This document comprises construction plans for the Rhode Island Department of Transportation's rehabilitation project of Wood River Road Bridge No. 056601, located in Hopkinton and Richmond, Rhode Island. The project, titled "Corridor - Hope Valley," involves comprehensive rehabilitation of the bridge structure that carries Switch Road over the Wood River. The plans include standard symbols, general and job-specific notes, typical sections, maintenance and protection of traffic plans, emergency detour plans, bridge general plans, stage construction details, abutment plans and elevations, proposed details, prestressed beam repair details, miscellaneous details, and a survey plan. The documentation establishes the technical specifications and design standards that contractors must follow, referencing the Rhode Island Department of Transportation Standard Specifications for Road & Bridge Construction (February 2026) and the AASHTO LRFD Bridge Construction Specifications (4th Edition, 2017).
The plans establish detailed design criteria including concrete specifications (High Performance Class HP with f'c = 5,000 PSI for cast-in-place elements), reinforcing steel requirements (AASHTO M31 Grade 60 and M55, galvanized), and construction load factors per AASHTO LRFD standards. Design parameters include an HL-93 vehicular live load, minimum temperature of -10 degrees Fahrenheit with maximum of 105 degrees Fahrenheit, design wind speed of 120 miles per hour, and construction wind pressures ranging from 33 PSF up to 17 feet in height to 47 PSF over 50 feet and up to 75 feet. The project requires contractor submission of erection plans with professional engineer certification, mandatory pre-erection conferences, daily inspections of erected girders until deck pouring completion, and temporary barrier installations meeting TL-3 test level. All work must comply with Rhode Island General Law 39-1.2 regarding utility notification through the DIG SAFE program, with contractors assuming responsibility for repair of any damaged utilities at no cost to the State.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING NEW
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
HOPKINTON / RICHMOND RHODE ISLAND
STANDARD PLAN SYMBOLS
& STANDARD LEGEND
UTILITY NOTES:
DRAINAGE AND EROSION CONTROL NOTES: DRAINAGE AND EROSION CONTROL NOTES (CONTINUED):GENERAL NOTES: GENERAL NOTES (CONTINUED):
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
HOPKINTON / RICHMOND RHODE ISLAND
STANDARD NOTES - NO. 1
STRUCTURAL NOTES FOR HIGHWAY SIGNS, TRAFFIC SIGNAL NOTES: MAINTENANCE AND PROTECTION OF TRAFFIC NOTES:LANDSCAPE NOTES:
LUMINAIRES AND TRAFFIC SIGNALS:
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
STANDARD NOTES - NO. 2
JOB SPECIFIC GENERAL NOTES:
JOB SPECIFIC PAVEMENT MARKINGS NOTES:
JOB SPECIFIC LEGEND
TYPICAL SIGN DESIGNATION SYMBOL
SURVEY NOTES:
WILDLIFE FENCE
COMPOST FILTER SOCK
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
JOB SPECIFIC NOTES AND LEGEND
WOOD RIVER ROAD
APPROACH SECTION AT BRIDGE
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
TYPICAL SECTIONS
DEPARTMENT OF TRANSPORTATION
NOTES:
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
HIGHWAY GENERAL PLAN
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
HOPKINTON / RICHMOND RHODE ISLAND
MAINTENANCE AND PROTECTION
OF TRAFFIC PLAN - NO.1
MAINTENANCE AND PROTECTION OF TRAFFIC NOTES:
LEGEND
MOBILE OPERATIONS ON
TWO-LANE ROAD
SHOULDER WORK WITH
MINOR ENCROACHMENT
WORK BEYOND
THE SHOULDER
TYPICAL LANE SHIFT ON
TWO-LANE ROADWAY
LANE CLOSURE ON TWO
LANE ROAD USING FLAGGERS (35 MPH OR GREATER IN URBAN AREA)
LEGEND
SWITCH ROAD ROAD CLOSURE DETAIL
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
SWITCH ROAD EASTBOUND AND WESTBOUND DETOURS
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
EMERGENCY DETOUR PLAN
W20-1 36"X36"
SWITCH ROAD
W20-1 36"X36"
G R
AN
TVILLE EXD
WORK ZONE
SW
IT
CH
R
O
AD
Locate at Old Switch Road
Locate at Kenyon Road
Locate 200' South of Garnet Ln., vicinity of UP 23
Locate 1500' South of North Side of I-95 Overpass
M.P.H.
(TYP.) 40' - 150'
SIGNAL #2
TEMPORARY BARRIER TL-3
TEMPORARY PAVEMENT MARKINGS
6W
12W
M.P.H.
6W
12W
TEMPORARY PAVEMENT MARKINGS
TEMPORARY BARRIER TL-3
SIGNAL #1
WORK ZONE
NARROW IMPACT ATTENUATOR (TYP)
100' MAX
100' MAX
TEMPORARY SIGNAL PLAN
PCMS DISPLAYS
PHASE AND SEQUENCE DIAGRAM
PHASE AND SEQUENCE CHART
SIGNAL HEADS
PROJECT LIMIT SIGNING
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
SWITCH ROAD TRAFFIC CONTROL PLAN - PHASE I
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
LIST OF ABBREVIATIONS
GENERAL NOTES
1. ALL CONSTRUCTION INDICATED ON THESE PLANS SHALL BE IN ACCORDANCE WITH:
· THE RHODE ISLAND DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD
& BRIDGE CONSTRUCTION, FEBRUARY 2026, WITH ALL REVISIONS.
· THE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)
LRFD BRIDGE CONSTRUCTION SPECIFICATIONS, 4TH EDITION, 2017, INCLUDING THE LATEST
INTERIM REVISIONS.
· THE SPECIFICATIONS ACCOMPANYING THESE PLANS.
2. DIMENSIONS, STATIONS, AND ELEVATIONS ARE SHOWN TO THE NEAREST ONE-HUNDREDTH OF A FOOT OR ONE-EIGHTH OF AN INCH, EXCEPT STRUCTURAL STEEL DIMENSIONS WHICH ARE TO THE
NEAREST ONE-SIXTEENTH OF AN INCH.
3. ALL ELEVATIONS ARE REFERENCED TO THE NATIONAL GEODETIC VERTICAL DATUM OF
NAVD 88 GEOID 12A.
4. COORDINATES USED ON THESE PLANS ARE BASED ON THE STATEWIDE COORDINATE SYSTEM, THE
NORTH AMERICAN DATUM OF 1983, NAD 83 (NA2011) EPOCH 2010.
5. TOPOGRAPHIC CONDITIONS WERE OBTAINED FROM GROUND SURVEY. TOPOGRAPHIC ACCURACY
CLASS T-1: 90% IS WITHIN 0.5' A FOOT FOR 1' CONTOURS.
6. FOR BENCH MARKS AND TIES SEE HIGHWAY LOCATION PLANS.
7. ANGLES ARE SHOWN TO THE NEAREST SECOND.
8. ALL WORKING POINTS ARE SHOWN AT THE CENTERLINES OF BEARINGS OF ABUTMENTS, UNLESS
OTHERWISE NOTED.
9. ALL ABUTMENTS AND WALLS ARE DRAWN LOOKING AT THE EXPOSED FACES.
10. THE EXISTING UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE AND WERE LOCATED USING
THE BEST AVAILABLE INFORMATION. NO BUILDING SERVICE CONNECTIONS (ELECTRIC,
TELEPHONE, GAS, WATER, SANITARY AND OTHERS) ARE SHOWN. THE CONTRACTOR IS TO
ASSUME THAT SERVICES TO ALL BUILDINGS ARE PRESENT.
11. BOTH FEDERAL AND STATE LAW (RI. GENERAL LAW 39-1.2) REQUIRE NOTIFICATION OF
APPROPRIATE UTILITY COMPANIES BEFORE DIGGING, TRENCHING, BLASTING, DEMOLISHING,
BORING, BACK FILLING, GRADING, LANDSCAPING, OR OTHER EARTH MOVING OPERATIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY ALL UTILITY COMPANIES (INCLUDING THROUGH THE “DIG SAFE” PROGRAM) TO ENSURE THAT ALL UTILITIES, BOTH UNDERGROUND AND OVERHEAD, HAVE BEEN MARKED BEFORE COMMENCEMENT OF SUCH WORK. THE CONTRACTOR SHOULD
UNDERSTAND THAT NOT ALL UTILITIES SUBSCRIBE TO THE “DIG SAFE” PROGRAM. ANY DAMAGE TO
EXISTING UTILITIES MARKED IN THE FIELD, OR AS A RESULT OF FAILING TO CONTACT THE
APPROPRIATE UTILITY COMPANIES, SHALL BE REPAIRED OR REPLACED (AS DEEMED APPROPRIATE BY THE STATE AND/OR THE IMPACTED UTILITY COMPANY) AT NO ADDITIONAL COST TO THE STATE.
