This is a Detailed Quantity of Work (DOQ) document for Contract No. 2025-CB-063, a bridge rehabilitation project in Rhode Island involving the Towns of Richmond and Hopkinton. The project encompasses the rehabilitation of Wood River Bridge No. 056601, which carries Switch Road over the Wood River. The scope of work includes 54 line items with detailed quantity breakdowns covering site preparation, demolition, excavation, concrete work, asphalt placement, bridge repairs, safety improvements, and traffic management. Key quantities include 300 square yards of clearing and grubbing, 1,075 linear feet of guardrail removal, 225 cubic yards of earth excavation, 625 square yards of asphalt preparation, 350 tons of Class 19.0 hot mix asphalt, 75 cubic yards of concrete for bridge decks, 250 drilling and grouting operations for reinforcing dowels, and 1,500 linear feet of pavement markings. The document was prepared by the Rhode Island Department of Transportation with an estimator date of October 9, 2025, and includes a bridge structure identified as Bridge No. 566 with detailed calculations for each line item supporting the quantity determinations.

The document provides comprehensive quantity backup for each work item with specific calculations referenced to project locations identified by station markers (ranging from approximately 69+70 to 77+00). Notable work elements include temporary traffic protection lasting approximately 12 months, hydrodemolition operations estimated at 5 days, protective sealer application to 9,000 square feet of concrete surfaces, removal of 4,000 square feet of deck surface concrete, installation of 18 elastomeric bearings, and environmental controls including 1,500 linear feet of wildlife fencing and compost filter socks. The quantities reflect both structural repairs to bridge components—including abutment stems, approach slabs, backwalls, and superstructure elements—and approach work involving guardrail replacement, curb work, and riprap placement. All quantities are documented with detailed measurements, cross-references between related items, and provisions for engineer-directed work, ensuring comprehensive cost estimation for the project rehabilitation scope.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Item Code Description UM Quantity Page #

1 201.0321 CLEARING AND GRUBBING SY 300 1

2 201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES LF 1075 2

3 202.0100 EARTH EXCAVATION CY 225 3

4 203.0100 STRUCTURAL EACAVATION EARTH CY 50 4

5 203.0700 PREVIOUS FILL CY 50 5

6 206.0301 COMPOST FILTER SOCK LF 1500 6

7 212.2200 MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION CONTROLS LS 1 7

8 213.0100 PLACEMENT OF MILLINGS BENEATH GUARDRAIL LF 1100 8

9 214.0100 CONTAINMENT SYSTEM FOR CONTROL OF HYDRODEMOLITION RUNOFF LS 1 9

10 214.0200 MAINTENANCE AND DISPOSAL OF HYDRODEMOLITION RUNOFF PDAY 5 10

11 302.0100 GRAVEL BORROW SUBBASE COURSE CY 225 11

12 401.0520 HOT MIX ASPHALT PREPARATION - FULL DEPTH SY 625 12

13 401.1000 CLASS 19.0 HMA TON 350 13

14 401.3100 MODIFIED CLASS 9.5 HMA TON 150 14

15 711.0400 WATERWAY SY 25 15

16 803.0350 REMOVAL AND DISPOSAL OF EXISTING CONCRETE MASONRY CY 130 16

17 803.0500 TEMPORARY DECK UNDERSIDE AND SIDE PROTECTIVE SHIELDING SF 1300 17

18 808.0324 CONCRETE SUBSTRUCTURE CLASS HP 3/4" BRIDGE SIDEWALK CY 2 18

19 808.0506 CONCRETE SUBSTRUCTURE CLASS HP 3/4" ABUT STEMS CY 25 19

20 808.0508 CONCRETE SUBSTRUCTURE CLASS XX 3/4" APPROACH SLABS CY 60 20

21 808.0602 CONCRETE SUBSTRUCTURE CLASS HP 3/4" BACKWALLS CY 30 21

22 808.1501 CONCRETE SUPERSTRUCTURE CLASS HP 3/4" BRIDGE DECKS CY 75 22

23 808.1502 CONCRETE SUPERSTRUCTURE CLASS HP 3/4" BRIDGE SIDEWALKS CY 1 23

24 810.0210 GALVANIZED BAR REINFORCEMENT GRADE 60 LBS 20000 24

25 810.0702 WELDED WIRE FABRIC (GALVANIZED) SF 4500 25

26 815.0200 HIGH PRESSURE WATER CLEANING OF BRIDGE STRUCTURES EACH 1 26

27 817.2112 REPAIRS TO STRUCTURE CONCRETE MASONRY - PATCHING MORTAR CF 7 27

28 817.2142 REPAIRS TO STRUCTURE CONCRETE MASONRY - FORM AND CAST IN PLACE CONCRETE CF 80 28

29 817.9901 FRP REPAIRS SF 290 29

30 819.0800 DRILL AND GROUT REINFORCING DOWELS EACH 250 30

31 820.0100 CONCRETE SURFACE TREATMENT PROTECTIVE SEALER SF 9000 31

32 822.1695 SILICONE HIGHWAY JOINT SEALER LF 200 32

33 824.9901 TEMPORARY JACKING AND SHORING OF EXISTING GIRDERS EACH 18 33

34 828.0303 ELASTOMERIC BEARINGS LAMINATED EACH 18 34

35 833.0400 GRANITE IDENTIFICATION TABLETS EACH 4 35

36 834.0100 GRANITE CURB FOR BRIDGES LF 20 36

37 839.0400 FULL DEPTH REMOVAL AND DISPOSAL OF ASPHALT FROM CONCRETE BRIDGE DECKS SY 475 37

38 840.0100 DECK SURFACE CONCRETE REMOVAL BY HYDRODEMOLITION SF 4000 38

39 901.1000 STEEL BEAM GUARDRAIL LF 1000 39

40 901.1050 GUARDRAIL CONNECTION TO END POST EACH 4 40

41 901.1100 STEEL BEAM GUARDRAIL APPROACH END TREATMENT EACH 2 41

42 901.1200 GUARDRAIL END TREATMENT PLATFORM EACH 2 42

43 901.1300 STEEL BEAM GUARDRAIL ANCHORAGE TRAILING END SECTIONS EACH 2 43

44 906.0700 REMOVE, HANDLE, HAUL TRIM RESET CURB EDGING, STRAIGHT, CIRCULAR ALL TYPES LF 100 44

45 920.0310 RIPRAP R-1, R-2 STANDARD 8.3.0 SY 50 45

46 920.0320 RIPRAP R-3, R-4, R-5 STANDARD 8.3.0 SY 25 46

47 936.0110 MOBILIZATION LS 1 47

48 937.0100 FURNISH, INSTALL, MAINTAIN AND MOVE TEMPORARY TRAFFIC PROTECTION LS 1 48

49 L01.0102 LOAM BORROW 4 INCHES DEEP SY 400 49

50 L02.0107 SEEDING SY 400 50

51 L11.9901 WILDLIFE FENCING LF 1500 51

52 T12.9910 PORTABLE TRAFFIC CONTROL SIGNAL SYSTEM LS 1 52

53 T20.0101 PAVEMENT MARKINGS LF 1500 53

54 T20.0102 TEMPORARY PAVEMENT MARKINGS LS 1 54

Quantity Backup Table of Contents

CORRIDOR - HOPE VALLEY

R.I. Contract No. - 2025-CB-063

Bridge FAP: STP-3030(001) - Safety FAP: STPG-3030(002)

Project: Corridor - Hope Valley Estimator Date

RICN GAF 10/9/2025

PTS ID Rev. Date

OSP ID

Office ID

Sheet 1

ITEM CODE: 201.0321 CLEARING AND GRUBBING

UM: SY

PROJECT WIDE Location SIZE (FT) SIZE (FT) = Say

72+00 Lt 30 20 67 70

72+00 Rt 30 20 67 70

73+50 Lt 30 20 67 70

73+75 Rt 30 20 67 70

As Directed By the Engineer 20

TOTAL 300 SY

Area

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

DISTRIBUTION OF QUANTITIES

PTS ID Rev. Date

OSP ID

Office ID

Sheet 2

ITEM CODE: 201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES

UM: LF

PROJECT WIDE FROM TO = Say

East Approach 69+70 72+30 Lt 260 260

East Approach 70+00 72+40 Rt 240 240

West Approach 73+30 77+00 Lt 370 370

West Approach 73+60 75+40 Rt 180 180

As Directed By the Engineer 25

TOTAL 1,075 LF

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 3

ITEM CODE: 202.0100 EARTH EXCAVATION

UM: CY

PROJECT WIDE Roundup

SF CF CY CY

12 inches 5,520 5520 204.44 205

TOTAL 225 CY

As Directed by Engineer

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

DISTRIBUTION OF QUANTITIES

Ref Item 401.0520/302.0100

Installation of Gravel Subbase

RICN JSC 10/9/2025

PTS ID Rev. Date

OSP ID

Office ID

Sheet 4

ITEM CODE: 203.0100 STRUCTURAL EXCAVATION EARTH

UM: CY

PROJECT WIDE

Height (ft) Width (ft) Length (ft) Qty CF CY

5.5 2 47 2 1034 40

TOTAL 50 CY

Bridge No 566

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

DISTRIBUTION OF QUANTITIES

As Directed by Engineer

Area behind Backwall

PTS ID Rev. Date

OSP ID

Office ID

Sheet 5

ITEM CODE: 203.0700 PREVIOUS FILL

UM: CY

PROJECT WIDE

CY

As Directed by Engineer 10

TOTAL 50 CY

2025-CB-063

2608A

TCB

Ref Item 203.0100

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

DISTRIBUTION OF QUANTITIES

Structural Excavation Earth

Bridge No 566

PTS ID Rev. Date

OSP ID

Office ID

Sheet 6

ITEM CODE: 206.0301 COMPOST FILTER SOCK

UM: LF

PROJECT WIDE 1400

As Directed by Engineer 100

TOTAL 1,500 LF

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 7

ITEM CODE: 212.2200 MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND

POLLUTION PREVENTION CONTROLS UM: LS

PROJECT WIDE 1

TOTAL 1 LS

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 8

ITEM CODE: 213.0100 PLACEMENT OF MILLINGS BENEATH GUARDRAIL

UM: LF

PROJECT WIDE FROM TO = Say

East Approach 69+70 72+30 Lt 260 260

East Approach 70+00 72+40 Rt 240 240

West Approach 73+30 77+00 Lt 370 370

West Approach 73+60 75+40 Rt 180 180

As Directed by Engineer 50

TOTAL 1,100 LF

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 9

ITEM CODE: 214.0100 CONTAINMENT SYSTEM FOR CONTROL OF HYDRODEMOLITION

RUNOFF

UM: LS

PROJECT WIDE LS

TOTAL 1 LS

Bridge No 566

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 10

ITEM CODE: 214.0200 MAINTENANCE AND DISPOSAL OF HYDRODEMOLITION RUNOFF

UM: PDAY

PROJECT WIDE PDAY

TOTAL 5 PDAY

Assume 5 days to perform Hydrodemolition

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

PTS ID Rev. Date

OSP ID

Office ID

Sheet 11

ITEM CODE: 302.0100 GRAVEL BORROW SUBBASE COURSE

UM: CY

PROJECT WIDE Roundup

Depth SF CF CY CY

12 inches 5,520 5520 204.44 205

As Directed by Engineer 20

TOTAL 225 CY

Ref Item 401.0520

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 12

ITEM CODE: 401.0520 HOT MIX ASPHALT PREPARATION - FULL DEPTH

UM: SY

PROJECT WIDE

Length* Width SF SY

60 46 2,760 307

60 46 2,760 307

SF Total 5,520

As Directed By the Engineer 11

TOTAL 625 SY

West Approach

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

DISTRIBUTION OF QUANTITIES

East Approach

* Average

PTS ID Rev. Date

OSP ID

Office ID

Sheet 13

ITEM CODE: 401.1000 CLASS 19.0 HMA

UM: TON

PROJECT WIDE TON

SY

625 at 4" 153

625 at 4" 153

As Directed by Engineer 44

TOTAL 350 TON

Ref Item 401.0520

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

8" Depth

PTS ID Rev. Date

OSP ID

Office ID

Sheet 14

ITEM CODE: 401.3100 MODIFIED CLASS 9.5 HMA

UM: TON

3.0" factor

PROJECT WIDE Roundup

SY SY Ton

625 625 117

Bituminous Curb Std 7.5.0

Convert to tons:

LF SF CF LBS/CF = /2000

75 0.419 31.425 150 4713.75 3 TONS 3

7.5.1B

35 LF

40 LF

75 LF

As Directed by Engineer 30

TOTAL 150 TON

East Approach West Approach

Ref Item 401.0520

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 15

ITEM CODE: 711.0400 WATERWAY

(PAVED)

UM: SY

PROJECT WIDE STATION L W SF SY

72+00 Rt 10 6 60 7.00

73+90 Lt 10 6 60 7.00

73+90 Rt 10 6 60 7.00

As Directed by Engineer 4

TOTAL 25 SY

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

DISTRIBUTION OF QUANTITIES

2025-CB-063

2608A

TCB

PTS ID Rev. Date

OSP ID

Office ID

Sheet 16

ITEM CODE: 803.0350 REMOVAL AND DISPOSAL OF EXISTING CONCRETE MASONRY

UM: CY

PROJECT WIDE

Length (ft) Height (ft) Width (ft) Qty CF CY

Abutment Beam Seat 54 1.5 3.5 2.00 567 21

App. Slab 13 1.17 47 2.00 1429.74 53

Deck 2.58 0.75 50 2.00 193.5 8

Backwall 50 6 1.25 2.00 750 28

Approach Safety Walk 10 1 0.92 4.00 36.8 2

Bridge Safety Walk 2.58 1 1 4.00 10.32 1

End Diaphragm 5 3.75 1 16.00 300 12

TOTAL 130 CY

As Directed by Engineer

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

PTS ID Rev. Date

OSP ID

Office ID

Sheet 17

ITEM CODE: 803.0500 TEMPORARY DECK UNDERSIDE AND SIDE PROTECTIVE SHIELDING

UM: SF

PROJECT WIDE

Length (ft) Width (ft) Height (ft) Area QTY Area

60 4 6 600 2 1200

TOTAL 1,300 SF

As Directed by Engineer

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

PTS ID Rev. Date

OSP ID

Office ID

Sheet 18

ITEM CODE: 808.0324 CONCRETE SUBSTRUCTURE CLASS HP 3/4" BRIDGE SIDEWALKS

UM: CY

PROJECT WIDE

Length (ft) Width (ft) Height (ft) QTY cf Area

10 1 0.92 4 36.8 2

TOTAL 2 CY

As Directed by Engineer

Approach Safety Walk

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

PTS ID Rev. Date

OSP ID

Office ID

Sheet 19

ITEM CODE: 808.0506 CONCRETE SUBSTRUCTURE CLASS HP 3/4" ABUT STEMS

UM: CY

PROJECT WIDE

Length (ft) Width (ft) Height (ft) QTY cf Area

54 4 1.5 2 648 24

3.25 2.33 0.92 2.00 13.9334 1

TOTAL 25 CY

Abutment Beam Seat

As Directed by Engineer

Keeper Block

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

PTS ID Rev. Date

OSP ID

Office ID

Sheet 20

ITEM CODE: 808.0508 CONCRETE SUBSTRUCTURE CLASS XX 3/4" APPROACH SLABS

UM: CY

PROJECT WIDE

Length (ft) Width (ft) Height (ft) QTY cf Area

13 47 1.17 2 1429.74 53

1 47 1 2 94 4

TOTAL 60 CY

Approach Slab

Haunch

As Directed by Engineer

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

PTS ID Rev. Date

OSP ID

Office ID

Sheet 21

ITEM CODE: 808.0602 CONCRETE SUBSTRUCTURE CLASS HP 3/4" BACKWALLS

UM: CY

PROJECT WIDE

Length (ft) Width (ft) Height (ft) QTY cf Area

50 1.25 5.5 2 687.5 26

TOTAL 30 CY

Bridge No 566

As Directed by Engineer

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 22

ITEM CODE: 808.1501 CONCRETE SUPERSTRUCTURE CLASS HP 3/4" BRIDGE DECKS

UM: CY

PROJECT WIDE

Length (ft) Width (ft) Height (ft) QTY cf Area

Deck End at Abutments 3.25 50 1.08 2 351 13

End Diapgragms 2.5 52.5 4.42 1 580.125 22

Subtract out beam widths 2.5 -1.33 4.42 9.00 -132.269 -5

Overlay 87.5 44 0.2917 1.00 1123.045 42 length of overlay=span-2x= 87.5 cl road span along curve= 90 FT distance from cl of brg to overlay= 1.25

TOTAL 75 CY

As Directed by Engineer

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

PTS ID Rev. Date

OSP ID

Office ID

Sheet 23

ITEM CODE: 808.1502 CONCRETE SUPERSTRUCTURE CLASS HP 3/4" BRIDGE SIDEWALKS

UM: CY

PROJECT WIDE

Length (ft) Width (ft) Height (ft) QTY cf Area

Bridge Safety Walk 2.583 1 1 4 10.332 1

TOTAL 1 CY

As Directed by Engineer

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

PTS ID Rev. Date

OSP ID

Office ID

Sheet 24

ITEM CODE: 810.0210 GALVANIZED BAR REINFORCEMENT GRADE 60

UM: LBS

PROJECT WIDE

wt/ft Length qty qty Weight

1-#5 horiz. bar 1.043 9.50 4.00 1 40

#5@12 D&G 1.043 2.00 108.00 2 460

#5@12 L bar 1.043 3.00 108.00 2 680

#5@12 C bar 1.043 4.00 54.00 2 460

7#5 horiz. bar 1.043 53.50 7.00 2 790

3-#5 U bar 1.043 5 12.00 2 130

#6@12 trans 1.502 50 13.00 2 1960

#7@6 long 2.044 13.5 89.00 2 4920

4-#5 haunch 1.043 50 4.00 2 420

#5@6 haunch 1.043 8 89.00 2 1490

#5@12 U-bar 1.043 6 54.00 2 680

#5@12 L-bar 1.043 3.5 54.00 2 400

#5@12 horiz. bar 1.043 52 10.00 2 1090

5-#5 U bar 1.043 10 5.00 16 840

5-#5 horiz. bar 1.043 5.33 8.00 16 720

#6@9 C bar 1.502 7 71.00 2 1500

10-#6 horiz. bar 1.502 52 10.00 2 1570

1-#5 horiz. bar 1.043 3.08 4.00 1 20

CY Lbs Lbs/cy

808.0324 Concrete Substructure Sidewalks 2.00 40 20.00

808.0506 Concrete Abutment Stems 25.00 2520 100.80

808.0508 Concrete Approach Slabs 57.00 8790 154.21

808.0602 Concrete Backwalls 26.00 2170 83.46

808.1501 Concrete Deck 13 4630 356.1538

808.1502 Concrete Superstructure Sidewalks 1 20 20

total 124 18170 146.53

+10% for Laps= 19987 lbs

1,830

TOTAL 20,000 LBS

End Diaphragm

Deck

Sidewalk on Bridge

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

DISTRIBUTION OF QUANTITIES

Sidewalk off Bridge

Beam Seat

Keeper Block

Approach Slab

Backwall

PTS ID Rev. Date

OSP ID

Office ID

Sheet 25

ITEM CODE: 810.0702 WELDED WIRE FABRIC

UM: SF

PROJECT WIDE

Width (ft) Length (ft) Area (sf)

43.5 93.50 4070

TOTAL 4,500 SF

Add 10% for laps

Bridge No 566

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 26

ITEM CODE: 815.0200 HIGH PRESSURE WATER CLEANING OF BRIDGE STRUCTURES

UM: EACH

PROJECT WIDE

EACH

TOTAL 1 EA

Bridge No 566

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 27

ITEM CODE: 817.2112 REPAIRS TO STRUCTURE CONCRETE MASONRY - PATCHING MORTAR

UM: CF

Inspection

Photo No.

Beam Abutment/ Beam End

Portion of Beam

Length (L) Height Depth Volume Pay Item 817.2112

FRP

Length (L+6)

FRP

Height

FRP Area 817.9901 in in in cf in in sf 16 A West Bottom 18 6 3

17 A West Bottom Flange

18 26 3 0.82 24 117 20

19 A East Web 8 12 3

20 A East Bottom Flange

6 6 0.5

21 A East Bottom Flange

43 24 2 1.20 49 117 40

22 B West Bottom Flange

9 9 2

23 B West Bottom Flange

13 12 1 0.10 19 117 15

24 B East Bottom Flange

6 6 3

25 B East Bottom Flange

20 26 1.5 0.46 26 117 21

26 B East Bottom Flange

13 8 2

27 C West Bottom Flange

16 7 1.5

28 C West Bottom Flange

32 11 2.5 0.51 38 117 31

29 C Midspan Bottom Flange

5 5 1 0.02

30 C East Bottom Flange

15 10 3

32 C East Bottom Flange

14 6 3

33 D East Bottom Flange

26 6 3

34 E Midspan Bottom Flange

12 2 0.5 0.01

37 F East Bottom Flange

22 5 2

38 G East Web 8 8 0.5

39 G East Bottom Flange

15 8 2

40 H West Bottom Flange

12 10 2 0.14 18 117 15

Subtotal= 3.26 x2= 6.52

Subtotal= 142 x2= 284

Say= 7.00 CF

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

PRESTRESSED BEAM REPAIR TABLE

PTS ID Rev. Date

OSP ID

Office ID

Sheet 28

ITEM CODE: 817.2142 REPAIRS TO STRUCTURE CONCRETE MASONRY - FORM AND CAST

IN PLACE CONCRETE

UM: CF

PROJECT WIDE

Total (CF)

Height Width Area Depth Volume Qty ft ft sf ft cf

0.6 6 3.6 0.33 1.19 1 1.20

2 1.17 2.34 0.33 0.77 1 0.80

2.5 2.5 6.25 0.33 2.06 1 2.10

8.33 5.25 43.7325 0.33 14.43 1 14.50

8 2.8 22.4 0.33 7.39 1 7.40

6.67 4.25 28.3475 0.33 9.35 1 9.40

3.42 2 6.84 0.33 2.26 1 2.30

2.5 2.5 6.25 0.33 2.06 1 2.10

39.80

Double qty to be conservative= 79.6

0.4

TOTAL 80.00 CF

Bridge No 566

As Directed by Engineer

Abutment Face Repairs

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

RICN JSC 8/3/2026

PTS ID Rev. Date

OSP ID

Office ID

Sheet 29

ITEM CODE: 817.9901 FRP REPAIRS

UM: SF

See 817.2112→ Say= 290.00 CF

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 30

ITEM CODE: 819.0800 DRILL AND GROUT REINFORCING DOWELS

UM: EACH

PROJECT WIDE No. of

Qty/Row Rows Qty Total

60 2 2 240

TOTAL 250 EA

Bridge No 566

Beam Seat

As Directed by Engineer

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID JSC 6/30/2026

Office ID

Sheet 31

ITEM CODE: 820.0100 CONCRETE SURFACE TREATMENT PROTECTIVE SEALER

UM: SF

PROJECT WIDE

Height (ft) Length (ft) Qty Total

7.92 94 2 1490

8 10 4 320

12 57 1 690

11 59 1 650

18 37 0.5 340

14 25 0.5 180

13 22 0.5 150

13 27 0.5 180

5 60 2 600

44 94 1 4140

TOTAL 9,000 SF

Bridge No 566

Safety Curb/Parapet

Endpost

East Abutment

West Abutment

SE Wall

NE Wall

SW Wall

NW Wall

Face of Diaphragm

As Directed by Engineer

Deck Surface

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID JSC 6/30/2026

Office ID

Sheet 32

ITEM CODE: 822.1695 SILICONE HIGHWAY JOINT SEALER

UM: LF

PROJECT WIDE

Bridge No 566 along the curblines:

2 x 94 = 188 LF

TOTAL 200 LF

As Directed by Engineer

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 33

ITEM CODE: 824.9901 TEMPORARY JACKING AND SHORING OF EXISTING GIRDERS

UM: EACH

PROJECT WIDE

Beams Qty TOTAL

9 2 18

TOTAL 18 EACH

Bridge No 566

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 34

ITEM CODE: 828.0303 ELASTOMERIC BEARINGS LAMINATED

UM: EACH

PROJECT WIDE

Beams Qty TOTAL

9 2 18

TOTAL 18 EACH

Bridge No 566

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 35

ITEM CODE: 833.0400 GRANITE IDENTIFICATION TABLETS

UM: EACH

PROJECT WIDE

TOTAL

TOTAL 4 EACH

Bridge No 566

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 36

ITEM CODE: 834.0100 GRANITE CURB FOR BRIDGES

UM: LF

PROJECT WIDE Length from

808.1502 Qty TOTAL

2.583 4 11

TOTAL 20 LF

As Directed by Engineer

Bridge No 566

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 37

ITEM CODE: 839.0400 FULL DEPTH REMOVAL AND DISPOSAL OF ASPHALT FROM

CONCRETE BRIDGE DECKS

UM: SY

PROJECT WIDE

TOTAL

STA STA Length Width

(L+2.5') (ft) (sf)

73+38 72+48 92.5 44 4070.00 460

TOTAL 475 SY

As Directed by Engineer

Bridge No 566

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 38

ITEM CODE: 840.0100 DECK SURFACE CONCRETE REMOVAL BY HYDRODEMOLITION

UM: SF

PROJECT WIDE

TOTAL

STA STA Length Width Area

(L2=L-2.5') (ft) (sf)

73+38 72+48 87.5 44 3850.00 3850.00

TOTAL 4,000 SF

As Directed by Engineer

Bridge No 566

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 39

ITEM CODE: 901.1000 STEEL BEAM GUARDRAIL

Subtract UM: LF

PROJECT WIDE End Treat.

FROM TO = Lengths Say

East Approach 69+70 72+30 Lt 260 10 250

East Approach 70+00 72+40 Rt 240 50 190

West Approach 73+30 77+00 Lt 370 50 320

West Approach 73+60 75+40 Rt 180 10 170

As Directed by Engineer 70

TOTAL 1,000 LF

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 40

ITEM CODE: 901.1050 GUARDRAIL CONNECTION TO END POST

(Bridge Parapet, Exist Guardrail or Barrier)

UM: EA

PROJECT WIDE Locations

72+30 Lt 1

72+40 Rt 1

73+30 Lt 1

73+60 Rt 1

As Directed by Engineer 0

TOTAL 4 EA

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 41

ITEM CODE: 901.1100 STEEL BEAM GUARDRAIL APPROACH END TREATMENT

RI Std.34.3.3

UM: EA

PROJECT WIDE Location

70+00 Rt 1

77+00 Lt 1

As Directed by Engineer 0

TOTAL 2 EA

50' estimated Length

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 42

ITEM CODE: 901.1200 GUARDRAIL END TREATMENT PLATFORM

UM: EA

PROJECT WIDE

70+00 Rt 1

77+00 Lt 1

As Directed by Engineer 0

TOTAL 2 EA

Location

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 43

ITEM CODE: 901.1300 STEEL BEAM GUARDRAIL ANCHORAGE TRAILING END SECTIONS

RI Std.34.3.4

UM: EA

PROJECT WIDE Location

69+70 Lt 1

75+40 Rt 1

As Directed by Engineer 0

TOTAL 2 EA

10' estimated Length

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

Project: Estimator Date

PTS ID Rev. Date

OSP ID

Office ID

Sheet 44

ITEM CODE: 906.0700 REMOVE, HANDLE, HAUL TRIM RESET CURB EDGING, STRAIGHT,

CIRCULAR ALL TYPES

UM: LF

Location

72+25 Lt 12

72+40 Rt 12

73+45 Lt 12

73+65 Rt 12

As Directed by Engineer 52

TOTAL 100 LF

PROJECT WIDE

Corridor - Hope Valley

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 45

ITEM CODE: 920.0310 RIPRAP R-1, R-2 STANDARD 8.3.0

UM: SY

PROJECT WIDE Along each Abument

Width Length Qty Area Total ft ft sf sy

3 60 2 360 40

As Directed by Engineer 10

TOTAL 50 SY

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

RICN GAF 7/9/2025

PTS ID Rev. Date

OSP ID

Office ID

Sheet 46

ITEM CODE: 920.0320 RIPRAP R-3, R-4, R-5 STANDARD 8.3.0

UM: SY

PROJECT WIDE

Sta. SF

72+00 Rt 60 7

73+90 Lt 60 7

73+90 Rt 60 7

As Directed by Engineer 5

TOTAL 25 SY

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

RICN RC 10/9/2025

PTS ID Rev. Date

OSP ID

Office ID

Sheet 47

ITEM CODE: 936.0110 MOBILIZATION

UM: LS

PROJECT WIDE TOTAL

TOTAL 1 LS

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

RICN JMS 10/9/2025

PTS ID Rev. Date

OSP ID

Office ID

Sheet 48

ITEM CODE: 937.0100 FURNISH, INSTALL, MAINTAIN, AND MOVE TEMPORARY

TRAFFIC PROTECTION

UM: LS

PROJECT WIDE

Duration:

Assume: 12 Months 1

TOTAL 1 LS

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 49

ITEM CODE: L01.0102 LOAM BORROW 4 INCHES DEEP

UM: SY

PROJECT WIDE Ave. Roundup

Sheet # Length (Ft.)Width (Ft.) SF SY SY

72+00 Lt 30 20 600 66.67 67

72+00 Rt 30 20 600 66.67 67

73+50 Lt 30 20 600 66.67 67

73+75 Rt 30 20 600 66.67 67

As Directed by Engineer 132

TOTAL 400 SY

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

41109.03

DISTRIBUTION OF QUANTITIES

2025-CB-063

2608A

TCB

PTS ID Rev. Date

OSP ID

Office ID

Sheet 50

ITEM CODE: L02.0107 SEEDING

UM: SY

PROJECT WIDE

TOTAL 400 SY

Ref Item L01.0102 LOAM BORROW

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 51

ITEM CODE: L11.9901 WILDLIFE FENCING

UM: LF

PROJECT WIDE

1,400

As Directed by Engineer 100

TOTAL 1,500 LF

from Item L206.0301 COMPOST FILTER SOCK

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 52

ITEM CODE: T12.9910 PORTABLE TRAFFIC CONTROL SIGNAL SYSTEM

UM: LS

PROJECT WIDE 1

TOTAL 1 LS

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 53

ITEM CODE: T20.0101 PAVEMENT MARKINGS

*Ave UM: LF

PROJECT WIDE

Sta. Sta.

71+50 74+50 Center 300 2 600

71+50 74+50 Lt 300 1 300

71+50 74+50 Rt 300 1 300

As Directed by the Engineer 300

TOTAL= 1,500 LF

4" Double Yellow

6" White Edge Line

6" White Edge Line

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

PTS ID Rev. Date

OSP ID

Office ID

Sheet 54

ITEM CODE: T20.0102 TEMPORARY PAVEMENT MARKINGS

UM: LS

PROJECT WIDE 1

From Item T20.0101

Assume 3 Phases

Includes grinding, sweeping, removed temporary pavement markings

TOTAL 1 LS

2025-CB-063

2608A

TCB

200 Main Street

Pawtucket, RI 02860

Tel. 401.726.4084

Fax: 401.728.1533

Estimate Summary
Table of Contents
201.0321 - Clearing and Grubbing
201.0415 - Remove and Dispose Guardrail and Posts All Types
202.0100 - Earth Excavation
203.0100 - Structure Excavation Earth
203.0700 - Pervious Fill
206.0301 - Compost Filter Sock
212.2200 - Maintenance and Cleaning of Erosion Controls
213.0100 - Placement of Millings Beneath Guardrail
214.0100 - Containment of Hydrodemolition Runoff
214.0200 - Maintenance an Disposal of Hydrodemolition Runoff
302.0100 - Gravel Borrow Subbase Course
401.0520 - Hot Mix Asphalt Preparation-Full Depth
401.1000 - Class 19.0 HMA
401.3100 - Modified Class 9.5 HMA
711.0400 - Waterway
803.0350 - Remove and Dispose Existing Concrete Masonry
803.0500 - Temporary Deck Underside and Side Protective Shielding
808.0324 - Concrete Substructure Sidewalks
808.0506 - Concrete Abutment Stems
808.0508 - Concrete Approach Slabs
808.0602 - Concrete Backwalls
808.1501 - Concrete Deck
808.1502 - Concrete Superstructure Sidewalks
810.0210 - Galvanized Rebar
810.0702 - Welded Wire Fabric (Galvanized)
815.0200 - High Pressure Water Cleaning of Bridge Structures
817.2112 - Repairs to Structure Concrete Masonry-Patching Mortar
817.2142 - Repairs to Structure Concrete Masonry - Form and Cast In Place
817.9901 - FRP Repairs
819.0800 - Drill and Grout Reinforcing Dowels
820.0100 - Concrete Surface Treatment Protective Coating
822.1695 - Silicone Highway Joint Sealer
824.9901 - Temporary Jacking and Shoring of Existing Girders
828.0303 - Elastomeric Bearings Laminated
833.0400 - Granite ID tablets
834.0100 - Granite Curb for Bridges
839.0400 - Full Depth Pavement Removal from Bridge Decks
840.0100 - Deck Surface Concrete Removal by Hydrodemolition
901.1000 - Steel Beam Guardrail
901.1050 - Guardrail Connection to Endpost
901.1100 - Steel Beam Guardrail Approach End Treatment
901.1200 - Guardrail End Treatment Platform
901.1300 - Steel Beam Guardrail Anchorage Trailing End Sections
906.0700 - Remove, Handle, Haul Trim Reset Curb Edging, Straight, Circular All Types
920.0310 - Riprap R-1, R-2 Standard 8.3.0
920.0320 - Riprap R-3, R-4 R-5 Standard 8.3.0
936.0110 - Mobilization
937.0100 - Furnish, Install, Maintain and Move Temporary Traffic Protection
L01.0102 - Loam Borrow 4 Inches Deep
L02.0107 - Seeding
L11.9901 - Wildlife Fencing
T12.9910 - Portable Traffic Control Signal System
T20.0101 - Pavement Markings
T20.0102 - Temporary Pavement Markings