Summary of Addendum #5 for Bid #2026-31

This addendum document pertains to the Town of Stratford, Connecticut's procurement for the replacement of Structure No. 06132 at Surf Avenue over an unnamed brook at the I-95 Exit Ramp #30 intersection. Addendum #5, issued July 2, 2026, incorporates corrections, revisions, additions, and clarifications to the contract documents and establishes a postponed sealed bid submission deadline of 10:00 AM on Tuesday, July 7, 2026. The project requires comprehensive civil construction services including demolition, excavation, site preparation, drainage system installation, concrete work, structural steel, permanent and temporary sheet piling, pavement markings, traffic control, landscaping, and environmental remediation. The addendum includes a revised bid form, updated special provisions, an RFI question-and-answer log addressing contractor inquiries, and updated construction drawings. Key project elements include controlled material handling at designated waste stockpile areas, invasive vegetation removal, utility protection and coordination, environmental health and safety protocols for Areas of Environmental Concern (AOEC), and compliance with wetland permit requirements. The contract documents reference an estimated $50,000 allowance for utility pole and overhead electric protection work.

Addendum #5 reflects responses to 30 numbered RFI questions from contractors addressing site access, material disposal locations, cost allocation, utility coordination, payment item clarifications, and specification revisions. Notable revisions include the addition of Item #0202315A for disposal of controlled materials charged per ton, Item #0952051A for invasive vegetation control and removal, clarification that the police traffic person cost (Item #0970006A) will be paid by the Town, removal of an item previously designated as Item #0970006A, confirmation that the bid bond requirement is 5 percent (not 10 percent), and updates to special provisions for waste stockpile area construction and controlled materials handling. The document establishes that contractors are responsible for identifying waste stockpile and access drive locations subject to engineer approval, coordinating with utility companies for any overhead wire or pole relocations required by their construction methods at their own expense, and implementing comprehensive environmental health and safety plans for contaminated material handling. Connecticut Department of Transportation-approved disposal facilities are specified for non-hazardous controlled materials, and the contract includes requirements for decontamination procedures, dust control, fugitive dust suppression, and documentation of material transport and disposal.

Text of this file

ADDENDUM #5

BID #2026-31

REPLACEMENT OF STRUCTURE NO. 06132

SURF AVENUE OVER AN UNNAMED BROOK

(SURF AVENUE AND I-95 EXIT RAMP #30 INTERSECTION)

2nd July, 2026 – It is intended that this Addendum incorporating the following corrections, revisions, additions, deletions and clarifications become part of the Contract Documents, including pricing as submitted.

POSTPONEMENT:

Sealed bids will be received by the Purchasing Department at the office of the Purchasing Agent, 2725 Main Street, Room 104, Stratford, Connecticut 06615, up to:

10:00AM – Tuesday, 7th July, 2026

Addendum #5 consists of responses to RFI received and updated specifications as follows.

- Revised Bid Form titled as “REVISED UNDER ADDENDUM NO. 5”

- Special Provisions titled as “REV. ADDENDUM NO. 05”

- RFI Question and Answer Log – Revised/Updated 2-July-2026

- Grading & Utility Plan - Drawing #GUP-1

- Stage 1 Phase 1 Plan – Drawing #STG-1

Phillip Ryan, Purchasing Agent offering more from forest to shore

PURCHASING

mailto:purchasing@townofstratford.com http://www.townofstratford.com/

BID FORM

REPLACEMENT OF STRUCTURE NO. 06132

TOWN OF STRATFORD, CONNECTICUT

BID NO. {{BID_NUM}}

Dated , 20__

Proposal of ("Bidder")

Sealed proposals are to be sent to the Office of the Purchasing Agent, Town Hall 2725 Main Street, Stratford, Connecticut 06615 and directed to the attention of Mr. Phillip Ryan, Purchasing Agent.

All proposals must be sealed in an opaque envelope and must be marked:

"BID ENCLOSED"

REPLACEMENT OF STRUCTURE NO. 06132, SURF AVENUE OVER AN UNNAMED BROOK

Proposals must be delivered to the Office of the Purchasing Agent, above mentioned, on or before {{DUE TIME AND DATE}}, at the Town Hall, Stratford, Connecticut.

The undersigned has examined the proposed work to be undertaken and has read all attached or referenced documents; and he proposes and agrees that he will contract with the Town of Stratford (herein called the

Owner) to provide all necessary labor, machinery, tools, apparatus, equipment and other means of construction and do all the work and furnish all materials called for or shown on the drawings, specifications and other requirements of the Owner, as therein set forth, and that he will take in full payment therefore, the following sums, to with:

Increase and Decrease of Contract Bid Items: The Town of Stratford reserves the right to increase or decrease any amount of any bid item of work included under this contract at any time before the award of the contract or during the course of the contract without any adjustment to the contract unit bid prices or without payment of any compensation to the Contractor for such increase or decrease other than the unit bid price compensation for the items furnished, installed or performed.

This paragraph supersedes all reference to such payments defined in Section 1.04.02, “Increased or Decreased

Quantities of Minor Items”, and “Elimination of Items”, and Section 1.04.03, “Changes in Quantities and

Significant Changes in the Character of the Work”, of the State of Connecticut Standard Specifications Form

819.

If the Town should adjust quantities in order to award a contract in an amount within established funding, the adjustment of quantities and award of contract will be made in the best interest of the Town.

