This is a Statement of Objectives (SOO) for the enhancement of the Emergency Mass Notification System (EMNS), also known as "Giant Voice," at Hill Air Force Base, Utah. The contractor must provide a turn-key solution to enhance the existing SiRcom system installed in 2025, with a performance period of 365 days commencing September 30, 2026, and concluding September 29, 2027. Key deliverables include four 16-horn speaker stacks, one Motorola repeater, and single horn speakers at three base entry gates (West Gate, South Gate, and Roy Gate), along with installation of utility poles and power infrastructure. The contractor is restricted to using exclusively SiRcom brand equipment for Giant Voice hardware and Motorola brand equipment for all RF communication and radios to ensure compatibility with existing infrastructure and future upgrades.

The system must meet specific performance requirements including intelligible voice coverage of ≥50 dB at 700 yards and tone coverage of ≥80 dB at 700 yards for 16-stack horn locations. All outdoor equipment must function in ambient temperatures from -10°F to 120°F and withstand sustained winds of 70 knots with gusts up to 100 knots. Equipment cabinets must be environmentally sealed, walk-up serviceable (no greater than 6 feet height), securable with integrated locking systems, and equipped with intrusion detection systems reporting to the Command Post. All new speaker stacks require ground-mounted, south-facing solar panel trickle chargers for backup battery maintenance. Installation work must comply with UFC 4-021-01, NEC, and applicable ANSI/TIA/EIA standards. Contractor deliverables include a comprehensive project plan, equipment manuals, as-built engineering drawings, and open architecture software with real-time health monitoring capabilities. Upon successful completion and acceptance testing, the contractor must provide on-site maintenance and operator training, with all equipment and work covered by a one-year warranty including all travel, diagnosis, and repair costs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives (SOO) Emergency Mass Notification System (EMNS) Enhancement

Hill Air Force Base, Utah

1.0 Introduction and Background

This Statement of Objectives (SOO) outlines the requirements for the enhancement of the existing Emergency Mass Notification System (EMNS), also known as "Giant Voice" (GV), at Hill Air Force Base (AFB), Utah. The current Giant Voice system, a SiRcom system was installed in 2025. This project seeks a turn-key solution to enhance the system's capabilities, reliability, and coverage.

2.0 Scope of Work

The contractor shall provide all personnel, equipment, materials, and supervision necessary to engineer, furnish, install, and test an enhancement to the existing SiRcom Giant Voice system at Hill AFB. The scope includes the addition of four (4) 16-horn speaker stacks, one (1) Motorola repeater, and a single horn at each of the 3 Base entry gates, to improve overall system coverage and performance.

To ensure full compatibility with the existing infrastructure and potential future upgrades, the contractor is restricted to utilizing only SiRcom brand equipment for the Giant Voice hardware and Motorola brand radios/repeaters.

The contractor proposal shall provide a detailed installation plan, to include method, schedule, equipment manuals, a final test and acceptance plan, and as-built drawings upon completion.

3.0 Specific Tasks and Requirements

3.1 Equipment and Installation

The contractor shall:

• 3.1.1 Furnish and install four (4) new 16-horn speaker stacks, and associated equipment required to achieve full functionality/integration with existing SiRcom system at locations to be determined in coordination with Hill AFB Radio Shop (SCOWR) to maximize audio coverage. All new horn stacks, node controllers, and associated Giant Voice hardware shall be exclusively SiRcom brand equipment and compatible with the existing GV system.

• 3.1.2 Provide/install new utility poles and power for the 16-horn stacks, according to approved installation plan. Existing poles and equipment within 50 feet of new installations shall be removed and disposed of by the contractor, except where designated for reutilization in 3.1.2.1.

• 3.1.2.1 Provide/install 3 new 55ft wood poles, reutilize 1 metal pole and remove old wooden poles in the existing GPS locations:

- 41.159423, -112.013331 (Reutilized metal pole in 729 parking lot)

- 41.133381, -112.019844 (HQ bld, new wood pole)

- 41.124965, -112.014804 (Falcon Hill Parking lot, new wood pole)

- 41.114598, -111.980491 (Command Post, new wood pole)

• 3.1.3 Furnish and install one (1) Motorola brand repeater to ensure seamless communication and integration with existing system. All RF communication equipment and radios utilized for this enhancement must be exclusively Motorola brand. The location of the repeater shall be determined by the Government (SCOWR) and proven by the contractor to provide reliable signal enhancement to the entire system.

• 3.1.4 Furnish and install one (1) single horn speaker and required equipment to achieve full functionality/integration with existing SiRcom system, at each of the following base entry gates:

West Gate (41.123802, -112.018129), South Gate (41.105491, -111.973141), and Roy Gate (41.157596, -112.020577). These speakers and associated installation hardware shall be exclusively SiRcom brand.

• 3.1.5 Ensure all new equipment is fully integrated with the existing SiRcom Giant Voice system, including the primary controller unit and software.

• 3.1.6 Ensure all installation work complies with UFC 4-021-01, the National Electric Code (NEC), ANSI/TIA/EIA-568, ANSI/TIA/EIA-569, and TIA/EIA-607 standards.

3.2 System and Performance Requirements

The enhanced system must meet the following requirements:

• 3.2.1 Audio Coverage: The system shall provide intelligible voice and tone coverage across all newly covered areas, meeting the following minimum sound pressure levels:

• Voice: ≥ 50 dB @ 700 Yards (for 16 Stack Horn Locations)

• Tone: ≥ 80 dB @ 700 Yards (for 16 Stack Horn Locations)

• 3.2.2 Environmental Durability: All outdoor equipment must be fully functional in ambient temperatures from -10°F to 120°F and withstand sustained winds of 70 knots (with gusts up to 100 knots).

• 3.2.3 Equipment Cabinets:

• Cabinets for new speaker stacks shall be installed at a walk-up serviceable height (no greater than 6’ from ground level to the top of the cabinet).

• Cabinets must be environmentally sealed, fully enclosed, and securable with an integrated locking system. They must also be equipped with an intrusion detection system that reports to the Command Post and the 75 ABW/SCOWR office.

• 3.2.4 Solar Power: New speaker stacks shall include a ground-mounted, south-facing solar panel trickle charger to maintain back up battery life.

• 3.2.5 Software and Health Monitoring: The system shall utilize open architecture software for all system operations and monitoring. The software must be capable of providing real-time, independent health monitoring and diagnostic reporting directly from each stack location back to the primary controller. Proprietary, closed-loop software architectures that restrict future integration are prohibited.

4.0 Deliverables

The contractor shall provide the following:

• 4.1 Project Plan: A comprehensive plan detailing the installation schedule, locations, and procedures, as part of their proposal.

• 4.2 Equipment Manuals: Complete operational and maintenance manuals for all new equipment installed.

• 4.3 As-Built Drawings: Detailed engineering drawings showing the final locations and configuration of all installed equipment.

• 4.4 Software/Firmware: All necessary open architecture software, firmware, licenses, backups and training for the new equipment/software.

5.0 Training

Upon successful installation and acceptance testing by SCOWR, the contractor shall provide on-site maintenance and operator training for Government personnel as a condition of final acceptance. This includes comprehensive training on the open architecture software and health monitoring tools.

6.0 Warranty

All equipment and installation work shall be covered by a one-year warranty from the date of Government acceptance. The warranty shall include all costs associated with travel, diagnosis, and repair of any system defects or failures.

7.0 Testing and Acceptance

The Government will perform regular inspections during the installation process. Upon completion, the contractor and Government representatives will conduct a final acceptance test to ensure performance requirements of this SOO have been met, including verifying the health monitoring capabilities of the open architecture software.

8.0 Period of Performance (PoP)

The Period of Performance for this effort shall be 365 days. The PoP will commence on September 30, 2026, and conclude on September 29, 2027. All installation, testing, training, and final acceptance by the Government must be completed within this timeframe.