20262020_A2_Addendum 1_Attachment C_Electrical Drawings.pdf

PDF 6 MB Posted

Attached to
RFP 20262020 Community Renewable Energy Project_Solar Electric and Battery Storage_Design Build
Solicitation number
S-KE0010-00016295
Issued by
Lane County, Oregon

About this file

This is a set of electrical drawings (Addendum 1, Attachment C) prepared by Paradigm Engineering for the City of Eugene, Oregon, detailing Phase 3 electrical improvements at the Public Works Maintenance Yard located at 1820 Roosevelt Boulevard. The project involves the installation of a new 480-volt electrical service with prepurchased switchgear, transformers, and panelboards across multiple buildings (Buildings 10, 18, 20, and future Building 23). Phase 1 work, completed previously, included installation of EWEB primary conduit, a primary pull vault, and a pad-mount transformer vault at Building 10. Phase 2, also completed, involved installation of underground conduit and pull vaults at Buildings 10, 18, and the future Building 23 site. The current Phase 3 bid package encompasses installation of prepurchased equipment and remaining conduit and wiring required for a complete and operational electrical system, with work divided into Phase 3a and Phase 3b activities. The drawings show site plans at 1"=40'-0" scale, area plans at 1/4"=1'-0" scale, elevation details, a one-line diagram, and panel schedules, with the project dated June 26, 2023, and the engineer's license expiring June 30, 2023.

The electrical improvements include installation of a 3000-ampere main distribution switchboard at Building 10 with 480Y/277-volt, three-phase, four-wire configuration; two 112.5 kVA transformers (one at Building 18 and one at Building 20) to step down to 480:208Y/120 volts; distribution panels at Buildings 18, 20, and 23; manual transfer switches for Buildings 18 and 20; and associated conduit runs, pull boxes, and grounding systems. The work requires coordination with EWEB (Eugene Water & Electric Board) for primary and secondary conductor installation, relocation of existing equipment and lockers by the City of Eugene, and phased cutover procedures to maintain operations. Specific tasks include pulling conductors in existing conduit, installing duplex receptacles and three-way dimmer switches, extending conduit provisions to future Building 23, bonding conductors to building steel, and provisioning for future EV charger installation and low-voltage system wiring. The drawings reference an electrical one-line diagram and panel schedules for specific circuit breaker configurations and feeder details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C A

P

N O

(201)

T

NEW PULL BOX

EXISTING PANEL

EXISTING PANEL

EXISTING PULL BOX

T

SYMBOLS:

DUPLEX RECEPTACLE.

EWEB PAD MOUNTED TRANSFORMER.

EWEB ELECTRIC METER

ELECTRICAL SITE PLAN

SCALE: 1"= 40'-0"

OVERHEAD CONDUCTORS

UNDERGROUND CONDUCTORS

OH

DRY TYPE TRANSFORMERT

CONDUIT RUN EXPOSED

UNDERGROUND FEEDER

OWNER FURNISHED OWNER INSTALLEDOFOI

OWNER FURNISHED CONTRACTOR INSTALLEDOFCI

C

IT

Y O

F

EU

G

EN

E

FA

C

IL

IT

Y

M A

N A

G

EM

EN

T

C H

ES

H

IR

E

AV

EN

U E

EU

G

EN

E, O R

EG

O

N

PH

O

N E:

(5

) 6

-2

FA

X:

(5

) 6

-6

SC

AL

E:

D R

W N

D

AT

E:

C H

KD

R

EV

Paradigm Engineering

James Krumsick P.E. LEED AP 85193 Appletree Drive

Eugene, Or. 97405

541 285 1680 jkrumsick@outlook.com

E1.0

PU

BL

IC

W

O R

KS

M

AI

N

TE

N

AN

C

E

YA

R D

SI

TE

P

LA

N

IT

Y

O F

EU

G

EN

E

- R O

O

SE

VE

LT

Y

AR

D

R O

O

SE

VE

LT

B

LV

D

EU

G

EN

E, O

R

1"

0'

