About this file
This is a Sanitary Sewer Bypass Specification document for the Solano County Justice Campus Asset Protection project, prepared by project manager KSN, Inc. and project engineer Baumbach & Piazza, Inc., dated February 23, 2026. The specification establishes requirements for a temporary sewer bypass system that contractors must furnish, install, and maintain during construction activities affecting sanitary sewer infrastructure. The work includes all labor, materials, equipment, and incidentals necessary to place and operate bypass pumping systems and pipelines as shown on plan sheet SS-1, along with complete site restoration including backfilling, grassing, sodding, and routine site restoration upon completion. The contractor must perform all work in accordance with Fairfield-Suisun Sewer District Standards and Sanitary Sewer Bypass Provisions detailed on the referenced plan sheets, while maintaining compliance with applicable City, District, County, State, and Federal environmental regulations and codes.
Compensation for the sewer bypass work is established on a lump-sum basis that includes all costs associated with installing, operating, and maintaining the bypass system, as well as furnishing all labor, materials, tools, transportation, disposal, supplies, equipment, appurtenances, and incidentals. The specification directs contractors to refer to plan sheet SS-1 for detailed Sanitary Sewer Bypass Provisions that govern preparation, execution, and submittal requirements. Items not specifically covered in the bid schedule are to be included in the cost for other bid items, ensuring comprehensive cost responsibility for all work required to implement the temporary bypass system and restore the site to specification standards.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLANO COUNTY
JUSTICE CAMPUS ASSET PROTECTION
SANITARY SEWER BYPASS SPECIFICATION
FEBRUARY 23, 2026
Project Manager KSN, Inc.
1550 Harbor Blvd.
West Sacramento, CA 95691
Project Engineer Baumbach & Piazza, Inc.
323 W. Elm St.
Lodi, CA 95240
Solano County Sanitary Sewer Bypass Justice Campus Asset Protection 02 01 40-1
SECTION 02 01 40
SANITARY SEWER BYPASS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. The Contractor shall furnish all labor, materials, equipment, and incidentals to place and maintain operation of a temporary sewer bypass system as shown on plan sheet SS-1.
1.02 MEASUREMENT AND PAYMENT
A. Full compensation for conforming to the requirements of this Section shall be paid by lump sum price. The lump sum price includes installing and operating bypass pumping (if used) and pipelines, and including furnishing all labor, materials, tools, transportation, disposal, supplies, equipment, appurtenances, and incidentals and for doing all the work involved in sewer bypass, complete as shown on plan sheet SS-1.
1.03 REFERENCES
A. Perform Work in accordance with the Fairfield-Suisun Sewer District (District) Standards, and the Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
1.04 REGULATORY REQUIREMENTS
A. Conform to applicable City, District, County, State and Federal regulations and/or codes for environmental requirements.
1.05 SUBMITTALS
A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
PART 2 - PRODUCTS – NOT USED
PART 3 - EXECUTION
3.01 PREPARATION
A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
3.02 GENERAL
A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.
B. Provide complete restoration including, but not limited to, all backfilling, grassing and sodding, and routine site restoration. Items not covered in the Bid Schedule shall be included in the cost for other items.
END OF SECTION 02 01 40