12. ENTIRE BRIDGE SHALL BE CLEANED IN ACCORDANCE WITH SECTION 815 OF THE RI STANDARD
SPECIFICATIONS.
13. PRIOR TO REMOVING EXISTING PAVEMENT FROM BRIDGE AND APPROACHES, CONTRACTOR SHALL
SURVEY EACH GUTTER AND CROWN AT 10 FOOT INTERVALS AND REPLICATE GRADES. SURVEY
PLAN SHALL BE SUBMITTED FOR REVIEW.
3. LOAD FACTORS
ALL LOAD FACTORS SHALL BE IN ACCORDANCE WITH THE AASHTO LRFD BRIDGE DESIGN
SPECIFICATIONS, EXCEPT AS MODIFIED IN THE RHODE ISLAND LRFD BRIDGE DESIGN MANUAL
(SPECIFIED BELOW).
· THE LOAD FACTOR FOR TEMPERATURE GRADIENT SHALL BE TAKEN AS ZERO FOR ALL LIMIT
STATES.
· THE LOAD FACTOR FOR LIVE LOAD FOR THE EXTREME EVENT I SHALL BE TAKEN AS ZERO.
· THE LOAD FACTOR FOR DEAD LOAD FOR THE EXTREME EVENT I AND EXTREME EVENT II SHALL
BE TAKEN AS 1.0
· THE LOAD FACTOR FOR SETTLEMENT FOR ALL LIMIT STATES SHALL BE TAKEN AS 1.0
4. LIVE LOADS
· THE DESIGN VEHICULAR LIVE LOAD SHALL BE THE HL-93 DESIGNATION ADJUSTED FOR
DYNAMIC LOAD ALLOWANCE, MULTIPLE PRESENCE FACTOR AND PER TAC-0347.
MATERIALS
REINFORCING STEEL:
· AASHTO DESIGNATION M 31, GRADE 60, GALVANIZED
· AASHTO DESIGNATION M55, GALVANIZED
CONCRETE STRENGTHS:
· CLASS HP 3 8" f'c=5,000 PSI
CAST IN PLACE BRIDGE DECK OVERLAY, END DIAPHRAGM, BACKWALL, KEEPER BLOCK, BEAM
SEAT AND APPROACH SLABS.
DESIGN DATA
1. DESIGN SPECIFICATIONS
· THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 10TH EDITION, 2024, INCLUDING ALL
INTERIM REVISIONS TO DATE.
· THE RHODE ISLAND LRFD BRIDGE DESIGN MANUAL 2007 EDITION INCLUDING ALL REVISIONS
TO DATE.
· ALL OTHER APPLICABLE DESIGN SPECIFICATIONS ARE REFERENCED IN SECTION 1 OF THE
RHODE ISLAND LRFD BRIDGE DESIGN MANUAL DATED 2007.
· THE RHODE ISLAND DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR
ROAD & BRIDGE CONSTRUCTION (RI STANDARD SPECIFICATIONS), FEBRUARY 2026.
· IN CASE OF CONFLICT, THE RHODE ISLAND LRFD BRIDGE DESIGN MANUAL SHALL GOVERN.
2. LOAD MODIFIERS
THE LOAD MODIFIERS FOR THIS PROJECT ARE AS FOLLOWS:
· THE LOAD MODIFIER FOR DUCTILITY SHALL BE TAKEN AS 1.0 FOR ALL LIMIT STATES.
· THE LOAD MODIFIER FOR REDUNDANCY SHALL BE TAKEN AS 1.0 FOR ALL LIMIT STATES.
· THE LOAD MODIFIER FOR OPERATIONAL IMPORTANCE SHALL BE TAKEN AS 1.0 FOR THE
STRENGTH LIMIT STATE, 1.0 FOR ALL OTHER STATES.
5. WIND LOADING DESIGN DATA
THE WIND LOADING DESIGN SHALL BE IN ACCORDANCE WITH THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, THE RHODE ISLAND LRFD BRIDGE DESIGN MANUAL, AND AS MODIFIED HEREIN.
· EXCEPT DURING CONSTRUCTION, THE DESIGN WIND PRESSURE IS BASED ON A DESIGN WIND
SPEED OF 120 MPH.
· THE DESIGN WIND PRESSURES DURING CONSTRUCTION SHALL BE AS SPECIFIED UNDER THE
NOTES TITLED “GENERAL NOTES REGARDING TEMPORARY CONSTRUCTION CONDITIONS”.
6. THERMAL DESIGN FORCE DATA
UNIFORM TEMPERATURE EFFECTS HAVE BEEN TAKEN INTO CONSIDERATION IN ACCORDANCE
WITH THE PROCEDURE B OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS. THE MINIMUM
DESIGN TEMPERATURE SHALL BE -10 DEGREES F, AND THE MAXIMUM TEMPERATURE SHALL BE
105 DEGREES F.
7. SEISMIC DESIGN DATA
· THE SEISMIC ANALYSIS IS NOT REQUIRED PER THE RHODE ISLAND LRFD DESIGN MANUAL
· THESE BRIDGES HAVE BEEN CLASSIFIED AS NON-CRITICAL.
· THE SITE HAS BEEN CLASSIFIED AS SITE CLASS 'C'.
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
BRIDGE GENERAL NOTES - NO.1
DECK OVERLAY NOTES:
1. DECK OVERLAY SHALL BE CAST MONOLITHIC WITH END DIAPHRAGMS AND PAID FOR UNDER ITEM
808.1501 BUT SHALL CONFORM TO SECTION 816 OF THE STANDARD SPECIFICATIONS.
2. AFTER FINAL FINISH, THE EXPOSED TOP SURFACE OF THE DECK OVERLAY SHALL BE PROVIDED WITH
A PENETRANT SEALER (M12.03.2) CONCRETE SURFACE TREATMENT PROTECTIVE SEALER IN
ACCORDANCE WITH SECTION 820 OF THE RI STANDARD SPECIFICATIONS.
SITE RESTORATION:
ALL PUBLIC OR PRIVATE PROPERTY (WITHIN OR ADJACENT TO THE PROJECT LIMITS DISTURBED BY THE CONTRACTOR'S OPERATIONS), SHALL BE RESTORED TO ITS PRE-CONSTRUCTION CONDITION BY THE CONTRACTOR TO THE SATISFACTION OF THE ENGINEER. ALL RESTORATION SHALL BE IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF THE RHODE ISLAND STANDARD SPECIFICATIONS FOR ROAD & BRIDGE CONSTRUCTION, FEBRUARY, 2026, WITH ALL REVISIONS. THE COST OF RESTORATIONS SHALL BE INCLUDED IN THE PRICES BID FOR OTHER SCHEDULED ITEMS OF WORK, AND NO SEPARATE PAYMENT
SHALL BE MADE.
MISCELLANEOUS JOINT NOTE:
ALL JOINT FILLERS AND JOINT SEALANTS OF ALL TYPES AND SIZES AS INDICATED ON THE CONTRACT DRAWINGS AND AS SPECIFIED IN SECTION 808 OF THE RI STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION WILL NOT BE MEASURED FOR PAYMENT AND WILL NOT BE PAID FOR
SEPARATELY. THESE ITEMS, WHICH INCLUDE BUT NOT LIMITED TO POLYURETHANE JOINT SEALANTS, POLYURETHANE ELASTOMERIC JOINT SEALANTS, MASTIC JOINT SEALANTS, BACKER RODS, AND CLOSED CELL POLYETHYLENE FOAMS ARE CONSIDERED INCIDENTAL ITEMS. THESE ITEMS WILL BE PAID FOR UNDER THE VARIOUS APPROPRIATE LUMP SUM ITEMS OR UNIT BID ITEMS AS LISTED IN THE PROPOSAL.
GENERAL NOTES REGARDING TEMPORARY CONSTRUCTION CONDITIONS:
1. DESIGN WIND PRESSURES FOR CONSTRUCTION:
MINIMUM WIND PRESSURES TO BE USED BY THE CONTRACTOR FOR DESIGN DURING THE
CONSTRUCTION CONTRACT (WITH THE EXCEPTION OF SIGNS) SHALL BE FROM THE FOLLOWING
TABLE:
TABLE NOTES:
A. APPLICATION OF THE TABULAR PRESSURE:
· BRIDGE COMPONENTS DURING CONSTRUCTION, PRIOR TO THE INSTALLATION OF THE
PERMANENT BRACING SYSTEMS, NOT INCLUDING CRANE LIFTING.
· FALSE WORK, SHORING, AND SCAFFOLDING AS DEFINED IN FHWA “GUIDE DESIGN
SPECIFICATION FOR BRIDGE TEMPORARY WORKS”, EXCLUDING 3-DIMENSIONAL LATTICED OR
TRUSSED FRAMES OR TOWERS;
· TEMPORARY SHIELDING.
WIND PRESSURES FOR ALL OTHER STRUCTURES SHALL BE CALCULATED BASED ON ASCE “DESIGN
LOADS ON STRUCTURES DURING CONSTRUCTION”, SEI/ASCE 37-02 (ALL REFERENCES TO THE
ASCE 7 IN THE SEI/ASCE 37-02 PUBLICATION, SHALL BE THE LATEST REVISION OF ASCE 7). THE
EXPOSURE CATEGORY SHALL BE "C" .
B. WHERE APPLICABLE HIGHER AMTRAK WIND REQUIREMENTS SHALL SUPERSEDE THESE
REQUIREMENTS.
C. FOR STRUCTURES SITUATED ABOVE LIVE INTERSTATE TRAFFIC, THE TABULAR VALUES SHALL
BE INCREASED BY 5 PSF.
33UP TO 17'
HEIGHT ABOVE
GROUND
WIND PRESSURE
(PSF)
37OVER 17' AND UP TO 33'
OVER 33' AND UP TO 50'
OVER 50' AND UP TO 75'
OVER 75' AND UP TO 100'
2. ERECTION OF BRIDGE COMPONENTS:
FOR THE ERECTION OF STRUCTURES, THE FOLLOWING SHALL APPLY:
· THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN THAT PROVIDES COMPLETE DETAILS OF
THE PROCESS INCLUDING, BUT NOT LIMITED TO, TEMPORARY SUPPORTS, SCHEDULING AND
OPERATION SEQUENCING, CRANE PLACEMENT, AND ASSUMED LOADS AND CALCULATED
STRESSES DURING VARYING STAGES OF LIFTING. THIS APPLIES TO STRUCTURES OF ANY KIND.
THE CAPACITY OF THE CRANE AND ALL LIFTING AND CONNECTING DEVICES SHALL BE
ADEQUATE FOR 125 PERCENT (150 PERCENT OVER AMTRAK) OF THE TOTAL PICK LOAD
INCLUDING SPREADERS, RIGGING, HOOKS, AND ALL OTHER MATERIALS. THIS FACTOR OF
SAFETY SHALL BE IN ADDITION TO ALL MANUFACTURERS' PUBLISHED FACTORS OF SAFETY.
· A REGISTERED PROFESSIONAL ENGINEER, LICENSED IN THE STATE OF RHODE ISLAND, WILL BE
REQUIRED TO STAMP THE CONTRACTOR'S ERECTION PLAN.
· THE CONTRACTOR'S PROFESSIONAL ENGINEER WILL BE REQUIRED TO INSPECT AND PROVIDE
WRITTEN APPROVAL OF INSTALLATION, PRIOR TO ALLOWING VEHICLES OR PEDESTRIANS ON OR
BELOW THE STRUCTURE. THE PROFESSIONAL ENGINEER MUST ALSO STAMP ALL CHANGES TO
THE CONTRACTOR'S ERECTION PLAN. ADDITIONALLY, ALL PROPOSED CHANGES MUST BE
SUBMITTED TO RIDOT FOR REVIEW AND APPROVAL PRIOR TO IMPLEMENTATION.
· A MANDATORY PRE-ERECTION CONFERENCE WILL BE HELD AT LEAST TWO WEEKS PRIOR TO
THE START OF THE GIRDER INSTALLATION TO DISCUSS THE PLAN AND PROCEDURES, WORK
SCHEDULES, CONTINGENCY PLANS, SAFETY REQUIREMENTS AND TRAFFIC CONTROL. THE
CONTRACTOR'S PROFESSIONAL ENGINEER AND ERECTION SUBCONTRACTOR WILL BE
REQUIRED TO ATTEND THIS MEETING, AS WILL THE RIDOT RESIDENT ENGINEER, THE PROJECT
MANAGER AND THE DESIGN CONSULTANT. BASED UPON DISCUSSIONS AT THIS MEETING AND A
REVIEW OF THE CONTRACTOR'S ERECTION PLAN, RIDOT MAY ORDER THE CONTRACTOR TO
MODIFY AND RESUBMIT THE ERECTION PLAN TO THE ENGINEER FOR REVIEW AND APPROVAL.
· THE CONTRACTOR WILL BE REQUIRED TO PERFORM DAILY INSPECTIONS OF THE ERECTED
GIRDERS UNTIL THE BRIDGE DECK IS COMPLETELY POURED.
· THE COST OF PREPARING AND STAMPING THE ERECTION PLAN, COMPUTATIONS, AND REPORTS, RESPONDING TO RIDOT'S COMMENTS AND MAKING THE NECESSARY REVISIONS, AND
ATTENDANCE AT MEETINGS SHALL BE CONSIDERED INCIDENTAL TO THE COST OF THE
SUPERSTRUCTURE PAY ITEM, BE IT CONCRETE, STEEL OR TIMBER.
3. TEMPORARY BARRIER ON BRIDGES:
TEMPORARY BARRIER TO BE UTILIZED ON BRIDGES AND THEIR APPROACH DURING
CONSTRUCTION SHALL MEET TEST LEVEL TL-3.
4. DESIGN OF ALL TEMPORARY CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST
EDITION AND REVISIONS TO THE AASHTO LRFD BRIDGE DESIGN AND CONSTRUCTION
SPECIFICATIONS (AASHTO LRFD). ALL SHOP DRAWINGS, WORKING DRAWINGS, AND APPLICABLE
CALCULATIONS SHALL BE BASED ON AASHTO LRFD.
CONCRETE NOTES
1. CLASS OF CONCRETE SHALL BE HIGH PERFORMANCE CLASS HP AS DESCRIBED IN THE RI STANDARD SPECIFICATIONS AND THE SPECIAL PROVISIONS OF THE SPECIFICATIONS. REFER TO THE “MATERIAL”
NOTES FOR CLASSES OF CONCRETE SPECIFIED FOR VARIOUS COMPONENTS.
2. THE CONTRACTOR MAY, AT THE APPROVAL OF THE ENGINEER, PROPOSE THE USE OF SELF
CONSOLIDATING CONCRETE FOR ANY CLASS OF CONCRETE ON THIS PROJECT. SECTION 606 “SELF CONSOLIDATING CONCRETE (SCC)”, CONTAINS THE REQUIREMENTS FOR MODIFYING ALL CLASSES OF
CONCRETE MIX DESIGN FOR SELF-CONSOLIDATING APPLICATIONS.
3. ALL PORTLAND CEMENT CONCRETE SHALL BE AIR-ENTRAINED.
4. ALL REINFORCING STEEL SHALL BE GALVANIZED. ALL WIRE TIES AND MISCELLANEOUS HARDWARE USED FOR PLACEMENT OF GALVANIZED REINFORCING SHALL ALSO BE GALVANIZED. GALVANIZED COATING FOR REINFORCING STEEL SHALL CONFORM TO SUBSECTION M.05.05 OF THE RI STANDARD SPECIFICATIONS.
5. ALL CRITICAL LAP SPLICES SHALL BE AS SHOWN ON THE PLANS. ALL SPLICES NOT SHOWN ON THE PLANS SHALL BE LAPPED IN ACCORDANCE WITH THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR CLASS B
LAP SPLICES.
6. THE TOP BARS IN THE DECK SLABS SHALL BE SPLICED AT THE CENTER OF SPANS BETWEEN GIRDERS; THE
BOTTOM BARS SHALL BE SPLICED OVER THE GIRDERS.
7. UNLESS OTHERWISE INDICATED ON THE PLANS, ALL MAIN REINFORCING BARS SHALL HAVE THE
FOLLOWING MINIMUM COVER:
MINIMUM COVER
CONCRETE CAST AGAINST OR PERMANENTLY 3"
EXPOSED TO EARTH (FOOTINGS, ABUTMENT
AND WALL FACES, BACKWALLS)
DECK SLAB TOP 2" (+1
4", -0")
BOTTOM 1" (+1
8", -0")
ALL OTHER BARS 2"
COVER TO TIES AND STIRRUPS MAY BE 12" LESS THAN THE ABOVE VALUES SPECIFIED FOR MAIN
REINFORCING, BUT IN NO CASE LESS THAN 11
2".
8. HORIZONTAL CONSTRUCTION JOINTS OTHER THAN THOSE SHOWN ON PLANS WILL NOT BE PERMITTED WITHOUT A WRITTEN REQUEST BY THE CONTRACTOR AND PRIOR AUTHORIZATION BY THE ENGINEER.
9. UNLESS OTHERWISE NOTED ON THE PLANS, ALL EXPOSED CONCRETE SURFACES VISIBLE IN ELEVATION TO ONE FOOT BELOW FINAL GROUND LINE (AND THE UNDERSIDE OF ALL CONCRETE DECK SLABS OUTSIDE OF THE FASCIA BEAM) SHALL RECEIVE A CONCRETE SURFACE RUBBED FINISH IN ACCORDANCE WITH THE RI
STANDARD SPECIFICATIONS.
10. ALL EXPOSED SURFACES OF CONCRETE, EXCLUDING BRIDGE DECK, EXPOSED PORTION OF APPROACH SLAB AND PRESTRESSED BEAMS SHALL BE PROVIDED WITH A FILM-FORMING SEALER (M12.03.1) CONCRETE SURFACE TREATMENT-PROTECTIVE COATING IN ACCORDANCE WITH SECTION 820 OF THE RI STANDARD
SPECIFICATIONS.
11. ALL EXPOSED EDGES AND REENTRANT CORNERS NOT OTHERWISE DETAILED ON THE PLANS SHALL HAVE A
MINIMUM 3 4" CHAMFER.
12. ALL JOINT SEALANT SHALL BE SILICONE AS DESIGNATED ON THE PLANS. THE COLOR OF THE JOINT SEALANT, WHERE EXPOSED, SHALL BE NEUTRAL (LIGHT GRAY OR TAN). COLOR OF THE SEALANT, WHERE
NOT EXPOSED, WILL BE AT THE DISCRETION OF THE CONTRACTOR.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING CONCRETE STAINS OR DISCOLORATION DURING CONSTRUCTION UNTIL SUCH TIME AS THE SURFACES ARE APPROVED AND ACCEPTED. ANY CONCRETE STAINS OR DISCOLORATION OCCURRING PRIOR TO ACCEPTANCE OF THE SURFACES SHALL BE
REMOVED BY THE CONTRACTOR AT AT NO ADDITIONAL COST TO THE STATE.
14. UNLESS OTHERWISE NOTED ON THE PLANS JOINT FILLER IS TO BE PREFORMED, NON-EXPANSIVE, NON-EXTRUDING TYPE IN ACCORDANCE WITH SECTION M.02.10.1 OF THE RI STANDARD SPECIFICATIONS.
15. ALL DECK FORMS SHALL BE OF THE REMOVABLE TYPE THAT WILL PRODUCE THE DIMENSIONS SHOWN ON
THE PLANS.
16. EMBEDMENT LENGTHS FOR DRILLED AND GROUTED DOWELS SHALL BE IN ACCORDANCE WITH SECTION
819 OF THE RI STANDARD SPECIFICATIONS.
17. IN ACCORDANCE WITH THE RI STANDARD SPECIFICATIONS, ALL METAL TIES OR ANCHORAGES WHICH ARE REQUIRED FOR CONCRETE FORMWORK SHALL BE SO CONSTRUCTED THAT THEY CAN BE REMOVED TO AT LEAST TWO INCHES BELOW THE EXPOSED SURFACE OF THE CONCRETE WITHOUT CAUSING DAMAGE TO THE CONCRETE SURFACE AND SHALL BE GALVANIZED. SNAP TIES MAY BE USED ONLY IF APPROVED BY THE ENGINEER. IF THE CONTRACTOR PROPOSES TO USE THEM, A CATALOG CUT AND OTHER NECESSARY INFORMATION MUST BE SUBMITTED TO THE ENGINEER TO DEMONSTRATE THAT THE TIES WILL SNAP-OFF FAR ENOUGH INTO THE CONCRETE TO ALLOW FOR PROPER PATCHING. SNAP TIES MUST PROVIDE ADEQUATE STRENGTH TO SUPPORT THE FORMS. ALL CAVITIES SHALL BE FILLED WITH AN APPROVED
CEMENT MORTAR MEETING THE REQUIREMENTS OF ASTM C 928.
18. WATER STOPS/SEALS ARE REQUIRED FOR HORIZONTAL AND VERTICAL CONSTRUCTION JOINTS IN ABUTMENTS AND WALLS WHEN EXPOSED TO BACKFILL EARTH MATERIAL. WATER STOPS/SEALS SHALL BE INSTALLED AT THE LOCATIONS DETAILED ON THE PLANS, AT THE LOCATIONS AS SPECIFIED ABOVE AND AT ALL LOCATIONS AS DIRECTED BY THE ENGINEER. NEOPRENE SEALS SHALL CONSIST OF A SELF ADHESIVE
STRIP WITH A DUROMETER OF 50-60, MEETING THE REQUIREMENTS OF ASTM D2240.
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
BRIDGE GENERAL NOTES 2
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
BRIDGE GENERAL PLAN
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
TYPICAL BRIDGE SECTIONS
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
STAGE CONSTRUCTION DETAILS
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
ABUTMENT DEMOLITION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
EAST ABUTMENT PLAN AND ELEVATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
WEST ABUTMENT PLAN AND ELEVATION
10" PLASTIC WATERSTOP DETAIL
LONGITUDINAL CONSTRUCTION JOINT
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
PROPOSED DETAILS - 1
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
PROPOSED DETAILS - 2
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
P.S. BEAM REPAIR DETAILS
STATE OF
RHODE I S LAND
1969/202X
RIVER
BRIDGE
OPH E
WOOD
ROAD
No. 056601
NOTES:
ELASTOMERIC BEARING PAD
RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
MISCELLANEOUS DETAILS
CORRIDOR - HOPE VALLEY
REHABILITATION OF WOOD RIVER ROAD BRIDGE NO. 056601
SURVEY PLAN
| Sheets and Views |
| 1 2608A_V1_001_COVER - COVER SHEET |
| 2 2608A_V1_002_STDSYM - STANDARD PLAN SYMBOLS & STANDARD LEGND |
| 3 2608A_V1_003_STDNOTES001 - STANARD NOTES - 1 |
| 4 2608A_V1_004_STDNOTES002 - STANDARD NOTES - 2 |
| 5 2608A_V1_005_JSNOTSYM - JOB SPECIFIC NOTES AND LEGEND |
| 6 2608A_V1_006_TYPICAL001 - TYPICAL SECTIONS |
| 7 2608A_V1_007_GENERAL001 - GENERAL PLAN No. 1 |
| 8 2608A_V1_008_MAIN & PRO OF TRAFFIC PLAN No. 1 |
| 9 2608A_V1_009_MAIN & PRO OF TRAFFIC PLAN No. 2 |
| 10 2608A_V1_010-TEMP_SIGNAL.dwg |
| 11 2608A_V1_011_ABBREV.dwg |
| 12 2608A_V1_012_STDBRNOT001.dwg |
| 13 2608A_V1_013_STDBRNOT002.dwg |
| 14 2608A_V1_014_BGENERAL.dwg |
| 15 2608A_V1_015_BTYPICAL.dwg |
| 16 2608A_V1_016_BSTAGE.dwg |
| 17 2608A_V1_017_DEMO.dwg |
| 18 2608A_V1_018_ABUTMENT001.dwg |
| 19 2608A_V1_019_ABUTMENT002.dwg |
| 20 2608A_V1_020_CONCDETL1.dwg |
| 21 2608A_V1_021_CONCDETL2.dwg |
| 22 2608A_V1_022_PS BEAM DETAILS.dwg |
| 23 2608A_V1_023_MISCDTL.dwg |
| 24 2608A_V1_024_SURVEY PLAN.dwg |