01 Notification and Identification Rev signed.pdf
PDF 1 MB Posted
- Attached to
- East Hawaii Hilo District Office Improvements
- Solicitation number
- B26002854
- Issued by
- Hawaii County, Hawaii
About this file
Summary of IFB-26-HHL-009: East Hawaii Hilo District Office Improvements
This Invitation for Bid (IFB) notification and identification document is issued by the Department of Hawaiian Home Lands (DHHL) Land Development Division for the East Hawaii Hilo District Office Improvements project located in Hilo, County of Hawaii. The project encompasses comprehensive renovation work including all supervision, labor, materials, equipment, and related items necessary to complete the work as detailed in the attached scope of work and architectural/engineering plans. The scope includes office and utility improvements across multiple building systems (structural, mechanical, plumbing, electrical, civil/site work). Electronic bid submissions are required through HIePRO no later than 2:00 p.m. Hawaii Standard Time (HST) on Wednesday, June 12, 2026. A pre-bid meeting is scheduled for 9:00 a.m. HST on Tuesday, May 19, 2026, at the DHHL District Office at 162 Baker Avenue, Hilo; attendance is not mandatory but highly recommended. Prospective bidders must submit a Notice of Intention to Bid and a completed Standard Qualification Questionnaire (SPO Form-21) by 4:00 p.m. HST on June 1, 2026. Written questions regarding the project must be posted by 4:00 p.m. HST on May 22, 2026, with responses provided by May 28, 2026.
Performance and payment bonds equal to one hundred percent of the Total Base Offer Amount are required if the bid amount exceeds fifty thousand dollars ($50,000). The project is subject to Hawaii Revised Statutes Section 103D and requires compliance with prevailing wage rates established by the State of Hawaii Department of Labor and Industrial Relations Wage Rate Schedule Bulletin No. 510 (February 16, 2026) and applicable apprentice schedules. Bidders and subcontractors must possess all required valid State of Hawaii licenses and specialty licenses needed for the work. A surety bid bond is mandatory for this IFB. All procurement documents are available through the HIePRO website at https://hiepro.ehawaii.gov/sav-search.html. Campaign contributions from state and county contractors are prohibited during the contract term under Hawaii Revised Statutes 11-355. DHHL reserves the right to amend the IFB by written addenda, reject any and all bids, or waive any bid defects as deemed in the best interest of the State.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hawaii District Office Renovation
IFB-26-HHL-009 TC-1 TABLE OF CONTENTS
TABLE OF CONTENTS
IFB NOTIFICATION AND INFORMATION PAGE
IFB NOTICE .............................................................................................................................................. 1-2
APPRENTICE SCHEDULE BULLETIN NO. 510 (FEBRUARY 16, 2026) ..................................... 1-11
WAGE RATE SCHEDULE BULLETIN NO. 510 (FEBRUARY 16, 2026) ........................................ 0-9
LIST OF PERSONS AUTHORIZED TO SIGN (ACT 17, HRS §103-55.6).......................................... 1-17
STATE HOLIDAYS 2025-2026
BIDDING AND CONTRACT REQUIREMENTS
INSTRUCTIONS FOR BID SUBMITTAL ............................................................................................ 1-14
IFB SCHEDULE FOR BIDDERS
BID OFFER FORM ................................................................................................................................ 1-15
SAMPLE DHHL CONTRACT
CONTRACT FOR GOODS OR SERVICES (FORM AG-003 REV. 06/22/2009) .................................. 1-2
CONTRACTOR’S STANDARDS OF CONDUCT (FORM AG-010 REV. 11/15/2005)
SCOPE OF SERVICES (FORM AG-011 REV. 7/28/2005) ..................................................................... 1-2
COMPENSATION AND PAYMENT SCHEDULE (FORM AG-012 REV. 11/15/2005) ...................... 1-4
TIME OF PERFORMANCE (FORM AG-013 REV. 11/15/2005)
CERTIFICATE OF EXEMPTION FROM CIVIL SERVICE (FORM AG-014 REV.6/26/2006)
SPECIAL CONDITIONS (FORM AG-015 REV. 11/15/2005) ................................................................ 1-7
DHHL CONSTRUCTION GENERAL CONDITIONS (MARCH 2014) .............................................. 1-68
103D GENERAL CONDITIONS (FORM AG-008) ............................................................................... 1-16
SAMPLE FORMS
NOTICE OF INTENTION TO BID
STANDARD QUALIFICATION QUESTIONNAIRE (SPO FORM-21 REV. 6/16/2003) ................... 1-17
CORPORATE RESOLUTION FORM
PROCUREMENT CIRCULAR NO. 2007-05 ................................................................................. 1-20
CERTIFICATION OF BIDDER’S PARTICIPATION (REV. 8/25/2010)
MONTHLY REPORT OF CONTRACTOR’S PARTICIPATION (REV. 8/25/2010)
CERTIFICATION OF COMPLIANCE FOR EMPLOYMENT OF STATE RESIDENTS
IFB-26-HHL-009 TC-2 TABLE OF CONTENTS
OFFICE IMPROVEMENT PLANS
TITLE SHEET .......................................................................................................................................... T01
GENERAL NOTES, ABBREVIATIONS, & SYMBOLS ..................................................................... G01
CIVIL NOTES AND BMP DETAIL........................................................................................................C01
EROSION AND SEDIMENT CONTROL PLAN ..................................................................................C02
EXISTING SITE AND DEMO PLAN ....................................................................................................C03
REVISED DRAINAGE PLAN ...............................................................................................................C04
CIVIL DETAILS ............................................................................................................................. C05-C06
SITE PLAN ............................................................................................................................................. A01
NEW FLOOR AND ROOF PLAN ........................................................................................................ A02
DEMO PLAN .......................................................................................................................................... A03
CEILING AND LIFE SAFETY PLAN ................................................................................................. A04
EXTERIOR ELEVATIONS, SECTIONS, AND DOOR & WINDOW SCHEDULES ......................... A05
INTERIOR ELEVATIONS AND MOUNTING HEIGHTS ................................................................. A06
OHA BUILDING PLANS ....................................................................................................................... A07
ROOM FINISH SCHEDULE .................................................................................................................. A08
STRUCTURAL NOTES ........................................................................................................................ S01
STRUCTURAL FLOOR PLANS ............................................................................................................ S02
STRUCTURAL DEMO FLOOR PLANS .............................................................................................. S03
STRUCTURAL SECTIONS .................................................................................................................... S04
STRUCTURAL DETAILS ............................................................................................................. S05-S06
PLUMBING NOTES, SPEC AND LEGEND ......................................................................................... P01
PLUMBING PLANS – OFFICE BLDG .................................................................................................. P02
PLUMBING PLANS – OHA BLDG........................................................................................................ P03
PLUMBING DETAIL AND ISO ............................................................................................................ P04
MECHANICAL NOTES, SPEC AND LEGEND .................................................................................. M01
MECHANICAL PLANS – OFFICE BLDG ............................................................................................ M02
MECHANICAL PLANS – OHA BLDG ................................................................................................. M03
MECHANICAL DIAGRAM AND DETAILS ....................................................................................... M04
ELECTRICAL NOTES ................................................................................................................... E01-E02
ELECTRICAL FLOOR PLAN ................................................................................................................ E03
ELECTRICAL FLOOR PLAN – OHA BUILDING ............................................................................... E04
ELECTRICAL SCHEDULES ................................................................................................................. E05
IFB-26-HHL-009 TC-3 TABLE OF CONTENTS
SCOPE OF WORK
SCOPE OF WORK
UTILITY IMPROVEMENT PLANS
TITLE SHEET .......................................................................................................................................... T01
WATER NOTES AND BMP DETAILS .................................................................................................C01
EXISTING SITE AND DEMOLITION PLAN ........................................................................................C02
REVISED SITE UTILITY PLAN ...........................................................................................................C03
CIVIL DETAILS .....................................................................................................................................C04
NOTICE TO BIDDERS
INVITATION FOR BID
Department of Hawaiian Home Lands Land Development Division
IFB NO.: IFB-26-HHL-009
BID OFFERS for IFB No.: IFB-26-HHL-009 East Hawaii Hilo District Office Improvements in Hilo, County of Hawaii, Hawaii, shall be electronically submitted via HIePRO no later than 2:00 p.m., Hawaii Standard Time (H.S.T.) Wednesday, June 12, 2026. The Bid Offer Form must be submitted, as an attachment, when submitting the offer via HIePRO. Failure to submit the Bid Offer Form shall be grounds for rejection of the Bid Offer. Bids received after the time fixed for opening or submitted anywhere other than as specified above will not be considered. A performance bond and payment bond equal to one hundred percent of the Total Base Offer Amount will be required if the Total Base Offer Amount exceeds fifty thousand dollars ($50,000).
