of award of the Subcontract. Acceptable documents must be submitted and a Notice to Proceed must be issued before any work may commence at the worksite.
• Site Specific Safety Plan, Injury and Illness Prevention Program (IIPP), and Job Hazards Analysis (JHAs) as required by the LBNL EH&S Operations Support Team.
• Statement and Acknowledgment Form (SF 1413)
• Insurance Certificate and Endorsements
• Performance Bond (per the Performance Bond clause of the General Provisions)
• Payment Bond (per the Payment Bond clause of the General Provisions)
The Subcontractor must complete and submit each of the following documents to the University as required by this Subcontract.
• Application for Payment (which complies with all requirements of FAR 52.232-5)
• Weekly Payroll Information
• Assignment and Release
The Subcontractor must submit other reports with respect to the Subcontractor's activities under this Subcontract, including reports on use of EPA-designated items and U.S. Government-owned property, as required by this Subcontract or as the University may require from time to time.
Construction Wage Rate Requirements (formerly known as the Davis-Bacon Act) and Related Requirements The construction work is subject to the Construction Wage Rate Requirements (formerly known as the Davis-Bacon Act) and related labor standard clauses identified in the General Provisions (FAR Clauses 52.222-6 through 52.222-15). The Subcontractor must pay its employees at least the minimum wages established by the General Wage Determination of the U.S. Department of Labor identified in this Subcontract and must comply with all other related requirements. The Wage Determination and the Davis- Bacon Poster (WH-1321) must be posted at all times by the Subcontractor and its subcontractors at the primary site of the work and the secondary site of the work, if any, in a prominent and accessible place
Subcontract No. 7889840 Page 3 where it can be easily seen by the workers. The most current version of the Davis-Bacon Poster is available at: http://www.dol.gov/whd/regs/compliance/posters/fedprojc.pdf. Subcontractors are advised that any revisions to the Davis-Bacon Poster shall render prior versions of the poster obsolete and thus the subcontractor must expeditiously replace older versions with the current. Davis-Bacon Poster instructions can be found at https://www.dol.gov/whd/regs/compliance/posters/davis.htm.
The Subcontractor must submit a completed and signed Statement and Acknowledgment Form (SF 1413) for itself and each lower tier subcontractor providing construction labor under this Subcontract.
The Subcontractor must also furnish weekly a payroll statement for all laborers and mechanics performing work at the worksite during the preceding week, accompanied by a signed "Statement of Compliance" indicating that the payrolls are correct and complete and that each laborer or mechanic has been paid not less than the proper Construction Wage (formerly known as the Davis-Bacon Act) prevailing wage rate for the work performed. The Subcontractor must ensure that the final payroll entered for work subject to the Construction Wage Rate Requirements (formerly known as the Davis Bacon Act) performed under the Subcontract by Subcontractor and each lower-tier subcontractor is designated as "Final" in LCPTracker©. The required weekly payroll information must be submitted electronically utilizing LBNL's LCPtracker© System, which is available at https://prod-cdn.lcptracker.net/login/login, unless otherwise authorized by the University Procurement Representative. Registration should be coordinated with the University Procurement Representative.
ARTICLE 2 WORK SCHEDULE
Schedule The period of performance of this subcontract shall commence as of the date of signature of this subcontract by both parties and shall end on March 7, 2028. The University will issue the Notice to Proceed upon acceptance of the documents identified in Required Documentation of Article 1 - Scope of Work. Pending issuance of the Notice to Proceed, the Subcontractor shall perform other tasks not involving work at the worksite, as authorized or required by the Subcontract.
It is agreed that time is of the essence for this Subcontract and definite and certain lengths of time have been fixed for performance. Work shall be prosecuted regularly, diligently, and uninterruptedly at such rate of progress as will insure completion thereof within the time specified. The date of beginning, rate of progress, and time for completion are reasonable and essential conditions of this Subcontract. No act of forbearance by the University or extension by the University of the time for performance of this Subcontract shall in any way constitute or operate as a waiver of or excuse for any future default by the Subcontractor. No such action by the University shall constitute a waiver, release, or relinquishment of any of the rights or power herein conferred upon the University.
http://www.dol.gov/whd/regs/compliance/posters/fedprojc.pdf https://www.dol.gov/whd/regs/compliance/posters/davis.htm https://prod-cdn.lcptracker.net/login/login
Subcontract No. 7889840 Page 4
ARTICLE 3 PRICE AND PAYMENT PROVISIONS
Fixed Prices The University will pay the Subcontractor for the performance of this Subcontract a total fixed Subcontract price of $x,xxx,xxx.xx.
