About this file
This is a Sanitary Sewer Bypass Specification document prepared for the Solano County Justice Campus Asset Protection project, with project management by KSN, Inc. and engineering by Baumbach & Piazza, Inc. The specification outlines the contractor's responsibility to furnish all labor, materials, equipment, and incidentals necessary to place and maintain operation of a temporary sewer bypass system as detailed on plan sheet SS-1. The work includes installing and operating bypass pumping systems and pipelines, with complete restoration including backfilling, grassing, sodding, and routine site restoration upon completion. The contractor must perform all work in accordance with Fairfield-Suisun Sewer District Standards and applicable City, District, County, State, and Federal regulations and codes for environmental requirements. Payment for the sewer bypass work shall be rendered as a lump sum price that encompasses all labor, materials, tools, transportation, disposal, supplies, equipment, appurtenances, and incidentals associated with the temporary bypass system installation and operation.
This specification component is part of the broader Asset Protection Project, which is being procured by Solano County under a multi-prime procurement structure to protect multiple County-owned properties from seasonal stormwater flooding damage. The project is federally funded through FEMA Hazard Mitigation Assistance programs and requires compliance with Title 2 Code of Federal Regulations Part 200, prevailing wage requirements under California Labor Code, and registration with the California Department of Industrial Relations. Contractors and subcontractors must comply with suspension and debarment verification through sam.gov and maintain compliance with applicable environmental and historic preservation laws. The overall Asset Protection Project encompasses barrier walls, berms, landscaping, hardscape, flood gates, underground utility reconfiguration, pump systems, and fencing at multiple County locations, with substantial completion required within 231 calendar days from Notice to Proceed.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLANO COUNTY
JUSTICE CAMPUS ASSET PROTECTION
SANITARY SEWER BYPASS SPECIFICATION
FEBRUARY 23, 2026
Project Manager KSN, Inc.
1550 Harbor Blvd.
West Sacramento, CA 95691
Project Engineer Baumbach & Piazza, Inc.
323 W. Elm St.
Lodi, CA 95240
Solano County Sanitary Sewer Bypass Justice Campus Asset Protection 02 01 40-1
SECTION 02 01 40
SANITARY SEWER BYPASS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. The Contractor shall furnish all labor, materials, equipment, and incidentals to place and maintain operation of a temporary sewer bypass system as shown on plan sheet SS-1.
1.02 MEASUREMENT AND PAYMENT
A. Full compensation for conforming to the requirements of this Section shall be paid by lump sum price. The lump sum price includes installing and operating bypass pumping (if used) and pipelines, and including furnishing all labor, materials, tools, transportation, disposal, supplies, equipment, appurtenances, and incidentals and for doing all the work involved in sewer bypass, complete as shown on plan sheet SS-1.
1.03 REFERENCES
A. Perform Work in accordance with the Fairfield-Suisun Sewer District (District) Standards, and the Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
1.04 REGULATORY REQUIREMENTS
A. Conform to applicable City, District, County, State and Federal regulations and/or codes for environmental requirements.
1.05 SUBMITTALS
A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
PART 2 - PRODUCTS – NOT USED
PART 3 - EXECUTION
3.01 PREPARATION
A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
3.02 GENERAL
A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
B. Provide complete restoration including, but not limited to, all backfilling, grassing and sodding, and routine site restoration. Items not covered in the Bid Schedule shall be included in the cost for other items.
END OF SECTION 02 01 40