E

LE

C

TR

IC

AL

IM

PR

O

VE

M

EN

TS

PH

AS

E

NOTE REFERENCE2

ELEVATION REFERENCE1

E2.1

DISCONNECT SWITCH

PANEL BOARD

208 VOLT OUTLET - AS NOTED

CONDUIT CAPPED FOR FUTURE USE

E2.3

E2.4

E2.2

E2.1

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

HAZMAT

AutoCAD SHX Text

RECYCLE RAMP

AutoCAD SHX Text

CARD ACCESS GATE

AutoCAD SHX Text

CARD ACCESS GATE

AutoCAD SHX Text

CARD ACCESS GATE

AutoCAD SHX Text

CARD ACCESS GATE

AutoCAD SHX Text

CARD ACCESS GATE

AutoCAD SHX Text

STORMWATER FILTRATION SWALE

AutoCAD SHX Text

PLANTED AREA

AutoCAD SHX Text

"DEAD LINE" VEHICLE PARKING

AutoCAD SHX Text

TEMPORARY FENCING

AutoCAD SHX Text

LOCKED GATE

AutoCAD SHX Text

STORAGE BINS

AutoCAD SHX Text

AutoCAD SHX Text

111 N. GARFIELD ST. CITY OWNED PROPERTY LEASED OUT

AutoCAD SHX Text

STORAGE BLDG

AutoCAD SHX Text

759 SQ. FT.

AutoCAD SHX Text

1,967 SQ. FT.

AutoCAD SHX Text

17,552 SQ. FT.

AutoCAD SHX Text

53,389 SQ. FT.

AutoCAD SHX Text

4,234 SQ. FT.

AutoCAD SHX Text

LAUNDRY

AutoCAD SHX Text

1,533 SQ. FT.

AutoCAD SHX Text

SANDING BLDG

AutoCAD SHX Text

13,390 SQ. FT.

AutoCAD SHX Text

DRYER BLDG

AutoCAD SHX Text

2,008 SQ. FT.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

TOTAL: 92,196 SQ. FT.

AutoCAD SHX Text

MAIN BLDG

AutoCAD SHX Text A

AutoCAD SHX Text E0

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 6/30/2023

Jim Krumsick Typewritten Text

GENERAL NOTE

A NEW 480 VOLT SERVICE IS BEING INSTALLED AT THE SOUTH PORTION OF

THE PUBLIC WORKS COMPLEX AT 1820 ROOSEVELT BOULEVARD IN EUGENE,

OREGON. ELECTRICAL SWITCHGEAR, TRANSFORMERS AND PANELBOARDS

HAS BEEN PREPURCHASED AND INSTALLATION WILL OCCUR IN THREE

PHASES OF WORK. PHASE 1 WORK HAS BEEN COMPLETED AND INCLUDES

INSTALLATION OF EWEB PRIMARY CONDUIT, A PRIMARY PULL VAULT AND

PAD MOUNT TRANSFORMER VAULT AT BUILDING 10. PHASE 2 WORK HAS

ALSO BEEN COMPLETED AND INCLUDES INSTALLATION OF UNDERGROUND

CONDUIT AND PULL VAULTS AT BUILDING 10, 18 AND FUTURE BUILDING 23.

THE CURRENT PHASE 3 BID PACKAGE INCLUDES INSTALLATION OF

PREPURCHASED EQUIPMENT AND INSTALLATION OF REMAINING CONDUIT

AND WIRING REQUIRED FOR A COMPLETE AND OPERATING ELECTRICAL SYSTEM.

Jim Krumsick Image

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text

SEE DRAWING E2.4

FOR PHASE 2 WORK

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text

Jim Krumsick Typewritten Text

APPROXIMATE OUTLINE OF BUILDING 23, TO BE

CONSTRUCTED UNDER A SEPARATE CONTRACT.

UNDER PHASE 2 EWEB PRIMARY CONDUIT AND

SECONDARY CONDUIT WAS RUN TO THE

NORTHEAST CORNER OF BUILDING. SEE DRAWING

E2.5 FOR PHASE 3 WORK UNDER THIS CONTRACT.

Jim Krumsick Rectangle

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Typewritten Text

PULL

VAULT

Jim Krumsick Typewritten Text

PHASE 3 MTS

& PULL BOX

Jim Krumsick Ellipse

Jim Krumsick Typewritten Text E2.5

Jim Krumsick Line

Jim Krumsick Typewritten Text

JUNE 26, 2023

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Image

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Polygon

Jim Krumsick Polygon

Jim Krumsick Polygon

HAZMAT

BUIDLING

DIST

MAIN

CT

2 TRANSFORMER

VAULT

8' x 13'

DISTRIBUTION

SECTION

MAIN BREAKER

SECTION

UTILITY CT

SECTION

INCOMING

SECTION

6" HOUSEKEEPING PAD

BUILDING 10 AREA PLAN

SCALE: 1/4"= 1'-0"

C

IT

Y O

F

EU

G

EN

E

FA

C

IL

IT

Y

M A

N A

G

EM

EN

T

C H

ES

H

IR

E

AV

EN

U E

EU

G

EN

E, O R

EG

O

N

PH

O

N E:

(5

) 6

-2

FA

X:

(5

) 6

-6

SC

AL

E:

D R

W N

D

AT

E:

C H

KD

R

EV

Paradigm Engineering

James Krumsick P.E. LEED AP 85193 Appletree Drive

Eugene, Or. 97405

541 285 1680 jkrumsick@outlook.com

E2.1

PU

BL

IC

W

O R

KS

M

AI

N

TE

N

AN

C

E

- B

U

IL

D

IN

G

AR

EA

P

Y

O F

EU

G

EN

E

- R O

O

SE

VE

LT

Y

AR

D

R O

O

SE

VE

LT

B

LV

D

EU

G

EN

E, O

R

1/ 4"

E

LE

C

TR

IC

AL

IM

PR

O

VE

M

EN

TS

PH

AS

E

A

A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text E2

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 6/30/2023

AutoCAD SHX Text A

AutoCAD SHX Text E2

Jim Krumsick Typewritten Text

JUNE 26 2023

Jim Krumsick Text Box Notes E2.1

1. Transformer Vault installed under Phase 2.

2. EWEB Transformer

3. Owner Furnished Main Distribution Panel to be installed under Phase 3. Under Phase 2 a 6” x 45” x 168” housekeeping pad was installed..

4. (8) 4” conduit for EWEB secondary conductors were installed under Phase 2. Coordinate conductor installation with EWEB.

5. (12) 4” Conduit to Building 18 were installed under Phase 2. Pull new conductors in this conduit under the current Phase 3 contract per one line diagram. See drawing E2.4 for conduit continuation.

6. See Drawings E1.0 and E2.4 for continuation of conduit to Building 18.

7. (2) 3” conduit for EWEB primary conductors were installed under Phase 2.

8. (2) 3” conduit for EWEB primary conductors were installed under Phase 2. See drawing E2.4 and E2.5 for continuation and work under this phase,

9. Phase 2 contractor installed #2 bare copper conductor from transformer ground ring to ground rod in new utility trench with 4’ extra conductor length in utility trench. Under current contract terminate this conductor at switchboard ground bus and provide bonding conductor to Building 10 structural steel.

10 Run 1" conduit from CT section to EWEB meter base. Route conduit inside Building 10.

11.Work shown on this drawing to be completed under Phase 3a. See specifications for scheduling requirements.

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Typewritten Text

UTILITY TRENCH WITH BARRIER

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Typewritten Text

EWEB SECONDARY

CONDUIT BANK

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Pen

Jim Krumsick Pen

Jim Krumsick Pen

Jim Krumsick Typewritten Text

CONDUIT DUCT BANK

TO BUILDING 18

Jim Krumsick Typewritten Text

Jim Krumsick Ellipse

Jim Krumsick Typewritten Text

Jim Krumsick Ellipse

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Typewritten Text

Jim Krumsick Ellipse

Jim Krumsick Typewritten Text

Jim Krumsick Ellipse

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text

EWEB

METER

BASE 10

Jim Krumsick Ellipse

Jim Krumsick Typewritten Text

`ELEVATION A-A

NTS

Jim Krumsick Rectangle

Jim Krumsick Line

Jim Krumsick Typewritten Text

Jim Krumsick Ellipse

Jim Krumsick Typewritten Text

EWEB

PRIMARY

VAULT

Jim Krumsick Typewritten Text

Jim Krumsick Ellipse

Jim Krumsick Typewritten Text

Jim Krumsick Ellipse

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Pen

Jim Krumsick Pen

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Dimension

Jim Krumsick Typewritten Text 13'6"

PANEL 20-2

PANEL 20-4

MANUAL TRANSFER SWITCH

EXISTING PULL BOX

PANEL 20-1

BUILDING 20 AREA PLAN

SCALE: 1/4"= 1'-0"

C

IT

Y O

F

EU

G

EN

E

FA

C

IL

IT

Y

M A

N A

G

EM

EN

T

C H

ES

H

IR

E

AV

EN

U E

EU

G

EN

E, O R

EG

O

N

PH

O

N E:

(5

) 6

-2

FA

X:

(5

) 6

-6

SC

AL

E:

D R

W N

D

AT

E:

C H

KD

R

EV

Paradigm Engineering

James Krumsick P.E. LEED AP 85193 Appletree Drive

Eugene, Or. 97405

541 285 1680 jkrumsick@outlook.com

E2.2

PU

BL

IC

W

O R

KS

M

AI

N

TE

N

AN

C

E

- B

U

IL

D

IN

G

AR

EA

P

Y

O F

EU

G

EN

E

- R O

O

SE

VE

LT

Y

AR

D

R O

O

SE

VE

LT

B

LV

D

EU

G

EN

E, O

R

1/ 4"

E

LE

C

TR

IC

AL

IM

PR

O

VE

M

EN

TS

PA

H

SE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text E2

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 6/30/2023

Jim Krumsick Typewritten Text

JUNE 26, 2023

Jim Krumsick Text Box Notes E2.2

1. After Building 18 has been cut over to new 480 volt service, pull new conductors in (3) existing 3 ½” underground conduit between pull box at northeast corner of Building 18 and the existing Building 7 pull box. Extend conduit and wire to new Owner furnished contractor installed manual transfer switch. See electrical one line diagram. Mount transfer switch on 4" housekeeping pad to be installed by Owner,

2. After Building 18 has been cut over to new 480 volt service disconnect Building 18 feeder conductors which originates from Building 6. Secure conductors from Building 6 for future rerouting to outdoor panelboard.

3. Install Owner furnished 480 volt panelboard fed from new manual transfer switch.

4. Install Owner furnished dry type transformer: 480:208Y/120 volt 3 phase, 4 wire. See one line diagram for line and load side connections. Providing bonding conductor to Building steel. Also provide #2 grounding conductor from building steel to ground bus in 480 volt distribution panel. Mount transformer on 4" housekeeping pad installed by Owner.

5. Refeed existing 208 volt panel 20-1 which is currently served from Building 8, from new panel 20-2. Install new Owner furnished 208 volt panel 20-2 adjacent to existing panel.

Reterminate existing feeder conduit and reconnect existing branch circuits. Use 200/3 subfeed breaker in new panel to feed Building 8 distribution panel using existing 3” underground conduit from Building 8.

6. Work shown on this drawing to be completed under Phase 3b. See specifications for scheduling requirements.

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text T

Jim Krumsick Text Box

480: 208Y/120 VOLT TRANSFORMER

Jim Krumsick Ellipse

Jim Krumsick Length Measurement 100'-10"

PANEL 8-2 PULL BOX

TO BUILDING 20

EXISTING UNDERGROUND

CONDUIT

BUILDING 8 AREA PLAN

SCALE: 1/4"= 1'-0"

C

IT

Y O

F

EU

G

EN

E

FA

C

IL

IT

Y

M A

N A

G

EM

EN

T

C H

ES

H

IR

E

AV

EN

U E

EU

G

EN

E, O R

EG

O

N

PH

O

N E:

(5

) 6

-2

FA

X:

(5

) 6

-6

SC

AL

E:

D R

W N

D

AT

E:

C H

KD

R

EV

Paradigm Engineering

James Krumsick P.E. LEED AP 85193 Appletree Drive

Eugene, Or. 97405

541 285 1680 jkrumsick@outlook.com

E2.3

PU

BL

IC

W

O R

KS

M

AI

N

TE

N

AN

C

E

- B

U

IL

D

IN

G

A R

EA

P

Y

O F

EU

G

EN

E

- R O

O

SE

VE

LT

Y

AR

D

R O

O

SE

VE

LT

B

LV

D

EU

G

EN

E, O

R

1/ 4"

E

LE

C

TR

IC

AL

IM

PR

O

VE

M

EN

TS

PH

AS

E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text E2

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 6/30/2023

Jim Krumsick Typewritten Text

JUNE 26, 2023

Jim Krumsick Text Box Notes E2.3

1. Install 12” wide x 8” deep x 36” long pull box at exterior wall of Building 8. Use for pulling new feeder conductors to Building 8 distribution panel. Bond Building 8 feeder ground conductor to existing Building steel and ground bus in existing service panel.

2. After Building 20 has been refed with new feeder from Building 10 distribution panel. Remove existing feeder conductors to Building 20 and pull new conductors in existing conduit per one line diagram.

3. Install new conduit and wire from new pull box to existing panel 8-2.

4. Disconnect and remove existing Building 8 feeder conductors from Building 3. Reconnect new feeder conductors from Building 20.

5. Work shown on this drawing to be completed under Phase 3b. See specifications for scheduling requirements.

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick

28'-1/2"

R

MANUAL

TRANSFER

SWITCH

TO BUILDING 20

21 22

BUILDING 18 PARTIAL FLOOR PLAN

SCALE: 1/4"= 1'-0"

C

IT

Y O

F

EU

G

EN

E

FA

C

IL

IT

Y

M A

N A

G

EM

EN

T

C H

ES

H

IR

E

AV

EN

U E

EU

G

EN

E, O R

EG

O

N

PH

O

N E:

(5

) 6

-2

FA

X:

(5

) 6

-6

SC

AL

E:

D R

W N

D

AT

E:

C H

KD

R

EV

Paradigm Engineering

James Krumsick P.E. LEED AP 85193 Appletree Drive

Eugene, Or. 97405

541 285 1680 jkrumsick@outlook.com

E2.4

PU

BL

IC

W O

R

KS

BU

IL

D

IN

G

PA

R

TI

AL

F

LO

O R

P

Y

O F

EU

G

EN

E

- R O

O

SE

VE

LT

Y

AR

D

R O

O

SE

VE

LT

B

LV

D

EU

G

EN

E, O

R

1/ 4"

E

LE

C

TR

IC

AL

IM

PR

O

VE

M

EN

TS

PH

AS

E

B

BAA

E3.1

E3.1

AutoCAD SHX Text A

AutoCAD SHX Text E2

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 6/30/2023

Jim Krumsick Typewritten Text

JUNE 26, 2023

Jim Krumsick Text Box Notes E2.4

1. New Owner Furnished, Contractor installed 480 volt distribution panel 18D4. See Panel Schedule, Drawing E5.1

2. New Owner Furnished Contractor installed 480:208Y/120 volt dry type transformer. Mount on 4" housekeeping pad provided by Owner,

3. Relocate existing fan control switch as required to accommodate new panelboard.

4. New Owner furnished, Contractor installed 208Y/120 volt panelboard 18D2. See Panel Schedule Drawing E5.1

5. Owner will relocate existing work lockers as required to accommodate new switchgear.

6. Existing refrigerator to be relocated by Owner.

7. New Oldcastle 444-LA pull vault with traffic cover, installed in Phase 2.

8. New Owner Furnished Contractor installed manual transfer switch. Mount on 4" housekeeping pad provided by Owner,

9. (4) existing 2” conduit run to island to remain. Locate line and protect deice subpanel.

Text Box

10. Refeed existing panel A from new 208 volt distribution panel.

11. Remove existing panel A disconnect switch.

12. Remove existing bussed gutter and abandoned CT enclosure.

13. Remove existing disconnect switch.

14. Install conduit rack at 10 foot intervals on inside of existing purlin. Use to support new Panel A feeder and future EV charger conduit. 15. Run 2” spare conduit for future level 3 EV charger. Stub down below vapor barrier and Cap conduit for future use.

16. Install conduit rack at 10 foot intervals on inside of existing purlin. Use to support new Level 3 charger.

17. Reroute existing hot box feeders from panel A to new 208 volt panel. Use new conduit rack where feasible.

18. Refeed Existing 60 amp and 20 amp 208 volt single phase hot box outlets.

19. Run 1"C, 2#8, #10 Ground from panel 18-2 to New EV charger. See specifications.

20. (3) 3” conduit have been run to Building 23 under phase 2. See drawing E2.5 for extension under this project.

Text Box

21. (2) 3” conduit were run to Building 23 under the Phase 2 project for future used by EWEB.

See drawing E2,5 for conduit termination.

22. Conduit reserved for future EWEB primary conductors. See drawing E1.0 for routing.

23. Conduit from Main Distribution distribution section. See drawing E1.0 for routing.

24. Under phase 2 (3) 3 ½” conduit were run ten feet north from existing pull box at northeast corner of building 18. Extend to northeast corner of building 18 under this project. Rack conduit on side of building and transition underground at north east and southeast corner of Building 18.

25. Existing in ground pull box. Existing building 18 feeder from Building 6 passes through this box. Remove feeder conductors after building has been cut over to new service.

Repull conduit between this pull box and the new Building 20 manual transfer switch per one line diagram.

26. Route of existing underground building feeder from Building 6. 8"

27. 24" X 24" X 8" pull box mounted on 4" Owner furnished concrete housekeeping pad.

Use to transition the following conduit between Building 18 and 23: 3" conduit to 480 Volt distribution panel; 3" conduit to 208 volt distribution panel; 3" conduit to truss space for low voltage system wiring.

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text

Jim Krumsick Ellipse

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text

Jim Krumsick Typewritten Text

Jim Krumsick Rectangle

Jim Krumsick

PULL BOX

Jim Krumsick Ellipse

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text

HOUSEKEEPING

PAD

Arrow

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Typewritten Text

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Ellipse

Jim Krumsick

51'-6"

Y O

F

EU

G

EN

E

FA

C

IL

IT

Y

M A

N A

G

EM

EN

T

C H

ES

H

IR

E

AV

EN

U E

EU

G

EN

E, O R

EG

O

N

PH

O

N E:

(5

) 6

-2

FA

X:

(5

) 6

-6

SC

AL

E:

D R

W N

D

AT

E:

C H

KD

R

EV

Paradigm Engineering

James Krumsick P.E. LEED AP 85193 Appletree Drive

Eugene, Or. 97405

541 285 1680 jkrumsick@outlook.com

E2.5

PU

BL

IC

W

O R

KS

BU

IL

D

IN

G

EL

EV

AT

IO

S

Y

O F

EU

G

EN

E

- R O

O

SE

VE

LT

Y

AR

D

R O

O

SE

VE

LT

B

LV

D

EU

G

EN

E, O

R

1/

E

LE

C

TR

IC

AL

IM

PR

O

VE

M

EN

TS

PH

AS

E

AutoCAD SHX Text

AutoCAD SHX Text E3.1

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 6/30/2023

AutoCAD SHX Text

AutoCAD SHX Text E3.1

Jim Krumsick Typewritten Text

JUNE 26, 2023

Jim Krumsick Typewritten Text A

Jim Krumsick Typewritten Text A

Jim Krumsick Text Box Notes E2.5

1. Install new Panel 23-2 in northeast corner of building. Extend conduit installed under Phase 2 from Building 18 to panel location and pull new feeder per one line diagram.

See Drawing E5.1 for Panel Schedule.

2. Extend 480 volt conduit provisions installed from Panel 18 under Phase 2 to future 480 volt panel location.

3. Extend electrical service conduit installed from Building 10 distribution panel under Phase 2 to future distribution panel location.

4. Extend communication conduit installed from Building 18 under Phase 2 to 4 x 8' x 3/4" plywood backboard.

5. (30) light fixtures will be installed in building as part of the building shell package. These fixtures will be pendant mounted from structure. Under phase 3 project install 3 way switches with dimmer switch at building corners and run branch circuit wiring to each light fixture. Connect as required.

6. Provide two sets of 3 way dimmers, one set controlling light fixtures at the west half of the building and the second pair controlling light fixtures at the east half of the building.

7 Provide (16) dedicated circuit duplex receptacles at locations shown, at +48" AFF.

8. Extend the following underground conduit systems installed under Phase 2 to the designated location in Building 23:

A. 3" 480 volt system conduit from Building 18. Extend to future 480 volt panel 23-4 location.

B. 3" 208 volt system conduit from Building 18. Extend to new Panel 23-2.

C. 3" low voltage system conduit from Building 18. Extend to communication backboard.

D. (3) 3.5" conduit from Building 10. Extend to future 480 volt distribution panel location.

E. (2) 3" EWEB primary conduit. Extend to northwest corner of Building 23 to location designated by Owner.

9. Work shown on this drawing to be completed under Phase 3a. See specifications for scheduling requirements.

Jim Krumsick Three Way Switch

Jim Krumsick Typewritten Text D

Jim Krumsick Typewritten Text

6 TYPICAL

Jim Krumsick Ellipse

Jim Krumsick Typewritten Text D

Jim Krumsick Three Way Switch

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Typewritten Text

RECEPTACLE

AT +48" TYPICAL

Jim Krumsick Ellipse

Jim Krumsick Snapshot

Jim Krumsick Snapshot

Jim Krumsick Snapshot

Jim Krumsick Typewritten Text

PANEL 23-2 1

Jim Krumsick Typewritten Text

SPACE FOR FUTURE TRANSFORMER

SPACE FOR FUTURE PANEL 23-4 2

SPACE FOR FUTURE 480

VOLT DISTRIBUTION PANEL 3

COMMUNICATION SYSTEM

BACKBOARD 4

Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Line

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Typewritten Text D

Jim Krumsick Three Way Switch

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Three Way Switch

Jim Krumsick Typewritten Text D

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Duplex Outlet

Jim Krumsick Line

Jim Krumsick Rectangle

Jim Krumsick Rectangle

CONDUIT

ZONE

Ellipse

3 4

7 7

4 5

ELEVATION A-A - BUILDING 18

SCALE: 1/4"= 1'-0"

C

IT

Y O

F

EU

G

EN

E

FA

C

IL

IT

Y

M A

N A

G

EM

EN

T

C H

ES

H

IR

E

AV

EN

U E

EU

G

EN

E, O R

EG

O

N

PH

O

N E:

(5

) 6

-2

FA

X:

(5

) 6

-6

SC

AL

E:

D R

W N

D

AT

E:

C H

KD

R

EV

Paradigm Engineering

James Krumsick P.E. LEED AP 85193 Appletree Drive

Eugene, Or. 97405

541 285 1680 jkrumsick@outlook.com

E3.1

PU

BL

IC

W

O R

KS

BU

IL

D

IN

G

EL

EV

AT

IO

N

S

C

IT

Y O

F

EU

G

EN

E

- R

O O

SE

VE

LT

Y

AR

ED

R O

O

SE

VE

LT

B

LV

D

EU

G

EN

E, O

R

1/ 4"

E

LE

C

TR

IC

AL

IM

PR

O

VE

M

EN

TS

PH

AS

E

Notes:

1. New 208Y/120 volt distribution panel, Owner furnished, Contractor installed.

2. Existing fan control switch to be relocated.

3. Replace existing duplex outlet with new and feed from new panel.

4. Relocate existing Spyder box receptacle and refeed from new panel.

5 New 480:208Y/120 volt transformer, Owner furnished, Contractor installed.

6. New 480Y/277 volt distribution panel, Owner furnished, Contractor installed.

7. Existing lockers to be relocated by Owner. Coordinate installation of new equipment with Owner.

ELEVATION B-B - BUILDING 18

SCALE: 1/4"= 1'-0"

Notes:

1. Existing disconnect switch to be removed.

2. Existing bussed gutter to be removed.

3. Existing CT Cabinet to be removed.

4. Existing disconnect switch to be removed.

5. Refeed existing Panel A from new 208 volt distribution panel.

6. Existing Junction box to remain.

7. New feeder from 208 volt distribution panel.

AutoCAD SHX Text

AutoCAD SHX Text E3.1

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 6/30/2023

AutoCAD SHX Text

AutoCAD SHX Text E3.1

Jim Krumsick Typewritten Text

JUNE 26/ 2023

Jim Krumsick Rectangle

Line

Y O

F

EU

G

EN

E

FA

C

IL

IT

Y

M A

N A

G

EM

EN

T

C H

ES

H

IR

E

AV

EN

U E

EU

G

EN

E, O R

EG

O

N

PH

O

N E:

(5

) 6

-2

FA

X:

(5

) 6

-6

SC

AL

E:

D R

W N

D

AT

E:

FI

LE

N

AM

E:

C H

KD

R

EV

Paradigm Engineering

James Krumsick P.E. LEED AP 85193 Appletree Drive

Eugene, Or. 97405

541 285 1680 jkrumsick@outlook.com

E4.1

PU

BL

IC

W

O R

KS

EL

EC

TR

IC

AL

O

N E

LI

N

E D

IA

G

R

AM

Y

O F

EU

G

EN

E

- R O

O

SE

VE

LT

Y

AR

E

R O

O

SE

VE

LT

B

LV

D

EU

G

EN

E, O

R

N

TS

E

LE

C

TR

IC

AL

IM

PR

O

VE

M

EN

TS

PH

AS

E

BUILDING 18 - 208V DIST. PANEL

18D2

480:208Y/120V

TRANSFORMER

112.5 KVA

EXISTING

PANEL

"A"

200A

SEE PANEL SCHEDULE FOR CIRCUIT BREAKERS

BUILDING 18 - 480V DIST. PANEL

18D4

G3

G

G3 G3

2 - 10'

GROUND

RODS

BUILDING

STEEL

MANUAL

TRANSFER

SWITCH

BUILDING 18

800C

800A

BUILDING 20 - 208V DIST. PANEL

20D2

480:208Y/120V

TRANSFORMER

112.5 KVA

EXISTING

BUILDING

PANEL

"G"

SEE PANEL SCHEDULE FOR CIRCUIT BREAKERS

BUILDING 20 - 480V DIST. PANEL

20D4

G3

G

2 - 10'

GROUND

RODS

BUILDING

STEEL

MANUAL

TRANSFER

SWITCH

BUILDING 20

800C

800E

G

G3G3

2 - 10'

GROUND

RODS

BUILDING

STEEL

EXISTING

PULL VAULT

PULL VAULT

AT BUILDING 18

800A 800A800B 800B

MAIN DISTRIBUTION SWITHCBOARD

3000A 480Y/277V, 3Ø, 4W

200A

SPACE

SPARE SPARE

100A

SPACE

3000 AMP BUS

G

CT SECTIONINCOMING SECTION

G2 G2

2 - 10'

GROUND

RODS

BUILDING

STEEL

3000A

EWEB

TRANSFORMER

480Y/277V

SECONDARY

BUILDING 10

EXISTING

PANEL

20.1

100A

SEE PANEL SCHEDULE FOR

CIRCUIT BREAKERS

BUILDING 18 BUILDING 20

SPARE SPARE

Jim Krumsick Line

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 6/30/2023

Jim Krumsick Typewritten Text

JUNE 26, 2023

Jim Krumsick Rectangle

Jim Krumsick Snapshot

Jim Krumsick Line

Jim Krumsick Typewritten Text 200C

Jim Krumsick Typewritten Text

NEW

PANEL

23-2

Jim Krumsick Snapshot

Jim Krumsick Rectangle

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text 800D

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text

BUILDING 23

DRAWING E2.5

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text

BUILDING 8

DRAWING E2.3

Jim Krumsick Text Box

DRAWING E2.5

Jim Krumsick Text Box

DRAWING E2.2

Jim Krumsick Text Box

DRAWING E2.1

Jim Krumsick Rectangle

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text 2-3"

Jim Krumsick Line

Jim Krumsick Typewritten Text

EWEB PRIMARY

VAULT

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Typewritten Text 150A

Jim Krumsick Typewritten Text 150A

Jim Krumsick Typewritten Text 400A

Jim Krumsick Typewritten Text 400A

Jim Krumsick Typewritten Text G1

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Ellipse

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Typewritten Text G2

Jim Krumsick Typewritten Text G2

Jim Krumsick Typewritten Text

Jim Krumsick Typewritten Text 800F

Jim Krumsick Image

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Rectangle

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Jim Krumsick Ellipse

Y O

F

EU

G

EN

E

FA

C

IL

IT

Y

M A

N A

G

EM

EN

T

C H

ES

H

IR

E

AV

EN

U E

EU

G

EN

E, O R

EG

O

N

PH

O

N E:

(5

) 6

-2

FA

X:

(5

) 6

-6

SC

AL

E:

D R

W N

D

AT

E:

C H

KD

R

EV

Paradigm Engineering

James Krumsick P.E. LEED AP 85193 Appletree Drive

Eugene, Or. 97405

541 285 1680 jkrumsick@outlook.com

E5.1

PU

BL

IC

W

O R

KS

PA

N

EL

S

C H

ED

U

LE

C

IT

Y O

F

EU

G

EN

E R

O O

SE

VE

LT

Y

AR

D

R O

O

SE

VE

L

E

LE

C

TR

IC

AL

IM

PR

O

VE

M

EN

TS

PH

AS

E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 6/30/2023

Jim Krumsick Typewritten Text

JUNE 26 2023

Jim Krumsick Image

Jim Krumsick Image

Jim Krumsick Rectangle

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Line

Jim Krumsick Image

Jim Krumsick Image

Jim Krumsick Rectangle

Jim Krumsick Image

Jim Krumsick Rectangle

Jim Krumsick Image

2023-06-26T07:43:01-0700
James Krumsick
2023-06-26T07:43:27-0700
James Krumsick
2023-06-26T07:43:49-0700
James Krumsick
2023-06-26T07:44:21-0700
James Krumsick
2023-06-26T07:46:30-0700
James Krumsick
2023-06-26T07:47:47-0700
James Krumsick
2023-06-26T07:48:14-0700
James Krumsick
2023-06-26T07:48:41-0700
James Krumsick
2023-06-26T07:49:09-0700
James Krumsick

File details come from the government source that posted it. Updated .