Line Description Design Price Construction Price Siemens Price Subtotal
1 Building-2 $ $ $ $
2 Building-26 $ $ $ $
3 Building-33 $ $ $ $
4 Building-76 $ $ $ $
Subtotal $ $ $ $
This Subcontract price shall constitute full payment for the work, materials, services and other items required for performance of this Subcontract, and includes all applicable federal, state, and local taxes, duties and all of the Subcontractor’s other obligations related to such work.
Any machinery or equipment purchased hereunder are for resale and are not subject to California sales tax, per the University's California State Resale Permit No. SR-CH 021-835970, with title thereto passing to the U.S. Government per the Government Property clause of the General Provisions prior to its use.
The University of California State Resale Permit No. SR-CH 021-835970 for LBNL is available at:
http://procurement.lbl.gov/supplier-forms/.
Progress Payments The University will make progress payments at the end of each calendar month or as soon thereafter as practicable, or at more frequent intervals, as determined by the University, based on estimates of the progress of the work prepared by the Subcontractor and approved by the University.
The Subcontractor shall email a completed Application for Payment (which complies with all requirements of FAR 52.232-5) for the period directly to the LBNL Accounts Payable Office at APInvoice@lbl.gov, with copies to ptgajda@lbl.gov and cguerrero@lbl.gov. The "subject" line of the email shall state the Subcontractor's name and the Subcontract number.
If requested, the Subcontractor shall also submit receipts or other vouchers showing its payments for material and labor to its subcontractors. The Application for Payment shall include all information required by FAR 52.232-5. The Subcontractor's estimates must be reasonable and exclude all amounts for materials to which Subcontractor has not acquired title.
As part of a progress payment, the University may authorize payment for material delivered on the site and preparatory work done. Payment for material delivered to the Subcontractor at locations other than the site may also be allowed if:
• Material is delivered to a remote location which is specifically authorized by this Subcontract; and
• The Subcontractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this Subcontract.
http://procurement.lbl.gov/supplier-forms/ http://procurement.lbl.gov/supplier-forms/ mailto:APInvoice@lbl.gov mailto:ptgajda@lbl.gov
Subcontract No. 7889840 Page 5
Certification for Progress Payments Along with each request for a progress payment the Subcontractor shall furnish the following certification, or payment will not be made:
"I hereby certify, to the best of my knowledge and belief, that:
The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the Subcontract;
Payments to lower-tier subcontractors and suppliers have been made from previous payments received under the Subcontract, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with the lower-tier subcontracts; and This request for progress payments does not include any amounts which will be withheld or retained from a lower-tier subcontractor or supplier in accordance with the terms and conditions of the lower-tier subcontract."
Progress Payment Terms Payment terms for progress payments shall be Net 30 days, or 15 days if the Subcontractor is a small business. For inquiries about the status of a progress payment, call (510) 486-6954 or email aphelp@lbl.gov.
Retention In making such progress payments, 10 percent thereof may be retained until final completion and acceptance of all work covered by the Subcontract. On completion and acceptance of any separate building, public work, or other division of the Subcontract on which the price is stated separately in the Subcontract, payment may be made in full, including retained percentages thereon, less authorized deductions.
Withholding of Payment The University may withhold progress payment to the Subcontractor to the extent necessary to protect the University upon the occurrence of any one or more of the following events.
Any failure of the Subcontractor to comply fully with any requirement of this Subcontract including, but not limited to, the following.
• Failure to adhere to, or recover to, the proposed construction schedule.
• Failure to make prompt payment to lower tier subcontractors for labor, materials, or services related to the work for which the Subcontractor has been paid by the University.
• Failure to rectify defective, omitted, non-conforming, or unauthorized work.
The filing, delivery, or recording of any claim, lien, stop notice, or similar action against the University or the work.
Any damage caused to a third party by the Subcontractor by reason of negligent acts of the Subcontractor where such acts are related to the work under this Subcontract.
The University reserves the right to determine the amount and degree of withholding, provided that the withholding shall not be unreasonable. The University will pay withheld amounts promptly upon removal of the grounds for such withholding.
When the work is substantially complete, the University may retain from previously withheld amounts or future payments an amount the University considers adequate for protection of the University until final payment is made under this Subcontract, and will release to the Subcontractor all the remaining withheld funds.
mailto:vendordesk@lbl.gov
Subcontract No. 7889840 Page 6
Transfer of Title to the U.S. Government All materials and work covered by progress payments shall thereupon become the property of the U.S.
Government, but this provision shall not be construed as relieving the Subcontractor from the sole responsibility for all materials and work upon which payments have been made, or the restoration of payments for any lost, stolen, damaged or destroyed work, or work otherwise not accepted under this Subcontract, or as a waiver of the right of the University or the U.S. Government to require the fulfillment of all of the terms of the Subcontract. The Subcontractor shall take whatever action is necessary to protect and establish said U.S. Government title to all materials and work covered by progress payments made hereunder.
Final Payment Subject to the terms hereof, final payment shall be made 35 calendar days after the recording by the County of the Notice of Completion for the work under this Subcontract. For inquiries about the status of the final payment, call (510) 486-6954 or aphelp@lbl.gov. The University will make the final payment under this Subcontract, including any retention or withhold, after:
Final completion and acceptance of all work;
• The recording by the County of the Notice of Completion for the work;
• Presentation of a properly executed voucher; and
• Presentation of a completed Assignment and Release for the total fixed price of this Subcontract, signed by the Subcontractor and any assignees, using the form incorporated as a part of this Subcontract.
California Tax Withholding For services physically performed in California, the University must withhold and remit California Franchise Tax Board (FTB) taxes from payments made to non-residents, in accordance with the California Revenue and Taxation Code Section 18662, unless a valid exemption or waiver has been claimed and accepted by the FTB. The FTB explains this process in Publication 1017 at:
https://www.ftb.ca.gov/forms/misc/1017.html.
The required FTB documentation (e.g., Form CA 587 Nonresident Withholding Allocation Worksheet or Form CA 590 Withholding Exemption Certificate) was previously submitted and accepted by the University for the purpose of vendor setup. Based on the submitted documentation, and in accordance with FTB guidance, the University will determine the appropriate nonresident withholding requirements for payments made under this subcontract. If the subcontractor's California withholding status changes during the performance period, the subcontractor must promptly provide updated documentation to the University by contacting the Accounts Payable department at APHelp@lbl.gov.
ARTICLE 4 SUBCONTRACT ADMINISTRATION
University Procurement Representative The designated University Procurement Representative for this Subcontract is the person authorized to make changes in the requirements of this Subcontract or make modifications to this Subcontract, including changes or modifications to the work. Certain changes to this subcontract may be made only by the University Procurement Representative without subcontractor agreement or negotiation prior to the change. Such changes may include: changes of an administrative nature, directed changes pursuant to the clause incorporated herein entitled: “CHANGES,” unilateral modifications authorized by clauses other than the Changes clause, and termination notices. Apart from the University Procurement Representative’s authority to issue unilateral changes, the parties may mutually agree to make changes in the work ordered, mailto:vendordesk@lbl.gov https://www.ftb.ca.gov/forms/misc/1017.html
Subcontract No. 7889840 Page 7 or modify any other term or condition of the subcontract, resulting in an amendment to the subcontract, but only by a written modification signed by the authorized representatives of both parties.
The Subcontractor shall submit all documents, notices, and requests for approval required by this Subcontract to the University Procurement Representative at the email address indicated on the signature page.
Any notices and approvals required by this Subcontract from the University to the Subcontractor shall be issued by the Procurement Representative.
University Technical Representative Carlos Guerrero is the University Technical Representative for this Subcontract (also called Project Manager). The University Technical Representative is the person designated to monitor the Subcontract work and to interpret and clarify the technical requirements, but may not modify the terms of this Subcontract.
Technical Direction and Changes Performance of the work under this Subcontract shall be subject to the technical direction of the University Technical Representative. The Subcontractor shall promptly proceed with the performance of technical direction of the nature prescribed by this article issued by the University Technical Representative.
The term "technical direction" is defined to include directions to the Subcontractor within the Scope of Work of the Subcontract which: (1) clarify the desired work emphasis between work areas or tasks; (2) direct the pursuit of certain lines of inquiry; (3) assist in the interpretation of drawings, specifications, or technical portions of the work description; or (4) fill in details necessary to perform and complete the Scope of Work. All technical direction must be issued in writing by the University Technical Representative.
The University Technical Representative is not authorized to issue any technical direction which would:
(1) constitute an assignment of work outside the general scope of the work covered by this Subcontract;
(2) change the description of the work to be performed or any applicable drawings, designs, and specifications; (3) change the time or place of performance; the method of shipment or packaging, or the place of inspection, delivery or acceptance; (4) increase the estimated cost for performance of the work, the fixed fee, or the time required for performance of the work; (5) change any expressed term or condition of the Subcontract; or (6) unreasonably interfere with the Subcontractor’s ability to perform and complete the work.
Any such technical direction must first be authorized by a written modification to this Subcontract issued by the University Procurement Representative, as provided in the clause of these General Provisions entitled Changes.
If any instruction or direction by the University Technical Representative falls within one of the types described in the paragraph above, the Subcontractor shall not proceed to act on such technical direction and shall promptly notify the University Procurement Representative.
Upon receipt of a notification from the Subcontractor, the University Procurement Representative shall promptly advise the Subcontractor either that, in accordance with the Changes clause: (1) the technical direction is within the general scope of the Subcontract and does not constitute a change and to proceed to act on such technical direction; or (2) the technical direction is not within the general scope of the Subcontract or would constitute a change, and to not act on such technical direction unless and until the University issues a written modification to the subcontract.
Subcontract No. 7889840 Page 8
Closeout The Subcontractor shall, as a condition of full payment, assist the University in accomplishing the administrative closeout of this Subcontract after the completion of performance, including, as necessary or required, the furnishing of documentation and reports, the disposition of property, the disclosure of any inventions, the execution of any required documents, the performance of any audits, and the settlement of any interim or disallowed costs.
ARTICLE 5 SAFETY-RELATED REQUIREMENTS-
Notice to Proceed Work may not commence at the worksite until the Subcontractor submits an acceptable Site-Specific Safety Plan, Injury and Illness Prevention Program (IIPP), and Job Hazards Analysis (JHAs), as required by the LBNL EH&S Operations Support Team, and the University Procurement Representative issues a written Notice to Proceed. The Subcontractor may proceed with all other work authorized or required by the Subcontract in preparation for performance at the worksite.
General The Subcontractor must comply with DOE Acquisition Regulation 970.5223-1, Integration of Environment, Safety, and Health into Work Planning and Execution, and all environment, health, and safety requirements, training, and associated safety documents referenced, attached, or incorporated to this Subcontract, including any incorporated safety related documents submitted by the Subcontractor and reviewed and accepted by the University. The Subcontractor must also comply with, and assist the University and the DOE in complying with the environment, health, and safety requirements identified in, or applicable to, this Subcontract.
Safety Standards and Testing; Electrical Device Certification Requirement The materials, equipment, tools, and supplies furnished or used by the Subcontractor must meet nationally recognized safety standards or have been tested and found safe for use by the University in a manner specified by the Subcontractor. All electrical equipment, components and conductors and other items of the type requiring testing by a Nationally Recognized Testing Laboratory (NRTL) recognized by the Occupational Safety and Health Administration (OSHA), must be NRTL listed, labeled, or tested, in accordance with Title 29, Part 1910, General Industry Standards, of the Code of Federal Regulations (29 CFR 1910). The Subcontractor must notify the University Procurement Representative and the University Technical Representative, in writing, of any materials, equipment, tools, or supplies to be furnished or used that do not meet these requirements. The University reserves the right to reject any such items.
Information on required NRTL testing is available at: https://www.osha.gov/nationally-recognized-testing-laboratory-program.
Worker Safety and Health Requirements The Subcontractor and its lower-tier subcontractors performing work at an LBNL worksite are subject to the DOE Worker Safety and Health Program regulation of Title 10, Part 851 of the U.S. Code of Federal Regulations (10 CFR 851), as amended by the variance to 10 CFR part 851, Worker Safety and Health Program, approved by DOE in August of 2019. The approved variance allows the Subcontractor and lower tier subcontractors to follow applicable California Department of Labor Codes such as California Occupational Safety and Health Administration's (Cal-OSHA) safety and health regulations in Title 8, including an Injury and Illness Prevention Program (IIPP), in lieu of specified provisions in 10 CFR part 851, Subparts B and C, and Appendix A. The Department of Energy retains enforcement authority per 10 CFR part 851, subpart A.
https://www.osha.gov/nationally-recognized-testing-laboratory-program https://www.osha.gov/nationally-recognized-testing-laboratory-program
Subcontract No. 7889840 Page 9
The Subcontractor must also perform the work in compliance with the LBNL Health and Safety Manual, available at: https://ehs.lbl.gov/resource/esh-manual-pub-3000/#gsc.tab=0, which implements the requirements of 10 CFR 851, as well as their Cal-OSHA mandated Injury and Illness Prevention Plan (IIPP) or equivalent and all other LBNL safety procedures and policies communicated to the Subcontractor.
As part of this requirement, the Subcontractor and its lower-tier subcontractors must inform their workers of their rights and responsibilities by appropriate means, including posting the DOE-designated 10 CFR 851 It's the Law Worker Protection Poster at its LBNL workplace where it is accessible to all workers.
The Subcontractor must ensure that workers requiring unescorted/unbadged access to an LBNL site complete the on-line General Employee Radiological Training (GERT), available at:
https://training.lbl.gov/ehs/training/webcourses/EHS0470/. Instructions for completing GERT without a Berkeley Lab Identity (LDAP) password are available at: Berkeley Lab – Getting Course Credit for Your LBNL Training.
Experience Modification Rate (EMR) Requirements The Subcontractor and the Subcontractor's lower tier subcontractors that the Subcontractor hires during the performance of this Subcontract should have a Workers' Compensation Experience Modification Rate (EMR) of 1.0 or less for the past three years from the date of this Subcontract. The Subcontractor is required to provide to the University Procurement Representative, and the University Technical Representative, information regarding the Subcontractor's own and all of the Subcontractor's lower tier subcontractor's safety records. The records include a communication from its Workers' Compensation insurance carrier(s) identifying the EMR for the Subcontractor and each lower tier subcontractor's EMR for the past three years preceding the effective date of this Subcontract. The EMR information may be either state(s) or interstate information, but must be appropriate for the business unit(s) that will perform the work. The Subcontractor must not hire, or use the services of any lower tier subcontractor that has EMRs higher than 1.0 without prior written approval from the University Procurement Representative.
Subcontractor Response to Incidents The Subcontractor must respond to incidents in accordance with PUB-3000. The Subcontractor must notify the University Technical Representative and/or Requester within one hour of the occurrence of an incident including initial basic information on the known facts including: location, time of occurrence, initial incident description facts, and Subcontractor Point of Contact (name, number). The Subcontractor must provide follow-up information in a timely manner as requested by LBNL.
The Subcontractor and lower-tier subcontractor personnel must be made available to participate in timely LBNL incident review, fact finding, incident investigation, cause analysis, and corrective action development. Participation may include (but is not limited to) on-site or remote interviews immediately or near-term subsequent to an incident.
ARTICLE 6 CHANGES
Definitions Changed Work. Changed Work means any in-scope addition, subtraction, or in-scope revision of work required under the Subcontract, that is made during Subcontract performance.
Change Order. Change Order is a written directive issued by the University that mandates the Subcontractor to undertake Changed Work that this Article authorizes.
Change Order Request (COR). Change Order Request is a written request from the Subcontractor to the University for the University to issue a Change Order.
https://ehs.lbl.gov/resource/esh-manual-pub-3000/#gsc.tab=0 https://training.lbl.gov/ehs/training/webcourses/EHS0470/ https://drive.google.com/file/d/1b8abCV277GHS5frcT22OVR309lUYEUJe/view?usp=sharing https://drive.google.com/file/d/1b8abCV277GHS5frcT22OVR309lUYEUJe/view?usp=sharing
Subcontract No. 7889840 Page 10
Changed Work may be processed in the following ways:
University Directed Change The University may issue a directed change (University Directed Change) directing the Subcontractor to perform Changed Work. The parties will promptly engage in good faith negotiations to reach an agreement on the terms of a Change Order following the issuance of the University Directed Change.
Subcontractor Change Order Requests The Subcontractor may request the University’s assent to Changed Work by requesting that the University issue a Change Order. To do so, the Subcontractor must submit a written COR, in accordance with the requirements of this Article, to the University Technical Representative (UTR) and University Procurement Representative (UPR). The Subcontractor shall not perform any Changed Work until the UTR and/or the UPR issues a Change Order or Directed Change. Subcontractor shall provide the UTR and UPR with a proposed price and/or time impact to the Subcontract due to the Changed Work in accordance with the requirements of this Changes Clause. The written COR must be submitted to the UTR and UPR within 30 days of the date the Subcontractor discovers or reasonably should have discovered the conditions giving rise to the requested change and prior to performing the Changed Work. The COR must abide by the requirements of this entire Article.
The University will take action with respect to each COR promptly after receipt of the COR in one of the following ways:
• Accept the change in its entirety upon the University's approval of the request, and issue a Subcontract modification. Once approved by the University, the Subcontractor must promptly proceed with the Changed Work consistent with the terms of the Subcontract.
• Reject the request in its entirety, setting forth the reasons for its determination that the Subcontractor is not entitled to a modification to the Subcontract for the requested Changed Work.
If the University determines that the Changed Work is necessary but does not believe it warrants an adjustment in the Subcontract price or time, the University may issue a mandate in the form of a University Directed Change for the Subcontractor to perform the Changed Work. If the Subcontractor disputes the University's rejection of the COR, the Subcontractor must follow the claims process outlined in the General Provisions. If the Subcontractor fails to dispute the rejection of the COR within 30 days of the rejection, it will be deemed to have waived any right to claim an adjustment to the Subcontract price and/or time.
• Submit a revised proposal to the Subcontractor providing for an alternative scope of the Changed Work or a different adjustment to the Subcontract price or Subcontract time, as appropriate, for consideration and negotiation by the parties. The parties will promptly engage in negotiations and negotiate in good faith to attempt to reach an agreement on the terms of a Change Order.
Only the University may authorize Changed Work by issuing a written Change Order. Once a Directed Change is issued consistent with this clause, the Subcontractor must perform the Changed Work in accordance with the terms and conditions of the Subcontract. Once a Change Order has been issued, the Subcontractor shall not delay or suspend performance of any Changed Work, or any other part of the work, pending agreement on a Change Order or the final resolution of any dispute or claim arising out of the change. Failure to reach an agreement on an equitable adjustment to the Subcontract price or Subcontract time shall be handled in accordance with the Claims and Disputes provisions of this Subcontract; however, nothing in this clause shall excuse the Subcontractor from its obligation to proceed with the work as directed.
The Subcontractor shall not perform the Changed Work without receiving a written Change Order from the University. If the Subcontractor performs what it considers Changed Work without receiving a written
Subcontract No. 7889840 Page 11
Change Order from the University, the work is at the Subcontractor's own risk, and the University is not obligated to issue an adjustment in the Subcontract price and/or time.
Subcontract Modification The UPR will finalize Change Order(s) by issuing a written Subcontract modification. The modification will list the change(s) to the Subcontract. The Subcontractor is deemed to waive any entitlement to a future modification of the Subcontract for the Changed Work and Change Orders finalized in the modification.
The issued modification shall identify all impacts to the Subcontract time, and the Subcontractor is deemed to have waived any entitlement to a future modification of the Subcontract time as a result of the scope of the Change Order.
Adjustment for Unilateral Change Orders A Unilateral Change Order may be issued by the University. If the University and Subcontractor do not agree with the Unilateral Change Order, then the Subcontractor shall abide by the COR process described herein.
Content of CORs Any submitted COR must identify in sufficient detail the scope of the proposed change, the requested adjustment to the Subcontract price and/or time. The Subcontractor shall include the following in its COR:
• Documented and reasonable justification for the requested change, a copy of the written University Change Directive directing the Subcontractor to perform the Changed Work.
• A summary of all costs by cost element.
• Identification, description, and submittal of all rate agreements utilized (if any).
• Identification and submittal of cost or pricing data that is based on verifiable factual information.
• Documentation and explanation of the estimating process used, including the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data.
Materials Proposals involving materials shall include the following:
• An explanation of the basis for the kinds, quantities, and cost of all material elements proposed.
• A priced bill of materials for the entire proposal showing part number, description, unit cost, quantity required, extended cost, basis for the proposed price (quotation, prior buy, similar item, etc.), and the rationale for the proposed price, unless an alternate method of estimating material costs has been accepted by the University.
• A summary by class of material (subcontracts, purchase parts, raw materials, etc.) showing base material costs and any factors applied (i.e., escalation, attrition, usage variance, etc.) and the basis for the development and application of these factors.
• Specific Subcontract effort to be performed and identification of each Subcontractor. For each Subcontract change, provide a listing by source, item, quantity, and price, including the results of the review of Subcontract proposals. Where the required data or reviews have not been made available, provide the reasons for the omission.
Direct Labor Proposals involving direct labor shall include the following:
• Identification of labor hours by task by labor category/skill mix.
Subcontract No. 7889840 Page 12
• Identification of rate agreement. In the absence of a labor rate agreement, provide a component breakdown of each labor rate by category.
Other Job Site Costs Proposals involving other job site costs shall include a list of all other costs by category/element (utilities, equipment rental, supervision, etc.) and provide supporting schedules and rationale for the amounts proposed for each category element.
Exclusions Except for time extensions, the direct cost for Change Order work shall not include any of the following:
labor costs for superintendents, assistant superintendents, project engineers, project managers, schedulers, estimators or drafting; administrative time/costs (general training, staff meetings, bonus, bridge toll, mileage, parking, etc.), truck, warranty, small tools; office expenses including staff, materials and supplies; on-site or off-site trailer and storage rental and expenses; utilities; data processing personnel and equipment; Federal, state or local business income and franchise taxes.
Markups For all Change Order work, price adjustments are calculated based on the agreed-upon direct costs (labor, payroll taxes, fringe benefits, materials, supplies, sales taxes, insurance, and transportation). Mark-ups for indirect costs and profit are applied as follows:
• Subcontractor (Direct Performance): Direct costs + 15% mark-up + bond costs.
• Second-Tier Subcontractors: Direct costs + 15% mark-up (for the 2nd-tier) + 5% mark-up (for the Subcontractor) + bond costs.
• Third-Tier & Lower Subcontractors: Direct costs + 15% mark-up (for the lower-tier) + 5% mark-up (for the higher-tier subcontractor) + 5% mark-up (for the Subcontractor) + bond costs.
The estimated direct costs for change order work and reduced or omitted work shall be consistent with the cost principles and procedures for construction contracts in FAR Part 31 (48 CFR Part 31), as may be supplemented by DEAR Part 931 (48 CFR Part 931), then in effect. No increases for indirect costs and profit shall be allowed above the fixed markup rates herein provided, regardless of the number of Subcontractors involved.
• No Payment for Changed Work Without an Issued Modification. As the Subcontractor performs Changed Work that it disputes or for which a Subcontract modification has not yet been issued, the Subcontractor may not include in its payment application the cost for performing such Changed Work. To the fullest extent permitted by law, under no other circumstances shall the Subcontractor be entitled to request or obtain payment from the University amounts greater than that permitted under this section without a modification issued by the University in writing for that Changed Work.
• Changes to Time. The University will grant a day-for-day extension of the Subcontract time only if the Subcontractor demonstrates that the delay meets all of the following four conditions:
o Criticality. The delay must impact the critical path. A delay is critical only if it affects a work activity that cannot be delayed without extending the Final Completion date beyond the current Subcontract time.
o Timely Notice & Documentation. Within 30 days of the date the Subcontractor discovers (or reasonably should have discovered) an event likely to impact the critical path, the Subcontractor must submit a complete COR. The Subcontractor shall also provide a critical path and analysis demonstrating the effect of the proposed change to the schedule. This requirement applies even if the actual delay to the work has not yet occurred.
Subcontract No. 7889840 Page 13 o Exclusions (Non-Excusable Delays). The delay must not be caused by any of the following:
Unforeseen conditions, unless they qualify as a materially differing site condition(s).
Financial inability, misconduct, or default of the Subcontractor or lower-tier subcontractors, suppliers, and/or consultants.
Unavailability of materials, parts, or equipment (unless the Subcontractor can demonstrate that multiple sources were sought in a timely manner and the materials, parts, or equipment were unobtainable within reasonable timeframes and within reasonable cost).
Errors or omissions in subcontract documents caused by the Subcontractor or its lower-tier subcontractors, suppliers, and/or consultants.
o Qualifying Causes (Excusable Delays). The delay must be caused by one of the following:
Force Majeure. Force Majeure is defined as an event or effect that cannot be reasonably anticipated or controlled that excuses performance if such event or effect cannot be reasonably anticipated or controlled (such as fire, strikes, boycotts, labor obstructions, war, or extreme weather).
Acts of God. Restricted to earthquakes (>3.5 Richter Scale) or tidal waves.
Site Conditions. Materially differing site conditions.
University Actions. Errors in Subcontract documents caused by the University, changes in scope, or University-ordered suspensions (provided these are not due to the Subcontractor’s default).
University Performance. Failure of the University (or its agents/separate subcontractors) to perform Subcontract obligations.
Excessive Adverse Weather. Weather delays caused by "Adverse Weather":
• The day must be a scheduled workday in the Subcontract schedule; and
• The weather must prevent the completion of at least 50% of the day’s scheduled critical path work.
• Adverse Weather is defined as high wind, unusual precipitation, or other weather condition which prevents or substantially impedes the construction work from proceeding. Construction work is substantially impeded if more than half of a planned and otherwise available workday is lost except to the extent the delay is also caused by any fault, neglect, act, or omission of the Subcontractor or any members of the Subcontractor’s team, its lower-tier subcontractors, or any of their respective employees, or suppliers.
Granting of Extension A time extension will be granted only for the specific number of days that Final Completion is delayed beyond the Subcontract time as a direct result of a delay meeting all four conditions in this article.
Waiver A waiver of, or failure by, the University or the University's Representative to enforce any requirement in this Article in connection with any adjustment of the Subcontract price or time, will not constitute a waiver
Subcontract No. 7889840 Page 14 of, and will not preclude the University, or the University's Representative, from enforcing such requirements in connection with any other adjustments of the Subcontract price or time. The Subcontractor agrees and understands that no oral approval, either express or implied, of any adjustment of the Subcontract price or time by University or its agents shall be binding upon University unless and until such approval is ratified by execution of a written Change Order.
ARTICLE 7 COMPLETION OF CONSTRUCTION
Substantial Completion Substantial completion means the stage in the progress of the construction work, as determined by the University Technical Representative, when the work is complete and in accordance with the terms of the Subcontract except only for completion of minor items which do not impair the University's ability to occupy and fully utilize the building for its intended purpose.
Upon notification by the Subcontractor that the construction work is substantially complete the University Technical Representative or designee will inspect the work and provide the Subcontractor with a comprehensive list of items to be completed or corrected before establishing substantial completion.
Subcontractor shall proceed promptly to complete and correct items on the list. The University Technical Representative or designee will then re-inspect the work to determine whether all items have been completed and corrected. Failure to include any item on the list does not alter the Subcontractor's responsibility to complete all work in accordance with the Subcontract.
When the University Technical Representative determines that the work is substantially complete, and following any necessary inspection by other University officials to determine that building is safe for occupancy, the Technical Representative will notify the Subcontractor in writing that the Construction Work is substantially complete. The notification will establish the date of substantial completion and the responsibilities of the University and the Subcontractor for security, maintenance, utilities, insurance and damage to the construction work.
Beneficial Occupancy The University reserves the right to occupy or otherwise make use of any part of the construction work at any time prior to substantial completion or final completion, herein referred to as "Beneficial Occupancy," upon 10 days written notice to the Subcontractor. Such beneficial occupancy shall be at no additional costs to the University, except as provided in this Article, and shall be subject to the following conditions:
• The University Technical Representative or designee will inspect the portion of the work to be beneficially occupied and prepare a list of items to be completed or corrected prior to final completion. The Technical Representative will notify the Subcontractor in writing of the University's intent to beneficially occupy a portion of the Work.
• Beneficial occupancy shall not be construed by Subcontractor as an acceptance by the University of that portion of the construction work that is to be occupied, and shall not constitute a waiver of existing claims of either the University or the Subcontractor against each other.
• Subcontractor shall provide as required, in the areas beneficially occupied, utility services, heating, and cooling for systems which are in operable condition at the time of beneficial occupancy. All responsibility for the operation and maintenance of equipment shall remain with Subcontractor while the equipment is so operated.
• The University will pay all normal operating and maintenance costs resulting from its use of equipment in areas beneficially occupied and all utility costs which arise out of the beneficial
Subcontract No. 7889840 Page 15 occupancy, and will use its best efforts to prevent its beneficial occupancy from interfering with the conduct of Subcontractor's remaining work.
• The Warranty period, as described in the Warranty of Construction Clause (FAR 52.246-21) of the General Provisions will commence upon the first date of actual occupancy or use of the portions of the construction work actually occupied and equipment or systems fully utilized. Equipment or systems shall not be considered fully utilized until all parts of the construction work served by the equipment or systems are actually occupied and used.
• The Subcontractor shall not be responsible for providing security in areas beneficially occupied or required to repair damage caused by the University in its beneficial occupancy, but shall continue to maintain all insurance required by this Subcontract in full force and effect during the University's beneficial occupancy.
Final Completion Upon receipt of notice from Subcontractor that the construction work is ready for final inspection, the University Technical Representative or designee will make such inspection. Final completion shall be when the University Technical Representative determines that the construction work is fully complete and in accordance with the Subcontract, including without limitation satisfaction of all "punch list" items.
Final completion is conditioned upon receipt of the following:
• The final Application for Payment (which complies with all requirements of FAR 52.232-5) and all required submittals.
• All guarantees and warranties procured by the Subcontractor from its subcontractors, all operating manuals for installed equipment, all as-built documents, and all other submittals required by this Subcontract.
ARTICLE 8 INSURANCE
Types of Coverage The Subcontractor shall at its expense obtain, keep in force, and maintain insurance to cover its performance under this Subcontract of the types and in the amounts set forth below. Such insurance shall be maintained in full force and effect during the performance of the Services required by this Subcontract.
The stipulation of required coverage and limits of insurance shall not in any way limit the liability of the Subcontractor.
Commercial General Liability Insurance Minimum Limit
Per Occurrence $ 1,000,000
Products/Completed Operations Aggregate $ 2,000,000
Personal and Advertising Injury $ 1,000,000
General Aggregate $ 2,000,000
Business Automobile Liability Insurance Minimum Limit
Per Occurrence $1,000,000
The automobile liability insurance shall cover liability to third parties related to the Subcontractor's use of any autos, including the Subcontractor's use of, and any resulting loss or destruction of, or damage to, Subcontract No. 7889840 Page 16
University-furnished U.S. Government owned vehicles. The certificate should have checkboxes checked for all applicable boxes in the automobile liability section. ‘Any auto’ coverage is not required if the Subcontractor does not own any autos.
Workers' Compensation As required under California or other applicable State Law for any work not performed in California, and Employer's Liability Insurance with a minimum limit of $1,000,000 per accident and employee.
Professional Liability Insurance Minimum Limit
Per Claim $1,000,000
Annual Aggregate $2,000,000
The professional liability insurance shall include an extended reporting period that covers work performed solely under this Subcontract for a period of three years following the end of performance of this Subcontract, and Contractual Liability coverage.
Assumption of Risk Subcontractor shall and does hereby assume all risk and responsibility for damage to any materials used both on and off any LBNL-controlled facility or site or work done in connection with the work from any cause or causes whatsoever, including fire, earthquake and storm, prior to the completion and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .