20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf
PDF 2 MB Posted
- Attached to
- Asset Protection - Fencing and Gates
- Solicitation number
- 330-0213-26
- Issued by
- Trinity County, California
About this file
This is a Temporary Sewer Bypass Drawing Sheet prepared for the Asset Protection project involving the City of Fairfield and County of Solano. The document is a preliminary engineering drawing dated February 24, 2026, that depicts sanitary sewer bypass provisions on a horizontal scale of 1 inch equals 30 feet. The drawing is part of a larger Justice Campus Asset Protection initiative designed to shield critical County facilities from seasonal stormwater flooding damage. The temporary sewer bypass plan serves as a critical design element for the broader Asset Protection Project, which encompasses multiple County-owned properties across the Fairfield area including locations at Union Avenue, Clay Street, Delaware Street, and Texas Street. Construction is scheduled to commence on March 2, 2026, with sealed bids due by 2:00 p.m. on March 9, 2026, submitted through the Solano County OpenGov E-Procurement Portal. A mandatory pre-bid conference is scheduled for February 19, 2026, at 10:00 a.m. at the County Administration Center, 675 Texas Street, Fairfield, California. Substantial completion is required within 231 calendar days from Notice to Proceed, with final completion required within an additional 30 calendar days.
The project is federally funded through FEMA's Hazard Mitigation Assistance programs and managed by the Solano County General Services Department, Capital Projects Management Division. Contractors must hold a current California Contractor's License with appropriate classifications and must comply with prevailing wage requirements under California Labor Code, Title 2 Code of Federal Regulations Part 200, and FEMA's Procurement under Grants Field Manual Supplement. All bidders must submit a bid bond or certified check equal to 10 percent of the base bid, a completed Non-Collusion Affidavit, a Subcontractor List Form, and proof of current licensure. The successful contractor must post Performance and Payment Bonds equal to 100 percent of the contract price and a one-year Warranty Bond for 10 percent of the final contract amount within five calendar days of Notice of Award. Liquidated damages are assessed at $2,000 per calendar day for delays exceeding the 231-calendar-day completion period. The project requires compliance with suspension and debarment verification through sam.gov and affirmative steps to solicit small businesses, minority-owned businesses, women-owned businesses, and labor surplus area firms. No specific budget amount is disclosed in the available documents.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R, S
EP
FE
BR
UA
RY
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ Ov erl an d S S
By pa ss P lan .dw g F eb
4,
- 8 :57 am
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
JU
ST
IC
E
CA
MP
US
A
SS
ET
P
RO
TE
CT
IO
N
CI
TY
O F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
SS1
TE
MP
OR
AR
Y
SE
W
ER
B
YP
AS
S
TEMPORARY SEWER BYPASS PLAN
HORIZONTAL: 1"=30'
SANITARY SEWER BYPASS PROVISIONS
File details come from the government source that posted it. Updated .