20260508 DHHL EHDO Office Improvements.pdf
PDF 10 MB Posted
- Attached to
- East Hawaii Hilo District Office Improvements
- Solicitation number
- B26002854
- Issued by
- Hawaii County, Hawaii
About this file
This file is an architectural and engineering design document for the Department of Hawaiian Home Lands (DHHL) East Hawaii Hilo District Office Improvements project located at 162 Baker Avenue, Hilo, Hawaii. The project encompasses comprehensive renovations to the existing DHHL office building and associated structures on two parcels (TMK: 3 2-1-023:157 & 158) totaling approximately 1.1836 acres. The scope of work includes enlargement and renovation of the DHHL office building (adding 864 square feet to the existing 4,896 square feet for a total of 5,760 square feet), creation of a new conference room (543 square feet), new office space (229 square feet), garage extension (229 square feet), parking lot resurfacing, fence replacement, mechanical system replacements including split air conditioning units, plumbing fixture upgrades with ADA accessibility features, electrical system upgrades including new lighting and data infrastructure, roof repairs and patching, interior wall finishes, and improvements to the OHA building including new flooring, fixture replacements, and telecommunication upgrades. The design plans are dated May 8, 2026, and include detailed architectural, structural, civil, plumbing, mechanical, and electrical drawings prepared by Hawaii Engineering Group, Inc. with professional engineers Gregory D. Santoro (Civil), Ather R. Dar (Structural), and Kenneth R. Welch (Electrical).
The project is designed to conform to the 2018 International Building Code, 2018 National Fire Protection Association standards, 2015 IECC energy code, and 2020 National Electrical Code requirements for Hawaii. Construction specifications require compliance with standard public works construction specifications and include detailed requirements for erosion control, best management practices, structural design criteria (140 mph wind loads, seismic design category D), material specifications for concrete, lumber, reinforcing steel, plumbing fixtures, mechanical equipment (Mitsubishi mini-split air conditioning units and fan coil units), and electrical components. The project requires special inspections for concrete work, reinforcing steel, termite protection, and complete load path/uplift ties. All construction materials, labor, equipment, and supervision necessary to complete the work as detailed in the scope of work and design plans are to be furnished by the contractor, with the contractor bearing full responsibility for construction methodology, safety precautions, utility coordination, protection of existing conditions, and field verification of all dimensions and site conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exp. Date: 4-30-26
H a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
T01
TITLE SHEET
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
KJ
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
ENGINEERS
HAWAII ENGINEERING GROUP, INC.
1088 BISHOP STREET, SUITE 2506
HONOLULU, HAWAII 96813
CONTACT:
CIVIL - GREGORY D. SANTORO, P.E.
STRUCTURAL - ATHER R. DAR, P.E.
ELECTRICAL - KENNETH R WELCH, P.E.
DEPARTMENT OF HAWAIIAN HOME LANDS, STATE OF HAWAII
LAND DEVELOPMENT DIVISION
91-5420 KAPOLEI PARKWAY
KAPOLEI, HAWAII 96707
CONTACT:
KALI WATSON
CHAIRMAN, HAWAIIAN HOMES COMMISSION
1. THE INFORMATION CONTAINED HEREIN IS BASED UPON LIMITED FIELD
INVESTIGATIONS AND AVAILABLE RECORD DRAWINGS.
2. DRAWINGS ARE INTENDED TO PROVIDE A GRAPHIC ILLUSTRATION OF DESIGN
CONCEPT, ONLY, AND DEPICT THE GENERAL PLACEMENT OF CERTAIN
COMPONENTS IN RELATION TO EACH OTHER.
3. FOR CLARITY, DETAIL DRAWINGS DO NOT SHOW ALL COMPONENTS OR
ILLUSTRATE ALL FIELD CONDITIONS THAT MAY BE PRESENT.
4. CONTRACTOR SHALL TAKE MEASUREMENTS AND FIELD-VERIFY ALL CONDITIONS
AND DIMENSIONS PRIOR TO CONSTRUCTION AND/OR FABRICATION.
5. ALL CONSTRUCTION SHALL CONFORM TO THE FOLLOWING BUILDING CODES:
2018 IBC
2018 NFPA 1, UFC
2018 UPC WITH STATE AMENDMENTS
2015 IECC
2020 NEC
TITLE 11 CHAPTER 39
OWNER: DEPARTMENT OF HAWAIIAN HOME LANDS
TAX MAP KEY: (3) 2-1-023:157 & 158 (?only?)
ZONING: RS-10
STATE LAND USE: URBAN
FLOOD ZONE: X
SMA: NOT IN SMA
LOT AREA: ?51,557 SQ. FT., (1.1836 ACRES)?
(E) OHA BUILDING: 960 SQ. FT.
(E) CLASSROOM C: 2,208 SQ. FT.
(E) CLASSROOM D: 960 SQ. FT.
(E) DHHL BUILDING: 4,896 SQ. FT.
(N) DHHL BLDG ADDITIONS: 864 SQ. FT.
TOTAL DHHL BLDG SQ. FT.: 5,760 SQ. FT.
OCCUPANCY GROUP: (LESS THAN 300) B
CONSTRUCTION TYPE: V-B
OCCUPANCY LOAD: 95, SEE SHEET A04
LOAD FACTORS: 400 NET, 15 NET
PLUMBING FIXTURES: CONFERENCE ROOM = 88
MALE WC: 1 PER 125, 2 UNISEX WATER CLOSETS PROVIDED
FEMALE WC: 1 PER 65, 2 UNISEX WATER CLOSETS PROVIDED
LAVATORIES: 1 PER 200, 2 UNISEX LAVATORIES PROVIDED
GENERAL NOTES
PREPARED BY
PREPARED FORISLAND MAP
PROJECT DATA INDEX TO DRAWINGS
STATE OF HAWAII
DEPARTMENT OF HAWAIIAN HOME LANDS
IFB-26-HHL-009
162 BAKER AVE, HILO, HI 96720
T.M.K.: (3) 2-1-023:157 & 158
EAST HAWAI'I DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
PAPA
MILOLII
WAIAHUKINI
KAALUALU
NAALEHU
HONUAPO
PAHALA
VOLCANOVOLCANO HOUSE
GLENWOO
D
MOUNTAIN VIEW
KALAOA
HOLUALOA
KAILUA-KONA
KEAUHOU
KEALAKEKUA
CAPTAIN COOK
HONAUNAU
KURTISTOWN
KEAAU
KAPAANU
KALAPANA
OPIHIKAO
POHOIKI
PAHOA
KOAE
HILO
PAPAIKOU
PUA AKALA
PEPEEKEO
HONOMU
HAKALAU
NINOLE
WELOK
A
PAPAALOA LAUPAHOEHOE
KEANAKOLU
UMIKOA
OOKALA
PAAUILO
PAAUHAU
HONOKAA
MANA
KIPAHULU
WAIMEA (KAMUELA)
KUKUIHAELE
NIULII
HALAULA
KAPAAU (KOHALA)
HAW
I
MAHUKONA
KAWAIHA
E
WAIAK
APUAKO
WAIKOLO
A
PUUANAHULU
KIHOLO
MAHAIULA
N
STATE OF HAWAII
HAWAII
MAUI
LANAI
MOLOKAI
OAHU
KAUAINIIHAU
VICINITY MAP
PROJECT LOCATION
COUNT SHEET NO. SHEET DESCRIPTION
1 T01 TITLE SHEET
2 G01 GENERAL NOTES, ABBREVIATIONS, & SYMBOLS
3 C01 CIVIL NOTES AND BMP DETAIL
4 C02 EROSION AND SEDIMENT CONTROL PLAN
5 C03 EXISTING SITE AND DEMO PLAN
6 C04 REVISED DRAINAGE PLAN
7 C05 CIVIL DETAILS
8 C06 CIVIL DETAILS
9 A01 SITE PLAN
10 A02 NEW FLOOR AND ROO PLAN
11 A03 DEMO PLAN
12 A04 CEILING AND LIFE SAFTEY PLAN
13 A05 EXTERIOR ELEVATIONS, SECTIONS, AND DOOR & WINDOW
SCHEDULES
14 A06 INTERIOR ELEVATIONS AND MOUNTING HEIGHTS
15 A07 OHA BUILDING PLANS
16 A08 ROOM FINISH SHEDULE
17 S01 STRUCTRUAL NOTES
18. S02 STRUCTURAL FLOOR PLANS
19 S03 STRUCTURAL DEMO FLOOR PLANS
20 S04 STRUCTURAL SECTIONS
21 S05 STRUCTURAL DETAILS
22 S06 STRUCTURAL DETAILS
23 P01 PLUMBING NOTES, SPEC AND LEGEND
24 P02 PLUMBING PLANS - OFFICE BLDG
25 P03 PLUMBING PLANS - OHA BLDG
26 P04 PLUMBING DETAIL AND ISO
27 M01 MECHANICAL NOTES, SPEC AND LEGEND
28 M02 MECHANICAL PLANS - OFFICE BLDG
29 M03 MECHANICAL PLANS - OHA BLDG
30 M04 MECHANICAL DIAGRAM AND DETAILS
31 E01 ELECTRICAL NOTES
32 E02 ELECTRICAL NOTES
33 E03 ELECTRICAL FLOOR PLAN
34 E04 ELECTRCIAL FLOOR PLAN - OHA BUILDING
35 E05 ELECTRICAL SCHEDULES
APPROVAL
PLANNING
DATE:
REVIEWER NAME:
PLUMBING
DATE:
REVIEWER NAME:
ENGINEERING
DATE:
REVIEWER NAME:
MECHANICAL
DATE:
REVIEWER NAME:
DEM WASTEWATER
DATE:
REVIEWER NAME:
FIRE
DATE:
REVIEWER NAME:
DOH WASTEWATER
DATE:
REVIEWER NAME:
STRUCTURAL
DATE:
REVIEWER NAME:
DOH FOOD SAFETY
DATE:
REVIEWER NAME:
BUILDING
DATE:
REVIEWER NAME:
ELECTRICAL
DATE:
REVIEWER NAME:
PROJECT LOCATION
NORTH
1t
A101
SIM
A101
SIM
A101
SIM
R e f
A101
SIM
WALL SECTION,
ELEVATION, OR IMAGE
PLAN DETAIL
REFERENCE
BUILDING SECTION
R e f
A101
SIM
DETAIL SECTION
DETAIL REFERENCE
DRAWING NUMBER
REVISION CLOUD
AND NUMBER
COLUMN GRID LINE
DOOR TAG
WINDOW TAG
INTERIOR ELEVATION
NORTH ARROW
00 XX KEY NOTE
ROOM
INTERIOR
ELEV
A
C
BD
SYMBOLS
Exp. Date: 4-30-26
H a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
G01
GENERAL NOTES, ABBREVIATIONS, & SYMBOLS
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
KJ
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
GENERAL NOTES:
1. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, ETC. TO COMPLETE THE WORK INDICATED ON THE
DRAWINGS AND SPECIFIED HEREIN.
2. THE CONTRACTOR SHALL VERIFY NEW WORK REQUIREMENTS AT EXISTING CONDITION AND LOCATION.
3. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES FOR CONSTRUCTION, INCLUDING, BUT NOT LIMITED TO SAFETY PRECAUTIONS. THE CONTRACTOR SHALL PROVIDE SAFE PASSAGEWAYS TO OCCUPIED SPACES AND ERECT SUCH BARRICADES AND COVERINGS FOR BUILDING OCCUPANTS, VISITORS AND WORK CREWS.
4. THE CONTRACT WORK ZONE PLAN DEFINES THE AREAS ACCESSIBLE, SHARED, RESTRICTED TO THE CONTRACTOR USE. THE CONTRACTOR IS STILL RESPONSIBLE FOR THE DEMOLITION, REPAIR AND REFINISH OF THOSE AREAS SHOWN AND SPECIFIED AS
SUCH IN THESE SET OF DOCUMENTS.
5. CONTRACTOR SHALL NOT SHUTDOWN ANY UTILITY SYSTEM OF THE BUILDING WITHOUT PRIOR WRITTEN APPROVAL FROM THE CONTRACTING OFFICER AND SHALL PROVIDE 72 HOURS ADVANCE NOTICE OF ANY SHUTDOWN. HOURS AND THE TIME OF THE DAY FOR ANY PROPOSED SHUTDOWN SHALL BE THE SOLE DISCRETION OF THE CONTRACTING OFFICER.
6. THE CONTRACTOR SHALL PROTECT FROM DAMAGE ALL EXISTING CONDITIONS, LANDSCAPE, WALKWAY, SURFACES AND AREAS WHICH ABUT THE PROPOSED WORK. RESTORE DAMAGED AREAS, SURFACES OR CONDITIONS TO ORIGINAL OR BETTER
CONDITION AT NO COST.
7. PROVIDE SECURITY AND FACILITIES TO PROTECT WORK AND EXISTING FACILITIES FROM UNAUTHORIZED ENTRY, VANDALISM, AND THEFT.
8. PROTECT EXISTING FINISHED SURFACES FROM TRAFFIC, DIRT, WEAR, DAMAGE, OR MOVEMENT OF HEAVY OBJECTS, BY
PROTECTING WITH DURABLE SHEET MATERIALS.
9. COORDINATE ACTIVITIES OF HEAVY NOISE AND VIBRATION WITH THE CONTRACTING OFFICER REPRESENTATIVE.
10. (E) INDICATES EXISTING DIMENSION. CONTRACTOR TO VERIFY ALL EXISTING DIMENSIONS.
11. TEMPORARY PASSAGEWAYS, IF REQUIRED, SHALL BE ACCESSIBLE AND COMPLY WITH THE AMERICANS WITH DISABILITIES ACT
ACCESSIBILITY GUIDELINES (ADAAG).
EROSION AND TEMPORARY DUST CONTROL:
1. FOR DRAIN INLETS OUTSIDE OF THE ROADWAY, USE FILTER SOCKS FOR SEDIMENT PROTECTION. FOR DRAIN INLETS WITHIN
THE ROADWAY, USE ULTRA DRAIN GUARD WITH OVERFLOW BYPASS OR EQUIVALENT.
2. DURING CONSTRUCTION, PREVENTATIVE MEASURES SHALL BE USED TO CONTROL FORESEEABLE DUST, EROSION OR
SEDIMENTATION PROBLEMS WHICH MAY ARISE AS THE JOB PROGRESSES.
3. FUGITIVE DUST AND SOLID WASTE DISPOSAL DURING GRUBBING AND GRADING ACTIVITIES SHALL MEET REQUIREMENTS OF ADMINISTRATIVE RULES, TITLE II, CHAPTER 60, AIR POLLUTION CONTROL AND CHAPTER 58, SOLID WASTE MANAGEMENT CONTROL.
4. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AREA AND SURROUNDING AREA FREE FROM DUST NUISANCE. THE WORK SHALL BE IN CONFORMANCE WITH THE AIR POLLUTION CONTROL STANDARDS AND REGULATIONS OF THE
STATE DEPARTMENT OF HEALTH.
BEST MANAGEMENT PRACTICES (BMP) NOTES:
1. EROSION CONTROL MEASURES TO BE INSTALLED PRIOR TO START OF PROJECT AND BE MAINTAINED UNTIL COMPLETION OF
PROJECT.
2. CONTRACTOR TO PERIODICALLY INSPECT SILT FENCE, STABILIZED CONSTRUCTION ENTRANCE, CATCH BASIN AND INLET FILTERS, ESPECIALLY DURING HEAVY RAINFALL. CONTRACTOR SHALL ALSO ENSURE DRAINAGE THROUGH FILTER MATERIAL IS
MAINTAINED.
3. THE FINAL LIFT OF EACH DAY'S WORK SHALL BE COMPACTED TO PREVENT EROSION OF FILL MATERIAL.
4. GOOD HOUSEKEEPING SHALL BE UTILIZED TO ENSURE PROTECTION OF ROADWAYS FROM MUD, DIRT, AND DEBRIS.
5. THE CONTRACTOR SHALL ENSURE THAT ALL TIRES OF CONSTRUCTION VEHICLES ARE SUFFICIENTLY CLEANED OFF SO THAT DIRT OR DEBRIS IS NOT TRACKED OFF THE CONSTRUCTION SITE. WASHING OFF TIRES WITH WATER WILL NOT BE ACCEPTABLE UNLESS THE RUNOFF IS CONTAINED AND DOES NOT ENTER THE STORM DRAIN SYSTEM OR ONTO THE STATE'S ROW.
6. AT THE END OF GRADING OPERATIONS AND AT THE COMPLETION OF PROJECT, CONTRACTOR SHALL INSPECT ALL CATCH BASIN, DRAIN INLET AND DRAIN MANHOLES SURROUNDING THE PROJECT SITE. ANY ACCUMULATED SEDIMENT AND DEBRIS FOUND IN THE STORM DRAIN STRUCTURES SHALL BE REMOVED. PLEASE NOTE THAT FLUSHING INTO THE DRAIN STRUCTURES IS
PROHIBITED.
7. ANY DIRT OR GRASSED AREA DISTURBED SHALL BE RESTORED BY RE-GRASSING THE AREA OR BY SEEDED HYDROMULCH.
THE GRASS SHALL BE FULLY ESTABLISHED AT COMPLETION OF PROJECT.
ABBREVIATIONS
& AND N NORTH
∠ ANGLE NIC NOT IN CONTRACT
@ AT NO NUMBER
℄ CENTERLINE NTS NOT TO SCALE
CHANNEL NVR NETWORK VIDEO RECORDER
∅ DIAMETER OR ROUND
% PERCENT OA OVERALL
PERPENDICULAR OC ON CENTER
# POUND OR NUMBER OD OUTSIDE DIAMETER/DIMENSION
⅊ PROPERTY LINE OF/CI OWNER FURNISHED-
OWNER INSTALLED
AB ANCHOR BOLT OFF OFFICE
ABV ABOVE OPNG OPENING
ACOUS ACOUSTICAL OPP OPPOSITE
ACS ACCESS CONTROL SYSTEM
ADA AMERICANS WITH DISABILITIES ACT PL PROPERTY LINE
ADDM ADDENDUM PNL PANEL
ADJ ADJACENT, ADJUSTABLE PROP PROPERTY
AFF ABOVE FINISH FLOOR PT POINT
ALUM ALUMINUM PTN PARTITION
ALT ALTERNATE
ANOD ANODIZED R RISER, RADIUS
APPROX APPROXIMATE REF REFERENCE
ARCH ARCHITECT(URAL) REINF REINFORCES, REINFORCING
REQD REQUIRED
BD BOARD RM ROOM
BLDG BUILDING RO ROUGH OPENING
BLKG BLOCKING
BOT BOTTOM SCHED SCHEDULE
SECT SECTION
CLG CEILING SHT SHEET
CLR CLEAR(ANCE) SIM SIMILAR
CMU CONCRETE MASONRY UNIT(S) SLDG SLIDING
COL COLUMN SPEC SPECIFICATION
CONC CONCRETE SQ SQUARE
COND CONDITION SST STAINLESS STEEL
CONN CONNECTION STC SOUND TRANSMISSION CLASS
CONSTR CONSTRUCTION STD STANDARD
CONT CONTINUOUS STL STEEL
CONTR CONTRACTOR STOR STORAGE
COORD COORDINATE STRUCT STRUCTURAL
SUSP SUSPEND(ED)
D DEEP, DEPTH SYMM SYMMETRICAL
DEMO DEMOLISH
DET DETAIL THK THICK
DIA DIAMETER TYP TYPICAL
DIAG DIAGONAL
DIM DIMENSION UL UNDERWRITERS LABORATORIES
DN DOWN UNO UNLESS NOTED OTHERWISE
DR DOOR
DWG DRAWING VERT VERTICAL
DWR DRAWER
W WEST, WIDE,WIDTH
EA EACH W/ WITH
EL ELEVATION WDW WINDOW
ELEC ELECTRICAL W/O WITHOUT
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EXH EXHAUST
EXP EXPANSION
(E), EXIST EXISTING
EXT EXTERIOR
FD FLOOR DRAIN
FFEL FINISHED FLOOR ELEVATION
FIN FINISH(ED)
FL FLOOR
FOF FACE OF FINISH
FR FRAME
FT FOOT, FEET
GA GAUGE
GALV GALVANIZED
GB RAB BAR
GL GLASS
GND GROUND
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
ID INSIDE DIAMETER/ DIMENSION
IDS INTRUSION DETECTION SYSTEM
INCL INCLUD(ED), (ING), (SIVE)
INT INTERIOR
KD KNOCKED DOWN
KO KNOCK-OUT
L LENGTH, LONG
LBP LEAD BASED PAINT
LT LIGHT
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MOD MODIFIED
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
Civil & Structural Engineers
HAWAII
ENGINEERING
GROUP, Inc.
Exp. Date: 4-30-26
H A
W A I I , U
S
A
LICENSED
PROFESSIONAL
ENGINEER
14472-C
G R
E G
O R Y D . S A N T O R
O
1088 BISHOP STREET #2506
HONOLULU, HI 96813
Tel: 808-533-2092 C01
3505/08/26
X
X X X X X X X X X X X X X
X X
X X
X X
X
X X X
X
X X X X X X X
X X
X X
X X
S6 S6 S6 S6
S6 S4
S4
S4
S4
Civil & Structural Engineers
HAWAII
ENGINEERING
GROUP, Inc.
Exp. Date: 4-30-26
H A
W A I I , U
S
A
LICENSED
PROFESSIONAL
ENGINEER
14472-C
G R
E G
O R Y D . S A N T O R
O
1088 BISHOP STREET #2506
HONOLULU, HI 96813
Tel: 808-533-2092
B A
K E
R
A V
E N
U E
TODD AVENUE
C02
PARCEL B (C.S.F. 17,620)
28,750 SQ.FT.
TMK: (3) 2-1-023:158
PARCEL A (C.S.F. 17,619)
22,807 SQ.FT.
TMK: (3) 2-1-023:157
X X
X X
X
X X X
X
X X X X X X X
X X
X X
X X
HAWAII
ENGINEERING
GROUP, Inc.
Exp. Date: 4-30-26
H A
W A I I , U
S
A
LICENSED
PROFESSIONAL
ENGINEER
14472-C
1088 BISHOP STREET #2506
HONOLULU, HI 96813
Tel: 808-533-2092
B A
K
E N
U E
TODD AVENUE
C03
PARCEL B (C.S.F. 17,620)
28,750 SQ.FT.
TMK: (3) 2-1-023:158
PARCEL A (C.S.F. 17,619)
22,807 SQ.FT.
TMK: (3) 2-1-023:157
X X
X X
X
X X X
X
X X X X X X X
X X
X X
X X
S6 S6 S6 S6
S6 S4
S4
S4
S4
Civil & Structural Engineers
HAWAII
ENGINEERING
GROUP, Inc.
Exp. Date: 4-30-26
H A
W A I I , U
S
A
LICENSED
PROFESSIONAL
ENGINEER
14472-C
1088 BISHOP STREET #2506
HONOLULU, HI 96813
Tel: 808-533-2092
B A
K
E N
U E
TODD AVENUE
C04
PARCEL B (C.S.F. 17,620)
28,750 SQ.FT.
TMK: (3) 2-1-023:158
PARCEL A (C.S.F. 17,619)
22,807 SQ.FT.
TMK: (3) 2-1-023:157
ENGINEERING
GROUP, Inc.
Exp. Date: 4-30-26
H A
W A I I , U
S
A
LICENSED
PROFESSIONAL
ENGINEER
14472-C
G R
E G
O R Y D . S A N T O R
O
1088 BISHOP STREET #2506
HONOLULU, HI 96813
Tel: 808-533-2092 C05
X X X X
C06 Civil & Structural Engineers
HAWAII
ENGINEERING
GROUP, Inc.
Exp. Date: 4-30-26
H A
W A I I , U
S
A
LICENSED
PROFESSIONAL
ENGINEER
14472-C
1088 BISHOP STREET #2506
HONOLULU, HI 96813
Tel: 808-533-2092
DN
5.
61°54' ← 230.00
241°54' → 230.00
61°54' ← 200.00
.0
5.
0.
1°
5.
1°
.0
°5
4'
.43
FD RR SPIKE PROPERT COR NER 5.3 E/O CL F
SET MAG NAIL 11 .7 S/E C CL F GATE ENTRANCE MAINT SHED
SET MAG NAIL S/E C HAND ICAP WHEELC HAIR ACCESS STRIPING
SET L ONG NAI L O N N /E C CON C DRAN INLET
SET M AG 3.15 FROM SIC MH ON BAKER AND BAKER AVE
M AG SET 5.10 SW FRO M SIC MH ON TO DD AVE
NW CO R
NW CO R
SW COR
SO UTH
SO UTH
SO UTH
SO UTH
SO UTH
NO RTH/EAST
NO RTH/EAST
NO RTH/EAST
NO RTH/EAST
NO RTH/EAST
BAKER AVE NEAR TODD AVE
BASE
GCP_1
GCP_2
GCP_3
GCP_4
GCP_5
B_ CLF_ 1
B_ CLF_ 2
CO R_CLF POL_CLF
PC_ CL F
PO C_CLF
PT_CLF
POL_ CLF_ 1
C_ CL F
C_ CLF_ GATE
C_ CL F_ GATE_ 1
C_ CLF_ 1
C_ CLF_ 2
CL _SSM H_ 1
X
X
X
X
X
X
X
X X
X X
X X
X X
X
XX XXX X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X XX X
X X
X X
X XX X X X X X X X X X X X XX X
X XX X X
X
X XX X X X X X X X
XX
X
X
X X
X XX X X
X XX X
X X
X X
X X
X X
X
XX X X X X X X X X X X X X XX X X X X X X X X
X X
X X
X
XX
X
X
X
X
X XX
X
X
X X
X
X X
X X
X XX X X X X X X X X X X X X X X X
X X
X X
X
X
X
X X
X X
X
X
X X
X X
X XX
X
(E) CLASSROOM B (BUILDING)
NO WORK
(E) CLASSROOM A (BUILDING)
NO WORK
(E) CLASSROOM C
BUILDING
NO WORK
(E) CLASSROOM D
BUILDING
NO WORK
(E) BUILDING
NO WORK
(E) MAINTENANCE
BUILDING
TMK: 2-1-023:157
TMK: 2-1-023:158
T O D D A V E
B A
K
E
X
X
X
X
(E) OHA
BUILDING
NO WORK
15' - 0"
9 87 6
(E) DHHL OFFICE
BUILDING
AA
B
C
DD
KEYNOTES
AREA OF WORK RESURFACE PARKING LOT SEE CIVIL
DRAWINGS FOR DETAILS
SECURITY CAMERA IN GARAGE AREA SEE ELECTRICAL
DRAWINGS
3 (E) 4'H FENCE & GATES
4 (E) 6'H FENCE & GATES
6'H FENCE & GATES, REMOVE (E) 4'H FENCE WHERE
OCCURS
6 AREA OF WORK NEW ROOM ENCLOSE FOR OFFICES
AREA OF WORK RENOVATE EXISTING KITCHEN AND
RESTROOMS SEE A100
AREA OF WORK FOR DHHL BUIDLING: NEW RAIN GUTTER
SPOUT INTO DRY WELLS SEE CIVIL DWGS FOR DETAILS
AREA OF WORK ENCLOSE EXISTING SPACE FOR NEW
CONFENENCE ROOM SEE A100 - UNPERMITTED BUILT
SPACE
AREA OF WORK RELOCATE EXISTING CHAPTER SCHOOL
ADMIN OFFICE TO OHA BUILDING SEE A100
RELOCATE (E) FAA ANTENNA - BY HDOT, DHHL TO
COORDINATE
12 CCTV, SEE ELECTRICAL
AREA OF WORK FOR OHA BUILDING: CARPET w/VCT, REPLACE BROKEN SPLIT AC, REPLACE BATHROOM
FIXTURES, AND FIX TELECOM CABINET DOORS
SCALE: 1/16" = 1'-0"A01
1 OVERALL SITE PLAN
Exp. Date: 4-30-26
H a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
A01
SITE PLAN
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
KJ
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
32'
1/16" = 1'-0"
16'16' 8' 04'12'
F
S
IN
K
4 44S
IN
K
X
X
X
X X
X
XX XXX X
X X
X
543 SF
ENLARGED CONFENCE
ROOM
154 SF
(E) LOUNGE
131 SF
(E) OFFICE
156 SF
(E) MAPS/FILE
STORAGE
67 SF
(E) OFFICE
106 142 SF
(E) WAITING
44 SF
(E) TOILET
43 SF
(E) TOILET
470 SF
(E) GENERAL OFFICE
10861 SF
TOILET
61 SF
TOILET
N
N
114A
431 SF
(E) CLASSROOM
EQ EQ
114B
A
A
0' - 4" 3' - 0"
16' - 6 7/8"
1' - 10" 9' - 10" 8' - 4"
STO.
16 SF
(E) STO.
805 SF
(E) GARAGE
26 SF
(E) STO.
49 SF
(E) TOILET
26 SF
(E) STO.
2 1
5 5
AA
B
C
DD
44' - 0" 24' - 0" 16' - 0" 56' - 0" 20' - 0" 24' - 0"
184' - 0"
160' - 0"
A
229 SF
NEW OFFICE ROOM
57' - 6"
229 SF
GARAGE EXTENSION
6' - 11"
4 4
9 9
C L E
A R
A06
A06
A06
WCLAV
WCLAV LAVWC LAVWC
LT
V.I.F. w/ TRHOW
19' - 8"
NEW WINDOW TAG
NEW DOOR TAG
SPILT AC SEE MENCHANICAL
DRAWINSG
N NEW 2X4 WOOD STUD WALL
LEGEND
NEW IWH
" 3
AA
B
C
DD
4" / 1'-0" 4" / 1'-0"3
KEYNOTES - NEW
1 TOILETRY CABINETS
2 MIRROR OVER THE SINK
3 PATCH ROOF LEAK AND CEILING
4 INSTANT WATER HEATER
5 CLEAN AND PAINT INTERIOR WALLS
6 LIGHT SWITCHES SEE ELEC DWGS FOR DETAILS
7 (E) ELEC. PANEL
8 CABINETS, FIXTURES, AND APPLIANCES
9 FIXTURES AND GRAB BARS
10 HVAC COVERS, SEE STRUCTURAL
11 REPLACE CONDENSER, SEE MECHANICAL
12 SPLIT A/C, SEE MECHANICAL
13 ROOF TO MATCH (E) ROOF
14 GOOSENECK VENT FOR (E) AHU
1HR FIRE SEPERATION, (2) LAYERS 5/8" TYPE "X" GYB.
BD. FROM SLAB TO ROOF SHEATHING
16 6'-0" HIGH FENCE AND GATE
17 (E) 6'-0" HIGH FENCE AND GATE
18 RELOCATE AC, SEE MECHANICAL
19 UNPERMITTED BUILT SPACE
20 1 HR CEILING
21 PROJECTOR SCREEN (PS)
22 CEILING MOUNTED PROJECTOR
Exp. Date: 4-30-26
H a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
A02
NEW FLOOR PLAN AND ROOF PLAN
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
KJ
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
SCALE: 1/8" = 1'-0"A02
2 PROPOSED DHHL BUILDING FLOOR PLAN
SCALE: 1/8" = 1'-0"A02
3 PROPOSED DHHL BUILDING ROOF PLAN
NORTH
ROOM
INTERIOR
ELEV
A
C
BD
16'
1/8" = 1'-0"
8'8' 4' 02'6'
WH
E
F
WH
X X
X X
X
XX XXX X
X X
X X X
X X
X X X X X X
X
KEYNOTES - DEMO
1 REMOVE WALL
2 REMOVE WALL CABINET
3 EXISTING ROOF LINE
4 REMOVE CANOPY
5 REMOVE PLUMBING FIXTURE
6 REMOVE DRAIN, SEE CIVIL
7 REMOVE DOOR
8 REMOVE WINDOW
9 REMOVE CABINET AND FIXTURES
10 REMOVE APPLIANCES AND WATER HEATER
11 RELOCATE ANTENNA - BY HDOT, DHHL TO COORDINATE
12 REMOVE COLUMNS AND BEAM ABOVE
13 REMOVE PRIVACY FENCE AND GATE
14 REMOVE CHAIN LINK FENCE AND GATE
15 REMOVE WATER HEATER
16 REMOVE STEEL SHELVING
17 REMOVE AHU AND HVAC CONDENSER
18 REMOVE (E) CONC SLAB
19 UNPERMITTED BUILT SPACE
1 1
4 4
812 1312
AA
B
C
DD
(E) GARAGE
(E) STO.
(E) STO.
(E) GENERAL OFFICE
(E) WAITING
(E) LOUNGE
(E) TOILET
(E) TOILET
(E) OFFICE
(E) MAPS/FILE
STORAGE
105 (E) OFFICE
(E) TOILET
(E) CLASSROOM
100 17
OFFICE
100A
OFFICE
100B
SCALE: 1/8" = 1'-0"A03
2 EXISTING DHHL BUILDING
Exp. Date: 4-30-26
H a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
A03
DEMO PLAN
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
KJ
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
NORTH
ROOM
INTERIOR
ELEV
A
C
BD
16'
F S
IN
K
S
IN
K
DESCRIPTION REQUIRED PROVIDED
EXIT SEPARATION
TRAVEL DISTANCE
EGRESS WIDTH
29' - 2" (MIN 1/3 OF DIAG)
300' MAX
DEAD END 50' MAX
32" MIN 36"
N/A
SEE ANALYSIS ON PLAN
60' - 0"
OCCUPANCY LOAD
ROOM NAME (IBC USE) SF
OCCUPY LOAD
RATIO
OCCUPANTS
(SF / OCCUP LOAD)
CONFENCE ROOM#1
(E) OFFICE 1
(E) OFFICE 2
(E) MAPS/FILE STORAGE
(E) WAITING 142 SF
156 SF
67 SF
131 SF
1323 SF 1 PER / 15 SF
1 PER / 400 SF
1 PER / 400 SF
1 PER / 400 SF
CONFENCE ROOMS
(E) GENERAL OFFICE
RENOVATED LOUNGE
WOMEN
MEN
470 SF
154 SF
44 SF
43 SF
1 PER / 400 SF 1
1 PER / 400 SF
1 PER / 400 SF
DESCRIPTION REQUIRED PROVIDED
EXIT SEPARATION
TRAVEL DISTANCE
EGRESS WIDTH
20' - 0" (MIN 1/3 OF DIAG)
300' MAX
DEAD END 50' MAX
32" MIN 36"
N/A
SEE ANALYSIS ON PLAN
24' - 10"
OFFICE ROOMS
RESTROOM 61 SF
RESTROOM 61 SF
EXIT REQUIRED SEPARATION (1/3 DIAG) = 29'- 2"
DIAGONAL =87'- 6"
EXIT SEPARATION 58' - 6"
131 SF
(E) OFFICE
156 SF
(E) MAPS/FILE
STORAGE
470 SF
(E) GENERAL OFFICE
44 SF
(E) TOILET
43 SF
(E) TOILET
154 SF
(E) LOUNGE
142 SF
(E) WAITING
67 SF
(E) OFFICE
(E) CLASSROOM
AA
B
C
DD
EXIT
S
EP
A R A
TIO
N
2'
6"
EXIT REQUIRED SEPARATION
(1/3 DIAG) = 26'- 9"
DIAGONAL =79'- 3"
(E) TOILET
(E) STO.
(E) STO.
61 SF
TOILET
61 SF
TOILET
229 SF
NEW OFFICE ROOM
805 SF
(E) GARAGE
16 SF
(E) STO.
14 SF
STO.
229 SF
GARAGE EXTENSION
EXISTING GYPSUM
+8' - 10"
EXISTING
GYPSUM
+8' - 10"
EXISTING
GYPSUM
+8' - 10"
EXISTING
GYPSUM
+8' - 10"
EXISTING
GYPSUM
+8' - 10"
EXISTING
GYPSUM
+8' - 10"
EXISTING GYPSUM
+8' - 10"
NEW
GYPSUM
+8' - 10"
NEW GYPSUM
+8' - 10"
EXISTING GYPSUM
+8' - 10"
AA
B
C
DD
(E) GYP.
+8' - 10"
(E) GYP.
+8' - 10"
(E) GYP.
+8' - 10"
(E) GYP.
+8' - 10"
EXISTING
GYPSUM
+10' - 0"
(E) GYP.
+10' - 0"
NEW GYPSUM
+8' - 10"
HEADER, WRAP w/
(2) LAYERS 5/8"
GYP. BD. TYPE 'X'
PATCH CEILING
(1 HR - (2) LAYERS
5/8" GYP. BD. TYPE 'X')
Exp. Date: 4-30-26
H a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
A04
CEILING AND LIFE SAFETY PLANS
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
KJ
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
SCALE: 1/8" = 1'-0"A04
1 DHHL BUILDING LIFE SATETY PLAN
SCALE: 1/8" = 1'-0"A04
2 DHHL BUILDING CEILING PLAN
NORTH
ROOM
INTERIOR
ELEV
A
C
BD
16'
FINISH FLOOR
0' - 0"
T.O.W.
8' - 11"
WALKWAY
7' - 7"
ABC
A05
Sim
GARAGE EXTENSION
FINISH FLOOR
0' - 0"
T.O.W.
8' - 11"
WALKWAY
7' - 7"
(E) MAPS/FILE
STORAGE
(E) GENERAL OFFICE(E) CLASSROOM
21 3 4 5 6 7
(E) GARAGE
A05
Sim
A05
Sim
A
5 1 5
GARAGE EXTENSION
NEW WINDOW TAG
NEW DOOR TAG
N NEW 2X4 WOOD STUD WALL
LEGEND
KEYNOTES - ELEV
1 GOOSENECK VENT FOR (E) AHU
2 SECURITY SCREEN TO MATCH (E)
3 PATCH ROOF LEAK
4 UTILIY SINK UNDER 4' EAVE
5 ROOF TO MATCH (E) ROOF
1HR FIRE SEPERATION, (2) LAYERS 5/8" TYPE "X" GYB.
BD. FROM SLAB TO ROOF SHEATHING
7 UNPERMITTED BUILT SPACE
FINISH FLOOR
0' - 0"
T.O.W.
8' - 11"
WALKWAY
7' - 7"
N N
21 3 4 5 6 7
A
A05
Sim
A05
Sim
A06
FINISH FLOOR
0' - 0"
T.O.W.
8' - 11"
WALKWAY
7' - 7"
NN
2 134567
A 114B
A
A05
Sim
A05
Sim
12 34 5 2 5 2
A06
SWING WOOD DOOR
SC FLUSH DOOR
'H
'W'
TYPE - 1
SWING METAL DOOR
TC FLUSH DOOR
'H
'W'
TYPE - 2
SWING METAL DOOR
TC FLUSH DOOR
'H
'W'
TYPE - 3
45 MIN. FIRE RATING
F.F.
DOUBLE SWING WOOD DOOR
SC FLUSH DOOR
TYPE - 4
'H (V
.I .F
'W' (V.I.F.)
F.F.
'A'
JALOUSIE WINDOW
6' - 0"
Exp. Date: 4-30-26
H a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
A05
EXTERIOR ELEVATIONS, SECTIONS, AND
DOOR & WINDOW SCHEDULES
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
KJ
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
SCALE: 1/8" = 1'-0"A05
2 DHHL BUILDING FRONT ELEVATION
SCALE: 1/8" = 1'-0"A05
1 DHHL BUILDING REAR ELEVATION
SCALE: 1/8" = 1'-0"A05
4 TYPICAL CROSS SECTION
SCALE: 1/8" = 1'-0"A05
3 CROSS SECTION
DOOR SCHEDULE
NUMBER TYPE STYLE H W Thickness COMMENTS
102 1 SOLID CORE FLUSH 6' - 8" 3' - 0" 0' - 2" HDWR SET 2
103 1 SOLID CORE FLUSH 6' - 8" 3' - 0" 0' - 2" HDWR SET 2
114A 1 SOLID CORE FLUSH 6' - 8" 3' - 0" 0' - 2" HDWR SET 3
114B 2 THERMAL CORE FLUSH 6' - 8" 3' - 0" 0' - 2" HDWR SET 4
115 3 THERMAL CORE FLUSH 6' - 8" 3' - 0" 0' - 2" HDWR SET 5
119 2 THERMAL CORE FLUSH 6' - 8" 3' - 0" 0' - 2" HDWR SET 1
O-01A 2 THERMAL CORE FLUSH 6' - 8" 3' - 0" 0' - 2" HDWR SET 4
O-01B 2 THERMAL CORE FLUSH 6' - 8" 3' - 0" 0' - 2" HDWR SET 4
O-01C 4 SOLID CORE FLUSH 6' - 8" 7' - 0" 0' - 2" HDWR SET 6
WINDOW SCHEDULE
NOTE TYPE H W HEAD HT. SILL HT. COMMENTS
A JALOUISE 4' - 0" 6' - 0" 6' - 8" 2' - 8" SECURITY SCREEN, SEE DETAIL
6/S06HARDWARE SET 1:
- LEVER PASSAGE LOCK SET
- DEADBOLT
HARDWARE SET 2:
- LEVER PRIVACY DOOR LOCK w/
OCCUPANCY INDICATOR
HARDWARE SET 3:
- LEVER PASSAGE SET
HARDWARE SET 4:
- CLOSURE
- RIM EXIT DEVICE w/ KEYED
ENTRY LEVER
HARDWARE SET 5:
- CLOSURE
- LEVER PASSAGE LOCK SET
- DEADBOLT
HARDWARE SET 6:
- PULL HANDLE (RIGHT PANEL)
- JIMMY PROOF DEADLOCK
(RIGHT PANEL)
- TOP & BOTTOM FLUSH BOLTS
(LEFT PANEL)
16'
74 8
(F R
P -1
(F R
P -1
KEYNOTES - INT ELEV
1 ADA GRAB BARS
2 ADA TOILET
3 ADA LAVATORY
4 BASE CABINETS
5 WALL CABINETS
6 REFRIGERATOR
7 SOLID SURFACE COUNTERTOP
8 SINK w/ FAUCET
9 ADA MIRROR
10 (E) WINDOW
11 SOAP DISPENSER
12 PAPER TOWEL DISPENSER
13 TOILET PAPER
14 INTANT HOT WATER HEATER
15 IWH SWITCH
PTD SD MI2436
U O
N
TYPICAL FRONT ELEVATION
AT ACCESSIBLE STALL
GRAB BAR
TYPICAL SIDE ELEVATION AT
ACCESSIBLE STALL
TPD
TYPICAL FRONT ELEVATION
AT ACCESSIBLE LAVATORY
SURFACE
MOUNTED
TOILET PAPER
DISPENSER
M
IN
TPD
SURFACE
MOUNTED
PAPER TOWEL
DISPENSER
SOAP DISPENSER MIRROR
3' - 0"
3' - 6" 1' - 0"
FACE OF FINISH
GRAB BAR
TPD
0' - 6" 3' - 0"
FACE OF FINISH
BOTTOM OF
REFLECTING
SURFACE
24"x36"
MIRROR
LAV
WC
WC
MAX.
0' - 6"
KNEE CLEARANCE
REQUIRED
0' - 8"9
M
IN
M
IN
M A
X
TYPICAL SIDE ELEVATION
AT ACCESSIBLE LAVATORY
U O
N
FACE OF FINISH
1' - 6"
WALL MOUNTED
TELEVISION MOUNTING
BRACKET
FINISH FLOOR
0' - 0"
T.O.W.
8' - 11"
(2) LAYERS 5/8"
TYPE 'X' GYP. BD.,
FROM FLOOR TO
ROOF SHEATHING
(E) STRUCTURE
3/4" PLYWOOD
CONC. SLAB
PRE-MANUFACTURED
WOOD TRUSSES
2x BLOCKING, TYP.
(2) LAYERS 5/8"
TYPE 'X' GYP. BD.
2x4 WALL w/
FIRE BLOCKING
FINISH FLOOR
0' - 0"
T.O.W.
8' - 11"
(2) LAYERS 5/8"
TYPE 'X' GYP. BD.,
FROM FLOOR TO
ROOF SHEATHING
2x4 WALL w/
FIRE BLOCKING
2x4 PURLIN
CONC. SLAB
2x BLOCKING, TYP.
PRE-MANUFACTURED
WOOD TRUSSES
3/4" PLYWOOD
(2) LAYERS 5/8"
TYPE 'X' GYP. BD.
METAL ROOFING
TO MATCH (E)
FINISH FLOOR
0' - 0"
T.O.W.
8' - 11"
(2) LAYERS 5/8"
TYPE 'X' GYP. BD.,
FROM FLOOR TO
ROOF SHEATHING
(E) STRUCTURE
3/4" PLYWOOD
CONC. SLAB
PRE-MANUFACTURED
WOOD TRUSSES
2x BLOCKING, TYP.
(2) LAYERS 5/8"
TYPE 'X' GYP. BD.
SCALE: 3/8" = 1'-0"A06
1 LOUNGE
SCALE: 3/8" = 1'-0"A06
5 (E) TOILET - 110
SCALE: 3/8" = 1'-0"A06
6 (E) TOILET - 111
SCALE: 3/8" = 1'-0"A06
3 TOILET - 103
SCALE: 3/8" = 1'-0"A06
4 TOILET - 102
SCALE: 3/8" = 1'-0"A06
2 CONFERENCE
Exp. Date: 4-30-26
H a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
A06
INTERIOR ELEVATIONS AND MOUNTING HEIGHTS
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
KJ
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
4'
3/8" = 1'-0"
2'2' 01'
SCALE: 3/4" = 1'-0"A06
7 1-HR FIRE WALL 1
SCALE: 3/4" = 1'-0"A06
8 1-HR FIRE WALL 2
SCALE: 3/4" = 1'-0"A06
9 1-HR FIRE WALL 3
NEW WINDOW TAG
NEW DOOR TAG
SPILT AC SEE MENCHANICAL
DRAWINSG
N NEW 2X4 WOOD STUD WALL
LEGEND
NEW IWH
(E) TOILET
(E) OFFICE
(E) ADMINSTRATION SPACE
E X
IT
R E
Q U
IR
E
D S
E P
A R
A T
IO
N (1
/3 D
IA
G
D
IA
G O
N A
L
5'-
E X
IT
S
E P
A R
A T
IO
N
710 SF
(E) ADMINSTRATION
SPACE
O-01
148 SF
(E) OFFICE
O-0243 SF
(E) TOILET
O-03
/2
6' - 6"
24' - 0"
5' - 0" 11' - 4"
1 2
1 2
O-01B
O-01A
O-01C
OCCUPANCY LOAD
ROOM NAME (IBC USE) SF OCCUP LOAD RATIO OCCUPANTS
(SF / OCCUP LOAD)
(E) TOILET
(E) OFFICE
(E) ADMINSTRATION SPACE 715 SF
144 SF
45 SF
1 PER / 400 SF 1
1 PER / 400 SF 1
DESCRIPTION REQUIRED PROVIDED
EXIT SEPARATION
TRAVEL DISTANCE
EGRESS WIDTH
20' - 0" (MIN 1/3 OF DIAG)
300' MAX
DEAD END 50' MAX
32" MIN 36"
N/A
SEE ANALYSIS ON PLAN
24' - 10"
OFFICE ROOMS
EXISTING GYPSUM
+8' - 10"
EXISTING GYPSUM
+8' - 10"
1 CLEAN AND REPAINT WALLS
OHA BUILDING NEW KEYNOTES
2 NEW VCT FLOORING
3 NEW ADA FIXTURES
4 REPLACE SLIT AC
5 4x4 POSTS & FRAME w/ SIMPSON HARDWARE, AND DOOR
6 FCU, SEE MECHANICAL
7 REPLACE (E) LIGHTS
8 NEW IWH
9 REPAINT EXTERIOR
10 UPGRADE CAT5 WIRING TO CAT6
1 REMOVE FIXTURES
OHA BUILDING DEMO KEYNOTES
2 REMOVE CARPET
3 REMOVE SPLIT AC
4 REMOVE (E) IT CLOSET DOORS
Exp. Date: 4-30-26
H a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
A07
OHA BUILDING PLANS
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
KJ
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
NORTH
ROOM
INTERIOR
ELEV
A
C
BD
16'
1/8" = 1'-0"
8'8' 4' 02'6'
SCALE: 3/16" = 1'-0"A07
1 OHA DEMO PLAN
SCALE: 3/16" = 1'-0"A07
2 OHA LIFE SAFETY PLAN
SCALE: 3/16" = 1'-0"A07
3 OHA PROPOSED PLAN
SCALE: 3/16" = 1'-0"A07
4 OHA CEILING PLAN
a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
A08
ROOM FINISH SCHEDULE
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
KJ
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
ROOM FINISH SCHEDULE
ROOM
NO. ROOM NAME
FLOOR
FINISH BASE
WALL FINISH CEILING
FINISHA B C D
100 (E) CLASSROOM VT-1 VB-1 P-1 P-1 P-1 P-1 P-4
101 ENLARGED CONFENCE ROOM VT-2 VB-2 P-1 P-3 P-1 P-3 P-4
102 TOILET VT-3 VB-2 P-2/FRP-1 P-2/FRP-1 P-2/FRP-1 P-2/FRP-1 P-4
103 TOILET VT-3 VB-2 P-2/FRP-1 P-2/FRP-1 P-2/FRP-1 P-2/FRP-1 P-4
104 (E) OFFICE VT-1 VB-1 P-1 P-1 P-1 P-1 P-4
105 (E) MAPS/FILE STORAGE VT-1 VB-1 P-1 P-1 P-1 P-1 P-4
106 (E) OFFICE VT-1 VB-1 P-1 P-1 P-1 P-1 P-4
107 (E) WAITING VT-1 VB-1 P-1 P-1 P-1 P-1 P-4
108 (E) GENERAL OFFICE VT-1 VB-1 P-1 P-1 P-1 P-1 P-4
109 (E) LOUNGE VT-1 VB-1 P-1 P-1 P-1 P-1 P-4
110 (E) TOILET VT-1 VB-1 P-2 P-2 P-2 P-2 P-4
111 (E) TOILET VT-1 VB-1 P-2 P-2 P-2 P-2 P-4
112 (E) STO. VT-1 VB-1 P-1 P-1 P-1 P-1 P-4
113 STO. VT-1 VB-1 P-1 P-1 P-1 P-1 P-4
114 NEW OFFICE ROOM VT-2 VB-2 P-1 P-1 P-1 P-1 P-4
115 (E) GARAGE NONE NONE P-5 P-5 P-5 P-5 P-4
116 (E) TOILET VT-1 VB-1 P-5 P-5 P-5 P-5 P-4
117 (E) STO. NONE NONE P-5 P-5 P-5 P-5 P-4
118 (E) STO. NONE NONE P-5 P-5 P-5 P-5 P-4
119 GARAGE EXTENSION NONE NONE P-5 P-5 P-5 P-5 P-4
O-01 (E) ADMINSTRATION SPACE VT-2 VB-2 P-1 P-1 P-1 P-1 P-4
O-02 (E) OFFICE VT-2 VB-2 P-1 P-1 P-1 P-1 P-4
O-03 (E) TOILET VT-3 VB-2 P-2 P-2 P-2 P-2 P-4
MATERIAL SCHEDULE
MARK MANUFACTURER MODEL UNDER MATERIAL / LOCATION COLOR SHEEN PRIMER STYLE TYPE SIZE THICKNESS COMMENTS
EXTERIOR PAINT
EP-1 PPG INDUSTRIES INC 649-10 WOOD T1-11 SIDING MATCH (E) SATIN SURE GRIP INTERIOR/EXTERIOR UNIVERSAL PRIMER/SEALER N/A N/A N/A N/A
EP-2 PPG INDUSTRIES INC 649-10 WOOD TRIM MATCH (E) SATIN SURE GRIP INTERIOR/EXTERIOR UNIVERSAL PRIMER/SEALER N/A N/A N/A N/A
EP-3 PPG INDUSTRIES INC 649-10 WOOD FASCIA & SOFFIT MATCH (E) SATIN SURE GRIP INTERIOR/EXTERIOR UNIVERSAL PRIMER/SEALER N/A N/A N/A N/A
FLOORING
VT-1 (E) FLOORING N/A CONCRETE N/A N/A N/A N/A N/A N/A N/A CLEAN (E) PER MANUF. RECOMMENDATION
VT-2 ARMSTRONG FLOORING - COMMERCIAL STANDARD EXCELON IMPERIAL CONCRETE TAUPE N/A N/A 51901 TILES 12"x12" .125"
VT-3 ARMSTRONG FLOORING - COMMERCIAL MEDINTONE CONCRETE FEATHERSMOOTH N/A N/A H2004 HOMOGENOUS SHEET 6.5' TO 65.5' .080"
PAINT
P-1 PPG INDUSTRIES INC 13-510 GYPSUM BOARD PARAFFIN SEMI-GLOSS PURE PERFORMANCE INTERIOR LATEX PRIMER N/A N/A N/A N/A
P-2 PPG INDUSTRIES INC 13-510 GYPSUM BOARD CRUMB COOKIE SEMI-GLOSS PURE PERFORMANCE INTERIOR LATEX PRIMER N/A N/A N/A N/A
P-3 PPG INDUSTRIES INC 13-510 GYPSUM BOARD FLAGSTONE SEMI-GLOSS PURE PERFORMANCE INTERIOR LATEX PRIMER N/A N/A N/A N/A
P-4 PPG INDUSTRIES INC 13-510 GYPSUM BOARD DELICATE WHITE SEMI-GLOSS PURE PERFORMANCE INTERIOR LATEX PRIMER N/A N/A N/A N/A
P-5 PPG INDUSTRIES INC 13-510 GYPSUM BOARD THIN ICE SEMI-GLOSS PURE PERFORMANCE INTERIOR LATEX PRIMER N/A N/A N/A N/A
WALL COVERING
FRP-1 MARLITE STANDARD FRP GYPSUM BOARD BISCUIT N/A N/A P 440N PEBBLED 48" HIGH .090"
VB-1 (E) WALL BASE N/A GYPSUM BOARD N/A N/A N/A N/A N/A N/A N/A CLEAN (E) PER MANUF. RECOMMENDATION
VB-2 ARMSTRONG FLOORING - COMMERCIAL COVED WALL BASE GYPSUM BOARD GREIGE N/A N/A R41GR BASE BOARD 4" HIGH .125"
FFE SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL SIZE (HxDxW) COMMENTS
Specialty Equipment
GB GRAB BARS AMERICAN SPECIALTIES, INC 3701-36 & 3701-42 36" & 42" SEE SHEET A06
MI MIRROR AMERICAN SPECIALTIES, INC 0620-2436 24" X 36" SEE SHEET A06
P PROJECTOR EPSON EX3290 WVGA 3LCD 3.2" x 9.2" x 11.9" CEILING MOUNTED
PS PROJECTOR SCREEN VIVID STORM SLIMLINE TENSION SCREEN 150" AMBIENT LIGHT REJECTING SCREEN MATERIL
PTD PAPER TOWEL DISPENSER AMERICAN SPECIALTIES, INC 0210 11" x 8" x 4" SEE SHEET A06
REF REFRIGERATOR SAMSUNG RT18DG6700SR 66 3/4" x 28 3/4" x 31 7/8" SEE SHEET A06
SD SOAP DISPENSER GEORGIA-PACIFIC 52060 13 1/8" x 7 1/8" x 4 5/8" SEE SHEET A06
TPD TOILET PAPER DISPENSER BOBRICK B-2888 11" x 6 1/16" x 5 15/16" SEE SHEET A06
Plumbing Fixtures
IWH INSTANT WATER HEATER SEE MECH. SEE MECH. SEE MECH.
LAV LAVATORY SEE MECH. SEE MECH. SEE MECH.
LT UTILITY SINK SEE MECH. SEE MECH. SEE MECH.
SINK DROP-IN SINK SEE MECH. SEE MECH. SEE MECH.
WC WATER CLOSET SEE MECH. SEE MECH. SEE MECH.
Casework
BC BASE CABINET BELLMONT CABINET COMPANY OR EQUAL 1900 SERIES SEE PLANS/INTERIOR ELEVATIONS SHOP DRAWING REQUIRED
CNTR COUNTERTOP w/ BACKSPLASH CORIAN OR EQUAL SOLID SURFACE SEE PLANS/INTERIOR ELEVATIONS SHOP DRAWING REQUIRED
UC-1 UPPER WALL CABINET BELLMONT CABINET COMPANY OR EQUAL 1900 SERIES SEE PLANS/INTERIOR ELEVATIONS SHOP DRAWING REQUIRED
UC-2 UPPER WALL CABINET BELLMONT CABINET COMPANY OR EQUAL 1900 SERIES SEE PLANS/INTERIOR ELEVATIONS SHOP DRAWING REQUIRED
SPECIALTY EQUIPMENT
PLUMBING FIXTURES
CASEWORK
#7
#6
#5
#3, #4
50"
36"
30"
24"
66"
46"
38"
30"
40"
28"
22"
18"
50"
36"
30"
24"
20"
18"
14"
12"
BAR
SIZE
LAP SPLICE
BOTTOM
BAR OR
WALL BAR
TOP
BAR
WITH
STANDARD
HOOK
STRAIGHT
EMBEDMENT
MINIMUM SPLICE & EMBEDMENT LENGTHS
BOTTOM
BAR OR
WALL BAR
TOP
BAR
Exp. Date: 4-30-26
H a w a i i , U S
A
Licensed
Professional
Engineer
7808-S
A T
H
ER
R .
D A
R
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
2 0 2 0 / C P - 1 8 6
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION AND
CONSTRUCTION OF THIS PROJECT
WILL BE UNDER MY OBSERVATION
DRAWEFILE FOLDER
DATE BYREVISIONS
DATE:
DESIGNED BY:
DRAWN BY:
SHEET
JOB NO.
OF SHTS
CHECKED BY:
SUPV:
REVISION NO.
DEPARTMENT OF HAWAIIAN HOME LANDS
T.M.K.:
S01
STRUCTRUAL NOTES
24-096
EAST HAWAII HILO DISTRICT OFFICE
DHHL OFFICE IMPROVEMENTS
05/08/26
KJ
AD
YK
162 BAKER AVE, HILO, HI 96720
(3) 2-1-023:157 & 158
GENERAL:
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE DRAWINGS AND SPECIFICATIONS.
2. THE STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, WIND, SEISMIC, ETC. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER SHALL NOT
INCLUDE INSPECTION OF THE ABOVE ITEMS.
3. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING LAGGING, SHORING AND
PROTECTION OF ADJACENT PROPERTY STRUCTURES, STREETS AND UTILITIES.
4. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES AND SHALL CHECK ALL DIMENSIONS. ALL DISCREPANCIES SHALL BE CALLED TO THE ATTENTION OF THE ARCHITECT AND BE RESOLVED BEFORE
PROCEEDING WITH THE WORK.
5. SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER FOR REVIEW
PRIOR TO FABRICATIONS.
6. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED ON FRAMED FLOORS OR ROOF. LOADS SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE SHORING, RESHORING AND/OR BRACING WHERE STRUCTURE HAS
NOT ATTAINED DESIGN STRENGTH.
7. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.
8. DIMENSIONS SHALL NOT BE SCALED FROM THE DRAWINGS.
9. DESIGN CRITERIA
A. STRUCTURAL DESIGN IS BASED ON THE PROVISIONS OF THE 2018 IBC AS AMMENDED BY THE COUNTY OF HAWAII
B. LIVE
1. ROOF = 20 PSF (4:12 ROOF SLOPE)
2. FLOOR = 40 PSF
C. WIND = 140 MPH, EXPOSURE C
Kz = 0.85 Kzt = 1.0 Kd = 0.85
D. SEISMIC = SEISMIC DESIGN CATEGORY D
SDS = 0.989 g SD1 = 0.68 g
10. SPECIAL INSPECTION REQUIREMENTS
CONCRETE ... REQUIRED
REINFORCING ... REQUIRED
TERMITE PROTECTION ... REQUIRED
COMPLETE LOAD PATH AND UPLIFT TIES ... REQUIRED
11. THE CONTRACTOR SHALL ANTICIPATE THE NEED FOR LOCALIZED STRUCTURAL STRENGTHENING DUE TO REQUIRED PENETRATIONS MADE TO EXISTING STRUCTURAL ELEMENTS. THIS SHALL NOT BE A BASIS FOR ANY COST OR TIME IMPACT.
12. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AS WELL AS NEW WORK. ANY
DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ENGINEER.
13. THESE DRAWINGS REPRESENT THE EXISTING CONDITIONS AND THE NEW WORK TO BE PERFORMED, BASED ON THE BEST AVAILABLE INFORMATION. SOME MODIFICATIONS AND REVISIONS IN THE DESIGN MAY BE REQUIRED DUE TO UNFORESEEN FIELD
CONDITIONS WHEN CONCEALED AREAS ARE UNCOVERED DURING CONSTRUCTION.
GRADING & SITEWORK:
1. THE SURROUNDING AREAS SHOULD BE GRADED SO AS TO ENSURE DRAINAGE AWAY FROM THE STRUCTURE.
2. ALL BACKFILL SHALL BE COMPACTED TO A MINIMUM OF 90% OPTIMUM DENSITY.
3. ALL WATER SHALL BE REMOVED FROM FOUNDATION EXCAVATIONS PRIOR TO PLACING OF CONCRETE.
4. ALL EXCAVATIONS SHALL BE INSPECTED AND APPROVED BY THE INSPECTOR PRIOR TO PLACEMENT OF STEEL OR CONCRETE.
FOUNDATION:
1. ANCHOR BOLTS SHALL COMPLY WITH ASTM A554 GRADE 36 UNLESS NOTED OTHERWISE.
2. CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION OF ALL CRIBBING, SHEATHING, AND SHORING NECESSARY TO
SAFELY RETAIN EXCAVATIONS AND EARTH BANKS.
3. PROVIDE TERMITE PROTECTION PER IBC, SECTION 2303.1.8 AS AMENDED AND ADOPTED BY THE COUNTY OF HAWAII.
4. CENTER FOOTING ON COLUMN, UNLESS NOTED OTHERWISE.
5. UNLESS NOTED OTHERWISE, FOOTING REINFORCING BARS ARE BOTTOM BARS.
6. FOOTING THICKNESSES ARE MINIMUM THICKNESSES ONLY AND MAY BE INCREASED DUE TO SPECIFIC CONDITIONS.
7. CLEAN AND MOISTEN FOOTING TRENCHES PRIOR TO POURING CONCRETE.
8. DO NOT PLACE CONDUITS AND UTILITY LINES IN FOOTING TRENCHES.
REINFORCING STEEL:
1. ALL REINFORCING STEEL SHALL BE DETAILED AND PLACED IN CONFORMANCE WITH THE "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" (ACI 318-05), THE CRSI "MANUAL OF STANDARD PRACTICE," AND THE "ACI DETAILING MANUAL - 2004"
(SP-66) AS MODIFIED BY THE PROJECT DRAWINGS AND SPECIFICATIONS.
2. ALL REINFORCING BAR BENDS SHALL BE MADE COLD.
3. REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM A615 WITH THE FOLLOWING GRADES:
A. #2 TIES ......................... GRADE 20 OR BETTER
B. #3 AND #4 ................... GRADE 40
C. #5 AND LARGER ........... GRADE 60
4. REINFORCING SPLICES SHALL BE MADE ONLY WHERE INDICATED ON THE DRAWINGS.
5. DOWELS BETWEEN FOOTING AND WALL OR COLUMNS SHALL BE THE SAME GRADE, SIZE AND SPACING OR NUMBER AS THE
VERTICAL REINFORCING RESPECTIVELY, U.O.N.
6. REINFORCING BARS SHALL BE IN AS LONG AS PRACTICABLE AND AS DETAILED AND SHALL BE LAPPED AT SPLICES AND
CORNERS NOT LESS THAN 48 BAR DIAMETER (24" MINIMUM), UNLESS OTHERWISE SHOWN.
NOTES:
(1) LENGTHS ARE FOR CONCRETE WITH
REBAR SPACED 6 BAR DIAMETERS MINIMUM.
INCREASE 25% FOR BARS SPACED LESS THAN
6 BAR DIAMETERS.
(2) "TOP BARS ARE HORIZONTAL BARS WITH
12" OR MORE OF CONCRETE CAST BELOW.
7. CONTRACTOR SHALL SUBMIT REINFORCING BAR LAYOUTS AND DETAILS FOR ARCHITECT'S REVIEW PRIOR TO FABRICATION.
FABRICATE FROM REVIEWED DRAWINGS ONLY.
8. ANCHOR BOLTS, DOWELS AND OTHER EMBEDDED ITEMS ARE TO BE SECURELY TIED IN PLACE BEFORE CONCRETE IS POURED.
9. WELDED WIRE FABRIC (WWF) SHALL CONFORM TO ASTM A185. WELDED WIRE FABRIC IN SUSPENDED SLABS SHALL HAVE FY= 60 KSI. LAP 6" MINIMUM OR ONE FULL MESH, WHICHEVER IS GREATER FOR SLABS ON GRADE.
10. WELDING OF REINFORCING STEEL IS NOT PERMITTED UNLESS OTHERWISE SHOWN ON THE DRAWINGS. WELDING OF REINFORCING STEEL SHALL CONFORM TO AWS D1.4-79 "AWS STRUCTURAL WELDING CODE - REINFORCING STEEL" OF THE
AMERICAN WELDING SOCIETY.
11. ALL REINFORCING STEEL SHALL HAVE THE FOLLOWING MINIMUM CONCRETE COVERAGE:
A. CONCRETE PLACED AGAINST EARTH............................................................................................................................3" B. CONCRETE WITH FORMED SURFACES IN CONTACT WITH EARTH.............................................................................2" C. CONCRETE EXPOSED TO WEATHER..............................................................................................................................3" D. SLABS, WALLS AND JOIST NOT EXPOSED TO WEATHER OR IN CONTACT WITH EARTH (#11 OR SMALLER) .......3/4" E. BEAMS, COLUMNS, AND GIRDERS NOT EXPOSED OR IN CONTACT WITH EARTH....................................................1-1/2"
LUMBER & WOOD FRAMING:
1. ALL FRAMING LUMBER SHALL BE DOUGLAS FIR-LARCH EXCEPT WHEN NOTED. ALL LUMBER SHALL BE GRADED IN ACCORDANCE WITH THE RULES OF THE WCLIB OR WWPA AND SHALL BEAR A GRADE MARK. LUMBER GRADES SHALL BE AS FOLLOWS:
2X4 & 2X6 STUDS......................... NO. 2
2X ROOF OR FLOOR JOIST............. NO. 1
4X HEADERS & BEAMS................... NO. 1
4X POST OR GREATER.................... NO. 1
2. ALL LUMBER IN CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESSURED TREATED.
3. DO NOT BORE OR NOTCH JOISTS, RAFTERS OR BEAMS, EXCEPT WHERE SHOWN IN DETAILS. OBTAIN ENGINEER'S APPROVAL
FOR ANY HOLES OR NOTHCES.
4. PROVIDE METAL WASHERS UNDER ALL BOLT HEADS AND NUTS BEARING ON WOOD.
5. ALL BOLTS SHALL BE GALVANIZED. BOLT HOLES SHALL BE 1/16" LARGER DIAMETER THAN NORMAL SIZE OF BOLT USED.
6. APPROVED CROSS BRIDGING OR SOLID BLOCKING SHALL BE SPACED AT 8'-0" O.C. MAX. WHEN MEMBERS ARE 10" OR MORE IN
DEPTH.
7. ALL CONNECTORS REFERENCES, UNLESS NOTED OTHERWISE ARE FROM "SIMPSON STRONG-TIE COMPANY" CATALOG, LATEST EDITION. ALL BOLTING AND NAILING SHALL BE PER SIMPSON CATALOG. STEEL PLATES FOR FABRICATED CONNECTIONS SHALL BE
ASTM A36.
8. PROVIDE 15# FELT BELOW ALL PLATES RESTING ON CONCRETE OR MASONRY.
WOOD PANEL SHEATHING:
1. WOOD STRUCTURAL PANELS SHALL COMPLY WITH 2018 IBC MINIMUM STANDARDS AND QUALITY SECTION 2303.
2. ALL PLYWOOD SHALL BE DOUGLAS FIR, STRUCTURAL I.
3. SILLS AND PLATES AT SHEAR WALLS SHALL BE CONTINUOUS AND FREE OF CUTS AND NOTCHES. PERFORATIONS SHALL BE ALLOWED WITH A MAXIMUM OF 1-3/4" DIAMETER AND SHALL BE LOCATED AS CLOSE TO CENTER AS POSSIBLE. SILL BOLTS TO
ENTER CONCRETE 7" MINIMUM AND 12" MAXIMUM FROM ENDS OF SILL AND CORNERS.
NAILS & FASTENERS:
1. ALL CONNECTORS SHALL BE SIMPSON HARDWARE, ANY CHANGES SHALL BE APPROVED BY THE ENGINEER AND BUILDING
OFFICIAL.
2. USE FULL NAILING/BOLTING AT ALL CONNECTORS.
3. ALL BOLTS TO BE A307 UNLESS NOTED OTHERWISE.
NAILING SCHEDULE:
JOIST TO SILL OR GIRDER - TOENAIL................................................. 3-8D BRIDGING TO JOIST - TOENAIL EACH END........................................... 2-8D
1X6 SUBFLOOR OR LESS TO EACH JOIST - FACE NAIL..................... 2-8D
WIDER THAN 1X6 SUBFLOOR TO EACH JOIST - FACE NAIL................ 3-8D
2" SUBFLOOR TO JOIST OR GIRDER - BLIND AND FACE NAIL........... 2-16D
SOLE PLATE TO JOIST OR BLOCKING - FACE NAIL............................. 6D @ 16" STUD TO TOP PLATE - END NAILING................................................... 2-16D STUD TO SOLE PLATE - TOE NAIL END NAIL...................................... 4-8D OR 2-16D CORNER STUDS, DOUBLE STUDS AND ANGLES..................................... 16D @ 24"
TOP PLATES, LAPS AND INTERSECTIONS - FACE NAILS...................... 2-16D
TOP PLATE SPLICES............................................................................... 24-16D EACH SIDE OF SPLICE CONTINOUS HEADER - TWO PIECES..................................................... 16D @ 16" ALONG EACH EDGE CEILING JOIST TO PLATE - TOE NAIL................................................... 4-8D CONTINOUS HEADER TO STUD - TOE NAIL.......................................... 4-8D
CEILING JOIST, LAPS OVER PARTITIONS - FACE NAIL.......................... 3-16D
CEILING JOIST TO PARALLEL RAFTERS - FACE NAIL............................ 3-16D
RAFTERS TO PLATE - TOE NAIL............................................................ 3-8
D1" BRACE TO EACH STUD AND PLATE - FACE NAIL........................... 2-8D
1X8 SHEATING OR LESS TO EACH BEARING - FACE NAIL.................. 2-8D
WIDER THAN 1" SHEATHING TO EACH BEARING - FACE NAIL............. 2-8D
BUILT UP CORNER STUDS..................................................................... 16D @ 24" 2" PLANKS.............................................................................................. 2-16D @ EACHING BEARING
FASTENING OF BUILT UP BEAMS
2-2X................................................................................ 16D @ 12" STAGGERED 3-2X OR UP TO 5-2X................................................... 1/2" DIA. M.B. @ 18" STAGGERED FASTENINGS SHALL BE
PLACED AT A MAXIMUM OF 1/4 THE BEAM DEPTH FROM TOP OR BOTTOM EDGES.
CONSTRUCTION NOTES:
1. ALL APPLICABLE CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, SEPTEMBER 1986 AND STANDARD DETAILS FOR PUBLIC WORKS CONSTRUCTION, SEPTEMBER 1984, AS AMENDED, OF THE DEPARTMENT OF PUBLIC WORKS, CITY AND COUNTY OF HONOLULU AND THE COUNTIES OF KAUAI, MAUI, AND
HAWAII.
2. THE UNDERGROUND PIPES, CABLES OR DUCTLINES KNOWN TO EXIST BY THE ENGINEER FROM HIS SEARCH OF RECORDS ARE INDICATED ON THE PLANS. THE CONTRACTOR SHALL VERIFY THE LOCATIONS AND DEPTHS OF THE FACILITIES AND EXERCISE PROPER CARE IN EXCAVATING IN THE AREA. WHEREVER CONNECTIONS OF NEW UTILITIES TO EXISTING UTILITIES ARE SHOWN ON THE PLANS, THE CONTRACTOR SHALL EXPOSE THE EXISTING LINES AT THE PROPOSED CONNECTIONS TO
VERIFY THEIR LOCATIONS AND DEPTHS PRIOR TO EXCAVATION FOR THE NEW LINES.
3. NO CONTRACTOR SHALL PERFORM ANY CONSTRUCTION OPERATION SO AS TO CAUSE FALLING
ROCKS, SOIL OR DEBRIS IN ANY FORM TO FALL, SLIDE OR FLOW INTO EXISTING CITY DRAINAGE
SYSTEMS, OR ADJOINING PROPERTIES, STREETS OR NATURAL WATERCOURSES. SHOULD SUCH
VIOLATIONS OCCUR, THE CONTRACTOR MAY BE CITED AND THE CONTRACTOR SHALL IMMEDIATELY
MAKE ALL REMEDIAL ACTIONS NECESSARY.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMANCE WITH THE APPLICABLE
PROVISIONS OF THE WATER QUALITY AND WATER POLLUTION CONTROL STANDARDS CONTAINED
IN HAWAII ADMINISTRATIVE RULES, TITLE 11, CHAPTER 54, "WATER QUALITY STANDARDS", AND TITLE 11, CHAPTER 55, "WATER POLLUTION CONTROL".
5. THE CONTRACTOR SHALL NOTIFY THE CIVIL ENGINEERING BRANCH, DEPARTMENT OF PLANNING AND PERMITTING, TO ARRANGE FOR INSPECTIONAL SERVICES AND SUBMIT FOUR (4) SETS OF APPROVED CONSTRUCTION PLANS SEVEN (7) DAYS PRIOR
TO COMMENCEMENT OF CONSTRUCTION WORK.
6. CONFINED SPACE FOR ENTRY BY CITY PERSONNEL, INCLUDING INSPECTORS, INTO A PERMIT REQUIRED CONFINED SPACE AS DEFINED IN 29 CFR PART 1910.146(B), THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING:
I. ALL SAFETY EQUIPMENT REQUIRED BY THE CONFINED SPACE REGULATIONS APPLICABLE TO ALL PARTIES OTHER THAN THE
CONSTRUCTION INDUSTRY, TO INCLUDE, BUT NOT LIMITED TO, THE FOLLOWING:
A. FULL BODY HARNESSES FOR UP TO TWO PERSONNEL.
B. LIFELINE AND ASSOCIATED CLIPS.
C. INGRESS/EGRESS AND FALL PROTECTION EQUIPMENT.
D. TWO-WAY RADIOS (WALKIE-TALKIES) IF OUT OF LINE-OF-SIGHT.
E. EMERGENCY (ESCAPE) RESPIRATOR (10 MINUTE DURATION).
F. CELLULAR TELEPHONE TO CALL FOR EMERGENCY ASSISTANCE.
G. CONTINUOUS GAS DETECTOR (CALIBRATED) TO MEASURE OXYGEN, HYDROGEN SULFIDE, CARBON
H. PERSONAL MULTI-GAS DETECTOR TO BE CARRIED BY INSPECTOR.
II. CONTINUOUS FORCED AIR VENTILATION ADEQUATE TO PROVIDE SAFE ENTRY CONDITIONS.
III. ONE ATTENDANT/RESCUE PERSONNEL TOPSIDE (TWO, IF CONDITIONS WARRANT IT).
7. PURSUANT TO CHAPTER 6E, HRS, IN THE EVENT ANY ARTIFACTS OR HUMAN REMAINS ARE UNCOVERED DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL IMMEDIATELY SUSPEND WORK AND NOTIFY THE HONOLULU POLICE DEPARTMENT, THE STATE DEPARTMENT OF LAND AND NATURAL RESOURCES-HISTORIC PRESERVATION DIVISION. IN ADDITION, FOR NON-CITY PROJECTS, THE CONTRACTOR SHALL INFORM THE CIVIL ENGINEERING BRANCH, DEPARTMENT OF PLANNING AND
PERMITTING AND FOR CITY PROJECTS, NOTIFY THE RESPONSIBLE CITY AGENCY.
3 4
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
B
C
3 4
A
C
B 8 8
48 8
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
A
C
B
4 8
4 8 4 8
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
A
B
C
5 6
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .