2026 FMP- Statement of Work .docx
DOCX document 72 KB Posted
- Attached to
- 38th Technical Rescue FMP Course Training
- Solicitation number
- FA483026Q0001
About this file
This is a Performance Work Statement (PWS) for a Full Mission Profile Capabilities Training Exercise for the 38th Rescue Squadron (38 RQS) at Moody Air Force Base. The training will occur from 15-21 February 2026, involving 25 squadron members and focusing on comprehensive rescue and tactical operations scenarios. The contractor must provide extensive support including scenario design, role players, medical logistics, land use support, aviation coordination, intelligence briefings, and specialized training environments covering technical rescue, medical operations, personnel recovery, and combat search and rescue.
Key requirements include providing eight full mission profile targets with complex scenarios simulating near-peer threats, medical training modules, extrication scenarios, and specialized equipment like aircraft fuselage hulks and mock drone wreckage. The contractor must deploy a highly experienced team with special operations backgrounds, including an Operations Director who is a former Pararescue (PJ) senior leader, lead rescue advisors with extensive special operations experience, and supporting personnel capable of executing realistic tactical scenarios. The training will adhere to specific Air Force manuals and Pararescue Career Field Education and Training Plan (CFETP) guidelines, with the ultimate goal of validating the squadron's readiness for potential CENTCOM Area of Responsibility operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated 38 RQS FMP PWS.docx | DOCX document | |
| DAF Approved Vendors List_16 JAN 26.pdf | ||
| Combo-Synopsis.pdf | ||
| UPDATED 38th RQS FMP PWS .docx | DOCX document | |
| Official Questions Form updated .pdf | ||
| Combo-Synopsis.pdf | ||
| 2026 FMP- Statement of Work .docx | DOCX document | |
| Combo-Synopsis.pdf | ||
| Combo-Synopsis.pdf | ||
| Pricing Schedule.pdf | ||
| Joint Travel Regulations 2026 PER DIEM Rate.pdf | ||
| Wage Determinations.pdf | ||
| Combo-Synopsis.pdf | ||
| 38th RQS FMP Regulations.docx | DOCX document | |
| ACC Element Leader QTP (Sep09).pdf | ||
| afman10-3507.pdf | ||
| 1T2X1 CFETP TCS CAO 12 July 18.docx | DOCX document | |
| Official Questions Form.pdf | ||
| afman10-3511.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
CUI
Performance Work Statement for 2026 Full Mission Profile Capabilities Training Exercise Pre-Deployment Training
1. Description of Services. The contractor shall furnish all labor, parts, tools, materials, equipment, facilities, transportation, personnel, land use, management, and supervision necessary to provide 25 members of the 38 Rescue Squadron (38 RQS) at Moody Air Force Base (Moody AFB), support for a full mission profile capabilities training exercise. This will include all methods of insertion and extraction, medical protocol, and special rescue Tactics Techniques and Procedures utilized by the Guardian Angel Weapons System. All contract performance will be conducted in accordance with DoD guidance, in terrain and environment conducive to perform safe, operational ground tactical maneuvers in accordance with the Performance Work Statement and any applicable governing laws and regulations. All contract performance will be conducted within 150 nautical miles from Moody AFB 31699 in order to limit the risk of damage and cost of transporting heavy rescue equipment and be within range of the 41st RQS for potential rotary wing training. It must take place during the timeframe 15-21 February 2026 (detailed schedule of services below).
2. Basic Services. The contractor shall provide all logistics necessary to facilitate every aspect of full mission profile capabilities training exercise in accordance with specific tasks below 15-21 February 2026.
3. Operational Requirements: Contractor Instructors will have Air Force Special Warfare (AFSPECWAR) Guardian Angel (GA) and Joint Special Operations Command (JSOC) operational experience. Non-GA instructors must have experience with Pararescue TTPs in order to provide instruction and feedback. Contractor will provide exercise support including scripting, CONOP development, target coordination, role players, and props required to conduct the exercise. This exercise is to validate readiness and capability to conduct Pararescue response in the CENTCOM Area of Responsibility (AOR). The exercise will include eight (8) full mission profile (FMP) targets over the period of time 15-21 Feb 2026 during which the contractor will provide role-players, staff and inter-agency subject matter experts (SME), lead planners (Chief Liaison Officer), Opposing Forces (OPFOR), Partner Forces, exercise controllers and realistic battlefield effects at the target locations. All must fall within the guidelines of the PJ/CRO CFETP chapters 5,6 and 10, AFMAN 10-3507 and AFMAN 10-3511. The contractor will provide a live Air Tasking Order (ATO), datalink integration and a Master Scenario Event List (MSEL) facilitating the incorporation of all assets into FMP execution. FMPs will require consistent contractor planning and unit liaison to ensure assistance in CONOP development and associated documentation is facilitated in its entirety. This support includes facilitation of asset requests, coordination, inter-agency scripting / coordination and assistance in command approvals. Contractor will provide academics by directorate and the appropriate SMEs necessary to provide RQS centric POI development and delivery through execution. The contractor will be responsible for creating regionalized and Open-source intel based full spectrum operational scenarios. Contractor will consult with 38th RQS White Cell personnel on scenario development. Scenarios will encompass multiple planning areas including providing Personnel Recovery (PR) and Combat Search and Rescue to other forces throughout corresponding AOR. Scenarios will be fully supported with multi-disciplined intelligence and operational reports. The contractor will produce relevant deployment orders, INTEL update briefs, and command and staff coordination.
4. Service Requirements. Contractor must be capable of adjusting to, and continuously provide services despite, GA training requirements, schedule change due to facility maintenance, and non-hostile threats (disease/injury) to support desired learning objectives (DLO’s), squadron evaluations, and white cell injects. The government shall maintain command & control (C2) of all aspects of the PWS. Additionally, the contractor must provide permits, training agreements, certificates of insurance and pictures of all training sites and props.
5. Specific Tasks (Training)
a. Full Mission Profile Design: The contractor will identify training locations and build the training scenarios NLT than 30 days prior to execution. The contractor will present the scenario details to the 38 RQS and make any required changes NLT 15 days prior to execution.
b. After Action Report: A comprehensive after-action report (AAR) of attending personnel’s objective actions and a summary report of all activities/training shall be submitted to the 38th RQS point of contact in electronic format no later than 60 days after the final training day. All information documented on attending personnel’s actions will be objective and any recommended improvement of actions may be subjective in nature. At no time will the AAR be utilized for grading or evaluating attending personnel performance. A brief description of the course activities and a brief description of the contractor’s involvement shall be included.
6. Medical Logistics Support: Vendor will provide live role-players in quantity sufficient to replicate mass casualty training, isolated personnel training, and realistic moulage/make-up/blood and prosthetics for all patient injuries. All medical scenarios and supplies must be in accordance with PJ CFETP Chapter 7: Emergency Medicine. Role players must be able to participate in dynamic scenarios in complex and confined spaces on land and water. Contractor will also provide the following medical resupply in support of the training events:
a. MASSIVE HEMMORAGE:
i. Gen 7 Combat Application Tourniquet: 64
ii. Hemostatic Gauze: 80
iii. Compressed Gauze: 160
iv. Ace Wrap 3 inch: 70
v. Combat Pressure Dressing: 20
vi. Coban: 32
vii. Junctional Tourniquet: provided by contractor for reuse in course
viii. Pelvic Binder: 8
b. AIRWAY:
i. Nasal Pharyngeal Airway: 80
ii. 6.0 Endotracheal Tubes Cuffed: 32
iii. Bougie: 20
iv. Supraglottic Airway: 20
c. RESPIRATION
i. 14 Gauge x 3.25-inch Needle Decompression: 100
ii. Chest Seal Non-Ventilated: 160
iii. Chest Tube: 20
iv. Chest Tube 1 way valve: 20
v. Bag Valve Mask: 20
d. CIRCULATION
i. 500 ml 0.9 % Normal Saline
ii. IV Pressure Infuser: 20
iii. Normal Saline Flush Syringes (10cc): 50
iv. 18 Gauge IV Catheter: 50
v. IV drug port: 50
vi. IV stabilizing dressing: 50
vii. 10 drop IV Tubing: 64
viii. 20,23 Gauge Drug Needles, 64 EA
ix. Syringes 3cc, 5cc, 10cc: 32 EA
x. 2 and 3 in medical tape: 20EA
xi. Y-Tubing: provided by contractor for reuse in course
xii. Brown Manual Intraosseous needle 7 Site access: provided by contractor for reuse in course
xiii. Intraosseous Needle Blue: 32, with extras provided by contractor for reuse in course
xiv. Sharps Shuttle: 32
e. HYPOTHERMIA
i. Space Blanket: 64
f. ADMIN
i. Durable Black Nitrile Gloves M, L, XL: 20boxes
ii. Scalpel: 80
iii. Pt Treatment Cards DD Form 1380: 160
iv. Permanent Marker Fine / Ultra Fine: 32
v. Trauma Shears: 20
7. Land Use Support: Contractor shall provide scenario locations that enable Full Mission Profile Scenarios that include but are not limited to Tactical Medicine, Military Operations in Urban Terrain (MOUT), Small unit tactics (SMUT), Rope and Technical Rescue, extrication, Close Quarters Battle (CQB) and Combat Clearance (CC), Personnel Recovery (PR), Combat Search and Rescue (CSAR). These scenarios must be in accordance with PJ CFETP Chapter 5: Tactical Operations. Acceptable locations include but are not limited to abandoned towns, man-made structures, temporary structures, refineries, train yard, naturally existing/urban high angle sites greater than 100 ft., caves, canyons, arroyos, flat ranges, water training sites, remote private home/farm structures, 360 degree shooting range, unknown distance shooting range, mounted/dismounted live- fire range, remote coastal regions with large open expansive flats suitable for heavy equipment DZs. Contractor shall ensure all training locations will be NEPA compliant. Examples of preferred training locations include, but are not limited to any location listed on DM PR Training Final EA and FONSI_2_5_2020.pdf (af.mil).
a. Licenses and Permits. The contractor shall, without additional expense to the Government, obtain any necessary licenses and permits, and comply with any Federal, State, and local laws, codes and regulations applicable to this PWS. The contractor shall provide proof of such applicable licenses and permits upon submittal of their proposal and at any time on request by the Government. The contractor shall submit any applicable certifications.
8. Full Mission Profile (FMP) Training Support: Contractor will be responsible for range reservations, logistic requirements, role player positioning, and prop placement in accordance with the scenario requirements. Contractor will provide at a minimum two (2) aircraft fuselage hulks for rescue/recovery extrication scenarios, two (2) mock drone fuselages for sensitive item recovery scenarios, two (2) up armored vehicles (HMMWV, MRAP, MATV, or similar) for extrication scenarios. Vehicles must be safe for use and welded shut/closed in a manner to force manual & significant extrication. Contractor will provide boat party and safety personnel required to stage water-based scenarios. Contractor will coordinate and set up the following FMPs:
a. The contractor will provide one day of technical rescue training on all TRIV equipment and TTPs for high angle rope rescue, confined space rescue, vehicle extrications and structural collapse in accordance with PJ CFETP Chapter 6: Technical Rescue and Recovery Operations and line item 10.2.4: Lead Confined Space/Structural Collapse Recovery Mission
b. The contractor will provide one (1) land isolated personnel (IP) pickup FMP with 4-6 IPs in accordance with PJ CFETP Chapter 7: Emergency Medical Operations
c. The contractor will provide one (1) Army ODA CASEVAC mission FMP with IED 4 casualty in accordance with PJ CFETP line item 10.1.3: Conduct Mass Casualty Recovery Mission
d. The contractor will provide one (1) Armored vehicle extrication mission in Euphrates/swift water rescue FMP - Contractor will provide armored vehicles (HMMWV, MRAP, MATV, or similar) for extrication scenarios. Vehicles must be safe for use and welded shut/closed in a manner to force manual & significant extrication in accordance with PJ CFETP Chapter 6: Technical Rescue and Recovery Operations
e. The contractor will provide one (1) SIR from drone wreckage Sensitive item recovery from MQ-9 FMP - Contractor will provide two mock drone fuselages which will be used for sensitive item recovery extrication scenarios in accordance with PJ CFETP Chapter 6: Technical Rescue and Recovery Operations
f. The contractor will provide (1) US embassy/Hotel AMCIT NEO FMP in accordance with 10.2.4: Lead Confined Space/Structural Collapse Recovery Mission
g. The contractor will prove one (1) Drone Base attack FMP - Contractor will provide a construction facility/building that can facilitate a collapsed structure scenario in accordance with line item 10.2.4: Lead Confined Space/Structural Collapse Recovery Mission
9. Scenario & Opposing Force (OPFOR) Support:
The contractor shall provide a versatile support team of at least six individuals to act as an opposing force (OPFOR), situational role-players, and simulated patients. This team must be capable of executing realistic scenarios using appropriate attire (e.g., foreign/domestic civilian clothing, military-style uniforms with body armor/load-bearing equipment) and be proficient with training weapon systems (simunition and blanks). The OPFOR element must demonstrate a high level of tactical proficiency, able to replicate a credible near-peer or asymmetric threat. To achieve this, it is highly desired that personnel have a background in special operations, advanced conventional military forces, or tactical law enforcement, with a strong understanding of modern TTPs (e.g., electronic warfare, night operations, UAS). Furthermore, at least one member of the team must possess verifiable experience in tactical air-to-ground communications to realistically simulate aircraft and air support coordination. All personnel must be in good physical condition, be self-sufficient for transportation, and be prepared to act as patients for medical scenarios. The vendor will also supply a variety of clothing that can be damaged to simulate injuries and battlefield effects.
10. Airspace & Aviation Coordination(Air Boss):
The contractor shall provide a qualified Air Boss to serve as the single point of contact for the coordination and safety of all exercise aircraft. This individual must be a current or former JTAC evaluator in accordance with AFMAN 10-3500V2 Chapter 4 Section 4.3.4 (goes over AFSC specifies for AFSPECWAR evaluator). Preferably, this individual is a current or former CCT E7 or above with Tier 1 expereince.
This individual must have significant, verifiable experience in aviation operations management, air-to-ground coordination, and airspace deconfliction in support of training or operational missions. They will be responsible for filing and ensuring adherence to all necessary NOTAMs, MOAs, and other airspace control measures.
11. JTAC support:
The contractor shall provide a qualified JTAC supporter who can control all HLZ’s in the area. This individual must be a current or former JTAC evaluator in accordance with AFMAN 10-3500V2 Chapter 4 Section 4.3.4 (goes over AFSC specifies for AFSPECWAR evaluator). Preferably, this individual is a current or former E6 and above CCT with extensive expereince.
12. Key Leadership & Advisory Personnel:
The contractor will provide a leadership and advisory team with the following qualifications:
Operations Director: A pararescuemen senior leader and former or current PJ AFSPECWAR Evaluator in accordance with AFMAN 10-3500V2 Chapter 4 Section 4.3.4 (goes over AFSC specifies for AFSPECWAR evaluator). Additionally, this individual must be a former 7-level Mountain Leader in accordance with AFMAN 10-3507 section 3.4: Mountain Leader Qualification (outlines the rope rescue requirements for mountain evaluators). Preferably, this individual is a current or former senior NCO with 12 years of experience with Tier 1 operators managing complex, multi-faceted training events or operations, preferably within a joint, interagency, or special operations environment.
Lead Rescue Advisor: A subject matter expert with at least 12 years of experience in a Special Operations combat medical or rescue field, including experience operating in high-threat or non-permissive environments. Required former PJ AFSPECWAR Evaluator in accordance with AFMAN 10-3500V2 Chapter 4 Section 4.3.4 (goes over AFSC specifies for AFSPECWAR evaluator). Additionally, this person must be a former 7-level Mountain Leader in accordance with AFMAN 10-3507 section 3.4: Mountain Leader Qualification (outlines the rope rescue requirements for mountain evaluators). Preferably, this person will be a former E7 or above with Tier 1 experience. This individual will provide high-level feedback on mission planning and execution.
Additional Rescue Advisors: A team of at least three advisors, each with a minimum of 7 years of operational experience in a SOF medical/rescue capacity or an equivalent high-level civilian specialty. Required PJ current or former 5 level and above, preferably E6 and above Mountain Leaders or former mountain leader in accordance with the Evaluator and Mountain Leader requirements mentioned above. These advisors must be proficient in instructing current TTPs for small unit tactics, tactical medicine, and advanced rescue disciplines (including confined space, high-angle, and vehicle extrication) to provide detailed, actionable feedback after each scenario.
13. Intel Support: Contractor will provide road to war brief no later than the first day of the exercise, 15 February 2026. Contractor will provide daily Intel update briefs/Operations & Intelligence (O&I) briefs that will guide realistic progression of scenarios. Contractor will build scenarios in conjunction with 38 RQS intel to include internally consistent road to war, daily alert briefs, and mission drops. Contractor will ensure that scenarios build upon actions of the teams on the ground and effects the intelligence and follow on missions accordingly.
14. Live Tissue Training Support: Contractor will provide all the support necessary to include at least 1 live tissue module per FMP and up to 6 modules for larger missions simulating a mass casualty situation.
15. Requirements.
a. Location: Training areas must support safe insertion via HH-60, airland or hoist. Training areas must not have administrative restrictions that prevent the executing team from maneuvering tactically on foot or in vehicles in the same manner that they would on an operational mission.
b. Applicable Documents and References. The unit will provide the below references upon request from the vendor.
i. AIR FORCE SPECIAL WARFARE BRIEFING GUIDE (Replaced Guardian Angel Briefing Guide)
ii. AFTTP 3-3.Guardian Angel
16. Contractor Provided Items, Services, Equipment and Materials. The contractor will provide the following equipment or service in support of the exercise. Required sizes will be sent to the contractor upon contract award. Items will be delivered on day one of the exercise, 15 February 2026.
a. 25x spiral bound, laminated hard copy Special Warfare Briefing Guide
b. 25x Printed Ranger Handbooks
c. 6x Mad Gear USA Modular Medical Wall Panel
d. 3x light lift kits (Savatech)
e. 32x Specter Polarized Glasses
f. 96x Born Primitive 9" Compression Black ($70)
g. 96x Born Primitive Heritage Tee Coyote ($48)
17. Government Provided Items, Equipment and Materials. The Government will ensure that individual and team equipment and uniforms will be provided as needed.
a. The 38 RQS will provide all necessary consumables e.g. batteries, 550 cord, 80 lbs. test, tape, rubber bands, chem-lights, etc...
b. The 38 RQS will provide sufficient military communication systems for all role players and white cell required to communicate with the executing team
c. The 38 RQS will provide night vision goggles for role players as needed
d. Government to provide armory support and weapons for OPFOR role players
e. Government to provide access to on-base training locations
f. Government to provide intel shop support from the 38th RQS to develop intel brief and FMP products consistent with contractor planned scenarios
g. Government to provide flight doc support to assist with telemedical, prolonged field care, and medical handoff scenarios
18. General Information.
a. Safety. The contractor shall comply with and maintain appropriate safety instructions and qualification. Nothing in the PWS, nor any government action or failure to act in performance of the contract shall relieve the contractor of their responsibility for the safety of the contractor’s personnel and property, the government’s personnel and property, and the general public. Furthermore, nothing in this PWS shall relieve the contractor of its responsibility for complying with applicable Federal, State, and Local laws, ordinances, codes and regulations (including those requiring applicable licenses and permits) in connection with the performance of this contract.
b. Mishaps. Safety and training related problems or mishaps involving government personnel observed by the contractor shall be addressed immediately. A formal written report shall be provided within two (2) working days of the incident to the 48 RQS Commander.
19. Environmental Protection Compliance
a. Adherence to the Training location Contractor Environmental Guide. Adherence to environmental guide is mandatory and will help increase the contractor’s awareness of the installation’s Environmental Management System (EMS) and environmental regulatory requirements that impact the training location. The guide covers the significant environmental aspects and impacts that contractors often influence. A list of these aspects can be found in Appendix F, Environmental Management System (EMS) Most Significant Environmental Aspects Awareness Form, of the guide. Upon contract award, the contractor shall complete Appendix F and submit it to the Contracting Officer. The environmental guide will be provided by the Contracting Officer.
b. Environmental Management System (EMS) Awareness Training. The contractor shall comply with the specific training areas Environmental Guide in completing the required EMS Awareness Training prior to start of work. The training is a requirement for project managers, on-site managers/supervisors, and contractor personnel who have a direct influence on the significant aspects identified in Appendix F of the guide. Training registration and login instructions can be found in Appendix E, EMS Awareness Level Training Login and Registration Instructions, of the Contractor Environmental Guide. The contractor shall submit a completed copy of the training certificate along with Appendix F to the Contracting Officer upon contract award to document completion of training.
c. Environmental Laws and Regulations. The contractor shall comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations/requirements change during the term of the contract, the contractor shall comply with such law/regulation as changed. The contractor is responsible for any penalties, fines, etc. resulting from violations. The contractor shall immediately notify the designated CES Environmental POC when violations occur, and cooperate fully with fire department personnel and Government investigators.
d. Environmental Permits. Contractors shall comply with all regulatory requirements to include permits if applicable. The contractor shall treat areas subject to dust producing activities with liquid palliatives which will not harm regrowth of vegetation, or other methods of dust control. The contractor shall also ensure methods to protect native plants, birds and wildlife are included in projects where required. All permit costs shall be considered as having been included as a factor in the contractor's bid price.
e. Hazardous Materials/Waste. The contractor shall be responsible for the proper management of both hazardous and non-hazardous waste. The contractor shall segregate hazardous or regulated materials and non-hazardous or non-regulated materials and handle, transport, store, and dispose of those materials, in accordance with the Resource Conservation and Recovery Act, all applicable federal, state, and local statutes and regulations, and in accordance with Appendix C, Hazardous, PCB, and Universal Waste: Proper Management and Disposal, of the Contractor Environmental Guide.
f. Hazardous Material (HAZMAT) Handling. The contractor shall plan, fill out, and submit a HAZMAT worksheet to the COR prior to bringing HAZMAT on the base - see Appendix A, Guidance For Submission Of Safety Data Sheets For Hazardous Material (HAZMAT) and Reporting of Hazmat Usage, and Attachment(s) A-1 to A-3 of the Contractor Environmental Guide for details. The contractor shall maintain one copy of the MSDS or SDS for each HAZMAT line item used within the work center.
g. Prohibited Substances/Chemicals. The contractor shall not use products that are, or contain Extremely Hazardous Substances (EHS), Ozone Depleting Substances (ODS), and/or Persistent Bio-accumulative and Toxic (PBT) chemicals.
h. Hazardous Materials/Waste Spills. The contractor shall take every reasonable precaution to prevent spills of HAZMAT. The contractor shall comply with this plan when handling and storing all oils and fuels. The Government Project Manager will provide the SPCC Plan to the contractor, upon contract award. The contractor shall clean and dispose of all HAZMAT spills in accordance with local, state, and federal laws and regulations. and the Contractor Environmental Guide. The contractor shall bear full financial obligation incurred from cleaning and disposing of HAZMAT spills, or release of HAZMAT within the confines of the training locations.
i. Spill Containment Kits. The contractor shall ensure that all vehicles used for transport of HAZMAT , carry a spill containment kit capable of containing a spill, until first responders arrive. The contractor shall make spill containment kits available for inspection by Government personnel, upon request.
File details come from the government source that posted it. Updated .