ATTACHMENT B – FACTOR RESPONSE REQUIREMENTS
RFP 2026-PTG-FACPR: Fire Alarm Control Panel Replacement Project
This document is an attachment to a Request for Proposal issued by Lawrence Berkeley National Laboratory for a Fire Alarm Control Panel Replacement Project (2026-PTG-FACPR). The RFP requires offerors to submit responses organized by four evaluation factors within a Technical Volume submission. Offerors must clearly identify each response narrative to its associated evaluation factor and provide information in the spaces provided or as narrative responses.
Factor 1 – Safety establishes mandatory qualification criteria with no acceptable threshold for a "No" answer or missing documentation, potentially resulting in offeror exclusion. Requirements include providing Experience Modification Rates for three prior premium years (must not exceed 1.00), OSHA Form 300A summaries with Total Recordable Incident Rate and Days Away/Restricted/Transferred rates for three calendar years, disclosure of any serious, willful, or repeat OSHA or Cal-OSHA citations within three years, a copy of the offeror's Injury and Illness Prevention Program complying with the DOE variance to 10 CFR Part 851, a project-specific safety approach addressing lockout/tagout, electrical safety, arc flash protection, asbestos and lead work protocols, fire alarm impairments in occupied buildings, occupant protection, and ladder work, description of lower-tier subcontractor safety prequalification and monitoring, and identification of an Onsite Health and Safety Representative with qualifications summary.
Factor 2 – Relevant Past Performance requires three references for similar projects valued at approximately $500,000 or more completed within ten years, with emphasis on design-build fire alarm replacement or modernization projects in occupied research, laboratory, hospital, university, or federal facilities. For each project, offerors must provide project name and location, client organization with project manager contact information, contract value and type, start and completion dates, design-build delivery confirmation, fire alarm scope details including manufacturer and panel/circuit count, occupancy status during work, and schedule and budget performance explanation. Offerors must describe past performance relevance, design-build project management experience, fixed-price contract cost development and field-discovered scope handling, public project administration and prevailing wage/apprenticeship reporting experience, and coordination with owner's project managers, construction managers, and Authorities Having Jurisdiction.
Factor 3 – Technical Approach, Schedule, and Management requires a comprehensive narrative addressing project understanding and principal technical challenges, field verification methodology for existing circuit loads and routing, design approach compliance with CDDR and LBNL Master Specifications, hazardous materials work protocols, a Critical Path Method schedule showing 50/75/95/100% design submittals, construction, and record drawings with two-week allowances for LBNL design review and ten business days for EHS review, fire alarm outage windows and hold points by building with six-month occupant notification requirement, submittal and equipment procurement management including Siemens Desigo components, acceptance testing and commissioning procedures, Quality Management System/QA/QC program application, and Responsible Design Professional construction administration services including periodic site visits.
Factor 4 – Key Personnel and Organizational Capability requires an organization chart identifying key team members and firm affiliations through all project phases with reporting relationships, specific individual identification for Design-Build Project Manager, Responsible Design Professional/Engineer of Record, Fire Protection Engineer, Electrical Engineer, Construction Superintendent, Lead Fire Alarm Technician (Siemens Desigo qualified), and Onsite Health and Safety Representative roles. Each key personnel member must provide a single-page resume including employer and tenure, educational background and professional licenses/certifications, and past performance relevant to the proposed role. Offerors must confirm individual commitment without substitution without prior written approval and identify self-performed work versus lower-tier subcontractor scope, approximate percentage of total value, relevant experience, and licenses for each identified subcontractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
University of California Lawrence Berkeley National Laboratory Request for Proposal: 2026-PTG-FACPR
ATTACHMENT B – FACTOR RESPONSE REQUIREMENTS
Request for Proposal: 2026-PTG-FACPR Project: Fire Alarm Control Panel Replacement Project Instructions: Offerors must provide all information within the Technical Volume submission. Offerors must ensure that each response narrative is clearly identifiable to its associated evaluation factor. Fill in the following pages or provide the answers in the narrative.
Information about the Offeror
Offeror Name:
Address:
Point of Contact:
Telephone:
Email Address:
California Contractor's License No. and Classification:
Unique Entity Identifier (SAM.gov):
Responsible Design Professional / Engineer of Record
Firm Name:
In-house or contracted?
Address:
Point of Contact:
Telephone:
Email Address:
California PE License No. of individual who will stamp the drawings:
Request for Proposal: 2026-PTG-FACPR
FACTOR 1 – SAFETY
A "No" answer or a failure to provide the required documentation will likely result in the offeror being excluded from further evaluation.
1. Experience Modification Rate
List the offeror's EMR for each of the three most recent completed premium years, and attach documentation from the offeror's insurance carrier or rating bureau. An EMR higher than 1.00 in any of the three years will result in an Unacceptable rating for this factor.
Year/Rating: Year/Rating: Year/Rating:
2. Injury And Illness Record Provide OSHA Form 300A summaries for the past three calendar years, and the Total Recordable Incident Rate (TRIR) and Days Away, Restricted, or Transferred (DART) rate for each year.
3. OSHA And Cal-OSHA Citations Has OSHA or Cal-OSHA cited and assessed penalties against the offeror, any of its affiliates, or its proposed lower-tier subcontractors for any "serious," "willful," or "repeat" violations in the past three years?
☐ Yes ☐ No If "Yes," describe each citation on a separate page, including the case number, the party cited, the date, the category of violation, the project and its owner, any penalty paid, the corrective action taken, and the current status. By submitting a proposal without such a disclosure, the offeror certifies that neither it, its affiliates, nor its proposed lower-tier subcontractors have received a serious, willful, or repeat OSHA or Cal-OSHA citation in the past three years. Failure to disclose a citation will render the proposal non-responsive and may be cause for default if discovered after award.
4. Injury and Illness Prevention Program Provide a copy of the offeror's IIPP, which must comply with the variance to 10 CFR Part 851 approved by DOE in August 2019. Describe how the program is implemented in the field, including training, pre-task planning and Job Hazard Analyses, stop-work authority, incident reporting and investigation, and corrective action tracking.
5. Project-Specific Safety Approach Describe how the offeror will manage the principal hazards of this Project, including:
a. lock out/tag out and electrical safety, including arc flash protection, for panelboard and branch circuit work;
b. work in areas where asbestos and lead may be present, including stop-work protocols;
c. fire alarm impairments and compensatory measures, in occupied buildings;
d. protection of building occupants, egress, and research operations during the work; and
e. ladder and elevated work.
6. Lower-Tier Subcontractor Safety Describe how the offeror prequalifies, monitors, and enforces safety requirements for its lower-tier subcontractors.
7. Onsite Health and Safety Representative Identify the individual proposed to serve as the Option C Onsite Health and Safety Representative described in RFP Section 4.14.A, and summarize his or her qualifications. Provide the resume under Factor 4.
Request for Proposal: 2026-PTG-FACPR
FACTOR 2 – RELEVANT PAST PERFORMANCE
1. Provide three references for similar projects, which LBNL may independently verify. Relevant projects are valued at approximately $500,000 or more and were completed within the past ten years.
This factor evaluates the offeror's demonstrated successful completion of fire alarm replacement or modernization projects, with emphasis on design-build work performed in occupied facilities. The University will consider performance related to quality, schedule, cost, coordination, and overall customer satisfaction.
Projects of similar scope and complexity may include, but are not limited to, the following characteristics:
a. Replacement or modernization of fire alarm control panels or fire alarm control units;
b. Design-build delivery, meaning the design and construction of a project under a single contract
(Construction Manager/General Contractor and Construction Manager at Risk delivery methods are not design-build);
c. Conversion or retrofit of legacy panel enclosures while reusing existing field wiring and conduit;
d. Work performed in occupied research, laboratory, hospital, university, or federal facilities;
e. Coordinated life-safety impairments and fire watch management under an Authority Having Jurisdiction;
and
f. Integration of fire alarm systems with building automation, EMCS, lighting controls, and central supervising station reporting.
2. For each project, provide:
a. Project name and location;
b. Client organization, and the client's project manager name, current telephone number, and email address;
c. Contract value and contract type;
d. Start date and completion date;
e. Whether the project was delivered design-build under a single contract;
f. A description of the fire alarm scope, including the manufacturer and platform installed and the number of panels and circuits involved;
g. Whether the facility remained occupied and operational during the work; and
h. Whether the project was completed on schedule and within the original contract value, and if not, an explanation.
3. Please alert references that a University Representative may contact them during the evaluation process.
Indicate the involvement of the offeror's proposed key team members on each project.
a. Describe how the offeror's past performance on the projects listed is relevant to this Project.
b. Describe the offeror's past performance managing design-build projects. Describe any issues or problems that arose and how they were resolved.
c. Describe the offeror's past performance developing and managing costs under a fixed-price contract, including how the offeror handled scope discovered in the field that was not reflected in the owner's records.
d. Describe the offeror's past performance with public project administration and reporting, including prevailing wage and apprenticeship reporting.
e. Describe the offeror's past performance working with an owner's project manager, construction manager, and Authority Having Jurisdiction.
Request for Proposal: 2026-PTG-FACPR
FACTOR 3 – TECHNICAL APPROACH, SCHEDULE, AND MANAGEMENT
Provide a narrative describing the offeror's overall approach to completing the Project. Consider the following in your narrative response:
1. Understanding of the work
Summarize the Project in the offeror's own words. Describe the principal technical challenges of replacing fire alarm control panels in occupied research buildings, such as verifying existing conditions that may not match LBNL records, maintaining life-safety protection during outages, and sequencing cutovers one building at a time.
2. Field verification of existing conditions Describe how the offeror will field-verify existing circuit loads, trace field routing, and update as-built documents to re-establish configuration control before procurement. Explain how the offeror will handle discrepancies between the drawings and what is found in the field.
3. Design approach and design reviews Describe the offeror's approach to completing the design in accordance with the CDDR and LBNL Master Specifications, including how the offeror will manage the various engineering disciplines, respond to LBNL design review comments, and handle any request for exemption from a CDDR requirement.
4. Hazardous materials Describe the offeror's approach to work in areas where asbestos and lead may be present, including stop-work protocols when suspect materials are encountered, and coordination with LBNL for waste disposal.
5. Project schedule Provide a proposed Project schedule in critical path method format showing major activities, durations, milestones, and the critical path. The schedule must include the 50%, 75%, 95%, and 100% Final Design submittals, construction, and record drawings. It must also allow two weeks for LBNL review of each design submittal and ten business days for LBNL EHS review of each safety submittal. Describe the assumptions on which the schedule is based, including sequencing and logic, crew sizes, and skilled labor availability.
6. Outages and cutover sequencing Show in the schedule the fire alarm outage windows and hold points for each building, and identify the expected duration of each building's system impairment. Occupants must receive written notice at least six months before any cutover. Final commissioning and cutover must proceed one building at a time, with a 7-day buffer.
7. Submittals, RFIs, and equipment procurement Describe how the offeror will manage submittals, Requests for Information, and procurement of long-lead equipment, including Siemens Desigo components, to complete the work within the required period of performance.
8. Testing, commissioning, and acceptance Describe the acceptance testing and commissioning plan, including how the offeror will schedule inspections and meet the required advance notification periods.
9. Quality management and construction administration Describe the offeror's Quality Management System or QA/QC program and how it will be applied during design and construction. Describe the construction administration services the Responsible Design Professional (RDP) will provide, including submittal review, RFI responses, RDP inspections, design
Request for Proposal: 2026-PTG-FACPR clarifications, commissioning support, as-built record drawings, and closeout support. Confirm that the RDP will make periodic site visits during construction.
10. Assumptions, clarifications, and exclusions List all technical assumptions, clarifications, and exclusions in one place. Do not include pricing information in the Technical Proposal.
FACTOR 4 – KEY PERSONNEL AND ORGANIZATIONAL CAPABILITY
1. The Offeror shall provide an organization chart showing key team members and their firm affiliation for all
Project phases, from design through closeout. Identify specific individuals for key functions and show reporting relationships. The same individual may perform more than one function.
2. Identify the individuals proposed for the following roles. Licensed professionals must hold a current license to practice in the State of California.
a. Design-Build Project Manager;
b. Responsible Design Professional / Engineer of Record;
c. Fire Protection Engineer
d. Electrical Engineer;
e. Construction Superintendent;
f. Lead Fire Alarm Technician (Siemens Desigo qualified); and
g. Onsite Health and Safety Representative.
3. For each key team member, provide a resume of no more than a single page, including:
a. Employer and number of years employed by the firm;
b. Educational background, professional licenses, and certifications; and
c. Past performance relevant to the proposed role and how it will benefit this Project.
4. Confirm that the individuals identified are committed to the roles indicated and will not be substituted without prior written approval from the UPR, and that any substitute will possess qualifications equal to or better than the person replaced.
5. Identify which portions of the work the offeror expects to self-perform and which will be performed by lower-tier subcontractors. For each identified lower-tier subcontractor, describe the scope, the approximate percentage of total value, and its relevant experience and licenses.
(END OF DOCUMENT)
| FACTOR 1 – SAFETY |
| FACTOR 2 – RELEVANT PAST PERFORMANCE |
| FACTOR 3 – TECHNICAL APPROACH, SCHEDULE, AND MANAGEMENT |
| FACTOR 4 – KEY PERSONNEL AND ORGANIZATIONAL CAPABILITY |