This project generally includes the furnishing of all supervision, labor, materials, equipment and all other items related to and necessary to perform the work for the HAWAII DISTRICT OFFICE RENOVATION, which is shown in the attached plans (collectively, the “Project”).
To be eligible to submit a bid, the Bidder and/or his subcontractors shall possess all required valid State of Hawaii licenses and specialty licenses needed to perform the work for this project. A surety bid bond will be required for this Invitation for Bids (IFB).
This project is subject to Section 103D, Hawaii Revised Statutes (“HRS”), and to the payment of not less than the prevailing salaries and wages promulgated by the State of Hawaii, Department of Labor and Industrial Relations.
Bid documents may be examined at or obtained from the State of Hawaii eProcurement system (HIePRO) website:
https://hiepro.ehawaii.gov/sav-search.html It is the responsibility of Interested Bidders to check the HIePRO website for any addenda issued by DHHL.
All prospective offerors are invited to attend a PRE-BID MEETING to be held 9:00am, H.S.T, on Tuesday, May 19, 2026, at the DHHL District Office at 162 Baker Ave, Hilo, Island of Hawaii 96720.
Subcontractors and union representatives are also invited to attend. The conference is to provide interested Bidders with an opportunity to ask questions about the requirements and technical aspects of the Project. Attendance of the pre-bid conference and/or site visit is not a condition for submitting a bid but is highly recommended. Submission of an offer shall be evidence that the bidder understands the scope of the project and shall comply with the specifications herein, if awarded. No additional compensation, subsequent to bid opening, shall be allowed by reason of any misunderstanding or error regarding site conditions or work to be performed. Persons needing special accommodations due to a disability may submit such requests to Joshua Takano, Land Development Division, via facsimile at (808) 730-0198 or e-mail to joshua.k.takano@hawaii.gov.
A written NOTICE OF INTENTION TO BID is required and shall be received by the DHHL, Land Development Division, at 91-5420 Kapolei Parkway, Kapolei, Hawaii 96707, no later than https://hiepro.ehawaii.gov/sav-search.html
4:00 pm, H.S.T, on June 1, 2026. Submittal of a NOTICE OF INTENTION TO BID via facsimile at (808) 730-0198 or e-mail to joshua.k.takano@hawaii.gov is acceptable.
A properly executed and notarized STANDARD QUALIFICATION QUESTIONNAIRE FOR OFFERORS, SPO Form-21 ("Questionnaire") is required and shall be submitted to the DHHL Land Development Division, at 91-5420 Kapolei Parkway, Kapolei, Hawaii 96707 no later than 4:00 pm, H.S.T, on June 1, 2026. Completed Questionnaires must be submitted as an original hard copy with wet signatures. Questionnaires that are submitted via facsimile or E-mail will not be accepted. The Questionnaire can be downloaded at the State Forms Central website:
http://spo.hawaii.gov/wp-content/uploads/2013/12/spo-021.pdf
DHHL reserves the right to amend the IFB by written addenda, reject any and all bids, or waive any defects in said bids where DHHL deems it is in the best interest of the State.
CAMPAIGN CONTRIBUTIONS BY STATE AND COUNTY CONTRACTORS
PROHIBITED. If awarded a contract in response to this solicitation, offeror agrees to comply with HRS §11-355, which states that campaign contributions are prohibited from a State and county government contractor during the term of the contract if the contractor is paid with funds appropriated by the legislative body between the execution of the contract through the completion of the contract.
Questions regarding this project shall be posted on HIePRO by 4:00 pm, H.S.T, May 22 , 2026.
Responses to questions shall be posted on HIePRO by 4:00 pm, H.S.T, May 28, 2026.
Dated at Kapolei, Hawaii, this 13th day of May 2026.
DEPARTMENT OF HAWAIIAN HOME LANDS
Kali Watson, Chairperson Hawaiian Homes Commission
Posted on the internet at: https://hiepro.ehawaii.gov/sav-search.html http://www.dhhl.hawaii.gov/procurement/ http://spo.hawaii.gov/wp-content/uploads/2013/12/spo-021.pdf https://stateofhawaii.na1.adobesign.com/verifier?tx=CBJCHBCAABAAxYAjFEt0nqmTzdIAiCcI2-F4xHmS8SQX
State of Hawai‘i
DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS
Princess Ruth Ke‘elikolani Building
830 Punchbowl Street
Honolulu, Hawai‘i 96813
February 16, 2026
WAGE RATE SCHEDULE BULLETIN NO. 510
This schedule of wage rates contained herein is recognized by the Director of Labor and Industrial Relations to be prevailing on public construction work for the purposes of Chapter 104, Hawai‘i
Revised Statutes. The schedule of wage rates determines the applicable wage determination for each classification and does not impose any staffing requirements for any classification.
As required by law, future wage rates for laborers and mechanics are incorporated into this bulletin based on available information and are subject to change. Whenever the Director determines that the prevailing wage has increased as shown in the wage rate schedule, the contractor must increase the wages accordingly during the performance of the contract. For addenda or additional wage rate schedules, please consult the Internet at http://labor.hawaii.gov/wsd.
The Apprentice Schedule is available on the Internet or upon request from the Wage Standards Division. Pursuant to
Section 12-22-6, Hawai‘i Administrative Rules, the Apprentice
Schedule is applicable only to apprentices who are parties to apprenticeship agreements registered with or recognized by the
Department of Labor and Industrial Relations.
Questions on the schedules should be referred to the Research and Statistics Office at (808) 586-8799.
The next wage rate schedule will be issued on or about
September 15, 2026.
JADE T. BUTAY
Director
STATE OF HAWAI‘I
JOSH GREEN, M.D., Governor
JADE T. BUTAY, Director
WILLIAM G. KUNSTMAN, Deputy Director
RESEARCH AND STATISTICS OFFICE
ASCENCION LOPEZ, Research Statistician
SCOTT S. WHEELER, Supervisor
In cooperation with:
WAGE STANDARDS DIVISION
SHERYL LEE, Administrator
MARI IMAMURA, Staff Supervisor
Prevailing Basic Fringe Prevailing Basic Fringe Prevailing Basic Fringe Prevailing Basic Fringe Remarks
Classification Wage Hourly Hourly Wage Hourly Hourly Wage Hourly Hourly Wage Hourly Hourly See
Total Rate Rate Total Rate Rate Total Rate Rate Total Rate Rate Pg 6-9
* BOILERMAKER: 2/16/26
Boilermaker / Blacksmith $76.33 $42.64 $33.69 - - - - - - - - - 13
CARPENTER: 9/15/25 8/31/26 8/30/27 9/4/28
Journeyman Carpenter (Form/Framer/Rough/Finish) $85.24 $55.50 $29.74 $87.24 $56.75 $30.49 $89.29 $58.00 $31.29 $91.34 $59.50 $31.84 1,12,13
Millwright and Machine Erector $85.49 $55.75 $29.74 $87.49 $57.00 $30.49 $89.54 $58.25 $31.29 $91.59 $59.75 $31.84 1,12,13
Power Saw Operator (2 h.p. & over) $85.39 $55.65 $29.74 $87.39 $56.90 $30.49 $89.44 $58.15 $31.29 $91.49 $59.65 $31.84 1,12,13
* CEMENT FINISHER: 2/16/26 8/31/26 8/30/27 9/4/28
Journeyperson Cement Finisher $85.16 $46.83 $38.33 $85.58 $46.85 $38.73 $85.63 $46.90 $38.73 $92.80 $53.67 $39.13 2,12,13
Trowel Machine Operator $85.31 $46.98 $38.33 $85.73 $47.00 $38.73 $85.78 $47.05 $38.73 $92.95 $53.82 $39.13 2,12,13
CHAIN-LINK FENCE ERECTOR: 9/29/25 10/5/26 10/4/27 10/2/28
$50.70 $29.75 $20.95 $52.90 $30.90 $22.00 $55.20 $32.10 $23.10 $57.50 $33.30 $24.20 10,13
CHLORINATOR: 9/15/25
$39.34 $35.33 $4.01 - - - - - - - - -
* DIVER: 9/15/25
AQUA LUNG DIVING (Scuba Diver):
Stand-By Diver $98.43 $62.97 $35.46 - - - - - - - - - 12,13
Scuba Diver (Wet) (up to 30 feet) $107.81 $72.35 $35.46 - - - - - - - - - 12,13
Scuba Diver (Wet) (over 30 feet) $117.18 $81.72 $35.46 - - - - - - - - - 12,13
DIVING OTHER THAN AQUA LUNG (Surface Supplied
Diving):
Tender $95.40 $59.94 $35.46 - - - - - - - - - 12,13
Stand-By Diver $98.43 $62.97 $35.46 - - - - - - - - - 3,12,13
Diver $117.18 $81.72 $35.46 - - - - - - - - - 3,12,13
DRAPERY INSTALLER: 9/15/25
$21.00 $21.00 $0.00 - - - - - - - - -
* DREDGING - CLAMSHELL AND HYDRAULIC SUCTION: 9/15/25
CLAMSHELL OR DIPPER DREDGES:
Clamshell or Dipper Operator $96.12 $60.66 $35.46 - - - - - - - - - 11,12,13
Mechanic or Welder, Watch Engineer [Clamshell or
Dipper Dredges] $95.46 $60.00 $35.46 - - - - - - - - - 12,13
Deckmate, Barge Mate [Clamshell or Dipper Dredges] $95.06 $59.60 $35.46 - - - - - - - - - 12,13
Bargeman, Deckhand, Fireman and Oiler [Clamshell or
Dipper Dredges] $93.40 $57.94 $35.46 - - - - - - - - - 12,13
HYDRAULIC SUCTION DREDGES:
Leverman $95.76 $60.30 $35.46 - - - - - - - - - 12,13
Watch Engineer (Steam or Electric) $95.61 $60.15 $35.46 - - - - - - - - - 12,13
Mechanic or Welder [Hydraulic Suction Dredges] $95.46 $60.00 $35.46 - - - - - - - - - 12,13
Dozer Operator $95.40 $59.94 $35.46 - - - - - - - - - 12,13
Deckmate [Hydraulic Suction Dredges] $95.06 $59.60 $35.46 - - - - - - - - - 12,13
Winchman (Stern Winch on Dredge) $94.95 $59.49 $35.46 - - - - - - - - - 12,13
Deckhand (can operate Anchor Scow under direction of
Deckmate), Fireman, Leveeman, Oiler [Hydraulic
Suction Dredges] $93.40 $57.94 $35.46 - - - - - - - - - 12,13
CONTINUED ON NEXT PAGE
WAGE RATE SCHEDULE BULLETIN NO. 510
Current 2026 2027 2028
2/16/26 Page 1
Prevailing Basic Fringe Prevailing Basic Fringe Prevailing Basic Fringe Prevailing Basic Fringe Remarks
Total Rate Rate Total Rate Rate Total Rate Rate Total Rate Rate Pg 6-9
WAGE RATE SCHEDULE BULLETIN NO. 510
Current 2026 2027 2028
* DREDGING - CLAMSHELL AND HYDRAULIC SUCTION: 9/15/25
DERRICKS:
Operators (Derricks, Piledrivers, and Cranes) $96.12 $60.66 $35.46 - - - - - - - - - 12,13
Saurman Type Dragline (over five [5] cubic yards) $95.46 $60.00 $35.46 - - - - - - - - - 12,13
Deckmate, Saurman Type Dragline (up to and including five [5] cubic yards) [Derricks] $95.06 $59.60 $35.46 - - - - - - - - - 12,13
Deckhand, Fireman, Oiler [Derricks] $93.40 $57.94 $35.46 - - - - - - - - - 12,13
BOAT OPERATORS:
Master Boat Operator $95.76 $60.30 $35.46 - - - - - - - - - 12,13
Boat Operator $95.61 $60.15 $35.46 - - - - - - - - - 12,13
Boat Deckhand $93.40 $57.94 $35.46 - - - - - - - - - 12,13
DRYWALL & ACOUSTICAL WORKER AND LATHER: 9/15/25 8/31/26 8/30/27 9/4/28
Journeyman [Drywall & Acoustical Worker and Lather] $85.49 $55.75 $29.74 $87.49 $57.00 $30.49 $89.54 $58.25 $31.29 $91.59 $59.75 $31.84 1,12,13
DRYWALL TAPER/FINISHER: 1/1/26 1/1/27 1/1/28
Journeyman Taper $83.84 $49.54 $34.30 - - - $86.70 $51.90 $34.80 $89.63 $54.58 $35.05
ELECTRICIAN: Inside 8/24/25
Cable Splicer [Inside] $97.28 $63.90 $33.38 - - - - - - - - - 4,13
Journeyman Wireman [Inside] $89.71 $56.55 $33.16 - - - - - - - - - 4,13
ELECTRICIAN: Outside 8/24/25
Cable Splicer [Outside] $97.28 $63.90 $33.38 - - - - - - - - - 4,13
Journeyman Wireman [Outside] $89.71 $56.55 $33.16 - - - - - - - - - 4,13
Journeyman Lineman $89.71 $56.55 $33.16 - - - - - - - - - 4,13
Heavy Equipment Operator $81.66 $50.90 $30.76 - - - - - - - - - 4,13
Groundman $69.55 $42.41 $27.14 - - - - - - - - - 4,13
ELEVATOR CONSTRUCTOR: 2/17/25
Mechanic [Elevator Constructor] $112.285 $73.85 $38.435 - - - - - - - - - 13
* EQUIPMENT OPERATOR: 9/15/25
Group 1 $93.12 $57.66 $35.46 - - - - - - - - - 5,12,13
Group 2 $93.23 $57.77 $35.46 - - - - - - - - - 5,12,13
Group 3 $93.40 $57.94 $35.46 - - - - - - - - - 5,12,13
Group 4 $93.67 $58.21 $35.46 - - - - - - - - - 5,12,13
Group 5 $93.98 $58.52 $35.46 - - - - - - - - - 5,12,13
Group 6 $94.63 $59.17 $35.46 - - - - - - - - - 5,12,13
Group 7 $94.95 $59.49 $35.46 - - - - - - - - - 5,12,13
Group 8 $95.06 $59.60 $35.46 - - - - - - - - - 5,12,13
Group 9 $95.17 $59.71 $35.46 - - - - - - - - - 5,12,13
Group 9A $95.40 $59.94 $35.46 - - - - - - - - - 5,12,13
Group 10 $95.46 $60.00 $35.46 - - - - - - - - - 5,12,13
Group 10A $95.61 $60.15 $35.46 - - - - - - - - - 5,12,13
Group 11 $95.76 $60.30 $35.46 - - - - - - - - - 5,12,13
Group 12 $96.12 $60.66 $35.46 - - - - - - - - - 5,12,13
Group 12A $96.48 $61.02 $35.46 - - - - - - - - - 5,12,13
Group 13 $93.40 $57.94 $35.46 - - - - - - - - - 12,13
Group 13A $93.67 $58.21 $35.46 - - - - - - - - - 12,13
Group 13B $93.98 $58.52 $35.46 - - - - - - - - - 12,13
Group 13C $94.63 $59.17 $35.46 - - - - - - - - - 12,13
Group 13D $94.95 $59.49 $35.46 - - - - - - - - - 12,13
Group 13E $95.06 $59.60 $35.46 - - - - - - - - - 12,13
2/16/26 Page 2
Prevailing Basic Fringe Prevailing Basic Fringe Prevailing Basic Fringe Prevailing Basic Fringe Remarks
Total Rate Rate Total Rate Rate Total Rate Rate Total Rate Rate Pg 6-9
WAGE RATE SCHEDULE BULLETIN NO. 510
Current 2026 2027 2028
FLOOR LAYER (CARPET, LINOLEUM & SOFT TILE): 3/2/25 3/1/26 2/28/27 3/5/28
Journeyperson [Floor Layer] $78.30 $43.27 $35.03 $81.05 $45.30 $35.75 $84.30 $47.65 $36.65 $87.40 $50.00 $37.40 12,13
* GLAZIER: 2/16/26
Journeyperson [Glazier] $88.60 $48.50 $40.10 - - - - - - - - - 6,13
HEAT AND FROST INSULATOR: 9/7/25
Mechanic [Heat and Frost Insulator] $76.65 $46.90 $29.75 - - - - - - - - - 7,13
* HELICOPTER WORK: 9/15/25
Pilot $97.29 $61.83 $35.46 - - - - - - - - - 12,13
Co-Pilot $97.12 $61.66 $35.46 - - - - - - - - - 12,13
Airborne Hoist Operator $96.98 $61.52 $35.46 - - - - - - - - - 12,13
IRON WORKER: 9/15/25 9/1/26
Journeyman [Iron Worker] $91.96 $50.50 $41.46 $94.46 $53.00 $41.46 - - - - - - 8,12,13
LABORER: 9/1/25 8/31/26 8/30/27 9/4/28
LABORER:
Laborer I $69.66 $42.85 $26.81 $71.66 $43.95 $27.71 $73.61 $45.05 $28.56 $75.56 $46.15 $29.41 1,13
Laborer II $67.06 $40.25 $26.81 $69.06 $41.35 $27.71 $71.01 $42.45 $28.56 $72.96 $43.55 $29.41 1,13
Licensed Powderman $70.66 $43.85 $26.81 $72.66 $44.95 $27.71 $74.61 $46.05 $28.56 $76.56 $47.15 $29.41 1,13
Driller $72.66 $45.85 $26.81 $74.66 $46.95 $27.71 $76.61 $48.05 $28.56 $78.56 $49.15 $29.41 1,13
Gunite or Shotcrete Operator $70.16 $43.35 $26.81 $72.16 $44.45 $27.71 $74.11 $45.55 $28.56 $76.06 $46.65 $29.41 1,13
Mason Tender/Hod Carrier $70.16 $43.35 $26.81 $72.16 $44.45 $27.71 $74.11 $45.55 $28.56 $76.06 $46.65 $29.41 1,13
High Scaler (Working Suspended) $70.16 $43.35 $26.81 $72.16 $44.45 $27.71 $74.11 $45.55 $28.56 $76.06 $46.65 $29.41 13
Window Washer (Outside) (Working from bosun's chair and/or cable-suspended scaffold or work platform) $69.16 $42.35 $26.81 $71.16 $43.45 $27.71 $73.11 $44.55 $28.56 $75.06 $45.65 $29.41 13
Light/Final Clean-up (Janitorial) Laborer $54.27 $31.95 $22.32 $55.82 $32.50 $23.32 $57.32 $33.05 $24.27 $58.82 $33.60 $25.22 1,13
UNDERGROUND WORK:
Worker in a raise, shaft, or tunnel.
Group 1 $70.26 $43.45 $26.81 $72.26 $44.55 $27.71 $74.21 $45.65 $28.56 $76.16 $46.75 $29.41 13
Group 2 $71.76 $44.95 $26.81 $73.76 $46.05 $27.71 $75.71 $47.15 $28.56 $77.66 $48.25 $29.41 13
Group 3 $72.26 $45.45 $26.81 $74.26 $46.55 $27.71 $76.21 $47.65 $28.56 $78.16 $48.75 $29.41 13
Group 4 $73.26 $46.45 $26.81 $75.26 $47.55 $27.71 $77.21 $48.65 $28.56 $79.16 $49.75 $29.41 13
Group 5 $73.51 $46.70 $26.81 $75.51 $47.80 $27.71 $77.46 $48.90 $28.56 $79.41 $50.00 $29.41 13
Group 6 $73.61 $46.80 $26.81 $75.61 $47.90 $27.71 $77.56 $49.00 $28.56 $79.51 $50.10 $29.41 13
Group 7 $73.86 $47.05 $26.81 $75.86 $48.15 $27.71 $77.81 $49.25 $28.56 $79.76 $50.35 $29.41 13
Group 8 $74.31 $47.50 $26.81 $76.31 $48.60 $27.71 $78.26 $49.70 $28.56 $80.21 $50.80 $29.41 13
LANDSCAPE & IRRIGATION LABORER: 9/15/25 8/31/26 8/30/27 9/4/28
Landscape & Irrigation Laborer A $47.20 $29.40 $17.80 $48.95 $30.40 $18.55 $50.80 $31.45 $19.35 $52.65 $32.50 $20.15
Landscape & Irrigation Laborer B $48.20 $30.40 $17.80 $49.95 $31.40 $18.55 $51.80 $32.45 $19.35 $53.65 $33.50 $20.15
Landscape & Irrigation Maintenance Laborer $41.80 $24.00 $17.80 $43.55 $25.00 $18.55 $45.40 $26.05 $19.35 $47.25 $27.10 $20.15
MASON (Bricklayer): 9/15/25 8/31/26 8/30/27 9/4/28
Bricklayer Stonemason Blocksetter $91.97 $56.03 $35.94 $95.37 $59.03 $36.34 $96.36 $60.02 $36.34 $96.77 $60.02 $36.75 2,12,13
Pointer/Caulker Weatherproofer $92.22 $56.28 $35.94 $95.62 $59.28 $36.34 $96.61 $60.27 $36.34 $97.02 $60.27 $36.75 2,12,13
2/16/26 Page 3
Prevailing Basic Fringe Prevailing Basic Fringe Prevailing Basic Fringe Prevailing Basic Fringe Remarks
Total Rate Rate Total Rate Rate Total Rate Rate Total Rate Rate Pg 6-9
WAGE RATE SCHEDULE BULLETIN NO. 510
Current 2026 2027 2028
* PAINTER: 2/16/26 7/1/26
Journeyperson Painter $76.33 $45.15 $31.18 $76.33 $45.15 $31.18 - - - - - - 12
Spray/Abrasive $76.33 $45.15 $31.18 $76.33 $45.15 $31.18 - - - - - - 12
PAVING: 9/15/25
ASPHALT PAVING (Jobsite):
Asphalt Spreader Operator $95.18 $59.16 $36.02 - - - - - - - - - 12, 13
Roller Operator (over five [5] tons) $94.86 $58.84 $36.02 - - - - - - - - - 12, 13
Asphalt Concrete Material Transfer $94.66 $58.64 $36.02 - - - - - - - - - 12, 13
Screed Person $94.66 $58.64 $36.02 - - - - - - - - - 12, 13
Asphalt Raker $93.70 $57.68 $36.02 - - - - - - - - - 12, 13
Roller Operator (five [5] tons and under) $93.43 $57.41 $36.02 - - - - - - - - - 12, 13
Laborer, Hand Roller (before 9/1/07) $93.20 $57.18 $36.02 - - - - - - - - - 12, 13
Laborer, Hand Roller (after 9/1/07) $90.93 $54.91 $36.02 - - - - - - - - - 12, 13
EQUIPMENT OPERATORS (Jobsite):
Grader $95.49 $59.47 $36.02 - - - - - - - - - 12, 13
Soil Stabilizer $95.49 $59.47 $36.02 - - - - - - - - - 12, 13
Cold Planer $95.49 $59.47 $36.02 - - - - - - - - - 12, 13
Loader (over 2-1/2 yds to and including 5 cu yds) $94.98 $58.96 $36.02 - - - - - - - - - 12, 13
Loader (2-1/2 yds and under) $94.66 $58.64 $36.02 - - - - - - - - - 12, 13
Concrete Saws and/or Grinder (self-propelled unit on streets, highways, airports and canals) $94.66 $58.64 $36.02 - - - - - - - - - 12, 13
Combination Loader/Backhoe (over 3/4 cu yd) $93.70 $57.68 $36.02 - - - - - - - - - 12, 13
Combination Loader/Backhoe (up to 3/4 cu yd) $92.72 $56.70 $36.02 - - - - - - - - - 12, 13
TRUCK DRIVERS:
Tractor Trailer (Hauling Equipment, Assistant to Engineer required) $95.09 $59.07 $36.02 - - - - - - - - - 12, 13
Hot Liquid Asphalt Tanker $94.98 $58.96 $36.02 - - - - - - - - - 12, 13
Oil Tanker [double] $94.98 $58.96 $36.02 - - - - - - - - - 12, 13
Slip-in or Pup $94.98 $58.96 $36.02 - - - - - - - - - 12, 13
Asphalt Distributor $94.66 $58.64 $36.02 - - - - - - - - - 12, 13
Semi-Trailer $94.66 $58.64 $36.02 - - - - - - - - - 12, 13
Semi-Dump $94.66 $58.64 $36.02 - - - - - - - - - 12, 13
Single or Rock Cans Tandem Dump Truck
(over 8 yds and under water level) $94.01 $57.99 $36.02 - - - - - - - - - 12, 13
Single or Rock Cans Tandem Dump Truck
(8 yds and under water level) $93.70 $57.68 $36.02 - - - - - - - - - 12, 13
Assistant to Engineer $93.43 $57.41 $36.02 - - - - - - - - - 12, 13
Utility, Flatbed $93.43 $57.41 $36.02 - - - - - - - - - 12, 13
* PLASTERER: 2/16/26 8/30/26 9/5/27 9/4/28
Journeyperson [Plasterer] $92.45 $54.12 $38.33 $93.52 $54.79 $38.73 $93.52 $54.79 $38.73 $93.92 $54.79 $39.13 2,12,13
* PLUMBER: 2/16/26
Journeyman [Plumber] $88.22 $54.33 $33.89 - - - - - - - - - 9,13
ROOFER: 9/7/25 9/6/26
Journeyman [Roofer] $67.75 $44.95 $22.80 $68.45 $45.55 $22.90 - - - - - - 12
Coal Tar Pitch $112.70 $89.90 $22.80 $114.00 $91.10 $22.90 - - - - - - 12
SANDBLASTER OR WATERBLASTER:
Use wages of craft to which sand or water blasting is incidental.
2/16/26 Page 4
Prevailing Basic Fringe Prevailing Basic Fringe Prevailing Basic Fringe Prevailing Basic Fringe Remarks
Total Rate Rate Total Rate Rate Total Rate Rate Total Rate Rate Pg 6-9
WAGE RATE SCHEDULE BULLETIN NO. 510
Current 2026 2027 2028
SHEET METAL WORKER: (Note: 2 increases per year) 9/15/25 3/1/26 2/28/27 2/27/28
Journeyworker [Sheet Metal Worker] $85.02 $51.20 $33.82 $86.17 $52.25 $33.92 $90.91 $55.51 $35.40 $94.46 $58.00 $36.46 13
8/30/26 9/5/27 9/3/28
Journeyworker [Sheet Metal Worker] - - - $88.06 $53.32 $34.74 $91.40 $55.51 $35.89 $94.85 $58.00 $36.85 13
TELECOMMUNICATION / TELEDATA: 8/24/25 8/23/26 8/22/27
Technician II (Licensed) $57.28 $41.00 $16.28 $59.99 $43.00 $16.99 $62.35 $45.00 $17.35 - - - 13
Technician I (Splicer) $53.62 $37.90 $15.72 $56.10 $39.70 $16.40 $58.22 $41.50 $16.72 - - - 13
TERMITE TREATER: 9/15/25
$20.23 $20.23 $0.00 - - - - - - - - -
TILE, MARBLE AND TERRAZZO WORKER: 9/15/25 8/30/26 9/5/27 9/3/28
Journeyperson (Tile, Marble & Terrazzo) $85.05 $50.10 $34.95 $87.30 $52.00 $35.30 $89.80 $54.00 $35.80 $92.50 $56.30 $36.20 2,12,13
Terrazzo Base Grinder $83.24 $48.29 $34.95 $85.49 $50.19 $35.30 $87.99 $52.19 $35.80 $90.69 $54.49 $36.20 2,12,13
Certified Terrazzo Floor Grinder, Tile & Marble Helper $81.69 $46.74 $34.95 $83.94 $48.64 $35.30 $86.44 $50.64 $35.80 $89.14 $52.94 $36.20 2,12,13
Terrazzo Floor Grinder $78.69 $43.74 $34.95 $80.94 $45.64 $35.30 $83.44 $47.64 $35.80 $86.14 $49.94 $36.20 2,12,13
TRUCK DRIVER: CONCRETE MIXER/BOOSTER: 9/15/25
$61.09 $40.83 $20.26 - - - - - - - - -
WATER WELL DRILLER: 9/15/25
Water Well Driller $69.36 $62.18 $7.18 - - - - - - - - -
Water Well Driller Helper $42.48 $37.74 $4.74 - - - - - - - - -
WELDER:
Use wages of craft to which welding is incidental, except for Chain-Link Fence Erector. See remark. 10
WINDOW FILM INSTALLER: 9/15/25
$27.65 $27.00 $0.65 - - - - - - - - -
* Indicates a wage, fringe benefit, remark, or title change from the previous bulletin.
Comments: Overtime must be paid at one and one-half times the basic hourly rate plus the hourly cost of required fringe benefits.
2/16/26 Page 5
REMARKS:
2/16/26 Page 6
1. Carpenter; Drywall & Acoustical Worker and Lather; Laborer (excluding High Scaler, Window Washer): $0.50 per hour shall be added to the regular straight-time rate for height pay for each hour while working from a bosun's chair and/or from a cable-suspended scaffold or work platform which is free swinging (not attached to building) for each hour worked on said rig.
2. Cement Finisher; Mason (Bricklayer); Plasterer; Tile, Marble and Terrazzo Worker: $1.00 per hour shall be added to the regular straight-time rate for height pay for each hour while working from a bosun's chair and/or from a cable-suspended scaffold or work platform which is free swinging (not attached to building) for each hour worked on said rig.
3. Diver (Diving Other Than Aqua Lung):
A. On any dive exceeding 50 feet, the diver shall, in addition, be paid the following amount of "depth money":
50 feet to 100 feet $1.50 per foot in excess of 50 feet 100 feet to 150 feet $100.00 plus $2.00 per foot in excess of 100 feet 150 feet to 200 feet $200.00 plus $3.00 per foot in excess of 150 feet
B. When it is necessary for a Diver to enter any pipe, tunnel or other enclosure, the said Diver shall, in addition to the hourly rate, receive a premium in accordance with the following schedule for distance traveled from the entrance of the pipe, tunnel or other enclosure:
1) When able to stand erect, but in which there is no vertical ascent:
5 feet to 50 feet $5.00 per day 50 feet to 100 feet $7.50 per day 100 feet to 150 feet $12.50 per day Greater than 150 feet The premium shall be increased an additional $7.50 for each succeeding 50 feet.
2) When unable to stand erect and in which there is no vertical ascent:
5 feet to 50 feet $5.00 per day 50 feet to 100 feet $7.50 per day 100 feet to 150 feet $12.50 per day 150 feet to 200 feet $36.75 per day 200 feet to 300 feet $1.00 per foot 300 feet to 450 feet $1.50 per foot 450 feet to 600 feet $2.50 per foot
4. Electrician (Inside, Outside):
A. One and one-half times the straight-time rate while working in a tunnel under construction; under water with aqualung equipment; in a completed tunnel which has only one entrance or exit providing access to safety and where no other personnel are working; or in an underground structure having no access to safety or where no other personnel are working.
B. Double the straight-time rate shall be paid for the following types of hazardous work regardless if fall prevention devices are used:
1) While working from poles, trusses, stacks, towers, tanks, bosun's chairs, swinging or rolling scaffolds, supporting structures, and open platforms, over 70 feet from the ground where the employee is subject to a free fall; provided, however, that when work is performed on stacks, towers or permanent platforms where the employees are on a firm footing within an enclosure, a hazardous condition does not exist regardless of height;
2) While working outside of a railing or enclosure, or temporary platforms extending outside of a building, or from scaffolding or ladder within an enclosure where an employee's footing is within one foot of the top of such railing, and the employee is subject to a free fall of over 70 feet;
3) Working on buildings while leaning over the railing or edge of the building, and is subject to a free fall of 70 feet; or
4) Two hours minimum hazardous pay per day shall be paid while climbing to a stack, tower or permanent platform which exceeds 70 feet from the ground but where the employee is on a firm footing within an enclosure.
C. Five percent per hour shall be added to the hourly wage for height pay while working above 9,000 feet elevation.
2/16/26 Page 7
5. Equipment Operator:
A. Operators and Assistants to Engineer (climbing a boom) of cranes (under 50 tons) with booms of eighty feet or more (including jib) or of cranes (under 50 tons) with leads of one hundred feet or more, shall receive additional premium according to the following schedule:
Per Hour Booms of 80 feet up to, or leads of 100 feet up to, but not including 130 feet $0.50 Booms and/or leads of 130 feet up to, but not including 180 feet $0.75 Booms and/or leads of 180 feet up to and including 250 feet $1.15 Booms and/or leads over 250 feet $1.50
Operators and Assistants to Engineer (climbing a boom) of cranes (50 tons and over) with booms of 180 feet or more (including jib) shall receive additional premium according to the following schedule:
Per Hour
Booms of 180 feet up to and including 250 feet $1.25 Booms over 250 feet $1.75
Note: The boom shall be measured from the center of the heel pin to the center of the boom or jib point sheave.
B. $1.25 per hour shall be added to the hourly wage while operating a rig suspended by ropes or cables or to perform work on a Yo-Yo Cat.
C. In a raise or shaft, a premium of $.40 per hour will be paid in addition to the regular straight time wage.
A raise is defined to be an underground excavation (lined or unlined) whose length exceeds its width and the inclination of the grade from the excavation is greater than 20 degrees from the horizontal.
A shaft is defined to be an excavation (lined or unlined) made from the surface of the earth, generally vertical in nature, but may decline up to 75 degrees from the vertical, and whose depth is greater than 15 feet and its largest horizontal dimension. Includes an underground silo.
D. In a tunnel, a premium of $.30 per hour will be paid in addition to the regular straight time wages.
A tunnel is defined to be an underground excavation (lined or unlined) whose length exceeds its width and the inclination of the grade from the excavation is no greater than 20 degrees from the horizontal.
6. Glazier:
A. $1.00 per hour shall be added to the hourly rate for height pay for performing work which requires protection from fall hazards by guardrail systems, safety net systems, personal fall arrest systems, position devise systems, fall restraint systems, perimeter safety cables or controlled decking zones or during the use of Swing Stages, Scissor lifts, Man lifts, Boom Lifts.
B. $4.00 per hour shall be added to the hourly rate for night work for performing work between 6:00 p.m. and 6:00 a.m. For the purposes of computing overtime, the night work premium shall be treated as part of the employee’s regular straight time rate.
7. Heat and Frost Insulator: Six percent per hour shall be added to the hourly wage for hazardous pay while working from a boatswain chair, staging or free standing scaffolding erected from the ground up or mezzanine floor subject to a free fall and skyclimber suspended from a permanent structure and when working above 40 feet.
8. Iron Worker:
A. $1.00 per hour shall be added to the hourly wage while working in tunnels or coffer dams.
$2.00 per hour shall be added to the hourly wage while working under or covered with water (submerged), or on the summits of Mauna Kea, Mauna Loa or Haleakala.
B. Certified Welder’s, while welding only, shall receive $3.00 above journeyman pay effective 9/1/2024.
9. Plumber: One and one-half times the straight-time rate for height pay while working from OSHA approved trusses, stacks, towers, tanks, bosun's chair, swinging or rolling scaffolding, supporting structures or on open platforms where the employee is subject to a direct fall of 40 feet or more. Provided, however, that when said work is performed where the employee is on a firm footing within an enclosure, a hazardous condition does not exist regardless of height. $1.00 per hour shall be added to the straight-time rate while working with flame cutting or any type of welding equipment on any galvanized material or product for at least an hour.
2/16/26 Page 8
10. Chain-Link Fence Erector: $2.00 per hour shall be added to the hourly wage while performing welding services.
11. Dredging – Clamshell and Hydraulic Suction (Clamshell or Dipper Operator): $.50 per hour shall be added to the straight-time rate while working with boom (including jib) over
130 feet.
12. Possible wage/fringe option increases:
Carpenter; Drywall & Acoustical Worker and Lather: Effective WRS #511 - $0.50; 8/30/27 - $0.65; 9/4/28 - $0.65 Cement Finisher: Effective WRS #511 - $0.30; 8/30/27 - $0.30; 9/4/28 - $0.30 Diver: Effective WRS #511 - $3.50; 8/30/27 - $3.30; 9/4/28 – $3.30 Dredging – Clamshell and Hydraulic Suction: Effective WRS #511 - $3.50; 8/30/27 - $3.30; 9/4/28 – $3.30 Equipment Operator: Effective WRS #511 - $3.50; 8/30/27 - $3.30; 9/4/28 – $3.30 Floor Layer (Carpet, Linoleum & Soft Tile): Effective 3/5/28 - $0.25 Helicopter Work: Effective WRS #511 - $3.50; 8/30/27 - $3.30; 9/4/28 – $3.30 Iron Worker: Effective WRS #511 - $0.79 Mason (Bricklayer): Effective WRS #511 - $0.30; 8/30/27 - $0.30; 9/4/28 - $0.30 Painter: Effective WRS #511 - $0.80 Paving: Effective WRS #511 - $3.50; 8/30/27 - $3.30; 9/4/28 – $3.30 Plasterer: Effective WRS #511 - $0.30; 9/5/27 - $0.30; 9/4/28 - $0.30 Roofer: Effective WRS #511 - $0.40 Tile, Marble and Terrazzo Worker: Effective WRS #511 - $0.25; 9/5/27 - $0.25; 9/3/28 - $0.30
13. Overtime/Holiday must be paid at one and one-half times the basic hourly rate, plus the hourly cost of required fringe, including legal holidays of the State
(https://dhrd.hawaii.gov/state-observed-holidays/), with the following exceptions:
A. Two times the basic hourly rate, plus the hourly cost of required fringe.
Boilermaker: Sunday, New Year’s Day, Martin Luther King Jr. Day, Presidents Day, Memorial Day, Kamehameha Day, July 4th, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day.
Diver: Sunday, New Year’s Day, Martin Luther King Day, Presidents' Day, Memorial Day, Kamehameha Day, Fourth of July, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day.
Dredging – Clamshell and Hydraulic Suction: Sunday, New Year’s Day, Martin Luther King Day, Presidents' Day, Memorial Day, Kamehameha Day, Fourth of July, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day.
Electrician (Inside, Outside): Sunday, New Year’s Day, Presidents’ Day, Memorial Day, Kamehameha Day, Fourth of July, Labor Day, Thanksgiving Day and
Christmas Day.
Elevator Constructor: Saturday, Sunday, New Year’s Day, Memorial Day, Independence Day, Labor Day, Veterans’ Day, Thanksgiving Day and
Christmas Day.
Equipment Operator: Sunday, New Year’s Day, Martin Luther King Day, Presidents' Day, Memorial Day, Kamehameha Day, Fourth of July, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day.
Floor Layer (Carpet, Linoleum & Soft Tile): Labor Day.
Glazier: Sunday.
Helicopter Work: Sunday, New Year’s Day, Martin Luther King Day, Presidents' Day, Memorial Day, Kamehameha Day, Fourth of July, Labor Day, Veterans'
Day, Thanksgiving Day and Christmas Day.
https://dhrd.hawaii.gov/state-observed-holidays/
2/16/26 Page 9
Iron Worker: Sunday, New Year’s Day, Presidents’ Day, Memorial Day, Kamehameha Day, Fourth of July, Labor Day, Veteran’s Day, Thanksgiving Day and Christmas Day.
Paving: Sunday, New Year’s Day, Martin Luther King Day, Presidents’ Day, Memorial Day, Kamehameha Day, Fourth of July, Labor Day, Veterans’ Day, Thanksgiving Day and Christmas Day.
Plumber: Sunday, New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Kamehameha Day, Independence Day, Labor Day, Veteran’s Day, Thanksgiving Day and Christmas Day.
Sheet Metal Worker: Sunday, New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Kamehameha Day, Independence Day, Labor
Day, Veteran’s Day, Thanksgiving Day and Christmas Day.
Telecommunication / Teledata: Sunday, New Year’s Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas
Day.
B. Three times the basic hourly wage, plus the hourly cost of required fringe on Labor Day.
Carpenter (Includes all classifications in the Carpenters Master Agreement) Cement Finisher Chain Link Fence Erector Drywall & Acoustical Worker and Lather Heat and Frost Insulator Laborer Mason (Bricklayer) Plasterer Tile, Marble and Terrazzo Worker
FRINGE
BENEFIT
HOURLY RATE
10,000+ hours Paid
Hrs 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th till Completed Total H & W Pension Vac. Trng.
* BOILERMAKER
BOILERMAKER / BLACKSMITH 1000 $29.85 $31.98 $34.11 $36.24 $38.38 $40.51 $33.69 $4.70 $21.21 $5.95 $1.83 10
CARPENTER
CARPENTER
Indentured After 9/1/02 1000 $22.20 $10.42 $7.52 - $2.75 $0.15 1,10
" 1000 $24.98 $14.74 $8.85 $2.20 $2.75 $0.94 1,10
" 1000 $27.75 $33.30 $23.24 $8.85 $9.70 $3.75 $0.94 1,10
" 1000 $38.85 $44.40 $25.24 $8.85 $10.70 $4.75 $0.94 1,10
" 1000 $49.95 $52.73 $27.24 $8.85 $11.70 $5.75 $0.94 1,10
MILLWRIGHT
Indentured After 10/14/19 1000 $22.30 $10.42 $7.52 - $2.75 $0.15 10
1000 $25.09 $14.74 $8.85 $2.20 $2.75 $0.94 10
1000 $27.88 $33.45 $23.24 $8.85 $9.70 $3.75 $0.94 10
1000 $39.03 $44.60 $25.24 $8.85 $10.70 $4.75 $0.94 10
1000 $50.18 $52.96 $27.24 $8.85 $11.70 $5.75 $0.94 10
* CEMENT FINISHER
Indentured Prior to 9/1/03 1000 $23.42 $12.27 $12.02 - - $0.25 2,10
" 1000 $25.76 $28.10 $32.78 $35.12 $37.46 $39.81 $42.15 $38.33 $12.02 $16.15 $8.50 $1.66 2,10
Indentured On or After 9/1/03 1000 $23.42 $25.76 $28.10 $32.78 $35.12 $37.46 $39.81 $42.15 $28.44 $12.02 $8.56 $6.60 $1.26 2,10
DRYWALL & ACOUSTICAL WORKER
Indentured After 9/1/02 1000 $22.30 $10.42 $7.52 - $2.75 $0.15 1,10
" 1000 $25.09 $14.74 $8.85 $2.20 $2.75 $0.94 1,10
" 1000 $27.88 $33.45 $23.24 $8.85 $9.70 $3.75 $0.94 1,10
" 1000 $39.03 $44.60 $25.24 $8.85 $10.70 $4.75 $0.94 1,10
" 1000 $50.18 $52.96 $27.24 $8.85 $11.70 $5.75 $0.94 1,10
* DRYWALL TAPERS/FINISHERS 1000 $19.82 $22.29 $24.77 $12.90 $12.65 - - $0.25
" 1000 $27.25 $29.72 $15.90 $12.65 $3.00 $0.25
" 1000 $32.20 $18.90 $12.65 $3.00 $3.00 $0.25
" 1000 $37.16 $42.11 $22.90 $12.65 $5.00 $5.00 $0.25
APPRENTICE SCHEDULE BULLETIN NO. 510 February 16, 2026
Rates are applicable only to apprentices who are parties to agreements registered with the Department of Labor and where the journeyworker to apprentice ratio is met.
Apprentice Classifications Interval
Remarks
See
Pg 6-7
B A S I C H O U R L Y R A T E
HOURLY RATE
10,000+ hours Paid
Hrs 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th till Completed Total H & W Pension Vac. Trng.
APPRENTICE SCHEDULE BULLETIN NO. 510 February 16, 2026
Rates are applicable only to apprentices who are parties to agreements registered with the Department of Labor and where the journeyworker to apprentice ratio is met.
Apprentice Classifications Interval
Remarks
See
Pg 6-7
B A S I C H O U R L Y R A T E
ELECTRICIAN (WIREMAN & LINEMAN)
Indentured Prior to 9/5/21
" 1000 $19.79 $11.99 $7.35 $0.59 $2.30 $1.75 10
" 1000 $22.62 $12.40 $7.35 $0.68 $2.62 $1.75 10
" 1000 $25.45 $19.92 $8.37 $6.85 $2.95 $1.75 4,10
" 1000 $28.28 $21.13 $8.48 $7.62 $3.28 $1.75 4,10
" 1000 $31.10 $22.32 $8.59 $8.37 $3.61 $1.75 4,10
" 1000 $33.93 $23.54 $8.71 $9.14 $3.94 $1.75 4,10
" 1000 $36.76 $24.73 $8.82 $9.90 $4.26 $1.75 4,10
" 1000 $39.59 $25.94 $8.93 $10.67 $4.59 $1.75 4,10
" 1000 $45.24 $28.35 $9.16 $12.19 $5.25 $1.75 4,10
" 1000 $50.90 $30.76 $9.39 $13.72 $5.90 $1.75 4,10
Indentured On or After 9/5/21
" 1000 $19.79 $11.99 $7.35 $0.59 $2.30 $1.75 10
" 1000 $22.62 $12.40 $7.35 $0.68 $2.62 $1.75 10
" 1000 $25.45 $19.92 $8.37 $6.85 $2.95 $1.75 4,10
" 1000 $28.28 $21.13 $8.48 $7.62 $3.28 $1.75 4,10
" 1000 $31.10 $22.32 $8.59 $8.37 $3.61 $1.75 4,10
" 1000 $33.93 $23.54 $8.71 $9.14 $3.94 $1.75 4,10
" 1000 $36.76 $24.73 $8.82 $9.90 $4.26 $1.75 4,10
" 1000 $39.59 $25.94 $8.93 $10.67 $4.59 $1.75 4,10
" 1000 $42.41 $27.14 $9.05 $11.42 $4.92 $1.75 4,10
" 1000 $45.24 $28.35 $9.16 $12.19 $5.25 $1.75 4,10
" 1000 $50.90 $30.76 $9.39 $13.72 $5.90 $1.75 4,10
ELEVATOR CONSTRUCTOR
" 850 $36.93 - - - - - 10
" 850 $40.62 $38.435 $16.275 $21.36 - $0.80 10
" 1700 $48.00 $51.70 $59.08 $38.435 $16.275 $21.36 - $0.80 10
* EQUIPMENT OPERATOR
GROUP 9A
CONSTRUCTION EQUIPMENT OPERATOR
Indentured On or After 9/1/02 1000 $29.97 $9.50 $9.50 - - - 3,10
" 1000 $32.97 $21.61 $9.50 $9.10 $3.01 - 3,10
" 1000 $35.96 $22.71 $9.50 $9.92 $3.29 - 3,10
" 1000 $41.96 $24.92 $9.50 $11.58 $3.84 - 3,10
" 1000 $47.95 $27.11 $9.50 $13.23 $4.38 - 3,10
" 1000 $53.95 $29.32 $9.50 $14.89 $4.93 3,10
HEAVY DUTY REPAIRER & WELDER
Indentured On or After 9/1/02 1000 $29.97 $9.50 $9.50 - - - 3,10
" 1000 $32.97 $21.61 $9.50 $9.10 $3.01 - 3,10
" 1000 $35.96 $22.71 $9.50 $9.92 $3.29 - 3,10
" 1000 $41.96 $24.92 $9.50 $11.58 $3.84 - 3,10
" 1000 $47.95 $27.11 $9.50 $13.23 $4.38 - 3,10
" 1000 $50.95 $28.22 $9.50 $14.06 $4.66 - 3,10
" 1000 $53.95 $29.32 $9.50 $14.89 $4.93 - 3,10
" 1000 $56.94 $30.43 $9.50 $15.72 $5.21 - 3,10
HOURLY RATE
10,000+ hours Paid
Hrs 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th till Completed Total H & W Pension Vac. Trng.
APPRENTICE SCHEDULE BULLETIN NO. 510 February 16, 2026
Rates are applicable only to apprentices who are parties to agreements registered with the Department of Labor and where the journeyworker to apprentice ratio is met.
Apprentice Classifications Interval
Remarks
See
Pg 6-7
B A S I C H O U R L Y R A T E
FLOOR LAYER (CARPET, LINOLEUM & SOFT TILE)
Indentured after 2/27/94 1000 $21.64 $21.64 $21.53 $11.07 $8.61 - $1.85 10
" 1000 $23.80 $25.96 $27.53 $11.07 $8.61 $6.00 $1.85 10
" 1000 $28.13 $30.29 $34.62 $38.94 $34.28 $11.57 $14.86 $6.00 $1.85 10
(Effective 3/1/26)
FLOOR LAYER (CARPET, LINOLEUM & SOFT TILE)
Indentured after 2/27/94 1000 $22.65 $22.65 $21.83 $11.37 $8.61 - $1.85 10
" 1000 $24.92 $27.18 $28.08 $11.37 $8.61 $6.25 $1.85 10
" 1000 $29.45 $31.71 $36.24 $40.77 $35.00 $12.04 $14.86 $6.25 $1.85 10
* GLAZIER
Indentured On or After 7/1/99 1000 $21.83 $37.36 $12.41 $19.69 $2.26 $3.00 5,10
" 1000 $24.25 $37.60 $12.41 $19.69 $2.50 $3.00 5,10
" 1000 $26.68 $37.86 $12.41 $19.69 $2.76 $3.00 5,10
" 1000 $29.10 $38.10 $12.41 $19.69 $3.00 $3.00 5,10
" 1000 $33.95 $38.60 $12.41 $19.69 $3.50 $3.00 5,10
" 1000 $36.38 $38.86 $12.41 $19.69 $3.76 $3.00 5,10
" 1000 $38.80 $39.10 $12.41 $19.69 $4.00 $3.00 5,10
" 1000 $41.23 $39.36 $12.41 $19.69 $4.26 $3.00 5,10
" 1000 $43.65 $39.60 $12.41 $19.69 $4.50 $3.00 5,10
" 1000 $46.08 $39.86 $12.41 $19.69 $4.76 $3.00 5,10
HEAT AND FROST INSULATOR
Indentured After 5/3/95 2000 $23.45 $10.00 $9.12 - - $0.88 6,10
" 2000 $23.45 $22.76 $11.07 $8.80 $2.01 $0.88 6,10
" 2000 $28.14 $23.10 $11.07 $8.80 $2.35 $0.88 6,10
" 2000 $32.83 $23.45 $11.07 $8.80 $2.70 $0.88 6,10
" 2000 $37.52 $23.79 $11.07 $8.80 $3.04 $0.88 6,10
IRON WORKER
Indentured After 10/31/93 1000 $25.25 $35.22 $16.11 $13.71 $3.13 $2.27 7,10
" 1000 $27.78 $35.84 $16.11 $14.02 $3.44 $2.27 7,10
" 1000 $30.30 $36.46 $16.11 $14.33 $3.75 $2.27 7,10
" 1000 $35.35 $37.72 $16.11 $14.96 $4.38 $2.27 7,10
" 1000 $40.40 $38.96 $16.11 $15.58 $5.00 $2.27 7,10
" 1000 $45.45 $40.22 $16.11 $16.21 $5.63 $2.27 7,10
LABORER
LABORER I
CONSTRUCTION CRAFT
Indentured On or After 9/3/02 1000 $21.43 $11.30 $11.30 - - - 1,10
" 1000 $25.71 $30.00 $34.28 $20.10 $11.30 $7.60 $0.60 $0.60 1,10
HAZARDOUS WASTE MATERIAL TECHNICIAN
" 1000 $21.43 $10.45 $10.45 - - - 1,10
" 1000 $25.71 $30.00 $34.28 $18.75 $10.45 $7.10 $0.60 $0.60 1,10
HOURLY RATE
10,000+ hours Paid
Hrs 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th till Completed Total H & W Pension Vac. Trng.
APPRENTICE SCHEDULE BULLETIN NO. 510 February 16, 2026
Rates are applicable only to apprentices who are parties to agreements registered with the Department of Labor and where the journeyworker to apprentice ratio is met.
Apprentice Classifications Interval
Remarks
See
Pg 6-7
B A S I C H O U R L Y R A T E
LANDSCAPE & IRRIGATION LABORER 1000 $23.52 $10.10 $10.10 - - -
" 1000 $24.99 $26.46 $27.93 $15.10 $10.10 $4.20 $0.60 $0.20
MASON (Bricklayer)
BRICKLAYER
Indentured prior to 9/1/03 1000 $28.02 $11.72 $11.72 - - - 2,10
" 1000 $30.82 $33.62 $39.22 $42.02 $44.82 $47.63 $50.43 $35.94 $11.72 $16.25 $6.10 $1.87 2,10
Indentured On or After 9/1/03 1000 $28.02 $30.82 $33.62 $39.22 $42.02 $44.82 $47.63 $50.43 $27.70 $11.72 $8.56 $6.10 $1.32 2,10
STONE MASON
Indentured On or After 9/1/03 1000 $30.82 $33.62 $36.42 $39.22 $42.02 $44.82 $47.63 $50.43 $27.70 $11.72 $8.56 $6.10 $1.32 2,10
POINTER/CAULKER WEATHERPROOFER
Indentured On or After 9/1/03 1000 $28.14 $30.95 $33.77 $39.40 $45.02 $50.65 $27.70 $11.72 $8.56 $6.10 $1.32 2,10
* PAINTER 1000 $20.32 $10.15 $9.80 - - $0.35
" 1000 $22.58 $24.83 $27.09 $29.35 $13.70 $9.80 - $3.55 $0.35
" 1000 $31.61 $14.70 $9.80 $1.00 $3.55 $0.35
" 1000 $33.86 $38.38 $15.45 $9.80 $1.00 $4.30 $0.35
PAVING
PAVING EQUIPMENT OPERATOR 1000 $32.25 $9.50 $9.50 - - - 10
" 1000 $41.05 $22.06 $9.50 $9.37 $3.19 - 10
" 1000 $46.91 $25.49 $9.50 $11.93 $4.06 - 10
" 1000 $52.78 $30.06 $9.50 $15.34 $5.22 - 10
PLASTERER
Indentured On or After 9/1/03 1000 $21.65 $24.35 $27.06 $29.77 $32.47 $37.88 $43.30 $48.71 $28.69 $12.02 $8.56 $6.60 $1.51 2,10
PLUMBER:
Indentured On or After 9/2/85 1000 $23.32 $12.72 $10.05 $2.17 $0.50 - 8,10
" 1000 $23.32 $12.77 $10.05 $2.17 $0.55 - 8,10
" 1000 $27.11 $16.34 $10.05 $5.11 $1.13 $0.05 8,10
" 1000 $27.11 $16.34 $10.05 $5.11 $1.13 $0.05 8,10
" 1000 $31.00 $17.25 $10.05 $5.80 $1.35 $0.05 8,10
" 1000 $33.59 $17.25 $10.05 $5.80 $1.35 $0.05 8,10
" 1000 $36.18 $18.50 $10.05 $6.92 $1.43 $0.10 8,10
" 1000 $38.78 $18.50 $10.05 $6.92 $1.43 $0.10 8,10
" 1000 $41.37 $19.33 $10.05 $7.60 $1.58 $0.10 8,10
" 1000 $43.96 $19.33 $10.05 $7.60 $1.58 $0.10 8,10
HOURLY RATE
10,0…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .