This document is the Contract-Specific General Provisions for Rhode Island Department of Transportation (RIDOT) Contract No. 2025-CB-063, a federal aid project for the rehabilitation of Wood River Road Bridge No. 056601 in the Towns of Hopkinton and Richmond, Washington County, Rhode Island. The project involves complete removal and replacement of bridge backwalls, abutment stems, approach slabs, and bridge deck ends; removal and reconstruction of the bituminous wearing surface with waterproofing membrane; removal and replacement of all bearings and bridge joints; concrete patching repairs to prestressed concrete I-beams and substructures; riprap repairs; installation of new guardrail and end treatments; signing and striping; and site stabilization and plantings. The work shall be completed in two phases with alternating traffic controlled by temporary signal during the first phase. Construction activities beneath the bridge are restricted to the low-flow season from July 1 through October 31 and must remain above the ordinary high-water level of Wood River. The project is funded through Federal Aid Project Nos. STP-3030(001) and STPG-3030(002) and will comply with the February 2026 Standard Specifications for Road & Bridge Construction (Blue Book). The Stormwater Pollution Prevention Plan (SWPPP) is included in the contract documents, with anticipated project duration of two to three months upon contract award.
The contractor is required to provide a Transportation Management Plan for work zone safety and mobility, establish erosion and sedimentation controls before commencing work, coordinate with utilities and municipalities, and maintain traffic according to specified procedures. All lane closures must be approved by the Administrator of Project Management and scheduled to begin Friday or Saturday nights with 21 days' written notice to allow for public notification. The contractor must notify utility companies at least two weeks in advance of any work near existing facilities, with coordination contacts provided for RI Energy (electric and gas), Verizon, Cox Communications, Enbridge/Algonquin Gas, and RIDOT Maintenance. Wildlife requirements for Tricolored bats, Northern long-eared bats, Eastern Spadefoot Toads, and Wood Turtles are specified in appendices, along with Migratory Bird Treaty Act compliance. Environmental Permit RIDEM FWP 25-0186 has been approved with conditions. The contractor must comply with price adjustments for Liquid Asphalt Cement and Diesel Fuel and install two portable traffic control signal units. No separate payment will be made for work zone lighting during nighttime operations or GPS sign location submission costs, as these are considered incidental to the contract.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF RHODE ISLAND
DEPARTMENT OF TRANSPORTATION
R.I. CONTRACT NO. 2025-CB-063
F.A. PROJECT NOS. STP-3030(001) & STPG-3030(002)
CORRIDOR – HOPE VALLEY
WOOD RIVER ROAD BRIDGE NO 056601
REHABILITATION
County of Washington Rhode Island
GENERAL PROVISIONS-CONTRACT SPECIFIC
200 Main Street Pawtucket, RI 02860
INDEX
GENERAL PROVISIONS - CONTRACT SPECIFIC
CS-i
PARAGRAPH TITLE PAGE
1. BRIEF SCOPE OF WORK
2. LIST OF PLAN SETS
3. APPLICABLE BLUE BOOK
4. UTILITY AND MUNICIPAL NOTIFICATION AND COORDINATION
5. LANE CLOSURES
6. SEQUENCE OF CONSTRUCTION
7. TRANSPORTATION MANAGEMENT PLAN
8. SPECIAL REQUIREMENTS FOR TRAFFIC MAINTENANCE AND PROTECTION
9. BRIDGE AND STRUCTURE WEIGHT RESTRICTIONS
10. COORDINATION WITH OTHER PROJECTS
11. SPECIALTY ITEMS
12. LUMPS SUM ITEM BREAKDOWN
13. MATERIAL TESTING BREAKDOWN LIST
14. PREFABRICATION INSPECTION NOTIFICATION
15. RIGHT-OF-WAY EASEMENTS
16. STRUCTURAL DISPOSITION LIST
17. STORMWATER POLLUTION PREVENTION PLAN
18. ENVIRONMENTAL PERMITS
19. SHOP DRAWINGS
20. SUBMITTALS
21. PAVEMENT CORES
CS-ii
22. RIDEABILITY
23. AMERICAN WITH DISABILITIES ACT (ADA) TECHNICAL INFEASIBILITY
24. GEOTECHNICAL DATA REPORT
25. BORING LOGS
26. HAZARDOUS MATERIALS INVESTIGATION
27. TEST PITS
28. SUBSURFACE UTILITY INVESTIGATION
29. OVERHEAD WIRE MEASUREMENTS
30. ENDANGERED SPECIES AND SPECIAL RESOURCES
31. MIGRATORY BIRDS
32. RAILROAD REQUIREMENTS
33. WEIGH-IN-MOTION (WIM) SYSTEM LOCATIONS
34. PAVEMENT SEALANT
35. RUBBERIZED ASPHALT CHIP SEAL
36. CRACK SEALING
37. RECORD PLANS
38. PROJECT SPECIFIC GENERAL PROVISIONS
CS-iii
APPENDICES
Appendix A Transportation Management Plan
Appendix B Stormwater Pollution Prevention Plan (SWPPP)
Appendix C Environmental Permits
Appendix D Wildlife Requirements
D1-Tri Colored Bats
D2-Northern Long-Eared Bats
D3-Migratory Birds
D4-RI Eastern Spadefoot Toad
D5-RI Wood Turtle
D6-Wildlife Fencing
CS-1
1. BRIEF SCOPE OF WORK
Rhode Island Contract No. 2025-CB-063, Federal Aid Project Nos. STP-3030(001) &
STPG-3030(002), PTS ID No. 2608A includes the rehabilitation of Bridge 056601. The work shall be completed in two phases with one lane of alternating traffic controlled with a temporary signal during the first phase. Construction activities beneath the bridge shall be during the low flow season of July 1st to October 31st and be above the ordinary high-water level of Wood River.
2. LIST OF PLAN SETS
• Volume 1 of 1: CORRIDOR – HOPE VALLEY REHABILITATION OF WOOD RIVER
ROAD BRIDGE NO. 056601
Additional Information Documents
The following documents are included but shall not be considered part of the Contract
Documents. These documents are included for informational purposes only. The
Contractor shall be responsible for verifying the information shown in these documents.
• Original Construction Plans
• Latest RIDOT Bridge Inspection Report
3. APPLICABLE BLUE BOOK
All work shall comply with the February 2026 Standard Specifications for Road & Bridge
Construction (Blue Book).
4. UTILITY AND MUNICIPAL NOTIFICATION AND COORDINATION
Existing utilities have been shown on the Plans using the best available information. The
Contractor shall check and verify the location of all existing utilities both underground and overhead in accordance with the “Dig Safe Program Law” enacted by the Rhode
Island Legislation Bill No. 79S-291, which became effective July 1, 1979. The Contractor should be aware that not all utility companies subscribe to the Dig Safe Program. It is the Contractor’s responsibility to ensure that all utility companies have been notified, and all utilities have been marked prior to commencing their work. Any damage to existing utilities shall be replaced or repaired to the satisfaction of the Engineer at no additional cost to the State.
The Contractor shall schedule his construction so as to allow for a coordinated highway and utility effort. Upon award, the Contractor shall notify the lead utility relative to his
CS-2
anticipated highway construction start date. Immediately following the Pre-construction Conference, the Contractor shall initiate survey layout required for utilities.
It is required that the Contractor notify each utility company no less than two (2) weeks in advance of any work near the existing utility facilities to remain.
The applicable utility/municipality representatives are as follows:
Municipality coordination contacts:
Agency Contact Person Telephone
Hopkinton DPW David Caswell 401-377-7790
Hopkinton Police Department Chief Mark J. Carrier 401-377-7750
Hope Valley Fire District Chief David Caswell 401-539-2229
Richmond DPW Scott W. Barber 401-539-8474
Richmond Police Department Chief Elwood M. Johnson, Jr. 401-539-8289
Richmond-Carolina Fire District Chief Scott W. Barber 401-213-6595
Utility coordination contacts:
Agency Contact Person Telephone
RI Energy Electric David Son 631-223-5650
RI Energy Gas Engineering James Paulette 401-465-8580
RI Energy Gas Construction Jay Eddy 617-634-2905
Verizon Ross Bilodeau 508-782-2112
Cox Communications Phil Haines 401-639-0421
Enbridge/Algonquin Gas James Clark 617-447-3186
RIDOT Maintenance Matt Ouellette 401-734-4809
During the progress of the work, the Contractor shall cooperate with the Owners of the utilities and permit their representative’s access to the work to determine if their utilities are being endangered in any way.
The following utility involvement is anticipated: Based on the scope of work and conducted surveys within the limits of work, no utility involvement is anticipated.
Utility Company Guidelines
• There are no utility company guidelines provided in the appendix.
5. LANE CLOSURES
All full closures, splits, or shifts unless approved by the Administrator of Project
Management or his designee shall be scheduled to begin on Friday or Saturday night as
CS-3
determined by the TMP to allow motoring public time to adjust to new travel patterns while allowing RIDOT the opportunity to evaluate its success. Construction work can commence on the Monday following the evaluation period. TMP modifications or revisions may be required in advance to allow for weekend work.
All full closures, splits, or lane shifts unless approved by the Administrator of Project
Management or his designee shall not be installed or remain in place during the winter shutdown period.
The Contractor shall notify the Department in writing at least twenty‐one (21) days in advance of the road/lane closure so that adequate public notice can be given. Upon the
Engineer’s approval, the Contractor shall coordinate the required traffic control.
6. SEQUENCE OF CONSTRUCTION
a. General
All work shall be completed in accordance with the Traffic-Related Work Restrictions indicated in the Transportation Management Plan.
The Contractor shall immediately establish all temporary erosion and sedimentation controls including temporary sedimentation basins and construction accesses.
b. Special Requirements
Traffic shall not be routed onto the new road until completion is achieved in accordance with Special Provision 108.1000, and the Engineer has given approval.
The Contractor shall develop an orderly sequence of construction and time schedule for all work to be performed under this contract in accordance with Section 108.03 of the RI
Standard Specifications for Road and Bridge Construction.
The schedule level requirements for this project shall be Level B.
If the contract is extended beyond the specified completion date, a similar work schedule will be established by the Engineer.
All erosion controls shall be in-place and accepted by the Engineer prior to commencing work. Locations of surface features and utilities shown on the plans are approximate.
The Contractor shall check and verify the exact location of all existing utilities, both underground and overhead, with Dig Safe. Any damage to existing utilities shall be the
Contractor's responsibility in addition to providing vehicle and pedestrian access to abutting residential, commercial, and/or recreational establishments.
CS-4
The Contractor shall be responsible for maintaining all roadways free from debris resulting from vehicles entering and exiting the construction site. The Contractor shall clean and sweep the roadways, at intervals as required, and/or as determined by the
Engineer to maintain the roadway in an acceptable condition. The cost associated with complying with this provision shall be considered incidental to the contract.
The cost of the work zone lighting required for nighttime operations shall be incidental to the contract in accordance with Section 944 Lighting for Night Work Operations of the
Standard Specifications. No separate payment will be made for lighting of the work zone during any nighttime operation.
The Contractor shall be responsible for providing GPS locations of all installed directional, regulatory, warning, parking, and street signs. The submission shall be made electronically in Microsoft Excel format to the RIDOT-GIS Section (contact person TBD by Engineer) in the following format:
Sign # MUTCD Code Easting Northing
1 R1-1 277311 323478
The cost for completing the GPS work shall be incidental to the cost of the signing items.
7. TRANSPORTATION MANAGEMENT PLAN
The Transportation Management Plan (TMP) for this project is included as an appendix to these Contract Specific General Provisions. The TMP lays out the set of coordinated transportation management strategies that will be used to manage the work zone safety and mobility impacts of this project. In the event of a discrepancy between information in the TMP and information elsewhere in the Contract Documents, the former shall govern.
The Contractor's attention is called to the Standard Specifications for Road & Bridge
Construction, SECTION 104.08 – MAINTENANCE OF TRAFFIC, which describes the requirements for the Contractor's designation of a TMP Implementation Manager for the
Contract.
The Department’s latest Training Guidelines for Personnel Responsible for Work Zone
Safety & Mobility is available under the “Work Zone Safety & Mobility” section at:
http://www.dot.ri.gov/business/contractorsandconsultants.php
CS-5
8. SPECIAL REQUIREMENTS FOR TRAFFIC MAINTENANCE AND PROTECTION
In addition to the requirements of the RI Standard Specifications and the special requirements of other sections of these Contract Documents, the following requirements shall be undertaken by the Contractor:
a. The Contractor is advised that the signs and other traffic control devices shown on the Maintenance and Protection of Traffic Plans are minimum requirements, and it is the Contractor’s responsibility to supplement these as directed by the Engineer if necessary to ensure public safety. All maintenance and protection of traffic devices must be in place and approved by the Engineer before any construction may commence. All maintenance and protection of traffic shall conform to the latest edition and revisions of the Manual on Uniform Traffic Control Devices (MUTCD).
b. The Contractor shall be responsible for maintaining appropriate construction related signing at all times. All temporary construction signs not appropriate for the construction activity taking place shall be removed, covered, or otherwise concealed to the satisfaction of the Engineer. This includes the period between erecting the signs and the start of construction, as well as when a construction phase is completed or suspended.
c. R.I. Std. 26.1.0 cones shall be used when traffic control set-up is utilized only during working hours and is subsequently removed at the end of the workday. R.I. Std. 26.2.0 shall be used when a traffic control set-up will remain beyond working hours when no workers are present.
9. BRIDGE AND STRUCTURE WEIGHT RESTRICTIONS
A current list of bridge restrictions can be found at www.dot.ri.gov/travel/truckrestrictions.com for coordination with the Department for necessary permits.
No bridge weight restrictions are listed for the bridge within the scope of work, Bridge
#056601.
10. COORDINATION WITH OTHER PROJECTS
The Contractor shall be aware of other projects ongoing or commencing during the construction period of this project. It shall be the Contractor’s responsibility to coordinate with the Department to determine the impacts of their construction operations on adjacent projects. The Contractor may be required to attend periodic coordination meetings with representatives of the Department, municipality, and/or
CS-6
other contractors to discuss and resolve potential conflicts. The Contractor shall be responsible for coordinating construction activities with the follow projects at a minimum:
• There are none known at this time.
11. SPECIALTY ITEMS
• The following Items are designated as Specialty Items per Section 101.83 of the
Blue Book:
o Seeding o Guardrail o Pavement Markings
12. LUMPS SUM ITEM BREAKDOWN
• The following is a list of Items requiring a breakdown of the cost of Lump Sum per
Section 109.07 of the Blue Book:
o Item Code 212.2200 Maintenance and Cleaning of Erosion, Sediment, and
Pollution Prevention Controls o Item Code 937.1000 Furnish, Install, Maintain and Move Temporary Traffic
Protection
13. MATERIAL TESTING BREAKDOWN LIST
• There are no Job Specific Items requiring material testing in this Contract.
14. PREFABRICATION INSPECTION NOTIFICATION
The Contractor shall provide at least 4 weeks notice to the Construction Manager in writing and dot.materials@dot.ri.gov of when offsite fabrication is scheduled to begin.
15. RIGHT-OF-WAY EASEMENTS
• There are no Temporary Easements or Temporary Use Agreements associated with construction of this project.
CS-7
16. STRUCTURAL DISPOSITION LIST
• There are no Structural Dispositions associated with this project.
17. STORMWATER POLLUTION PREVENTION PLAN
• The Stormwater Pollution Prevention Plan (SWPPP) is provided in Appendix B. The
Operator shall sign and return the SWPPP Cover Sheet to the Department’s
Project Manager in advance of the Pre-Construction Conference.
18. ENVIRONMENTAL PERMITS
• The following Environmental Permits are provided in Appendix C:
o RIDEM FWP 25-0186.
19. SHOP DRAWINGS
The following list of work for which shop drawings are required is provided for the convenience of the contractor. This list includes only major items of work; it does not itemize all submittals required by the contract documents. The contractor is responsible for timely submission of all shop drawings and other documents required by the contract. No extra payment will be made, nor will any extension be made to the contract completion date for making required submittals.
• The list of expected Shop Drawings is provided below:
o Demolition; Shielding, Equipment and Detailed Sequence of Work o Temporary Shielding o Temporary Shoring o Concrete; Placing & Pouring Sequence, Methods and Equipment, Curing
Plan including Methods, Personnel Resources o Cementitious Materials o FRP o Reinforcing Steel, Splicers, Grouted Splice Sleeves, and Inserts o Erection Procedures; Type/Size, Placement and Support of Equipment, Detailed Sequence of Work o Structural steel armor angles o Hydrodemolition Methods o Bridge Identification Tablets o Guardrail o Temporary Signal
CS-8
20. SUBMITTALS
• See Paragraph 19. Shop Drawings. All submittals shall be in accordance with
Section 105.02 of the Specifications.
21. PAVEMENT CORES
• There are no Pavement Cores associated with this project.
22. RIDEABILITY
• There is no Rideability associated with this project.
23. AMERICAN WITH DISABILITIES ACT (ADA) TECHNICAL INFEASIBILITY
• There is no ADA work associated with this project.
24. GEOTECHNICAL DATA REPORT
• There was no Geotechnical Data Report required for the design of this project.
25. BORING LOGS
• There was no Geotechnical Data Report required for the design of this project.
26. HAZARDOUS MATERIALS INVESTIGATION
• There was no Hazardous Materials Investigation completed for this project.
27. TEST PITS
• There were no test pits required for design of this project.
28. SUBSURFACE UTILITY INVESTIGATION
• There was no subsurface utility investigation required for design of this project.
CS-9
29. OVERHEAD WIRE MEASUREMENTS
• There were no overhead wire measurements required for design of this project.
30. ENDANGERED SPECIES AND SPECIAL RESOURCES
• The Tricolored bat and Northern long-eared bat regulated by the U.S. Fish and
Wildlife Service are present within the project area; requirements are provided in
Appendices D1 and D2, respectively.
• Endangered Eastern Spadefoot Toad regulated by the Rhode Island Department of Transportation (RIDOT) Natural Resources Unit (NRU) are present within the project area; requirements are provided in Appendix D4.
• Greatest Conservation Needed Wood Turtle regulated by the Rhode Island
Department of Transportation (RIDOT) Natural Resources Unit (NRU) are present within the project area; requirements are provided in Appendix D5.
• Wildlife Fencing shall be installed and paid per the requirements provided in
Appendix D6.
31. MIGRATORY BIRDS
• Migratory Bird Treaty Act requirements are provided in Appendix D3.
32. RAILROAD REQUIREMENTS
• There is no railroad coordination required for this project.
33. WEIGH-IN-MOTION (WIM) SYSTEM LOCATIONS
• There are no existing WIM System Locations within the project limits.
34. PAVEMENT SEALANT
• There is no pavement sealant required for this project.
35. RUBBERIZED ASPHALT CHIP SEAL
• There is no Rubberized Asphalt Chip seal associated with this project.
CS-10
36. CRACK SEALING
• There is no Crack Sealing associated with this project.
37. RECORD PLANS
• The following Record Plans for work within the project limits are provided in the
Additional Information Documents file.
o RIC 6951 - WOOD RIVER ROAD BRIDGE (No. 566) AND APPROACHES
38. PROJECT SPECIFIC GENERAL PROVISIONS
• The following list includes Job Specific items for this project:
o Intent to comply with the replacement of Section 106.01.1 from RIDOT
Standard Specifications for Road & Bridge Construction, February 2026 with 106.01.1 Buy America Job Specification (BABA).
o FRP Repairs per Code 817.9901.
o Temporary Jacking and Shoring of Existing Girders per Code 824.9901.
o Comply with price adjustments due to Liquid Asphalt Cement and Diesel
Fuel prices.
o Install two (2) Portable Traffic Control Signal Units (PTS) and maintain their operation at required locations per Code T12.9910.
APPENDIX A
Transportation Management Plan
APPENDIX B
Stormwater Pollution Prevention Plan (SWPPP)
SMALL-SITE
Stormwater Pollution Prevention Plan
For:
Wood River Road Bridge No. 566 Rehabilitation
Corridor – Hope Valley, PTSID: 2608A
Switch Road over the Wood River
Hopkinton and Richmond, Rhode Island
Owner:
RI DEPARTMENT OF TRANSPORTATION
Alisa Diaz Richardson
2 Capitol Hill
Providence, RI 02903
401-222-2468
Operator:
TO BE DETERMINED UPON
CONTRACT AWARD
Estimated Project Dates:
Start Date: To be determined
Completion Date: To be determined
SWPPP Prepared By:
GM2 Associates, Inc.
Kevin M. Nagle, P.E.
200 Main Street, Suite 300
Pawtucket, RI 02860
(401) 726-4084
SWPPP Preparation Date: 3/5/2025
RIDOTVersion NEW212 10.30.23
OWNER CERTIFICATION
I certify under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
___________________________________________3/5/25_______ Owner Signature: Date
Owner Name: Alisa Diaz Richardson, PE
Owner Title: Administrator, Environmental Division
Company Name: Rhode Island Department of Transportation
Table of Contents
OWNER CERTIFICATION
INTRODUCTION
SECTION 1: SITE DESCRIPTION
1.1 Project/Site Information
1.2 Nature and Sequence of Construction Activity
1.3 Construction Site Estimates
1.4 Potential Discharges
1.5 Allowable Non-Storm Water Discharges
1.6 Potential Sources of Pollution
1.7 Site Plans
SECTION 2: EROSION AND SEDIMENTATION CONTROLS
☒ 2.1 Minimize Disturbed Area and Protect Natural Features
☒ 2.2 Phase Construction Activity
☒ 2.3 Control Stormwater Flowing Onto & Through Project
☒ 2.4 Stabilizing Soils
☒ 2.5 Protect Slopes
☐ 2.6 Protect Storm Drain Inlets (N/A, none in project area)
☐ 2.7 Protect Storm Drain Outfalls (N/A, none in project area)
☒ 2.8 Establish Perimeter Controls and Sediment Barriers
☒ 2.9 Retain Sediment On-Site and Control Dewatering Practices
☒ 2.10 Monitoring Weather Conditions
SECTION 3: GOOD HOUSEKEEPING BMPS
☒ 3.1 Off-site Tracking of Sediments
☒ 3.2 Waste Disposal
☒ 3.3 Spill Prevention and Control Plan
☒ 3.4 Control of Allowable Non-Storm Water Discharges
☒ 3.5 Establish Proper Building Material Staging Areas
☒ 3.6 Designate Washout Areas
☒ 3.7 Establish proper equipment/vehicle fueling & maintenance practices
☒ 3.8 Dust Control
☒ 3.9 Sweeping
SECTION 4: POST-CONSTRUCTION BMPs
4.1 Post-Construction BMPs
SECTION 5: MAINTENANCE and INSPECTIONS
5.1 Maintenance
5.2 Inspections
5.3 Corrective Actions
SECTION 6: Amendments
SECTION 7: Recordkeeping
7.1 Requirements
SECTION 8: Party Certifications
SWPPP APPENDICES
Small-Site SWPPP Inspection Report with Instructions Small-Site SWPPP Corrective Action Log Location Map dot.swppp@dot.ri.gov RIDOT Small-Site SWPPP Inspection Report
This Table of Contents is structured to be automatically populated by Microsoft Word.
Upon completion of this template, “right-click” anywhere in the Table of Contents, select “Update Field”, and then “Update entire table”. Page numbers will automatically be synced with the changed document.
INTRODUCTION
This Small-Site Storm Water Pollution Prevention Plan (SWPPP) has been prepared for the State of Rhode Island Department of Transportation (RIDOT) for a construction project that has less than one (1) acre of soil disturbance. This document provides general guidance for the installation and maintenance of erosion and sediment controls on small projects.
The purpose of erosion and sedimentation best management practices (BMPs) is to prevent pollutants from leaving the construction site and entering waterways or environmentally sensitive areas during and after construction. This SWPPP has been prepared prior to the initiation of construction activities to address anticipated worksite conditions. The best management practices (BMPs) depicted on the site plan and described in this narrative should be considered the minimum measures required to control erosion, sedimentation, and stormwater runoff at the site. Since construction is a dynamic process with changing site conditions, it is the operator’s responsibility to manage the site during the construction phases to prevent pollutants from leaving the site. This may require the operator to revise and amend the SWPPP during construction to address varying site and/or weather conditions, such as by adding or realigning erosion or sediment controls.
It is the responsibility of the RIDOT Construction Manager to maintain the SWPPP, including all attachments, amendments, and inspection records, at the project field office and to make all records available for inspection by RIDEM during construction.
The RIDOT Construction Manager and designated Certified SWPPP Inspector are required to review the SWPPP and sign the Party Certification pages (Section 8). The prime contractor and all subcontractors involved in earthwork or exterior construction activities are also required to review the SWPPP and sign the certification pages before construction begins.
Any questions regarding the SWPPP, BMPs, inspection requirements, or any other facet of this document may be addressed to the RIDOT Environmental Division at 401-734- 4892.
Please note: Even if practices are correctly installed on a site according to the approved plan, the site is only in compliance when erosion and sedimentation are effectively controlled throughout the entire site.
- 7 -
SECTION 1: SITE DESCRIPTION
1.1 Project/Site Information
The Rhode Island of Transportation (RIDOT) will be undertaking a program of repairs and rehabilitation measures upon Wood River Road Bridge (No. 056601), which carries Switch Road over the Wood River in the Towns of Hopkinton and Richmond, Rhode Island. The location of the existing crossing within the surrounding environment is depicted on the General Location Map provided as an attachment to this
SWPPP.
1.2 Nature and Sequence of Construction Activity
The work to be performed under this Contract includes complete removal and replacement of the backwalls; removal and replacement of top 12"± of the abutment stem; complete removal and reconstruction of the approach slabs; reconstruction of the concrete bridge deck ends (including slab-over-backwall extension details); removal and reconstruction of new bituminous wearing surface over new waterproofing membrane; removal and replacement of all bearings; installation of new bridge joints;
concrete patching repairs to the prestressed concrete I-beams; temporary jacking and shoring of the superstructure; concrete patching repairs to the substructures; repairs to the existing riprap located at the base of the abutments; installation of new guardrail and end treatments; signing and striping; site preparation; tree trimming; plantable soil and seed; maintenance and protection of traffic; and ancillary tasks necessary to complete the work.
Ground disturbance will be limited to the minor clearing and grading required to provide worker access to lower portions of the bridge, and upon completion of the work all areas temporarily disturbed will be returned to pre-project conditions through grading, stabilization, and plantings. Construction activities beneath the bridge will be conducted during the low flow season (July 1 to October 31) and be outside/above the ordinary high water levels of the Wood River.
Estimated Project Start Date: (to be determined upon contract award)
Estimated Project Completion Date: (to be determined upon contract award)
Estimated Number of Months: 2-3 months
1.3 Construction Site Estimates
The following are estimates of the construction site:
Total Project Area 0.2 acres
Construction Site Area to be disturbed 0.02 acres
Percentage impervious area before construction 80 %
Percentage impervious area after construction 80 %
- 8 -
1.4 Potential Discharges
Indicate where the stormwater from the active site may discharge to:
Environmentally Sensitive Areas
Construction Site
Discharges to:
(Yes / No)
List discharge points & indicate how determination was made
Waters of the State Yes The subject bridge spans the Wood River (RI0008040R-16C), which flows in a general southerly direction and is the municipal boundary between the Towns of Hopkinton (west) and Richmond (east) for most of its length.
(RIGIS/RIDEM data)
Wetlands (Coastal or Upland) Yes The watercourse is a freshwater wetland feature subject to protection under the state’s Freshwater Wetlands Rules (250-RICR-150- 15-3).
(RIGIS/RIDEM data)
Separate Storm Sewer System No There are no closed drainage facilities in or near the project area.
(RIDOT record plans, Stormwater Database)
303(d) Impaired Waters Yes The Wood River is on the current 303(d) List of Impaired Waters and is impaired by non-native aquatic plants and bacteria (Enterococcus).
(RIGIS/RIDEM data, 2024 IWQMA Report)
TMDL Waters No No TMDLs have been effected to date for the above impairments. A TMDL to address Enterococcus is scheduled for 2036.
(RIGIS/RIDEM data, 2024 IWQMA Report)
Special Resource Protection Waters (SRPWs)
Yes Recreation, Critical Habitat (Rare and Endangered Species), Wild & Scenic
(RIGIS/RIDEM data)
Cold Water Fisheries Yes (RIGIS/RIDEM data)
- 9 -
Natural Heritage Areas Yes Bridge is within the spatial extent of an NHA (No. 215) in the current (2023) dataset.
(RIGIS/RIDEM data)
Historic/Cultural Areas No There are no such areas or features in the vicinity of the bridge. The bridge itself is not historic, eligible, or potentially eligible.
(RIGIS/RIDEM data)
Permanent Stormwater Structures (swales, outfalls, treatment units, etc.)
No None in vicinity of bridge.
(RIDOT record plans, Stormwater Database)
- 10 -
1.5 Allowable Non-Storm Water Discharges
RIPDES Construction General Permit – IV.E.1.g
Are there allowable non-stormwater discharges on or near the project area?
☐ Yes ☒ No
List of allowable non-stormwater discharges:
N/A
Are there any known or contaminated discharges, including dewatering operations, on or near the project area?
☐ Yes ☒ No
If yes, list the discharges and the RIPDES individual permit number(s) or RIPDES Remediation General Permit Authorization number(s) associated with these discharges.
RIPDES individual permit number: N/A
RIPDES Remediation General Permit Authorization number: N/A
- 11 -
1.6 Potential Sources of Pollution
Check the potential pollution sources that may reasonably be expected to affect the quality of storm water discharges from the site
Anticipated on this Project
(Y/N)
Operation/ Location Stormwater Pollutants
Y Clearing, grading, excavating, and unstabilized areas
Sediment; Trash/Debris
Y Construction Entrance Sediment
N Soil Stockpiles Sediment
Y Paving operations Sediment; Trash/Debris
Y Concrete washout and waste Heavy metals; pH; Trash/Debris
Y Structure construction/ painting/ cleaning
Nutrients; pH; Trash/Debris; Toxic chemicals
Y Demolition and debris disposal Sediment; Trash/Debris
N Dewatering operations Sediment; Nutrients
N Drilling and blasting operations Sediment; pH; Trash/Debris
Y Material delivery and storage Sediment; Nutrients; Heavy metals; pH;
Pesticides/Herbicides; Oil/Grease;
Trash/Debris; Toxic chemicals
Y Material use during building process Nutrients; heavy metals; pH;
pesticides/herbicides; oil/grease;
trash/debris; toxic chemicals
Y Solid waste/ trash/ debris trash/debris; toxic chemicals
N Hazardous waste heavy metals; pH; pesticides/herbicides;
oil/grease; toxic chemicals
N Contaminated spills Nutrients; heavy metals; pH;
pesticides/herbicides; oil/grease; toxic chemicals
Y Sanitary/septic waste (porta potty?)
Nutrients; pH; Bacteria/Viruses; toxic chemicals
N Vehicle/equipment fueling and maintenance
Oil/Grease; Toxic chemicals; fuel
Y Vehicle/equipment use and storage Oil/Grease; Toxic chemicals
Y Landscaping operations Sediment; Nutrients; Trash/Debris
N Off-site LUHPPL run-on Industrial toxins; oil/grease; heavy metals;
fuel; salt; hazardous materials
N Other:
- 12 -
1.7 Site Plans
TITLE & DATE OF PLAN SET(S):
State of Rhode Island, Department of Transportation Corridor – Hope Valley: Wood River Road Bridge No. 566 Rehabilitation
(______ Sheets, Date: )
* Date of approved Advertising Plan Set to be added above. See Section 6 (Amendments) and Section 7 (Recordkeeping).
☐ Total area of development
☐ Total area of soil disturbance
☐ Areas that will not be disturbed
☐ The location of all erosion and sediment controls
☐ Locations of storm drain inlets and outfalls
☐The location and name of the receiving waters or separate storm sewer system and the ultimate receiving waters
☐Location and name of all waters of the State, including wetlands
☐Location of environmentally sensitive features/areas to be protected (Section 1.4)
☐ Constraint locations of material storage areas, equipment storage areas, concrete washouts, dumpsters, stockpiles, fueling locations etc.
(i.e. locations where these activities will not occur)
- 13 -
SECTION 2: EROSION AND SEDIMENTATION CONTROLS
What is a BMP?
Erosion and Sedimentation controls are Best Management Practice (BMP) devices, practices, or methods for preventing storm water pollutants from leaving the construction site and reaching environmentally sensitive areas. The most common BMPs are compost filter socks, straw bales, and silt fence, but a BMP can also be a policy or procedure like construction sequencing and street sweeping. The objectives of erosion and sediment controls are to minimize the potential for erosion and sedimentation during construction activities.
If BMPs are not depicted on the approved plan set, but erosion or sedimentation is occurring, appropriate BMPs must be installed as directed by the RIDOT Construction Manager.
For this construction project, please check any BMPs that will be utilized on-site.
This section may be amended at any time during the project.
☒ 2.1 Minimize Disturbed Area and Protect Natural Features
Limiting the disturbed areas as much as possible leaves natural vegetation to serve as the erosion control.
Preservation of topsoil is also important – layers underneath topsoil are much more prone to erosion and have less absorption capacity.
As far as is practicable, existing vegetation will be protected and left in place, in accordance with the clearing limits shown on the approved Plans. Prior to any land disturbance activities commencing on the site, the Contractor will physically mark limits of disturbance (LOD) on the site and any areas to be protected within the site, so that workers can see the areas to be protected. Topsoil will be preserved where possible, in accordance with stock pile management specifications
☒ 2.2 Phase Construction Activity
Proper sequencing of construction activities is essential to maximize the effectiveness of erosion and sediment control measures.
At a minimum, construction sequencing and timing of construction activities will include:
1. Before any earthwork begins, erosion and sediment controls will be installed as depicted on the Approved Plans, and in accordance with all applicable sections of the RIDOT Standard Specifications. Upon acceptable completion of site preparation and installation of erosion and sediment controls, site construction activities may commence.
2. While earthwork is being done, routine inspection and maintenance and/or modification of erosion and sediment controls will be performed.
3. Final stabilization of any disturbed areas after earthwork has been completed.
- 14 -
☒ 2.3 Control Stormwater Flowing Onto & Through Project
Stormwater flow protection is necessary to prevent concentrated stormwater flows from coming on to the project site &/or moving through the project site.
Structural BMPs will be used to divert flows from exposed soils, retain or detain flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site.
BMPs will be installed as depicted on the approved plan set and in accordance with applicable RIDOT Standard Specifications.
Control measures that may be used, upon approval, include straw bales/silt fencing, compost filter socks, fiber rolls, gravel bag berms, slope drains, check dams, and riprap.
☒ 2.4 Stabilizing Soils
Phased Clearing & Grubbing:
Only areas that can be reasonably expected to have active construction work being performed within 21-days of disturbance will be cleared/grubbed at any one time. It is NOT acceptable to clear and grub the entire construction site if disturbed portions will not be active within the 21-day time-frame.
Clearing/Grubbing will not take place during a rain event if erosion is likely to occur; nor will it occur if a rain event is forecasted and appropriate erosion controls cannot be installed prior to the storm and in accordance with section 201, 206 through 211 of the RIDOT standard specifications.
No undisturbed areas will be cleared of existing vegetation after October 15th of any calendar year or during any period of full or limited winter shutdown. All disturbed soils exposed prior to October 15 of any calendar year will be seeded or protected by that date. Any such areas that do not have adequate vegetative stabilization, as determined by the Construction Manager or environmental inspector, by November 15 of any calendar year, must be stabilized by erosion control matting or mulch, in accordance with specifications contained within the RI Soil Erosion and Sediment Control Handbook (as amended). If work continues within any of these areas during the period from October 15 through April 15, care must be taken to ensure that only the area required for that Day’s work is exposed, and all erodible soil must be restabilized within 5 working days.
As per RIDOT Standard Specification 201.03.1 – Clearing and Grubbing:
After clearing, and by the end of each day's grubbing operation, the Contractor will install erosion control measures that are indicated on the Plans or as directed by the Construction Manager. Such erosion control measures will be installed in strict accordance with the requirements of SECTIONS 206, 207, and 208 of these Specifications, PERIMETER EROSION CONTROLS, CHECK DAMS, and TEMPORARY DEWATERING BASINS, respectively.
Initiating Stabilization Practices
Upon completion and acceptance of site preparation and initial installation of erosion and sediment controls the operator will initiate appropriate stabilization practices during all phases of construction on all disturbed areas as soon as possible but not more than fourteen (14) days after the construction activity in that area has temporarily or permanently ceased, unless the activity is to resume within twenty-one (21) days.
Any disturbed areas that will not have active construction activity occurring within twenty-one (21) days must be stabilized using the BMPs depicted on the approved plan set and in accordance with RIDOT Standard Specifications Section L.02 – Seeding, Section L.05 - Seed Stabilizers and Section M.18 – Landscape Materials (M.18.08 – Mulch and M.18.09 – Seed Stabilizer Materials).
- 15 -
Maintaining Stabilization
Controls and methods that may be used to maintain soil stabilization include the placement of geotextiles, erosion control blankets/mats, and temporary seeding. If the stabilization BMPs fail and erosion occurs, then alternative control measures &/or methods may need to be substituted.
☒ 2.5 Protect Slopes
Slope protection is necessary to prevent concentrated stormwater flow from eroding the slope.
Structural BMPs will be used to temporarily conduct concentrated stormwater runoff safely down the face of a cut or fill slope without causing erosion on or below the slope.
BMPs will be installed as depicted on the approved plan set and in accordance with applicable RIDOT Standard Specifications.
Control measures that may be used, upon approval, include temporary slope drains, compost filter socks, fiber rolls, gravel bag berms, erosion control mats/blankets, and temporary vegetative cover.
☐ 2.6 Protect Storm Drain Inlets (N/A, none in project area)
Inlet protection is necessary to prevent sediment and debris from entering the storm drain system.
Structural BMPs will be used to protect ALL stormwater inlets &/or catch basins that may receive sediment-laden stormwater flow.
BMPs will be installed as depicted on the approved plan set and in accordance with applicable RIDOT Standard Specifications.
Control measures that may be used, upon approval, include catch basin inserts, compost filter socks, fiber rolls, and gravel bag berms.
☐ 2.7 Protect Storm Drain Outfalls (N/A, none in project area)
Outfall protection is necessary to prevent scour or severe erosion at discharge points. Outfalls often have high velocity, high volume flows, and require strong materials that will withstand the forces of the water.
The function of these BMPs is to protect the soil surface, reduce velocity, and promote infiltration. Storm drain outlet BMPs also offer a last line of protection against sediment entering environmentally sensitive areas.
Structural BMPs will be used to protect ALL stormwater outfalls that may discharge sediment-laden stormwater flow.
BMPs will be installed as depicted on the approved plan set and in accordance with applicable RIDOT Standard Specifications.
Control measures that may be used, upon approval, include compost filter socks, fiber rolls, gravel bag berms, and rip-rap.
- 16 -
☒ 2.8 Establish Perimeter Controls and Sediment Barriers
Perimeter controls and sediment barriers are necessary to prevent sediment and debris from leaving the construction site.
Structural BMPs will be used to establish perimeter barriers that will stop sediment-laden stormwater flow from leaving the construction site.
BMPs will be installed as depicted on the approved plan set and in accordance with applicable RIDOT Standard Specifications.
Control measures that may be used, upon approval, include baled straw &/or silt fence, compost filter socks, fiber rolls, and gravel bag berms.
☒ 2.9 Retain Sediment On-Site and Control Dewatering Practices
Sediment traps, basins, and barriers are used to retain sediment on the site to protect streams, lakes, drainage systems, and adjacent property. These devices are used at the outlets of channels, diversions, and other runoff conveyance measures to allow sediment-filled water to pool and sediment to settle. These measures are often used as the last line of defense to stop sediment from leaving the site.
The dewatering of non-contaminated non-stormwater (i.e. groundwater) or accumulated precipitation discharge of sediment-laden water into storm drains, streams, lakes or wetlands prior to sediment removal is prohibited.
The dewatering of contaminated non-stormwater cannot be discharged without prior notice and approval from either the Rhode Island Department of Environmental Management (RIDEM) or the Coastal Resources Management Council (CRMC). Should dewatering of contaminated water be occurring on this construction project, appropriate permits will have been obtained, and will be included as part of the Contract Documents.
Describe controls, including design specifications and details, to be used to retain sediments on-site.
Describe dewatering practices that will be implemented if water must be removed from an area so that construction activity can continue.
None of the proposed rehabilitation measures require dewatering.
☒ 2.10 Monitoring Weather Conditions
Care will be taken to avoid having unstabilized areas exposed during precipitation events. Weather forecasts will be routinely checked, and in the case of an expected precipitation event of over 0.25-inches over a 24-hour period, all BMPs will be inspected, and maintained as necessary, prior to the weather event.
In the case of an extreme weather forecast (greater than one-inch of rain over a 24-hour period), additional erosion/sediment controls will be installed where appropriate.
List the weather gauge station that will be utilized to monitor weather conditions on the construction site.
See www.wunderground.com or www.weather.gov for available stations.
Westerly State Airport (KWST) - 41.38 °N, 71.84 °W https://www.wunderground.com/weather/KWST
- 17 -
SECTION 3: GOOD HOUSEKEEPING BMPS
The purpose of good housekeeping is to prevent daily construction operations and activities from causing pollution.
For this construction project, please check any BMPs that will be utilized on-site.
This section may be amended at any time during the project.
☒ 3.1 Off-site Tracking of Sediments
Any construction site access point must employ the BMPs depicted on the approved plan set and in accordance with RIDOT Standard Specifications Section 211 – Construction Accesses, or any method approved of by the RIDOT Construction Manager and the RIDOT Environmental Division. Construction accesses will be used in conjunction with the stabilization of construction roads to reduce the amount of mud picked up by construction vehicles. All RI STD 9.9.0 Construction Access roads will be constructed prior to any roadway accepting construction traffic
If a Construction Access BMP is not designated on the plans, it is still the responsibility of the Operator to ensure that no sediment is tracked off the construction site by any vehicles leaving the site. Additional control measures that may be used, upon approval, include a vehicle washing station and/or daily street sweeping.
The Operator will remain responsible for the clean-up of any mud or dirt that is tracked onto streets or paved areas, even with the installation of gravel construction entrances. Inspect access for excessive sediment build up. Remove sediment and rebuild the exit as necessary to retain effectiveness and prevent off-site tracking. Additional street cleaning may be required if unable to retain sediment on site.
☒ 3.2 Waste Disposal
Building materials and other construction site wastes will be properly managed and disposed of to prevent the discharge of solid materials from wind and precipitation. All types of waste generated at the site will be disposed of in a manner consistent with State Law and/or regulations.
The waste collection area will not be within any of the constraint areas located on the “Constraint Map” (Section 1.7) and will be approved by the RIDOT Construction Manager.
All waste containers will be covered to avoid contact with wind and precipitation.
Waste collection will be scheduled frequently enough to prevent containers from overfilling.
All construction site wastes will be collected, removed, and disposed of in accordance with applicable regulatory requirements and only at authorized disposal sites.
Equipment and containers will be checked for leaks, corrosion, support or foundation failure, or other signs of deterioration. Those that are found to be defective will be immediately repaired or replaced.
- 18 -
☒ 3.3 Spill Prevention and Control Plan
Spills and leaks will be avoided through frequent inspection of equipment and material storage areas.
Heavy equipment and other vehicles will be routinely inspected for leaks and repaired as necessary.
Material storage areas will be routinely inspected for leaky containers, open containers, or improper storage techniques that may lead to spills or leaks. Appropriate cleanup procedures and supplies will be available on-site.
Spills will be cleaned up immediately and following proper response procedures and in accordance with any applicable regulatory requirements. At no time will spills be cleaned and flushed down storm drains or in to any environmentally sensitive area (i.e. stream, pond, wetland).
Equipment/vehicle fueling and repair/maintenance operations or hazardous material storage will not take place within any of the constraint areas located on the “Constraint Map” (Section 1.7) and will be approved by the RIDOT Construction Manager.
☒ 3.4 Control of Allowable Non-Storm Water Discharges
Non-storm water discharges will be controlled to reduce the likelihood of contamination. Allowable discharges will be kept separate from stormwater flow with BMPs.
For contaminated non-stormwater discharge(s), the requirements and regulations of the associated RIPDES individual permit or RIPDES Remediation General Permit will be adhered to at all times.
☒ 3.5 Establish Proper Building Material Staging Areas
Stock pile management consists of procedures and practices designed to minimize or eliminate the discharge of stockpiled material (soil, topsoil, base material, rubble) from entering drainage systems or water courses.
Stock piles will not be located within any of the constraint areas located on the “Constraint Map” (Section 1.7) and will be approved by the RIDOT Construction Manager. They will have side slopes no greater than 30% and stockpiles of erodible material will be seeded and ringed with RI STD 9.1.0 to stabilize (or RIDOT approved equivalent: berms, dikes, fiber rolls, compost socks, sandbag, gravel bags).
If soil stockpiles are not stabilized with vegetation, then they will be securely covered at the end of each workday.
All chemicals and/or hazardous waste material must be stored properly and legally in covered areas, with containment systems constructed in or around the storage areas. Areas must be designated for materials delivery and storage. Designated areas will not be located within any of the constraint areas located on the “Constraint Map” (Section 1.12) and will be approved by the RIDOT Construction Manager.
- 19 -
☒ 3.6 Designate Washout Areas
Concrete mixer trucks and chutes will be washed in a designated area or concrete wastes will be properly disposed of off-site. Washout areas for concrete, paint or any other material will not be within any of the constraint areas located on the “Constraint Map” (Section 1.12) and will be approved by the RIDOT Construction Manager.
Temporary concrete washout areas must be constructed and maintained to contain all water and concrete waste generated by washout operations. A sign should be placed at the washout site to inform concrete equipment operators of the facility location. Facilities must be cleaned or replaced when they reach 75% capacity.
At no time will any material (concrete, paint, chemicals) be washed into storm drains, open ditches, streets, streams, wetlands, or any environmentally sensitive area. The site operator must ensure that construction waste is properly and legally disposed of, to avoid exposure to precipitation, at the end of each working day. Designated areas will not be located within any of the constraint areas located on the “Constraint Map” (Section 1.12) and will be approved by the RIDOT Construction Manager.
☒ 3.7 Establish proper equipment/vehicle fueling & maintenance practices
Vehicle fueling, maintenance and/or washing will occur off-site, or in designated areas. Designated areas will not be located within any of the constraint areas located on the “Constraint Map” (Section 1.7) and will be approved by the RIDOT Construction Manager.
Areas will be clearly designated, and berms, sandbags, or other barriers will be used around the perimeter of the maintenance area to prevent storm water contamination.
Construction vehicles will be inspected frequently for leaks. Repairs will take place immediately. Disposal of all used oil, antifreeze, solvents and other automotive-related chemicals will be according to applicable regulations; at no time will any material be washed down the storm drain or in to any environmentally sensitive area.
☒ 3.8 Dust Control
Dust control procedures and practices will be used to suppress dust on a construction site during the construction process, as applicable. Precipitation, temperature, humidity, wind velocity and direction will determine amount and frequency of applications. However, the best method of controlling dust is to prevent dust production. This can best be accomplished by limiting the amount of bare soil exposed at one time.
RIDOT Standard Specifications Section…