REVISED UNDER ADDENDUM NO. 5

BID FORM - PAGE 2

NOTE: Bids shall include all applicable fees

Base Bid

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

DEMOLITION

0101081A 600 CY CONTROLLED MATERIAL HANDLING SITE NO. 1

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0101128A 1 LS SECURING, CONSTRUCTION AND

DISMANTLING OF A WASTE STOCKPILE AND

TREATMENT AREA

LUMP SUM PRICE

__________________________ dollars and ________________________cents $_________ $_________

0202000 900 CY EARTH EXCAVATION (INCLUDES REMOVAL OF

ASPHALT PAVEMENT)

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0202529 136 LF CUT BITUMINOUS CONCRETE PAVEMENT

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0204001 150 LF COFFERDAM AND DEWATERING (Sand Bags)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

* REVISED UNDER ADDENDUM NO. 1

BID FORM - PAGE 3

Base Bid

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0212000 275 CY SUBBASE (FOR TEMPORARY PAVEMENT)

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0210306A 100 LF TURBIDITY CURTAIN

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0219001 400 LF SEDIMENTATION CONTROL SYSTEM - FILTER

FABRIC FENCE

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0219011 10 EA SEDIMENT CONTROL SYSTEM AT CATCH BASIN

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0406171 67 TON HMA S0.5 (FOR TEMPORARY PAVEMENT)

PRICE PER TON

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 4

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0406303 136 LF SAWING AND SEALING JOINTS

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0409001 111 SY MILLING OF BITUMINOUS CONCRETE (0" TO 4")

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

0586790.10 2 EA REMOVE DRAINAGE STRUCTURE - 0' - 10' DEEP

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0653002A 1 LS CLEAN EXISTING DRAINAGE SYSTEM

LUMP SUM PRICE

__________________________ dollars and ________________________cents $_________ $_________

0686950.10 121 LF REMOVE EXISTING PIPE - 0'-10' DEEP

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 5

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0716000 4290 SF TEMPORARY EARTH RETAINING SYSTEM

PRICE PER SQUARE FOOT

__________________________ dollars and ________________________cents $_________ $_________

0822100.02 220 LF TEMPORARY TRAFFIC BARRIER (PINNED)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0822101.02 840 LF RELOCATED TEMPORARY TRAFFIC BARRIER

(PINNED)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0970006A 720 HR TRAFFIC PERSON (MUNICIPAL POLICE OFFICER)

PRICE PER HOUR

__________________________ dollars and ________________________cents $_________ $_________

0970007 1920 HR TRAFFIC PERSON (UNIFORMED FLAGGER)

PRICE PER HOUR

__________________________ dollars and ________________________cents $_________ $_________

REVISED UNDER ADDENDUM NO. 5

*ITEM REMOVED FROM BID

BID FORM - PAGE 6

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0974001 250 CY REMOVAL OF EXISTING MASONRY

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0976002 180 DAY BARRICADE WARNING LIGHTS

PRICE PER DAY

__________________________ dollars and ________________________cents $_________ $_________

0977001 18 EA TRAFFIC CONE

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

1220027 105 SF CONSTRUCTION SIGNS

PRICE PER SQUARE FOOT

__________________________ dollars and ________________________cents $_________ $_________

1807210 2 EA TEMPORARY IMPACT ATTENUATION SYSTEM

(SAND INERTIAL BARRIER)

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 7

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

1807211 7 EA RELOCATION OF TEMPORARY IMPACT

ATTENUATION SYSTEM

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

1131002 30 DAY REMOTE CONTROL CHANGEABLE MESSAGE

SIGN (Allowance)

PRICE PER DAY

__________________________ dollars and ________________________cents $_________ $_________

1209114 5172 LF HOT APPLIED PAINTED PAVEMENT MARKINGS

4" YELLOW (TEMPORARY)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

1209124 1116 LF HOT APPLIED PAINTED PAVEMENT MARKINGS

4" WHITE (TEMPORARY)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

SITE IMPROVEMENTS

0202200A 1450 CY CHANNEL EXCAVATION-EARTH

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 8

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0203000 1300 CY STRUCTURE EXCAVATION -- EARTH (Complete)

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0209001 3100 SY FORMATION OF SUBGRADE

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

0212000 883 CY SUBBASE

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0213100 480 CY GRANULAR FILL

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0216000 340 CY PERVIOUS STRUCTURE BACKFILL

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 9

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0304002 18 CY PROCESSED AGGREGATE BASE

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0406170 1010 TON HMA S1.0

PRICE PER TON

__________________________ dollars and ________________________cents $_________ $_________

0406171 518 TON HMA S0.5

PRICE PER TON

__________________________ dollars and ________________________cents $_________ $_________

0406236 233 GAL MATERIAL FOR TACK COAT

PRICE PER GALLON

__________________________ dollars and ________________________cents $_________ $_________

0509001 1300 EA WELDED STUDS

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 10

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0586003.10A 2 EA TYPE 'C' CATCH BASIN DOUBLE GRATE TYPE 1 -

(4' SUMP) 0' - 10' DEEP

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0586005.1A 6 EA TYPE 'C' CATCH BASIN DOUBLE GRATE TYPE 2 -

(4' SUMP) 0' - 10' DEEP

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0586511.05A 1 EA SPECIAL MANHOLE (5' DIAMETER) - 0' - 10' DEEP

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0586750 3 EA TYPE "C" CATCH BASIN TOP

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0586752 1 EA TYPE 'C' CATCH BASIN TOP DOUBLE GRATE

TYPE 2

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 11

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0586760 1 EA TYPE "C-L" CATCH BASIN TOP

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0601062 170 CY FOOTING CONCRETE

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0601064 145 CY ABUTMENT AND WALL CONCRETE

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0601091A 275 SY SIMULATED STONE MASONRY (FORM LINER)

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

0601124 7 CY BARRIER WALL CONCRETE

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 12

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0601125A 168 LF PRECAST CONCRETE BOX CULVERT

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0601365 23 CY CONCRETE PAD

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

0601502 50 SF 1/2'' PREFORMED EXPANSION JOINT FILLER FOR

BRIDGES

PRICE PER SQUARE FOOT

__________________________ dollars and ________________________cents $_________ $_________

0601504 400 SF 1'' PREFORMED EXPANSION JOINT FILLER FOR

BRIDGES

PRICE PER SQUARE FOOT

__________________________ dollars and ________________________cents $_________ $_________

0602030 41000 LB DEFORMED STEEL BARS - GALVANIZED

PRICE PER POUND

__________________________ dollars and ________________________cents $_________ $_________

* REVISED UNDER ADDENDUM NO. 1

130*55*

BID FORM - PAGE 13

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0602054 800 LB WELDED WIRE FABRIC - GALVANIZED

PRICE PER POUND

__________________________ dollars and ________________________cents $_________ $_________

0602910 34 EA DRILLING HOLES AND GROUTING DOWELS

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0603768 95 LB STRUCTURAL STEEL

PRICE PER POUND

__________________________ dollars and ________________________cents $_________ $_________

0686000.15 32 LF 15" R.C. PIPE (0'-10' DEEP)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0686000.18 221 LF 18" R.C. PIPE (0'-10' DEEP)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 14

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0686000.24 37 LF 24" R.C. PIPE (0'-10' DEEP)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0686000.36 32 LF 36" R.C. PIPE (0' TO 10' DEEP)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0686200.24A 15 LF 24" POLYVINYL CHLORIDE PIPE - 0' - 10' DEEP

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0686902A 1 EA FLAP GATE

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0703008 123 CY INTERMEDIATE RIPRAP

PRICE PER CUBIC YARD

__________________________ dollars and ________________________cents $_________ $_________

4 **

** REVISED UNDER ADDENDUM NO. 3

BID FORM - PAGE 15

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0706001 8 EA MICROPILES

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0706002 1 EA VERIFICATION TEST FOR MICROPILES

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0706004 16 LF MICROPILE LENGTH ADJUSTMENT

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0707009A 250 SY MEMBRANE WATERPROOFING (COLD LIQUID

ELASTOMERIC)

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

0708001 75 SY DAMPPROOFING

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 16

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0713040 9000 SF PERMANENT SHEET PILING

PRICE PER SQUARE FOOT

__________________________ dollars and ________________________cents $_________ $_________

0755014 80 SY GEOTEXTILE (SEPARATION - HIGH

SURVIVABILITY)

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

0811003 1493 LF 6" PRECAST CONC CURBING

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0819002 260 SY PENETRATING SEALER PROTECTIVE

COMPOUND

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

0904487A 70 LF METAL BRIDGE RAIL - HANDRAIL

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 17

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0913001 200 LF 4' CHAIN LINK FENCE

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0913952A 75 LF PROTECTIVE FENCE(5' HIGH)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0921001 2652 SF CONCRETE SIDEWALK

PRICE PER SQUARE FOOT

__________________________ dollars and ________________________cents $_________ $_________

0921005 210 SF CONCRETE SIDEWALK RAMP

PRICE PER SQUARE FOOT

__________________________ dollars and ________________________cents $_________ $_________

0921048 70 SF DETECTABLE WARNING STRIP

PRICE PER SQUARE FOOT

__________________________ dollars and ________________________cents $_________ $_________

130*

BID FORM - PAGE 18

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0922500 135 SY BITUMINOUS CONCRETE DRIVEWAY

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

0924004 10 SY CONCRETE DRIVEWAY RAMP

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

0944000 1280 SY FURNISHING AND PLACING TOPSOIL

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

0949038 5 EA CERCIS CANADENSIS, EASTERN REDBUD, 2"-

2.5" CAL. B .B.

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0949268 7 EA JUNIPERUS HORIZONTALIS, BLUE RUG JUNIPER

- 1GAL

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

BID FORM - PAGE 19

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0949340 4 EA AMELANCHIER LAEVIS, ALLEGHENY

SERVICEBERRY, 7'-8' HT multistem

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0949375 1 EA QUERCUS ALBA, WHITE OAK, 21/2" - 3" CAL. B.B.

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0949719 6 EA CORNUS FLORIDA FLOWERING DOGWOOD 6'-8'

HT. B.B.

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0949833 3 EA ACER RUBRUM RED MAPLE 2 1/2''- 3'' CAL. B.B.

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0949875 1 LS WETLAND PLANTINGS (Allowance)

LUMP SUM PRICE

__________________________ dollars and ________________________cents $_________ $_________

* REVISED UNDER ADDENDUM NO. 1

A **

** REVISED UNDER ADDENDUM NO. 3

BID PROPOSAL - PAGE 20

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

0950019 1280 SY TURF ESTABLISHMENT - LAWN

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

1301932A 34 LF 18" STEEL PIPE SLEEVE (WATER MAIN)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0000001 1 EA HINGED FLOOD GATE

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

------- 1 LS PROTECTION OF EXISTING UTILITIES

LUMP SUM PRICE

__________________________ dollars and ________________________cents $_________ $_________

PAVEMENT MARKINGS, TRAFFIC CONTROL, TRAFFIC SIGNS

1208937 22 SF SIGN FACE - SHEET ALUMINUM (TYPE XI

RETROREFLECTIVE SHEETING)

PRICE PER SQUARE FOOT

__________________________ dollars and ________________________cents $_________ $_________

BID PROPOSAL - PAGE 21

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

1209124 1120 LF HOT APPLIED PAINTED PAVEMENT MARKINGS

4" WHITE (PROJECT LIMITS)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

1209124 800 LF HOT APPLIED PAINTED PAVEMENT MARKINGS

4" WHITE (OUTSIDE PROJECT LIMITS)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

1210101 250 LF 4" WHITE EPOXY RESIN PAVEMENT MARKINGS

(RAMP)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

1210102 1280 LF 4" YELLOW EPOXY RESIN PAVEMENT

MARKINGS (SURF AVE CL/RAMP EDGE LINE)

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

1210105 400 SF EPOXY RESIN PAVEMENT MARKINGS, STOP

BAR, SYMBOLS AND LEGENDS

PRICE PER SQUARE FOOT

__________________________ dollars and ________________________cents $_________ $_________

BID PROPOSAL - PAGE 22

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

MISCELLANEOUS

0201001 1 LS CLEARING AND GRUBBING

LUMP SUM PRICE

__________________________ dollars and ________________________cents $_________ $_________

0980020 1 LS CONSTRUCTION SURVEY (STAKING)

LUMP SUM PRICE

__________________________ dollars and ________________________cents $_________ $_________

0971001A 1 LS MAINTENANCE & PROTECTION OF TRAFFIC

LUMP SUM PRICE

__________________________ dollars and ________________________cents $_________ $_________

0975003A 1 LS MOBILIZATION

LUMP SUM PRICE

__________________________ dollars and ________________________cents $_________ $_________

0101000A 1 LS ENVIRONMENTAL HEALTH AND SAFETY

LUMP SUM PRICE

__________________________ dollars and ________________________cents $_________ $_________

BID PROPOSAL - PAGE 23

ITEM NO.

ESTIMATED

QUANTITY

UNIT

DESCRIPTION

ADD UNIT PRICE (IN WORDS)

UNIT

PRICE

EXTENDED

PRICE

ITEMS ADDED UNDER ADDENDUM NO. 1 & NO. 5

0201199A 71 LF REMOVE AND RESET FENCE

PRICE PER LINEAR FOOT

__________________________ dollars and ________________________cents $_________ $_________

0952051A 3100 SY CONTROL AND REMOVAL OF INVASIVE

VEGETATION

PRICE PER SQUARE YARD

__________________________ dollars and ________________________cents $_________ $_________

0202315A 1100 TON DISPOSAL OF CONTROLLED MATERIALS

PRICE PER TON

__________________________ dollars and ________________________cents $_________ $_________

0202452 1 EA TEST PIT

PRICE FOR EACH

__________________________ dollars and ________________________cents $_________ $_________

0000002A 1 EST PROTECTION OF UTILITY POLES AND

OVERHEAD ELECTRIC (ALLOWANCE)

ESTIMATE TOTAL VALUE

Fifty Thousand dollars and Zero cents $1 $50,000

BID FORM (cont.)

REPLACEMENT OF STRUCTURE NO. 06132

The total amount of this bid on the estimated quantities shown herein and as computed by the undersigned bidder is Dollars and

Cents.

It is understood and agreed that the prices bid for the various units of construction shall control in any

Contract awarded hereinafter. As stated in the "Instructions to Bidders", the Town of Stratford reserves the right to revise the estimated quantities with no fixed limits set nor extra compensation allowed other than the above stated unit prices.

l. If this proposal should be accepted by the Town of Stratford and the undersigned shall fail to negotiate and fulfill all terms of the Contract, the ten percent (5%10%) Bid Bond accompanying this Proposal, shall become the property of the Town of Stratford; otherwise the accompanying Bid Bond will be returned to the undersigned.

2. We understand that the Town of Stratford reserves the right to reject any or all bids.

3. The full names and residences of all persons and parties interested in the foregoing Proposal as principles are as follows: (give first and last name in full; in case of corporation, give name of President, Treasurer and Manager).

(Signature and Business Address of

Bidder)

Dated at the day of in the year 20__

Question No Date Contractor Question Response

1 6/5/2026 Empire Channel Excavation will include the root removal for the phragmites that has to be cleared can a bid item be added for this as it is an invasive species and will re-grow wherever it is transported to

The following Notice to Contractor and special provision/pay item will be added to account for this. NTC-Invasive Species and Item 0952051A Control and Removal of Invasive Vegetation.

2 6/5/2026 Empire Will saturated soils be an issue for controlled materials handling. Should there be a bid item for this? Any excess saturated soils shall be included in the bid item No. 0101081A

- Controlled Materials Handling Site No. 1.

3 6/5/2026 Empire Where is a bid item for access drive and where is it located per detail 3 on sheet no 27.5.

See sheet no. 9. The Access Drive detail on Sheet No 27.5 is intended for the “Gravel Driveway” called out on sheet no 9, that extends from the flood gate at STA 24+90LT to the concrete end wall at STA 24+38 LT.

There is no single pay item for “Access Drive”. The materials for the access drive identified on sheet no 27.5 shall be bid separately (i.e.

processed aggregate base, subbase, and geotextile)

4 6/5/2026 Empire Is any construction access allowed in cemetery property?

Yes, access to the cemetery to perform construction activities is allowed and is limited to the fill limits and driveway reconstruction limits shown on Sheets No.'s 9 & 10. The contractor shall be responsible to coordinate any activities on the cemetery property with a representative of the cemetery.

The selected contractor will be provided the cemetery contact information upon request. The Contractor shall exercise caution not to damage existing headstones and other miscellaneous existing items within the cemetery. Any cost to repair damages to items not proposed to be replaced/removed shall be the responsibility of the contractor. Additionally, there is an existing decorative aluminum fence within the cemetery property along Surf Ave. This fence shall be removed, stored, and reset by the contractor. A future addendum will include a new pay item and plan revisions for this work.

5 6/5/2026 Empire Is a field office required for the Engineer? If so, can a bid item be provided for it? A construction field office will not be required.

6 6/5/2026 Empire Who is responsible for the analytical testing of all controlled material? This is the responsibility of the Engineer, the special provisions will be updated in an addendum to state this.

7 6/5/2026 Empire Can a contractor build a larger waste stockpile area? Spec says only 100CY of material can be stored before it disposes.

The Special Provision for 0101128A will be revised to remove this statement. The Contractor shall size and select the WSA location based upon their means and methods for approval by the engineer.

8 Pre-Bid Meeting Q Can the grass area adjacent to the I-95 southbound exit be used to store materials?

This area is the State's property and not the Town's. If the contractor would like to store materials in this area, they will need approval from the State which is not guaranteed.

9 Pre-Bid Meeting Q Are permanent and/or temporary utility pole relocations required and who is responsible for paying for permanent and/or temporary utility pole relocations?

The utility poles in their existing locations do not conflict with the location of proposed elements to be installed under this project and are not anticipated to conflict with the temporary work. Thus utility poles have not been identified on the plans to be permanently or temporarily relocated. If the contractor deems that pole relocation is required to perform work based upon their means and methods, the cost of relocating the utility poles shall be the responsibility of the contractor. The contractor is also responsible for any coordination necessary with the utility pole and aerial utility owners.

10 6/13/2026 NJR Construction Item# 0101128A Securing, Construction and Dismantling of a Waste Stockpile and Treatment Area, at what location is this to be constructed?

Please see the "Construction Methods" section of this special provision, paragraph 1. "The WSA shall be constructed in accordance with the Contract at a location to be determined by the Contractor and approved by the Engineer.". This special provision for this item will be updated in an addendum to include one location the Town may be able to offer as a

WSA.

11 6/12/2026 Blakeslee Arpaia Chapman, Inc 1. WB-1 indicates rock above the permanent sheet piling designed tip elevation. What do we do if sheets refuse above the designed tip elevation?

If sheet piles encounter refusal on bedrock within 1 foot of specified tip elevation, the embedment shall be considered acceptable and no additional action is required. If refusal is encountered greater than 1-foot of specified tip elevation. Contractor shall contact the Engineer for review. A note will be added to Drawing No. STR-2 stating this in a future addendum.

12 6/12/2026 Blakeslee Arpaia Chapman, Inc 1. Referencing plans GUP-1 and STR-2, what is the bottom elevation of the sheeting caps?

As noted on STR-2, the concrete cap on the sheet pile wall shall be 1'-6" below the top of the modified rip rap which will be at grade. The top of grade on shown on GUP-1 varies along the length of the wall for each of the permanent sheet pile wall locations. Thus the bottom elevation of the concrete cap will vary to ensure 1'-6" of concrete below top of grade.

13 6/12/2026 Empire In the invitation to bid it states a 5% Bid Bond is required. However, in the bid form, page 21, it refers to a 10% Bid Bond. Please advise. The Town requires a five percent (5%) Bid Bond.

14 6/16/2026 Grasso Companies Will the Town provide an area for the WSA location? Or will the contractor be responsible for leasing private land to locate this WSA?

See Special Provision for item #0101128A, within the construction methods paragraph 1, the WSA shall be determined by the contractor and approved by the engineer. The contractor will be responsible for determining the WSA location, whether that is coordinating with CTDOT to use an existing WSA, leasing private land, or using Town Land. There is one location that can be offered for use by the Town. Information on this location will be added to the special provision for item #0101128A in an addendum.

15 6/16/2026 Grasso Companies The bid item for Handling Controlled Materials covers loading and trucking of material to and from the WSA. If this material cannot be reused on site, can new bid items be added for per-ton offsite disposal of contaminated and polluted materials? Otherwise, we cannot accurately price this item.

An additional special provision and pay item "#0202315A Disposal of Controlled Materials" will be added under an addendum to account for disposal of controlled materials in TONS. The item "#0101081A Controlled Materials Handling" will be revised in an addendum to remove any conflicting language with this new item.

16 6/16/2026 Grasso Companies Item 094975 Wetland Plantings is listed as both a lump sum and an allowance. Will we get paid the lump sum price we bid, or do we get paid an allowance based on actual costs plus a markup?

This item should be bid and will paid at the Lump Sum Price. The bid form will be updated in an addendum to remove "Allowance".

17 6/17/2026 Empire There is no bid amount allowance mentioned for Item# 0949875 Wetland Plantings. This item should be bid and will paid at the Lump Sum Price. The bid form will be updated in an addendum to remove "Allowance".

18 6/17/2026 Empire Is there any staining associated with Item# 0601091A Simulated Stone Masonry (Form liner) No, staining of the form lined surfaces is not required.

19 6/17/2026 Blakeslee Arpaia Chapman, Inc How do we get paid to furnish and install the sidewalks on top of the box culvert?

The cost of concrete for this shall be included in the pay item "0601365 Concrete Pads", the cost of reinforcement shall be included in pay item "0602030 Deformed Steel Bars - Galvanized".

20 6/17/2026 Blakeslee Arpaia Chapman, Inc What specific utilities is the contractor required to protect?

Based on survey and coordination during design, there is an existing underground water main within the project limits and existing utility poles with aerial utilities within the project limits. The existing and relocated underground watermain shall be protected in place throughout construction. The utility poles and overhead utilities shall be protected in place throughout construction. These are the utilities known at this time that are known to need protection at this time. As stated in the Notice to Contractor - Protection of Existing Utilities, it is the contractors responsibility to verify the presence of any and all utilities that may or may not be shown on the plans. The contractor shall protect any additional existing utilities discovered in the field as required.

21 6/17/2026 Blakeslee Arpaia Chapman, Inc 1. Are the overhead wires along Surf Ave going to be relocated? A. For the permanent sheet piling, B For the temporary cofferdams

Relocation of the utility poles and/or overhead wires is not included in the contract documents. If the Contractors means and methods require temporary relocation or protection of over overhead wires and/or utility poles. It shall be the contractors responsibility to coordinate this work with the utility owners. A "Notice to Contractor - Coordination with Utilities" will be added under an addendum and will provide utility contact information for all known utilities at this time. The Contractor shall verify the presence of any additional utilities and coordinate as required.

22 6/17/2026 Blakeslee Arpaia Chapman, Inc 2. If we are responsible for moving the wires, how do we get paid for that work and how do we coordinate it?

If the Contractor based upon their means and methods and coordination with the utility companies, deems that relocation of overhead wires is required, the Contractor shall be responsible for coordinating with the affected utility company. A "Notice to Contractor - Coordination with Utilities" will be added under an addendum and will provide utility contact information for all known utilities at this time. The Contractor shall verify the presence of any additional utilities and coordinate as required. The cost of relocating any overhead utilities and utility poles shall be the responsibility of the contractor.

23 6/22/2026 Grasso Companies For police it says the Town will pay, but there is also a pay item 0970006A for this?

The Town will pay for the Police included in Item 0970006A in accordance with the special provision. This item will be removed from the bid form in an addendum.

24 Pre-Bid Meeting Q Does CHRO apply to this project? CHRO does not apply to this project. There is no State funding involved.

Town funds only.

25 6/22/2026 All Seasons Landscaping Item #0949875 Wetland Plantings has been changed from an “allowance” to “Lump Sum Price” – Please provide a plant list and special provision for this item.

A specification has been added in Addendum #3 identifying the "New England Costal Salt Tolerant Grass Mix” to be included and paid for under the item #0949875 Wetland Plantings.

26 6/22/2026 All Seasons Landscaping Drawing TWP-1 Sheet 13.A1 includes a seed mix “New England Costal Salt Tolerant Grass Mix” there is no associated Item number for this mix – please identify what pay item this is to be included in.

A specification has been added in Addendum #3 identifying the "New England Costal Salt Tolerant Grass Mix” to be included and paid for under the item #0949875 Wetland Plantings.

27 6/22/2026 Loureiro Contractors, Inc Some facilities that are listed in the specifications are no longer accepting soils. Can we use alternate CTDOT approved facilities?

The special provision for #0202315A - Disposal of Controlled Materials has been updated in Addendum #3 to match the current CTDOT approved recycling facilities for non-hazardous materials.

28 6/25/2026 Fucci The Bid #0686902A – Flap Gate pay unit is 1-ea, however there are 4 heavy duty flap gates listed in the specs. The bid form has been updated in Addendum #3 for a quantiity of 4 for item #0686902A.

29 6/26/2026 Loureiro Contractors, Inc Question submitted to UI: Do you have an estimate worked up for relocation if needed?

An additional pay item (estimated) and special provision for item "Protection of Utility Poles and Overhead Utilities (Allowance)" has been added to the contract under Addendum No 5. The estimated value of this item is not to be altered and shall be bid the same for each contractor.

The special provision for this item and the addendum no. 5 plans indicate what protection activities apply under this item. Any additional protection/relocation measures that the contractor feels is necessary based on there means and methods shall not be measured for payment.

30 6/24/2026 Empire Paving Question submitted to UI: We would like to inquire whether there will be a charge to shield the paver lines for work along Surf Avenue on Project 2026-31 – Replacement of Structure No. 06132, Stratford.

An additional pay item (estimated) and special provision for item "Protection of Utility Poles and Overhead Utilities (Allowance)" has been added to the contract under Addendum No 5. The estimated value of this item is not to be altered and shall be bid the same for each contractor.

The special provision for this item and the addendum no. 5 plans indicate what protection activities apply under this item. Any additional protection/relocation measures that the contractor feels is necessary based on there means and methods shall not be measured for payment.

INDEX.A5

REPLACEMENT OF STRUCTURE NO. 06132

SPECIAL PROVISIONS

REV. ADDENDUM NO. 05

INDEX

NOTICE TO CONTRACTOR – PROTECTION OF EXISTING UTILITIES (REV. A.01)

NOTICE TO CONTRACTOR – UTILITY GENERATED WORK SCHEDULE

NOTICE TO CONTRACTOR – ENVIRONMENTAL INVESTIGATIONS (REV. A.01)

NOTICE TO CONTRACTOR – TOWN INLAND WETLAND PERMIT

NOTICE TO CONTRACTOR – COORDINATION WITH UTILITIES

NOTICE TO CONTRACTOR – INVASIVE PLANT SPECIES

SECTION 1.08 PROSECUTION AND PROGRESS

#0000001A HINGED FLOOD GATE

#0000002A PROTECTION OF UTILITY POLES AND OVERHEAD UTILITIES

(ALLOWANCE)

#0101000A ENVIRONMENTAL HEALTH AND SAFETY

#0101081A CONTROLLED MATERIAL HANDLING SITE NO. 1(REV. A.01)

#0101128A SECURING, CONSTRUCTION AND DISMANTLING OF A WASTE

STOCKPILE AND TREATMENT AREA (REV. A.01)

#0201199A REMOVE AND RESET FENCE

#0202200A CHANNEL EXCAVATION -– EARTH (REV. A.01)

#0202315A DISPOSAL OF CONTROLLED MATERIALS (REV. A.03)

#0204001A TURBIDITY CURTAIN

#0586003.1A TYPE "C" CATCH BASIN DOUBLE GRATE - TYPE I

#0586005.1A TYPE ''C'' CATCH BASIN DOUBLE GRATE - TYPE II

#0586511.5A SPECIAL MANHOLE – 5’ DIAMETER

#0601091A SIMULATED STONE MASONRY

#0601125A PRECAST CONCRETE BOX CULVERT

INDEX.A5

SPECIAL PROVISIONS

REV. ADDENDUM NO. 05

INDEX CONTINUED

#0653002A CLEAN DRAINAGE SYSTEM

#0686200.24A 24” POLYVINYL CHLORIDE PIPE – 0’-10’ DEEP

#0686902A FLAP GATE

#0707009A MEMBRANE WATERPROOFING (COLD LIQUID ELASTOMERIC)

#0904487A METAL BRIDGE RAIL (HANDRAIL)

#0949875A WETLAND PLANTINGS

#0952051A CONTROL AND REMOVAL OF INVASIVE VEGETATION

#0970006A TRAFFIC PERSON (MUNICIPAL POLICE OFFICER)

#0971001A MAINTENANCE AND PROTECTION OF TRAFFIC

#0975003A MOBILIZATION

#0913952A PROTECTIVE FENCE (5’ HIGH)

#1301932A 18” STEEL PIPE SLEEVE (WATER MAIN)

NOTICE TO CONTRACTOR

NOTICE TO CONTRACTOR – PROTECTION OF EXISTING UTILITES

Existing utilities shall be maintained during construction except as specifically stated herein and/or noted on the plans and as coordinated with the utilities. The Contractor shall verify the location of underground, structure mounted and overhead utilities. Construction work within the vicinity of utilities shall be performed in accordance with current safety regulations.

The Contractor shall notify "Call Before You Dig", telephone 1-800-922-4455 for the location of public utility, in accordance with Section 16-345 of the Regulations of the Department of Utility

Control.

Representatives of the various utility companies shall be provided access to the work, by the

Contractor.

Contractors are cautioned that it is their responsibility to verify locations, conditions, and field dimensions of all existing features, as actual conditions may differ from the information shown on the plans or contained elsewhere in the specifications.

The Contractor shall notify the Engineer prior to the start of work and shall be responsible for all coordination with the Department. The Contractor shall allow the Engineer complete access to the work.

The Contractor shall be liable for all damages or claims received or sustained by any persons, corporations or property in consequence of damage to the existing utilities, their appurtenances, or other facilities caused directly or indirectly by the operations of the Contractor.

Any damage to any existing private and public utility, as a result of the Contractors operations, shall be repaired to the Utilities and Engineer's satisfaction at no cost to the State or the Utilities, including all materials, labor, etc., required to complete the repairs.

The Contractor's attention is directed to the requirements of Section 1.07.13 – "Contractor's

Responsibilities for Adjacent Property and Services".

Prior to opening an excavation, effort shall be made to determine whether underground installations, i.e., water, sanitary, gas, electric ducts, communication ducts, etc., will be encountered and, if so, where such underground installations are located. When the excavation approaches the estimated location of such an installation, the exact location shall be determined by careful probing or hand digging, and when it is uncovered, proper supports shall be provided for the existing installation. Utility companies shall be contacted and advised of proposed work prior to the start of actual excavation, as noted above.

NOTICE TO CONTRACTOR – UTILITY GENERATED SCHEDULE

The attached project specific utility work schedule was provided to the Town of Stratford

(Town) by the utility companies regarding their identified work on this project.

The utility scheduling information is provided to assist the Contractor in scheduling its activities.

However, the Town does not ensure its accuracy and Section 1.05.06 of the Standard

Specifications still is in force.

The utility scheduling information shall be incorporated into the Contractor’s pre-award schedule in accordance with Section 1.05.08 of the Standard Specifications.

After award, the Contractor shall conduct a utility coordination meeting or meetings to obtain contemporaneous scheduling information from the utilities prior to submitting its baseline schedule to the Town in accordance with Section (1.05.08 – Schedules and Reports) of the

Contract.

The Contractor shall incorporate the contemporaneous utility scheduling information into its baseline schedule submittal. The baseline schedule shall include Contractor predecessor and successor activities to the utility work in such detail as acceptable to the Engineer.

CTDOT Project Number:

Utility Company:

Prepared By: 68

UTILITY WORK SCHEDULE Rev 3/2015

Location

(Station to Station) Description of Utility Work Activity

Duration

(working days) Predecessor Activity

25037-810

Carlos Vizcarrondo

Aquarion Water Company

Schedule

The following schedule identifies each major activity of utility work in sequential order to be performed by the utility or its contractor. The location of each activity of work is identified by the baseline stationing on the CTDOT plans. All activities identify the predecessor activity which must be completed before a utility work activity may progress. The duration provided is the number of working days required to complete the utility work activity based on historical information and production rates.

Total Working Days:

Sta. 27+43 to 28+05

Sta. 24+05 & 28+20

Sta. 24+10 & 28+20

Sta. 24+05 & 28+20

Sta. 24+05 to 26+80

Sta. 24+05 to 26+80

Sta. 26+80 to 28+05

Complete special test pits.

