2025-01-06 BSFD 3 GMP Pricing Set - Project Manual.pdf
PDF 40 MB Posted
- Attached to
- Material Testing and 3rd Party Inspections
- Solicitation number
- RFP_F-BSFD-0000000002
- Issued by
- Gallatin County, Montana
About this file
This file is a Project Manual for the Big Sky Fire Department Station 3 project located in Big Sky, Montana, prepared on January 6, 2025. The comprehensive document contains detailed specifications across multiple divisions, including architectural, structural, mechanical, electrical, and site work requirements for constructing a new 10,273 square foot fire station. The project involves building a two-story facility with three drive-through apparatus bays, sleeping quarters, administrative spaces, and support areas, with a strong emphasis on fire mitigation strategies reflected in material selections like stone, heavy timber, fire-treated wood, and standing seam metal roofing.
The project specifications indicate a focus on high-performance, durable construction materials and systems, with detailed technical requirements for each building component. The Project Manual includes extensive technical specifications covering everything from concrete and masonry to electrical and communication systems, suggesting a comprehensive approach to design and construction. While specific budget details are not explicitly outlined in this document, the level of detail and quality of specified materials suggest a significant capital investment in creating a resilient, functional fire station that meets modern safety and operational standards. The document appears to be prepared for a Guaranteed Maximum Price (GMP) construction delivery method, with technical specifications serving as a comprehensive guide for potential contractors and suppliers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIG SKY FIRE DEPARTMENT
STATION 3
SOUTH FORK ROAD
BIG SKY, MT 59716
Project Manual | Volume 01 | Divisions 00-28
GMP PRICING SET
2025.01.06
Project #123149.00
Project No. 123149 Big Sky Fire Department – Station 3
TABLE OF CONTENTS
1/6/2025 GMP Pricing Set
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 2500 GENERAL BIDDING INFORMATION
00 3100 AVAILABLE PROJECT INFORMATION
Geotechnical Report
00 5000 CONTRACTING FORMS AND SUPPLEMENTS
00 6000 PROJECT FORMS
Architect’s Project Forms
DIVISION 01 - GENERAL REQUIREMENTS
01 1000 SUMMARY
01 2000 PRICE AND PAYMENT PROCEDURES
01 2500 SUBSTITUTION PROCEDURES
Architect’s Substitution Request Form
01 2600 CONTRACT MODIFICATION PROCEDURES
01 3000 ADMINISTRATIVE REQUIREMENTS
01 4000 QUALITY REQUIREMENTS
01 4100 REGULATORY REQUIREMENTS
01 4216 DEFINITIONS AND EXPLANATIONS
01 4533 CODE-REQUIRED SPECIAL INSPECTIONS AND PROCEDURES
01 5000 TEMPORARY FACILITIES AND CONTROLS
01 5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01 6000 PRODUCT REQUIREMENTS
01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS
01 7800 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 4113 SELECTIVE SITE DEMOLITION
DIVISION 03 - CONCRETE
03 3000 CAST-IN-PLACE CONCRETE
03 3500 CONCRETE FLOOR FINISHING
03 4513 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 2913 REINFORCED UNIT MASONRY
04 4313.13 STONE MASONRY VENEER
DIVISION 05 - METALS
05 1200 STRUCTURAL STEEL FRAMING
05 2100 STEEL JIST FRAMING
05 3100 STEEL DECKING
05 5000 METAL FABRICATIONS
05 5100 METAL STAIRS
05 5200 METAL RAILINGS
TABLE OF CONTENTS
1/6/2025 GMP Pricing Set
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 1000 ROUGH CARPENTRY
06 1753 SHOP-FABRICATED WOOD TRUSSES
06 1800 GLUED-LAMINATED WOOD CONSTRUCTION
06 2000 FINISH CARPENTRY
06 4100 ARCHITECTURAL WOOD CASEWORK
06 8316 FIBERGLASS REINFORCED PLASTIC (FRP) PANELS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 1113 BITUMINOUS DAMPPROOFING
07 1300 SHEET WATERPROOFING
07 1400 FLUID-APPLIED WATERPROOFING
07 2100 THERMAL INSULATION
07 2113 THERMAL WALL INSULATION SYSTEM
07 2119 FOAMED-IN-PLACE INSULATION
07 2613 ABOVE-GRADE VAPOR RETARDERS
07 4113 METAL ROOF PANELS
07 4213 METAL WALL PANELS
07 4623 WOOD SIDING
07 6200 SHEET METAL FLASHING AND TRIM
07 7200 ROOF ACCESSORIES
07 7616 ROOF DECKING PAVERS
07 8400 FIRESTOPPING
07 9200 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 1113 HOLLOW METAL DOORS AND FRAMES
08 1416 FLUSH WOOD DOORS
08 3510 FOLDING PANEL DOORS
08 4313 ALUMINUM-FRAMED STOREFRONTS
08 5659 SERVICE WINDOW UNITS
08 7100 DOOR HARDWARE
08 8000 GLAZING
DIVISION 09 - FINISHES
09 0571 ACOUSTICAL UNDERLAYMENT
09 2116 GYPSUM BOARD ASSEMBLIES
09 3000 TILING
09 5100 ACOUSTICAL CEILINGS
09 6500 RESILIENT FLOORING
09 6513 RESILIENT BASE
09 6813 TILE CARPETING
09 9113 EXTERIOR PAINTING
09 9123 INTERIOR PAINTING
09 9123.13 PAINTED PAVEMENT MARKINGS
09 9300 STAINING AND TRANSPARENT FINISHING
TABLE OF CONTENTS
1/6/2025 GMP Pricing Set
DIVISION 10 - SPECIALTIES
10 1419 DIMENSIONAL SIGN CHARACTERS
10 1456 CODE-REQUIRED SIGNAGE
10 2813 TOILET AND UTILITY ACCESSORIES
10 2819 TUB AND SHOWER ENCLOSURES
10 4116 EMERGENCY KEY BOXES
10 5113 METAL LOCKERS
10 7500 FLAGPOLES
DIVISION 12 - FURNISHINGS
12 2400 WINDOW SHADES
12 3600 COUNTERTOPS
12 4813 ENTRANCE FLOOR GRILLES AND FRAMES
DIVISION 14 – CONVEYING SYSTEMS
14 2400 HYDRAULIC ELEVATORS
DIVISION 21 – FIRE SUPPRESSION
21 0500 BASIC FIRE SUPPRESSION REQUIREMENTS
21 0503 THROUGH PENETRATION FIRESTOPPING (NOT APPROPRIATE LOCATION – SEE
07 8400)
21 0529 FIRE SUPPRESSION SUPPORTS AND ANCHORS
21 0550 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS
21 0553 FIRE SUPPRESSION IDENTIFICATION
21 1302 FIRE PROTECTION SYSTEMS
DIVISION 22 - PLUMBING
22 0500 BASIC PLUMBING REQUIREMENTS
22 0503 THROUGH PENETRATION FIRESTOPPING
22 0516 PLUMBING EXPANSION COMPENSATION
22 0529 PLUMBING SUPPORTS AND ANCHORS
22 0548 PLUMBING VIBRATION ISOLATION
22 0550 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS
22 0553 PLUMBING IDENTIFICATION
22 0593 PLUMBING TESTING, ADJUSTING, AND BALANCING
22 0719 PLUMBING PIPING INSULATION
22 0900 INSTRUMENTATION
22 1000 PLUMBING PIPING
22 1030 PLUMBING SPECIALTIES
22 1123 DOMESTIC WATER PUMPS
22 1429 SUMP PUMPS
22 3000 PLUMBING EQUIPMENT
22 4000 PLUMBING FIXTURES
TABLE OF CONTENTS
1/6/2025 GMP Pricing Set
DIVISION 23 - HVAC
23 0500 BASIC HVAC REQUIREMENTS
23 0513 MOTORS
23 0515 VARIABLE FREQUENCY DRIVES
23 0529 HVAC SUPPORTS AND ANCHORS
23 0548 HVAC VIBRATION ISOLATION
23 0550 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS
23 0553 HVAC IDENTIFICATION
23 0593 TESTING, ADJUSTING, AND BALANCING
23 0713 DUCTWORK INSULATION
23 0716 HVAC EQUIPMENT INSULATION
23 0719 HVAC PIPING INSULATION
23 0801 COMMISSIONING OF HVAC
23 0900 CONTROLS
23 0913 INSTRUMENTATION
23 2100 HYDRONIC PIPING
23 2116 HYDRONIC SPECIALTIES
23 2123 HVAC PUMPS
23 2500 CHEMICAL (WATER) TREATMENT
23 3100 DUCTWORK
23 3300 DUCTWORK ACCESSORIES
23 3423 POWER VENTILATORS
23 3700 AIR INLETS AND OUTLETS
23 4000 AIR CLEANING
23 5733 GEOTHERMAL HEAT EXCHANGERS
23 5733.10 GEOTHERMAL LOOP TESTING REQUIREMENTS
23 6433 MODULAR WATER CHILLERS
23 7200 ENERGY RECOVERY DEVICES
23 7313 INDOOR MODULAR AIR HANDLING UNITS
23 8126 SPLIT SYSTEM AIR CONDITIONING UNITS
23 8200 TERMINAL HEAT TRANSFER UNITS
23 8216 AIR COILS
23 8300 RADIANT FLOOR HEATING SYSTEMS
DIVISION 26 - ELECTRICAL
26 0500 COMMON WORK RESULTS FOR ELECTRICAL
26 0513 WIRE AND CABLE
26 0517 ELECTRIC HEAT TRACE AND SNOW MELT
26 0526 GROUNDING AND BONDING
26 0527 SUPPORTING DEVICES
26 0533 CONDUIT AND BOXES
26 0548 SEISMIC REQUIREMENTS FOR EQUIPMENT AND SUPPORTS
26 0553 ELECTRICAL IDENTIFICATION
16 0573 POWER SYSTEM STUDY
26 0933 LIGHTING CONTROL SYSTEMS
26 2000 SERVICE ENTRANCE
26 2200 DRY TYPE TRANSFORMERS
26 2413 SWITCHBOARDS
26 2416 PANELBOARDS
26 2726 WIRING DEVICES
TABLE OF CONTENTS
1/6/2025 GMP Pricing Set
26 2813 FUSES
26 2816 DISCONNECT SWITCHES
26 3213 PACKAGED ENGINE GENERATOR SYSTEMS
26 3600 TRANSFER SWITCHES
26 4300 SURGE PROTECTION DEVICES
26 5119 LED LIGHTING
26 5215 EMERGENCY LIGHTING INVERTER
DIVISION 27 - COMMUNICATIONS
27 0500 BASIC COMMUNICATIONS SYSTEMS REQUIREMENTS
27 0526 COMMUNICATIONS BONDING
27 0528 INTERIOR COMMUNICATIONS PATHWAYS
27 0553 IDENTIFICATION
27 1100 COMMUNICATION EQUIPMENT ROOMS (CER)
27 1500 HORIZONTAL CABLING REQUIREMENTS
27 1710 TESTING
27 1720 STRUCTURED CABLING SYSTEM WARRANTY
27 5113 IP PAGING SYSTEMS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 0500 BASIC ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS
28 1300 ELECTRONIC ACCESS CONTROL
28 2300 VIDEO SURVEILLANCE
28 3100 FIRE ALARM AND DETECTION SYSTEMS
END OF TABLE OF CONTENTS
This page intentionally left blank
Project No. 123149 00 3100 - 1 1/6/2025 Big Sky Fire Department - Station 3 AVAILABLE PROJECT INFORMATION GMP Pricing Set
SECTION 00 3100
AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.01 EXISTING CONDITIONS
A. Certain information relating to existing surface and subsurface conditions and structures is available to Contractor but will not be part of Contract Documents, as follows:
END OF SECTION
PART 1 GENERAL
1.01 INFORMATION
A. Montana Prevailing Wage Rates for Building Construction Services
1. A copy is included immediately following this Section.
SECTION 00 2500
GENERAL BIDDING INFORMATION
00 2500 - 1
GENERAL BIDDING INFORMATION
MONTANA
PREVAILING WAGE RATES FOR BUILDING CONSTRUCTION SERVICES 2024
Effective: Effective January 13, 2024
Greg Gianforte, Governor
State of Montana
Sarah Swanson, Commissioner
Department of Labor & Industry
To obtain copies of prevailing wage rate schedules, or for information relating to public works projects and payment of prevailing wage rates, visit ERD at erd.dli.mt.gov/labor-standards or contact:
Employment Standards Division
Montana Department of Labor and Industry
P. O. Box 8011
Helena, MT 59601
Phone 406-444-6543
The department welcomes questions, comments, and suggestions from the public. In addition, we’ll do our best to provide information in an accessible format, upon request, in compliance with the Americans with Disabilities Act.
MONTANA PREVAILING WAGE REQUIREMENTS
The Commissioner of the Department of Labor and Industry, in accordance with Sections 18-2-401 and 18-2-402 of the
Montana Code Annotated (MCA), has determined the standard prevailing rate of wages for the occupations listed in this publication.
The wages specified herein control the prevailing rate of wages for the purposes of Section 18-2-401, et seq., MCA. It is required each employer pay (as a minimum) the rate of wages, including fringe benefits, travel allowance, zone pay and per diem applicable to the district in which the work is being performed as provided in the attached wage determinations.
All Montana Prevailing Wage Rates are available on the internet at https://erd.dli.mt.gov/labor-standards/state-prevailing-wage-rates or by contacting the department at (406) 444-6543.
In addition, this publication provides general information concerning compliance with Montana’s Prevailing Wage Law and the payment of prevailing wages. For detailed compliance information relating to public works contracts and payment of prevailing wage rates, please consult the regulations on the internet at erd.dli.mt.gov/labor-standards or contact the department at (406)
444-6543.
SARAH SWANSON
Commissioner
Department of Labor and Industry
State of Montana https://erd.dli.mt.gov/labor-standards/ https://erd.dli.mt.gov/labor-standards/state-prevailing-wage-rates https://erd.dli.mt.gov/labor-standards/state-prevailing-wage-rates https://erd.dli.mt.gov/labor-standards/
TABLE OF CONTENTS
MONTANA PREVAILING WAGE REQUIREMENTS:
WAGE RATES:
A. Date of Publication ………………………………………………………………………………………………………………
B. Definition of Building Construction ……………………………………………………………………………………… C. Definition of Public Works Contract …………………………………………………………………………………………………………………….……
D. Prevailing Wage Schedule …………………………………………………………………………………………………………………………………………… E. Rates to Use for Projects ………………………………………………………………………………………………………………………………………………
F. Wage Rate Adjustments for Multiyear Contracts ………………………………………………………………………………….………………………
G. Fringe Benefits ……………………………………………………………………………………………………………………………………………………..……… H. Prevailing Wage Districts ………………………………………………………………………………………………………………………………………………
I. Dispatch City …………………………………………………………………………………………………………………………………………………..…………… J. Zone Pay ……………………………………………………………………………………………………………………………………………………….……………
K. Computing Travel Benefits …………………………………………………………………………………………………………………………………………… L. Per Diem …………………………………………………………………………………………………………………………………………………….………………
M. Apprentices ………………………………………………………………………………………………………………………………………………………………… N. Posting Notice of Prevailing Wages …………………………………………………………………………………………………………..…………………
O. Employment Preference …………………………………………………………………………………………………………………………………..…… P. Projects of a Mixed Nature
Q. Occupations Definitions Website ……………………………………………………………………………....................................................……… R. Welder Rates ……………………………………………………………………………………………………………………
S. Foreman Rates …………………………………………………………………………………………………………………
BOILERMAKERS ………………………………………………………………………………………………………………………
BRICK, BLOCK, AND STONE MASONS ………………………………………………………………………………………
CARPENTERS …………………………………………………………………………………………………………………………
CARPET INTALLERS ………………………………………………………………………………
CEMENT MASONS AND CONCRETE FINISHERS ……………………………………………………………………………………………………………….………………
CONSTRUCTION EQUIPMENT OPERATORS
OPERATORS GROUP 1 …………………………………………………………………………………………………………
OPERATORS GROUP 2 ……………………………………………………………………………………………………………
OPERATORS GROUP 3 ……………………………………………………………………………………………………………
OPERATORS GROUP 4 ……………………………………………………………………………………………………………
OPERATORS GROUP 5 ……………………………………………………………………………………………………………
OPERATORS GROUP 6 ……………………………………………………………………………………………………………
OPERATORS GROUP 7 ……………………………………………………………………………………………………………
CONSTRUCTION LABORERS
LABORERS GROUP 1 ……………………………………………………………………………………………………………
LABORERS GROUP 2 ……………………………………………………………………………………………………………
LABORERS GROUP 3 ……………………………………………………………………………………………………………
LABORERS GROUP 4 ……………………………………………………………………………………………………………
DRYWALL APPLICATORS ……………………………………………………………………………………………………………
ELECTRICIANS: INCLUDING BUILDING AUTOMATION CONTROL ……………………………………………………………
ELEVATOR CONSTRUCTORS ………………………………………………………………………………………………………
FLOOR LAYERS ………………………………………………………………………………………………………………………
GLAZIERS ………………………………………………………………………………………………………………………………
HEATING AND AIR CONDITIONING …………………………………………………………………………………………………
INSULATION WORKERS - MECHANICAL (HEAT AND FROST) ………………………………………………………………
IRONWORKERS - REINFORCING IRON AND REBAR WORKERS ……………………………………………………………
IRONWORKERS - STRUCTURAL IRON AND REBAR WORKERS …………………………………………………………………………………………………………………………. 15
MILLWRIGHTS …………………………………………………………………………………………………………………………
PAINTERS: INCLUDING PAPERHANGERS ………………………...………………………………………………………………
PILE BUCKS ……………………………………………………………………………………………………………………………
PILOT CAR DRIVERS …………………………………………………………………………………………………………………………………………………………………………………….
PLASTERERS …………………………………………………………………………………………………………………………
PLUMBERS, PIPEFITTERS, AND STEAMFITTERS ………………………………………………………………………………
ROOFERS ………………………………………………………………………………………………………………………………
SHEET METAL WORKERS ……………………………………………………………………………………………………………
SOLAR PHOTOVOLTAIC INSTALLERS
SPRINKLER FITTERS ………………………………………………………………………………………………
TAPERS …………………………………………………………………………………………………………………………………
TELECOMMUNICATIONS EQUIPMENT INSTALLERS ……………………………………………………………………………
TERRAZZO WORKERS AND FINISHERS
TILE AND STONE SETTERS …………………………………………………………………………………………………………………………
TRUCK DRIVERS …………………………………………………………………………………………………………………………
A. Date of Publication Effective January 13, 2024
B. Definition of Building Construction For the purposes of Prevailing Wage, the Commissioner of Labor and Industry has determined that building construction occupations are defined to be those performed by a person engaged in a recognized trade or craft, or any skilled, semi-skilled, or unskilled manual labor related to the construction, alteration, or repair of a public building or facility, and does not include engineering, superintendence, management, office or clerical work.
The Administrative Rules of Montana (ARM), 24.17.501(2) – 2(a), states “Building construction projects generally are the constructions of sheltered enclosures with walk-in access for housing persons, machinery, equipment, or supplies. It includes all construction of such structures, incidental installation of utilities and equipment, both above and below grade level, as well as incidental grading, utilities and paving.
Examples of building construction include, but are not limited to, alterations and additions to buildings, apartment buildings (5 stories and above), arenas (closed), auditoriums, automobile parking garages, banks and financial buildings, barracks, churches, city halls, civic centers, commercial buildings, court houses, detention facilities, dormitories, farm buildings, fire stations, hospitals, hotels, industrial buildings, institutional buildings, libraries, mausoleums, motels, museums, nursing and convalescent facilities, office buildings, out-patient clinics, passenger and freight terminal buildings, police stations, post offices, power plants, prefabricated buildings, remodeling buildings, renovating buildings, repairing buildings, restaurants, schools, service stations, shopping centers, stores, subway stations, theaters, warehouses, water and sewage treatment plants (buildings only), etc.”
C. Definition of Public Works Contract Section 18-2-401(11)(a), MCA defines “public works contract” as “…a contract for construction services let by the state, county, municipality, school district, or political subdivision or for nonconstruction services let by the state, county, municipality, or political subdivision in which the total cost of the contract is in excess of $25,000…”.
D. Prevailing Wage Schedule This publication covers only Building Construction occupations and rates. These rates will remain in effect until superseded by a more current publication. Current prevailing wage rate schedules for Heavy Construction, Highway
Construction, and Nonconstruction Services occupations can be found on the internet at https://erd.dli.mt.gov/labor-standards/state-prevailing-wage-rates/ or by contacting the department at (406) 444-6543.
E. Rates to Use for Projects ARM, 24.17.127(1)(c), states “The wage rates applicable to a particular public works project are those in effect at the time the bid specifications are advertised.”
F. Wage Rate Adjustments for Multiyear Contracts Section 18-2-417, MCA states:
“(1) Any public works contract that by the terms of the original contract calls for more than 30 months to fully perform must include a provision to adjust, as provided in subsection (2), the standard prevailing rate of wages to be paid to the workers performing the contract.
(2) The standard prevailing rate of wages paid to workers under a contract subject to this section must be adjusted 12 months after the date of the award of the public works contract. The amount of the adjustment must be a 3% increase.
The adjustment must be made and applied every 12 months for the term of the contract.
(3) Any increase in the standard rate of prevailing wages for workers under this section is the sole responsibility of the contractor and any subcontractors and not the contracting agency.”
https://erd.dli.mt.gov/labor-standards/state-prevailing-wage-rates/ https://erd.dli.mt.gov/labor-standards/state-prevailing-wage-rates/
G. Fringe Benefits Section 18-2-412, MCA states:
“(1) To fulfill the obligation...a contractor or subcontractor may:
(a) pay the amount of fringe benefits and the basic hourly rate of pay that is part of the standard prevailing rate of wages directly to the worker or employee in cash;
(b) make an irrevocable contribution to a trustee or a third person pursuant to a fringe benefit fund, plan, or program that meets the requirements of the Employee Retirement Income Security Act of 1974 or that is a bona fide program approved by the U. S. department of labor; or
(c) make payments using any combination of methods set forth in subsections (1)(a) and (1)(b) so that the aggregate of payments and contributions is not less than the standard prevailing rate of wages, including fringe benefits and travel allowances, applicable to the district for the particular type of work being performed.
(2) The fringe benefit fund, plan, or program described in subsection (1)(b) must provide benefits to workers or employees for health care, pensions on retirement or death, life insurance, disability and sickness insurance, or bona fide programs that meet the requirements of the Employee Retirement Income Security Act of 1974 or that are approved by the U. S. department of labor.”
Fringe benefits are paid for all hours worked (straight time and overtime hours). However, fringe benefits are not to be considered a part of the hourly rate of pay for calculating overtime, unless there is a collectively bargained agreement in effect that specifies otherwise.
H. Prevailing Wage Districts Montana counties are aggregated into 4 districts for the purpose of prevailing wage. The prevailing wage districts are composed of the following counties:
I. Dispatch City ARM, 24.17.103(11), defines dispatch city as “...the courthouse in the city from the following list which is closest to the center of the job: Billings, Bozeman, Butte, Great Falls, Helena, Kalispell, Miles City, Missoula and Sidney.” A dispatch city shall be considered the point of origin only for jobs within the counties identified in that district (as shown below):
District 1 – Kalispell and Missoula: includes Flathead, Lake, Lincoln, Mineral, Missoula, Ravalli, and Sanders;
District 2 – Butte and Helena: includes Beaverhead, Broadwater, Deer Lodge, Glacier, Granite, Jefferson, Lewis and Clark, Liberty, Madison, Pondera, Powell, Silver Bow, Teton, and Toole;
District 3 – Bozeman and Great Falls: includes Blaine, Cascade, Chouteau, Fergus, Gallatin, Golden Valley, Hill, Judith Basin, Meagher, Park, Petroleum, Phillips, Sweet Grass, and Wheatland;
District 4 – Billings, Miles City and Sidney: includes Big Horn, Carbon, Carter, Custer, Daniels, Dawson, Fallon, Garfield, McCone, Musselshell, Powder River, Prairie, Richland, Roosevelt, Rosebud, Sheridan, Stillwater, Treasure, Valley, Wibaux, and
Yellowstone.
J. Zone Pay Zone pay is not travel pay. ARM, 24.17.103(24), defines zone pay as “...an amount added to the base pay; the combined sum then becomes the new base wage rate to be paid for all hours worked on the project. Zone pay must be determined by measuring the road miles one way over the shortest practical maintained route from the dispatch city to the center of the job.” See section I above for a list of dispatch cities.
K. Computing Travel Benefits ARM, 24.17.103(22), states “ ‘Travel pay,’ also referred to as ‘travel allowance,’ is and must be paid for travel both to and from the job site, except those with special provisions listed under the classification. The rate is determined by measuring the road miles one direction over the shortest practical maintained route from the dispatch city or the employee's home, whichever is closer, to the center of the job.” See section I above for a list of dispatch cities.
L. Per Diem ARM, 24.17.103(19), states “ ‘Per diem’ typically covers costs associated with board and lodging expenses. Per diem is paid when an employee is required to work at a location outside the daily commuting distance and is required to stay at that location overnight or longer.”
M. Apprentices Wage rates for apprentices registered in approved federal or state apprenticeship programs are contained in those programs. Additionally, Section 18-2-416(2), MCA states “…The full amount of any applicable fringe benefits must be paid to the apprentice while the apprentice is working on the public works contract.” Apprentices not registered in approved federal or state apprenticeship programs will be paid the appropriate journey level prevailing wage rate when working on a public works contract.
N. Posting Notice of Prevailing Wages Section 18-2-406, MCA provides that contractors, subcontractors and employers who are “…performing work or providing construction services under public works contracts, as provided in this part, shall post in a prominent and accessible site on the project or staging area, not later than the first day of work and continuing for the entire duration of the project, a legible statement of all wages and fringe benefits to be paid to the employees.”
O. Employment Preference Sections 18-2-403 and 18-2-409, MCA requires contractors to give preference to the employment of bona fide Montana residents in the performance of work on public works contracts.
P. Projects of a Mixed Nature Section 18-2-408, MCA states:
“(1) The contracting agency shall determine, based on the preponderance of labor hours to be worked, whether the public works construction services project is classified as a highway construction project, a heavy construction project, or a building construction project.
(2) Once the project has been classified, employees in each trade classification who are working on that project must be paid at the rate for that project classification”
Q. Occupations Definitions You can find definitions for these occupations on the following Bureau of Labor Statistics website:
http://www.bls.gov/oes/current/oes_stru.htm
R. Welder Rates Welders receive the rate prescribed for the craft performing an operation to which welding is incidental.
S. Foreman Rates
Rates are no longer set for foremen. However, if a foreman performs journey level work, the foreman must be paid at least the journey level rate.
https://www.bls.gov/oes/current/oes_stru.htm
WAGE RATES
BOILERMAKERS
No Rate Established
Duties Include:
Construct, assemble, maintain, and repair stationary steam boilers, boiler house auxiliaries, process vessels, and pressure vessels.
↑ Back to Table of Contents
BRICK, BLOCK, AND STONE MASONS
Wage Benefit
District 1 $33.11 $17.39
District 2 $33.11 $17.39
District 3 $33.11 $17.39
District 4 $33.11 $17.39
Travel:
All Districts
0-70 mi. free zone
>70-90 mi. $60.00/day
>90 mi. $80.00/day
CARPENTERS
District 1 $30.06 $11.48
District 2 $27.50 $14.07
District 3 $30.78 $11.28
District 4 $31.39 $11.74
Install roll and batt insulation, and hardwood floors.
Zone Pay:
All Districts
0-30 mi. free zone
>30-60 mi. base pay + $4.00/hr.
>60 mi. base pay + $6.00/hr.
CARPET INSTALLERS
Lay and install carpet from rolls or blocks on floors. Install padding and trim flooring materials.
CEMENT MASONS AND CONCRETE FINISHERS
District 1 $30.55 $6.74
District 2 $29.45 $5.87
District 3 $30.75 $6.51
District 4 $30.00 $7.40
Smooth and finish surfaces of poured concrete, such as floors, walks, sidewalks, or curbs. Align forms for sidewalks, curbs, or gutters.
Travel and Per Diem:
All Districts
No travel or per diem established.
CONSTRUCTION EQUIPMENT OPERATORS GROUP 1
District 1 $31.51 $16.68
District 2 $30.61 $16.68
District 3 $30.86 $16.68
District 4 $30.86 $16.68
This group includes but is not limited to:
Air Compressor; Auto Fine Grader; Belt Finishing; Boring
Machine (Small); Cement Silo; Crane, A-Frame Truck Crane;
Crusher Conveyor; DW-10, 15, and 20 Tractor Roller; Farm
Tractor; Forklift; Form Grader; Front-End Loader, under 1
cu. yd; Oiler, Herman Nelson Heater; Mucking Machine;
Oiler, All Except Cranes/Shovels; Pumpman.
Travel Pay
District 1
0-45 mi. free zone
>45-85 mi. $60.00/day
>85 mi. $90.00/day
Zone Pay
District 2
0-30 mi. free zone
>30-60 mi. base pay + $3.50/hr.
>60 mi. base pay + $5.50/hr.
Districts 3 and 4
0-30 mi. free zone
>30-60 mi. base pay + $3.05/hr.
>60 mi. base pay + $4.85/hr.
CONSTRUCTION EQUIPMENT OPERATORS GROUP 2
District 1 $27.85 $ 7.57
District 2 $30.60 $11.06
District 3 $29.60 $10.03
District 4 $31.58 $11.20
Air Doctor; Backhoe\Excavator\Shovel, up to and incl. 3 cu.
yds; Bit Grinder; Bitunimous Paving Travel Plant; Boring
Machine, Large; Broom, Self-Propelled; Concrete Travel
Batcher; Concrete Float & Spreader; Concrete Bucket
Dispatcher; Concrete Finish Machine; Concrete Conveyor;
Distributor; Dozer, Rubber-Tired, Push, & Side Boom;
Elevating Grader\Gradall; Field Equipment Serviceman;
Front-End Loader, 1 cu. yd up to and incl. 5 cu. yds; Grade
Setter; Heavy Duty Drills, All Types; Hoist\Tugger, All;
Hydralift Forklifts & Similar; Industrial Locomotive; Motor
Patrol (except finish); Mountain Skidder; Oiler, Cranes\Shovels; Pavement Breaker, EMSCO; Power Saw, Self-Propelled; Pugmill; Pumpcrete\Grout Machine; Punch
Truck; Roller, other than Asphalt; Roller, Sheepsfoot (Self-
Propelled); Roller, 25 tons and over; Ross Carrier; Rotomill, under 6 ft; Trenching Machine; Washing /Screening Plant.
Travel Pay
District 1
0-45 mi. free zone
District 2
0-30 mi. free zone
Districts 3 and 4
>30-60 mi. base pay + $3.05/hr.
>60 mi. base pay + $4.85/hr.
CONSTRUCTION EQUIPMENT OPERATORS GROUP 3
District 1 $30.07 $12.82
District 2 $32.83 $16.68
District 3 $32.31 $10.70
District 4 $29.36 $11.27
Asphalt Paving Machine; Asphalt Screed;
Backhoe\Excavator\Shovel, over 3 cu. yds; Cableway
Highline; Concrete Batch Plant; Concrete Curing Machine;
Concrete Pump; Cranes, Creter; Cranes, Electric Overhead;
Cranes, 24 tons and under; Curb Machine\Slip Form Paver;
Finish Dozer; Front-End Loader, over 5 cu. yds;
Mechanic\Welder; Pioneer Dozer; Roller Asphalt
(Breakdown & Finish); Rotomill, over 6 ft; Scraper, Single, Twin, or Pulling Belly-Dump; YO-YO Cat Haul Truck, Articulating Trucks, Vac Truck.
0-45 mi. free zone
Districts 2 - 4
0-30 mi. free zone
CONSTRUCTION EQUIPMENT OPERATORS GROUP 4
District 1 $34.05 $16.68
District 2 $29.05 $12.85
District 3 $30.90 $13.50
District 4 $33.92 $16.68
Asphalt\Hot Plant Operator; Cranes, 25 tons up to and incl.
44 tons; Crusher Operator; Finish Motor Patrol; Finish
Scraper.
0-45 mi. free zone
0-30 mi. free zone
CONSTRUCTION EQUIPMENT OPERATORS GROUP 5
District 1 $35.05 $16.68
District 2 $30.78 $15.32
District 3 $29.05 $15.38
District 4 $35.02 $16.68
Cranes, 45 tons up to and incl. 74 tons.
0-45 mi. free zone
0-30 mi. free zone
CONSTRUCTION EQUIPMENT OPERATORS GROUP 6
District 1 $36.11 $16.68
District 2 $36.11 $16.68
District 3 $36.11 $16.68
District 4 $36.11 $16.86
Cranes, 75 tons up to and incl. 149 tons; Cranes, Whirley
(All).
Zone Pay:
All Districts
0-30 mi. free zone
CONSTRUCTION EQUIPMENT OPERATORS GROUP 7
District 1 $37.21 $16.68
District 2 $37.21 $16.68
District 3 $37.21 $16.68
District 4 $37.21 $16.68
Cranes, 150 tons up to and incl. 250 tons; Cranes, over
250 tons—add $1.00 for every 100 tons over 250 tons;
Crane, Tower (All); Crane Stiff-Leg or Derrick; Helicopter
Hoist.
Zone Pay:
All Districts
0-30 mi. free zone
CONSTRUCTION LABORERS GROUP 1/FLAG PERSON FOR TRAFFIC CONTROL
District 1 $24.55 $12.00
District 2 $24.55 $12.00
District 3 $24.55 $12.00
District 4 $24.55 $12.00
Zone Pay:
0-15 mi. free zone
>15-30 mi. base pay + $0.65/hr.
>30-50 mi. base pay + $0.85/hr.
>50 mi. base pay + $1.25/hr.
CONSTRUCTION LABORERS GROUP 2
District 1 $26.23 $12.00
District 2 $27.25 $12.00
District 3 $26.29 $ 8.91
District 4 $27.25 $12.00
General Labor; Asbestos Removal; Burning Bar; Bucket
Man; Carpenter Tender; Caisson Worker; Cement Mason
Tender; Cement Handler (dry); Chuck Tender; Choker
Setter; Concrete Worker; Curb Machine-lay Down; Crusher and Batch Worker; Heater Tender; Fence Erector;
Landscape Laborer; Landscaper; Lawn Sprinkler Installer;
Pipe Wrapper; Pot Tender;
Powderman Tender; Rail and Truck Loaders and Unloaders;
Riprapper; Sign Erection; Guardrail and Jersey Rail; Spike
Driver; Stake Jumper; Signalman; Tail Hoseman; Tool
Checker and Houseman and Traffic Control Worker.
Zone Pay:
All Districts
0-15 mi. free zone
>15-30 mi. base pay + $0.65/hr.
CONSTRUCTION LABORERS GROUP 3
District 1 $25.55 $12.00
District 2 $25.55 $12.00
District 3 $25.55 $12.00
District 4 $25.55 $12.00
Concrete Vibrator; Dumpman (Grademan); Equipment
Handler; Geotextile and Liners; High-Pressure Nozzleman;
Jackhammer (Pavement Breaker) Non-Riding Rollers;
Pipelayer; Posthole Digger (Power); Power Driven
Wheelbarrow; Rigger; Sandblaster; Sod Cutter-Power and
Tamper.
Zone Pay:
All Districts
0-15 mi. free zone
>15-30 mi. base pay + $0.65/hr.
CONSTRUCTION LABORERS GROUP 4
District 1 $25.60 $12.00
District 2 $26.27 $12.00
District 3 $26.41 $12.00
District 4 $25.60 $12.00
Hod Carrier***; Water Well Laborer; Blaster; Wagon Driller;
Asphalt Raker; Cutting Torch; Grade Setter; High-Scaler;
Power Saws (Faller & Concrete) Powderman; Rock & Core
Drill; Track or Truck Mounted Wagon Drill and Welder incl.
Air Arc.
Zone Pay:
All Districts
0-15 mi. free zone
>15-30 mi. base pay + $0.65/hr.
***Hod Carriers will receive the same amount of travel and/or subsistence pay as bricklayers when requested to travel.
DRYWALL APPLICATORS
District 1 $31.24 $14.07
District 2 $31.24 $14.07
District 3 $31.24 $14.07
District 4 $31.24 $14.07
Drywall and ceiling tile installation.
Zone Pay:
All Districts
0-30 mi. free zone
ELECTRICIANS: INCLUDING BUILDING AUTOMATION CONTROL
District 1 $34.15 $15.38
District 2 $33.90 $17.75
District 3 $34.43 $16.40
District 4 $38.86 $16.73
Electrical wiring; equipment and fixtures; street lights;
electrical control systems. Installation and/or adjusting of building automation controls also during testing and balancing, commissioning and retro-commissioning.
Travel:
No mileage due when traveling in employer’s vehicle.
The following travel allowance is applicable when traveling in employee’s vehicle:
0-15 mi. free zone
>15-45 mi. $0.585/mi. in excess of the free zone.
>45 mi. $75.00/day
Districts 2 & 3
0-08 mi. free zone
>08-50 mi. current federal mileage rate/mi.
in excess of the free zone.
>50 mi. $71.57/day
District 4
0-18 mi. free zone
>18-60 mi. federal mileage rate/mi.
Per Diem
>60 mi. $80.00/day
Per Diem in Big Sky and West Yellowstone $125/day.
ELEVATOR CONSTRUCTORS
District 1 $62.25 $45.24
District 2 $62.25 $45.24
District 3 $62.25 $45.24
District 4 $62.25 $45.24
0-15 mi. free zone
>15-25 mi. $49.73/day
>25-35 mi. $99.45/day
>35 mi. $112.90/day
Special Provision:
.93/mile when added to amounts above if using employee vehicle.
FLOOR LAYERS
Apply blocks, strips, or sheets of shock-absorbing, sound-deadening, or decorative coverings to floors.
GLAZIERS
District 1 $24.78 $4.33
District 2 $23.28 $5.66
District 3 $23.75 $4.41
District 4 $22.97 $4.37
Travel and Per Diem:
HEATING AND AIR CONDITIONING
District 1 $33.00 $20.73
District 2 $33.00 $20.73
District 3 $33.00 $20.73
District 4 $33.30 $20.73
Testing and balancing, commissioning and retro-commissioning of all air-handling equipment and duct work.
0-45 mi. free zone
>45 mi.
• $0.25/mi. in employer vehicle.
• $0.65/mi. in employee vehicle.
Per Diem:
$85/day
INSULATION WORKERS - MECHANICAL (HEAT AND FROST)
District 1 $40.56 $21.99
District 2 $40.56 $21.99
District 3 $40.56 $21.99
District 4 $37.34 $21.99
Insulate pipes, ductwork or other mechanical systems.
>30-40 mi. $25.00/day
>40-50 mi. $35.00/day
>50-60 mi. $45.00/day
>60 mi. $130.00/day plus
• $0.56/mi. if transportation is not provided.
▪ $0.20/mi. if in company vehicle.
IRONWORKERS – REINFORCING IRON AND REBAR WORKERS
District 1 $33.95 $25.59
District 2 $33.95 $24.50
District 3 $33.95 $24.50
District 4 $33.95 $24.50
Structural steel erection; assemble prefabricated metal buildings; cut, bend, tie, and place rebar; energy producing windmill type towers; metal bleacher seating; handrail fabrication and ornamental steel.
Travel:
All Districts
0-45 mi. free zone
>45-85 mi. $100.00/day
>85 mi. $150.00/day
IRONWORKERS – STRUCTURAL IRON AND STEEL WORKERS
District 1 $33.95 $24.50
District 2 $33.95 $24.50
District 3 $33.95 $24.50
District 4 $33.95 $24.50
Structural steel erection; assemble prefabricated metal buildings; cut, bend, tie, and place rebar; energy producing windmill type towers; metal bleacher seating; handrail fabrication and ornamental steel.
Travel:
All Districts
0-45 mi. free zone
>45-85 mi. $100.00/day
>85 mi. $150.00/day
MILLWRIGHTS
District 1 $40.49 $18.84
District 2 $40.49 $18.84
District 3 $40.49 $18.84
District 4 $40.49 $18.84
Zone Pay:
All Districts
0-30 mi. free zone
PAINTERS: INCLUDING PAPERHANGERS
District 1 $30.00 $12.81
District 2 $21.28 $12.81
District 3 $25.55 $12.81
District 4 $30.30 $12.81
Travel and Per Diem:
PILE BUCKS
District 1 $34.50 $14.07
District 2 $34.50 $14.07
District 3 $34.50 $14.07
District 4 $34.50 $14.07
Set up crane; set up hammer; weld tips on piles; set leads;
insure piles are driven straight with the use of level or plum bob. Give direction to crane operator as to speed and direction of swing. Cut piles to grade.
Zone Pay:
All Districts
0-30 mi. free zone
PILOT CAR DRIVERS
PLASTERERS
All materials beyond the substrate, such as a moisture barrier, any type of drainage installation between the moisture barrier and insulation or EPS board, the attachment of the EPS board, installation of fiberglass mesh embedded in the base coat, any water-resistant coat that is applied on top of the insulation to serve as a weather barrier, and the application of the finish coat.
PLUMBERS, PIPEFITTERS, AND STEAMFITTERS
District 1 $37.63 $16.26
District 2 $37.90 $16.45
District 3 $37.90 $16.45
District 4 $36.71 $20.31
Assemble, install, alter, and repair pipe-lines or pipe systems that carry water, steam, air, other liquids or gases.
Testing of piping systems, commissioning and retro-commissioning. Workers in this occupation may also install heating and cooling equipment and mechanical control systems.
Disrict 1
0-30 mi. free zone
>30-50 mi. $35.00/day
>50-75 mi. $45.00/day
>75 mi. $100.00/day
Special Provision
If transportation is not provided, mileage at $0.35/mi. for one trip out and one trip back is added to the amounts above. However, if the employee is traveling more than 75 miles/day, only subsistence at the rate of $85.00/day is required.
Districts 2 & 3
0-45 mi. free zone
>45 mi.
• $0.00/mi. in employer vehicle.
• $0.65/mi. in employee vehicle.
Special Provision:
At the contractors’ option, mileage for one trip out and one trip back per week may be paid plus subsistence at the rate of $135.00/day.
0-70 free zone
>70 mi.
• On jobs when employees do not work consecutive days: $0.55/mi. if employer doesn’t provide transportation. Not to exceed two trips.
• On jobs when employees work any number of consecutive days: $110.00/day.
ROOFERS
District 1 $31.47 $13.26
District 2 $31.47 $13.26
District 3 $29.83 $ 9.20
District 4 $24.42 $ 9.06
Metal roofing, covers roofs, walls and foundations with water proofing, insulation and vapor barriers in addition to metal flashings. Roofing includes shingles, low slope membranes, metal roofs, insulation, spray foam, coatings and vapor barriers. Wall coverings include metal panels, insulated metal panels and other waterproofing or rain screen systems. Foundation systems include waterproofing and insulation. Excludes prefabricated metal buildings.
0-50 mi. free zone
>50 mi.
• $0.35/mi. in employee vehicle.
District 2 and 3
0-35 mi. free zone
>35 mi.
• $0.40/mi. in employee vehicle.
0-50 mi. free zone
>50 mi.
• $0.35/mi. in employee vehicle.
$84.00/day
District 2 and 3
Employer pays for room + $30.00/day.
Employer pays for room + $25.00/day.
SHEET METAL WORKERS
District 1 $33.00 $20.73
District 2 $33.00 $20.73
District 3 $33.00 $20.73
District 4 $33.00 $20.73
Testing and balancing, commissioning and retro-commissioning of all air-handling equipment and duct work.
Manufacture, fabrication, assembling, installation, dismantling, and alteration of all HVAC systems, air conveyer systems, and exhaust systems. All lagging over insulation and all duct lining.
All Districts
0-45 mi. free zone
>45 mi.
• $0.25/mi. in employer vehicle.
▪ $0.65/mi. in employee vehicle.
$85/day
SOLAR PHOTOVOLTAIC INSTALLERS
District 1 $32.75 $17.75
District 2 $32.75 $17.75
District 3 $33.90 $16.40
District 4 $33.70 $16.40
Districts 1, 2 and 3
0-08 mi. free zone
>08-50 mi. federal mileage rate/mi. in excess of the free zone.
>50 mi. $60.57/day
0-18 mi. free zone
>18-60 mi. federal mileage rate/mi.
>60 mi. $75.00/day
SPRINKLER FITTERS
District 1 $37.66 $23.68
District 2 $39.06 $25.39
District 3 $39.06 $25.39
District 4 $39.06 $25.39
Duties Include but not limited to any and all fire protection systems: Installation, dismantling, inspection, testing, maintenance, repairs, adjustments, and corrections of all fire protection and fire control systems, including both overhead and underground water mains, all piping, fire hydrants, standpipes, air lines, tanks, and pumps used in connection with sprinkler and alarm systems.
Travel in employee’s vehicle.
0-60 mi. free zone
>60-80 mi. $19.00/day
>80-100 mi. $29.00/day
>100 mi. $105.00/day + the IRS rate per mile and
$8.92 for every 15 miles traveled for one trip out and one trip back
No travel allowance required when in employer’s vehicle except when staying the night.
TAPERS
Travel and Per Diem:
TELECOMMUNICATIONS EQUIPMENT INSTALLERS
District 1 $32.36 $9.73
District 2 $23.33 $7.03
District 3 $24.17 $8.12
District 4 $23.93 $2.32
Install voice; sound; vision and data systems. This occupation includes burglar alarms, fire alarms, fiber optic systems, and video systems for security or entertainment
Travel:
All Districts
The federal mileage rate/mi. in effect when travel occurs if using own vehicle.
Employer pays for meals and lodging up to $75.00/day.
When jobsite is located in Big Sky, West Yellowstone, and
Gardiner, lodging and meals will be provided by the employer for all actual and reasonable expenses incurred.
TERRAZZO WORKERS AND FINISHERS
Finish work on hard tile, marble, and wood tile to floors, ceilings, and roof decks
TILE AND STONE SETTERS
District 1 $22.94 $3.74
District 2 $22.94 $3.74
District 3 $22.94 $3.74
District 4 $22.94 $3.74
Apply hard tile, stone, and comparable materials to walls, floors, ceilings, countertops, and roof decks.
Travel and Per Diem
TRUCK DRIVERS
Pilot Car Driver No Rate Established
District 1 $23.42 $ 5.30
District 2 $25.00 $ 5.50
District 3 $31.06 $10.16
District 4 $30.60 $ 9.93
Truck drivers include but are not limited to:
Combination Truck & Concrete Mixer; Distributor Driver; Dry
Batch Trucks; DumpTrucks & Similar Equipment; Flat
Trucks; Lowboys, Four-Wheel Trailers, Float Semitrailer;
Powder Truck Driver (Bulk Unloader Type); Servicemen;
Service Truck Drivers, Fuel Truck Drivers, Tiremen; Trucks with Power Equipment; Truck Mechanic; Water Tank
Drivers, Petroleum Product Drivers.
Zone Pay:
No zone pay established.
Project No. 123149 00 3100 - 1 1/6/2025 Big Sky Fire Department - Station 3 AVAILABLE PROJECT INFORMATION GMP Pricing Set
SECTION 00 3100
AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.01 EXISTING CONDITIONS
A. Certain information relating to existing surface and subsurface conditions and structures is available to Contractor but will not be part of Contract Documents, as follows:
B. Geotechnical Report: Geotechnical Engineering Investigation, South Fork Road Fire Station, Madison County, Montana ; prepared by CTL / Thompson, Inc.; Project No. MT011040.000-125 , dated June 7, 2024 .
1. A copy is included immediately following this Section .
2. General Information:
a. This report identifies properties of below grade conditions and offers recommendations for the design of foundations and other construction elements, prepared primarily for use of Architect and other design team consultants.
b. Recommendations contained in this document shall not be construed as requirements of Contract Documents.
c. Interpretation: Report is provided only for information and convenience. Owner and Architect disclaim responsibility for accuracy, true location and extent of subsurface conditions that have been evaluated and reported by others. Owner and Architect further disclaim responsibility for interpretation of report data by Contractor; including but not limited to projecting soil bearing values, rock profiles, soil stability, or presence, level, and extent of underground water or other potentially deleterious substances.
d. Applicable Requirements: Specific and variable recommendations contained in this document are subject to acceptance by Owner for incorporation in Contract Documents prepared by Architect and other design team consultants. Comply with requirements specified in Contract Documents for earthwork, paving systems, and other applicable work scope items.
1.02 TESTED ASSEMBLY DATA
A. Tested assembly data for specified fire-resistive assemblies and systems is required to be provided as part of the building permit documents.
1. This data is included in the Drawings.
B. Interpretation: Tested assembly data is provided for information and convenience. Owner and Architect disclaim responsibility for data that has been prepared by others. Owner and Architect further disclaim responsibility for interpretation of the data.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION
CTL|Thompson, Inc.
Denver, Fort Collins, Colorado Springs, Glenwood Springs, Pueblo, Summit County – Colorado
Cheyenne, Wyoming and Bozeman, Montana
SOUTH FORK ROAD FIRE STATION
MADISON COUNTY, MONTANA
Prepared for:
CH SP ACQUISITION, LLC
P.O. Box 160040
Big Sky, MT 59716
Attention:
Jon Olsen, P.E.
Project No. MT01140.000-125
June 7, 2024
GEOTECHNICAL ENGINEERING INVESTIGATION
https://ctlthompson.com/ https://ctlthompson.com/denver https://www.ctlthompson.com/fortcollins https://www.ctlthompson.com/coloradosprings https://www.ctlthompson.com/glenwoodsprings https://www.ctlthompson.com/pueblo https://www.ctlthompson.com/summitcounty https://www.ctlthompson.com/cheyenne https://www.ctlthompson.com/bozeman
Table of Contents
CH SP ACQUISITION, LLC Page i of ii
SOUTH FORK ROAD FIRE STATION
CTL|T PROJECT NO. MT01140.000-125
SCOPE
SITE CONDITIONS
PROPOSED CONSTRUCTION
SITE GEOLOGY
Seismicity
SUBSURFACE CONDITIONS
EARTHWORK
Excavation
Subexcavation and Structural Fill
Site Grading Fill
Foundation Wall Backfill
Utility Trench Backfill
Pavement Subgrade
Permanent Slope Construction
BUILDING FOUNDATION
SLAB-ON-GRADE CONSTRUCTION
BUILDING FOUNDATION WALLS
SITE EARTH RETAINING WALLS
SURFACE DRAINAGE
SUBSURFACE DRAINAGE
CONCRETE
PAVEMENTS
CONSTRUCTION OBSERVATIONS
GEOTECHNICAL RISK
LIMITATIONS
FIGURE 1 – VICINITY MAP
FIGURE 2 – AERIAL PHOTOGRAPH
FIGURE 3 – PROPOSED DEVELOPMENT
FIGURE 4 – SUMMARY LOGS OF EXPLORATORY PITS
FIGURE 5 – SUMMARY LOGS OF EXPLORATORY BORINGS
FIGURE 6 AND 7 – SWELL-CONSOLIDATION TEST RESULTS
FIGURE 8 – GRADATION TEST RESULTS
Table of Contents, Continued
CH SP ACQUISITION, LLC Page ii of ii
SOUTH FORK ROAD FIRE STATION
CTL|T PROJECT NO. MT01140.000-125
TABLE I – SUMMARY OF LABORATORY TESTING
APPENDIX A – EXPLORATORY PIT PHOTOGRAPHS
APPENDIX B – SOIL SAMPLE PHOTOGRAPHS
APPENDIX C – PAVEMENT MATERIALS AND CONSTRUCTION RECOMMENDATIONS
CH SP ACQUISITION, LLC 1 of 18
CTL|T PROJECT NO. MT01140.000-125
SCOPE
CTL|Thompson, Inc. (CTL|T) has completed a geotechnical engineering investigation for the South Fork Road Fire Station that is proposed within the Spanish Peaks development in
Gallatin County, Montana. We conducted this investigation to evaluate subsurface conditions at the site and provide geotechnical engineering recommendations for design and construction of the building. Our geotechnical engineering recommendations were developed with data from our field exploration, laboratory testing, engineering analysis, and our experience with similar conditions. The recommendations in this report are based on the construction as currently planned. Revisions to the planned construction could affect our recommendations. CTL|T should be contacted to participate in design-team meetings so we can provide geotech-nical/geo-structural engineering input.
SITE CONDITIONS
The South Fork Road Fire Station is proposed east of the intersection of South Fork
Road and Inspiration Point Road within the Spanish Peaks Development. A vicinity map with the location of the site is included as Figure 1. The site is bounded by South Fork Road to the south and Inspiration Point Road to the west and north. Vacant land is east of the site. An aerial pho-tograph (dated June 2014) of the site is shown on Figure 2. The site is near the base of a hill that slopes down to the southwest at grades of about 10 to 15 percent. The site has sparse co-niferous trees and ground cover consists of native grass and shrubs. A vehicle pullout is present on the west side of the site.
PROPOSED CONSTRUCTION
CTL|T was provided with schematic design plans for the fire station by OZ Architecture
(OZ) dated March 29, 2024. A plan view of the proposed construction is shown on Figure 3. The fire station will be a two-story building that is partially below-grade on the uphill (northeast) side.
The building will have three apparatus bays for fire trucks, vehicles, and equipment storage. The building will include offices, restrooms, and living quarters. An exterior staircase is planned at the northwest corner of the building. The building will be surrounded by paved parking and ac-cess drives to the south, east and west. Access to the site will be from South Fork Road and In-spiration Point Road.
CH SP ACQUISITION, LLC 2 of 18
CTL|T PROJECT NO. MT01140.000-125
The northeast side of the building will be below-grade. The proposed finished floor ele-vation is 6467 feet, which is about 22 feet below existing grades at the northeast corner. We an-ticipate excavation depth of about 30 feet will be needed at the northeast corner to reach the bottom of proposed subexcavation elevations to facilitate the currently planned construction. We anticipate the contractor intends to lay the temporary excavation back at safe slopes per OSHA standards. It appears fill depths up to about 10 feet are planned at the southwest side of the building. Permanent slopes are planned at inclinations of 2:1 (horizontal:vertical).
Site plans indicate permanent retaining walls are planned east of the building, above the parking area. We were not provided with retaining wall details. It appears a three-tier retaining wall is contemplated, with a total maximum height of about 13 feet. Existing slopes with grades of about 10 to 15 percent are above the proposed retained slope.
SITE GEOLOGY
As part of our geotechnical investigation, we reviewed geologic mapping by the Montana
Bureau of Mines and Geology (MBMG) titled, “Geologic Map of the Sphinx Mountain quadrangle and adjacent parts of the Cameron, Cliff Lake, and Hebgen Dam quadrangles, Montana” by
Russell G. Tysdal (dated 1990). The mapping indicates the site is underlain by bedrock of the
Mowry Shale Formation that is near the ground surface.
The Mowry Shale Formation is described as slope-forming, dark-gray mudstone and silty mudstone, and a few interbeds of siltstone, sandstone, bentonite, coal and coaly shale in the upper part. The lower part of the formation is predominantly gray green, yellow, and brown, or-ange mudstone, bentonitic mudstone, porcellanite; welded tuff and siltstone. The claystone ob-served in our exploratory borings appears to be consistent with the described mudstone in the upper part of the formation. The natural overburden soils encountered in our borings appear to be directly derived from weathering of the underlying bedrock.
Geologic constraints mapping by Treadwell & Rollo (T&R) shows the proposed fire sta-tion site is about 200 feet southeast of the southeastern extent of a mapped landslide desig-nated as LS-13. We do not believe the subject site is at risk of significant lateral ground move-ment.
CH SP ACQUISITION, LLC 3 of 18
CTL|T PROJECT NO. MT01140.000-125
Seismicity
Based on criteria set forth in ASCE/SEI7-16, we estimate a Seismic Site Class C for the proposed fire station site. Assuming a Risk Category II for the structure, we estimate a peak ground acceleration (PGA) of 0.369, a maximum earthquake spectral response acceleration for the short period (SS) of 0.852, and a maximum spectral response acceleration for the 1-second period (S1) of 0.272. A geophysical consultant can utilize field testing methods, such as multi-channel analysis of surface waves (MASW), to measure the shear wave velocity in the upper
100 feet of the subsurface profile. This would provide data to determine whether a Site Class B can be used for structural design.
SUBSURFACE CONDITIONS
We investigated subsurface conditions at the site by observing excavation of two explor-atory pits (TP-1 and TP-2) in proposed pavement areas and drilling three exploratory borings
(TH-1, TH-2, and TH-3) near the proposed structure footprint. Approximate locations of the ex-ploratory pits and borings are shown on Figures 2 and 3. The pits were excavated with a track-hoe on March 7, 2024.