2026_Preventative_Maintenance_Checklist_-_State_Intersections_EVPS.pdf

PDF 172 KB Posted

Attached to
TRAFFIC SIGNAL MAINTENANCE
Solicitation number
26/27-13
Issued by
Hartford County, Connecticut

About this file

This is a Preventative Maintenance Checklist document prepared for the Town of Manchester, Connecticut, in connection with Traffic Signal Maintenance Contract #26/27-013. The checklist outlines the maintenance procedures and inspection requirements for traffic signal systems at state-maintained intersections throughout Manchester. The contract period runs from December 1, 2026, through November 30, 2028, a two-year term. The document specifies inspection tasks including Emergency Vehicle Pre-Emption system checks, detector head aim and operation verification, phase selector testing, chassis inspection, and auxiliary equipment cabinet evaluation. Sealed bids for this project (Bid No. 26/27-13) were required to be submitted via the Town's eProcurement Portal by 11:00 am on Friday, November 6, 2026, at which time bids were to be publicly opened and read aloud.

The checklist serves as a functional tool for documenting completed and incomplete maintenance tasks at state-maintained intersections with town-maintained Opticom systems. The document includes fields for the contractor to record the date of service, location of work, and comments regarding findings. No specific pricing information, staffing requirements, or budget allocations are detailed within this preventative maintenance checklist, as it functions primarily as an operational inspection and documentation form rather than a pricing or scope specification document.

View the file

Other files

File Type Posted
TRAFFIC_SIGNAL_MAINTENANCE.pdf PDF
CTDOT_FORM_819_Traffic_Control_Plans_(2026-10-08).pdf PDF
DOT-owned_Traffic_Signals_(EVPS_Maintenance_List).pdf PDF
Town-owned_Traffic_Signals_&_Beacons.pdf PDF
Preventative_Maintenance_Checklist_-_Town_Signals.pdf PDF
Alpha_FXM1100_Manual.pdf PDF
Alpha_UATS-UGTS_Manual.PDF PDF
Alpha_UPS_Side_Cabinet.PDF PDF
AlphacellXTV_Battery_Datasheet.pdf PDF
CTDOT_Pre-Award_DBE_Approval_Request_Form.pdf PDF
DWSRF_1445_Labor_Standards_Interview_Form.pdf PDF
Prevailing_Wage_-_CTDOL_Poster.pdf PDF
Town_of_Manchester_Labor_and_Materials_Payment_Bond.pdf PDF
CDBG_Requirements.pdf PDF
Prevailing_Wage_-_Bulletins.pdf PDF
Prevailing_Wage_-_Contractor's_Wage_Certification_Form.pdf PDF
Prevailing_Wage_-_Payroll_Certification_Form.pdf PDF
Prevailing_Wage_-_Payroll_Certification_Form_(SAMPLE).pdf PDF
Required_Provisions_-_FHWA_funded_projects.pdf PDF
Special_Provisions_-_DBE_Requirements_for_Federal_Funded_Projects.pdf PDF
Town_of_Manchester_2026_Holiday_Calendar.pdf PDF
Town_of_Manchester_Traffic_Control_Ordinance_(2020-01-23).pdf PDF
Attachment_H_-_2026-2027_Working_Days_Calendar_and_Reporting_Form.pdf PDF
DWSRF_Contracting_Requirements2.pdf PDF
Prevailing_Wage_-_Footnotes_(July_1,_2025).pdf PDF
Town_of_Manchester_Living_Wage_Certification_Form.pdf PDF
Connecticut_Natural_Gas_Requirements.pdf PDF
Contract_langauge_-_municipal_projects-_CHRO.pdf PDF
Prevailing_Wage_-_July_1st_2025_Rates_Information.pdf PDF
Town_of_Manchester_Contract_(Blank).pdf PDF
Town_of_Manchester_Performance_Bond.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Manchester Traffic Signal Maintenance Contract # 26/27-013 Done By:

Location:

Contract duration: December 1, 2026 through November 30, 2028 Date:

Done Not Done N/A Emergency Vehicle Pre-Emption

Check aim and operation of Detector Heads Test Phase Selector check chassis check Auxiliary Equipment Cabinet

COMMENTS:

State Maintained Intersections w/Town Maintained Opticom

Notes

File details come from the government source that posted it. Updated .