20220613 - 00 10 00-3_Supplemental Price Breakdown.pdf
PDF 151 KB Posted
- Attached to
- B-21 Radio Frequency Facility (RF-Hangar) Federal contract opportunity
- Solicitation number
- W9128F22R0054_Volume-1
About this file
This document contains a supplemental price breakdown template and details of a federal contract opportunity to construct a Radio Frequency Facility at Ellsworth Air Force Base in South Dakota.
The supplemental price breakdown template separates estimated costs into divisional work breakdown structure codes and requires contractors to itemize costs for general requirements, existing conditions, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and transportation. The template also includes fields for contractors to include markups for general and administrative expenses, field office overhead, profit, and performance and payment bonds.
The related federal contract opportunity involves the design and construction of a new approximately 64,500 square foot Radio Frequency Facility with a single aircraft measurement bay and associated support spaces. The facility must be designed to secure area standards and comply with antiterrorism and force protection requirements. The solicitation is being conducted by the Department of the Army Corps of Engineers Omaha District. The project delivery method will be design-bid-build and the contractor must provide a complete facility and warranty based on the request for proposal documents.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Am_0005_Dwgs_Vol-2.pdf | ||
| W9128F22R0054_Amendment 0005_SPS Solicitation_EL98.pdf | ||
| Am_0005_Dwgs_Vol-1.pdf | ||
| Am_0005.pdf | ||
| Am_0004_Dwgs_EL98.pdf | ||
| W9128F22R0054_Amendment 0004_SPS Solicitation_EL98.pdf | ||
| Am_0004_EL98.pdf | ||
| W9128F22R0054_Amendment 0003_SPS Solicitation_EL98.pdf | ||
| W9128F22R0054 - Sec 001000 Pricing Schedule (for industry)v6.xlsx | XLSX spreadsheet | |
| W9128F22R0054_SPECS_Vol2_EL98.pdf | ||
| W9128F22R0054_Amendment 0002_SPS Solicitation_EL98.pdf | ||
| W9128F22R0054 - Sec 001000 Pricing Schedule (for industry)v5.xlsx | XLSX spreadsheet | |
| W9128F22R0054_Amendment 0001_SPS Solicitation_EL98.pdf | ||
| W9128F22R0054_SPECS_Vol1_EL98.pdf | ||
| W9128F22R0054 - Sec 001000 Pricing Schedule (for industry)v4.xlsx | XLSX spreadsheet | |
| W9128F22R0054_DIV00_SPS Solicitation_EL98.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN SCHEDULE 00 10 00 – 6 W9128F-22-R-0054
SUPPLEMENTAL PRICE BREAKDOWN OF PRICING SCHEDULE TEMPLATE
TOTAL WITH MARKUPS AMOUNT TO EQUAL TOTAL BASIC AMOUNT
AS INDICATED ON PAGE 3 AND 4 OF THIS SECTION 00 10 00
DIVISION MASTERFORMAT 2016 DESCRIPTION UNIT AMOUNT
01 GENERAL REQUIREMENTS (minus item 0101) LS $_______________
0101 01 33 29 Sustainability Documentation LS $_______________
02 EXISTING CONDITIONS LS $_______________
03 CONCRETE LS $_______________
04 MASONRY LS $_______________
05 METALS LS $_______________
06 WOOD, PLASTICS, AND COMPOSITES LS $_______________
07 THERMAL AND MOISTURE PROTECTION LS $______________
08 OPENINGS LS $_______________
09 FINISHES LS $_______________
10 SPECIALTIES LS $______________
11 EQUIPMENT LS $_______________
12 FURNISHINGS LS $_______________
13 SPECIAL CONSTRUCTION LS $_______________
14 CONVEYING EQUIPMENT LS $_______________
21 FIRE SUPPRESSION LS $_______________
22 PLUMBING LS $______________
23 HEATING, VENTILATING, AND AIR CONDITIONING LS $_______________
25 INTEGRATED AUTOMATION LS $_______________
26 ELECTRICAL LS $_______________
27 COMMUNICATIONS LS $_______________
28 ELECTRONIC SAFETY AND SECURITY LS $_______________
31 EARTHWORK LS $_______________
32 EXTERIOR IMPROVEMENTS LS $_______________
33 UTILITIES LS $_______________
34 TRANSPORTATION LS $_______________
Total Price Breakdown Amount
Prime Contractor Markups:
--G&A General and Administrative Expense $ ______________ --FOOH Field Office Overhead not defined by Division -01 $ ______________ --PROFIT Profit $ ______________ --P&PB Performance and Payment Bond $ ______________
TOTAL WITH MARKUPS
• All items must be entered in dollars.
• “TOTAL WITH MARKUPS” from this Price Breakdown must match the “TOTAL BASIC
AMOUNT”.
| CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE |
| BASIC ITEMS |
| OPTION ITEMS |
| TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________ |
File details come from the government source that posted it. Updated .