Restrain existing joints.

Install 12" valves and tee South of culvert.

Install new 12" water main on Surf Ave North from 12" tee and valve to 2" air vent with temp. plug.

Fill, chlorinate and pressure test new 12" water main.

Relocate hydrant.

Cut and cap existing water main North and South of culvert. Install 12" valves and 2" air vent with temp.

plug.Assemble 18" Steel Sleeve.

Connect to new 12" water main South of culvert.

Install New 12" water main on Surf Ave North from culvert to 2" air vent with temp. plug.

Fill, chlorinate and pressure test new 12" water main.

Sta. 26+65

Sta. 24+10 & 28+10

Sta. 26+88 to 27+43

Sta. 26+80

Assemble 18" Steel Sleeve.

None

Complete special test pit.

Restrain existing joints.

Install 12" valves and tee South of culvert.

Install new 12" water main on Surf Ave

North from 12" tee and valve to 2" air vent

Install new 12" water main on Surf Ave

North from culvert to 2" air vent with temp.

Fill, chlorinate and pressure test new 12" water main.

Relocate hydrant.

Stage 2 culvert excavation work by Town

Contractor.

Assemble 18" Steel Sleeve.

NOTICE TO CONTRACTOR.A1

NOTICE TO CONTRACTOR - ENVIRONMENTAL INVESTIGATIONS

Due to historical industrial and highway-transportation uses upstream of Structure No. 06132 carrying Surf Avenue over an unnamed brook, excavation within the brook channel immediately upstream and downstream of the culvert shall be considered an Area of Environmental Concern

(AOEC), known as AOEC Site No. 1, due to potential contamination. See Contract Plan Sheet

No 13.A1 for location and limits of AOEC(s).

Notice is given to the contractor that no formal environmental site investigations have been conducted by the Town of Stratford within AOEC(s) Site No. 1. Therefore, documentation is not available from the Town regarding potential contaminants or controlled materials within the project limits.

The Contractor is hereby notified that controlled materials requiring special management or disposal procedures may be encountered during various construction activities conducted within the Project limits. Therefore, the Contractor will be required to implement appropriate health and safety measures for all construction activities to be performed within the AOECs. These measures shall include, but are not limited to, air monitoring, engineering controls, personal protective equipment and decontamination, equipment decontamination and personnel training.

WORKER HEALTH AND SAFETY PROTOCOLS WHICH ADDRESS POTENTIAL

AND/OR ACTUAL RISK OF EXPOSURE TO SITE SPECIFIC HAZARDS IS SOLELY THE

RESPONSIBILITY OF THE CONTRACTOR.

The Town of Stratford, as Generator, will provide an authorized representative to sign all manifests and waste profile documentation required by disposal facilities for disposal of contaminated water and controlled materials.

All suitable material excavated within the AOECs shall be utilized as fill/backfill within the same/similar AOEC, in accordance with the following conditions: (1) such soil is deemed to be structurally suitable for use as fill by the Engineer; (2) such soil is not placed below the water table; 3) the DEEP groundwater classification of the area where the soil is to be reused as fill does not preclude said reuse; and (4) such soil is not placed in an area subject to erosion.

The Sections which shall be reviewed by the Contractor include, but are not limited to, the following:

• Item No. 0101000A - Environmental Health and Safety

• Item No. 0101081A - Controlled Materials Handling Site No. 1

• Item No. 0101128A - Securing, Construction, and Dismantling of a Waste Stockpile and

Treatment Area

• Item No. 0202200A - Channel Excavation – Earth

• Item No. 0202315A – Disposal of Controlled Materials

NOTICE TO CONTRACTOR – TOWN INLAND WETLAND PERMIT

The Contractor must perform his work in accordance with the terms, conditions and requirements of the project Inland Wetland Permit contained in the Project Special Conditions.

There will be no direct payment for complying with all these permit requirements but the cost shall be considered as included in the general cost of the contract.

NOTICE TO CONTRACTOR.A01

Rev. 6-12-2026

NOTICE TO CONTRACTOR – INVASIVE PLANT SPECIES

Invasive Plant Species1 Are Not Permitted In the Inland/Tidal Wetland Mitigation Site(s):

Only plant materials native and indigenous to the Northeast shall be used within the Inland/Tidal

Wetland Mitigation Site(s). Species not specified in the Turf, Wetland, and Landscape Plan, Sheet

No. 13, shall not be used without written approval from the Engineer. All woody debris stockpiled in accordance with the special provision for "Clearing and Grubbing" must be free from the invasive species.

All invasive vegetation listed on the following websites will be subject to eradication:

• Connecticut Invasive Plant Working Group (CIPWG) Invasive Plants Council (http://cipwg.uconn.edu/invasive_plant_list/ )

• US Army Corps of Engineers (ACOE) New England District Compensatory Mitigation

Guidance Appendix K

(http://www.nae.usace.army.mil/portals/74/docs/regulatory/Mitigation/2016_New_Engla nd_Compensatory_Mitigation_Guidance.pdf)

Project specific invasive species additional to those listed on the website will be subject to removal at the Environmental Scientist’s discretion.

1Scientific names are those used primarily in National Wetland Plant List

(http://wetland_plants.usace.army.mil/) and secondarily in USDA PLANTS database

(http://plants.usda.gov/).

SECTION 1.08

SECTION 1.08 – PROSECUTION AND PROGRESS

Article 1.08.04 – Limitation of Operations – Add the following:

TIME RESTRICTIONS

In order to provide for traffic operations as outlined…

This is the start of the file's text. The full file is on GovTribe.

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .