The document is a Schedule of Values for the Chaffee County Phase 2 Cell 7 Construction Project located in Salida, Colorado, prepared by Sanborn, Head & Associates, Inc. The project involves constructing a new 6.6-acre municipal solid waste (MSW) landfill disposal cell, with Chaffee County Government soliciting bids for geosynthetic liner system installation. The scope includes purchasing, delivering, and installing geosynthetic clay liner (288,080 square feet), high-density polyethylene geomembrane (288,080 square feet), geotextile (156,047 square feet), and turf reinforcement mat (2,650 square feet). The project requires specific liner connections to existing Cell 2 and Cell 6, with anchor trench and liner termination work spanning 1,815 linear feet.
The Schedule of Values indicates that all sitework construction activities, including earthwork, will be performed by Chaffee County Landfill and Chaffee County Road & Bridge Department Personnel, with the contractor focused solely on geosynthetic materials and installation. No specific pricing is currently populated in the document, with all unit prices and total prices showing as zero. The project does not require a leachate sump due to the cell's upgradient location, and the liner system will include a geosynthetic clay liner and HDPE geomembrane. The contract appears to be structured as a unit price contract with specific quantities defined for each component of the liner system installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20250407 Schedule of Values - Addendum No. 3.xlsx | XLSX spreadsheet | |
| 20250325 Chaffee County LF Ph2 C7 Bid Package.pdf | ||
| 20250401 CCLF Ph2 C7 Addendum No. 1.pdf | ||
| 20250407 CCLF Ph2 C7 Addendum No. 3.pdf | ||
| 20250403 CCLF Ph2 C7 Addendum No. 2.pdf | ||
| Q&A Document 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Bid Project Name: Chaffee County Phase 2 Cell 7 Construction
Project Location: Salida, Colorado
Contractor:
| Item No. | ITEM DESCRIPTION | UNITS | QUANTITY | UNIT PRICE | TOTAL PRICE | |
| 1 | Mobilization/Demobilization | LS | 1 | $ - 0 | ||
| 2 | Geosynthetic Clay Liner | SF | 288,080 | $ - 0 | ||
| 3 | Geomembrane | SF | 288,080 | $ - 0 | ||
| 4 | Geotextile | SF | 156,047 | $ - 0 | ||
| 5 | Anchor Trench and Liner Terminations/Connections | |||||
| a. | Anchor Trench | LF | 625 | $ - 0 | ||
| b. | Liner Termination (Floor Condition) | LF | 480 | $ - 0 | ||
| c. | Liner Termination (Side Slope Condition) | LF | 130 | $ - 0 | ||
| d. | Cell 2 Liner Connection | LF | 575 | $ - 0 | ||
| e. | Cell 6 Liner Connection | LF | 505 | $ - 0 | ||
| 6 | Turf Reinforcement Mat | SF | 2,650 | $ - 0 | ||
| Subtotal | $ - 0 | |||||
| Payment Bond @100% | ||||||
| Performance Bond @100% | ||||||
| Total Estimated Contract Price | $ - 0 |
&"Arial,Bold"&12 ATTACHMENT 1&"Arial,Regular"&10 &"Arial,Bold"&12CONTRACTOR'S SCHEDULE OF VALUES
&9&F &9Page &P of &N &9Sanborn, Head && Associates, Inc.
File details come from the government source that posted it. Updated .