20220518_North_Cargo_Feasibility_Study_Overview_Graphics_DRAFT.pdf

PDF 4 MB Posted

Attached to
CVG Global Logistics Park - Enabling Work Design Services
Solicitation number
25-029-RFQ
Issued by
Kenton County, Kentucky

About this file

The document is a North Cargo Feasibility Assessment draft from May 2022, prepared by CVG (Cincinnati/Northern Kentucky International Airport) for evaluating potential cargo facility expansion alternatives. The study examines three site layout options for a new cargo facility, analyzing aircraft parking configurations, facility footprints, and operational requirements for different aircraft types including B747-8F, B777F, and B767-300F. Each alternative explores different scenarios for facility placement, temporary structures, cargo positions, and ground support equipment staging areas, with detailed considerations for utility infrastructure, parking needs, and operational efficiency.

The feasibility assessment includes comprehensive cost estimates for each alternative, ranging from approximately $26 million to $38.6 million, with detailed breakdowns of facility costs, sitework, design evolution, markups, and soft costs. The study also explores temporary structure options using Sprung structures, which could potentially save around $3.1 million compared to permanent structures. The analysis provides in-depth technical details such as facility requirements (tons per square foot), automation levels, parking calculations, utility load capacities, and shadow studies to assess potential impacts on surrounding airport infrastructure. Alternative configurations were evaluated to optimize cargo handling capabilities, aircraft positioning, and overall operational effectiveness for the North Cargo site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N o r t h C a r g o F e a s i b i l i t y As s e s s m e n t | M a y 2 0 2 2

Annual Operations

B747- 8F

B777F

B767- 300F

Alternative 1

Alternative 2

Alternative 3

520 936

Annual Tonnage

23,712

28,912

27,560 80,184

80,184

80,184

Max Payload (tons)

53 139

High Automation/Efficiency 20,000 sq.ft.

Average Automation/Efficiency

32,100 sq.ft.

Low Automation/Efficiency (Manual) 80,200 sq.ft.

Facility Footprint

Low Automation/Efficiency (Manual)

Average Automation/Efficiency

High Automation/Efficiency

Facility Requirements (tons/SF) 1 ton/SF

1.5 – 2.5 tons/SF

2.5 – 4 tons/SF

Planning Factors

Employee Parking (Warehouse)

Visitor Parking

Truck Docks

Number of Stalls/Docks

24 – 64

Employee Parking (Office)

16 – 24

8 – 16

24 – 48

3 – 8 stalls per 10,000 SF of warehouse

1 – 2 stalls per 10,000 SF of warehouse

0.3 – 0.6 per 1,000 SF of warehouse

2 – 3 stalls per 1,000 SF of office

Landside Total Stalls

76 Recommended

Utility Load/Capacity Needs ROM Cost Estimate Existing gas line (1 ¼”) is undersized for the proposed building Recommend upsizing and connecting to 4” main gas line 150’ from building Assume a delivered pressure of 2 psi and 27,000 CFH required (3”-4”)

Existing sanitary line (6”) is adequate size and outlets to a 15” main line Recommend to evaluate condition of 6” pipe for re-use Discharge to the sewer system of about 1200 gallons per day

Existing water line (6”) is undersized for the proposed building’s fire suppression system Recommend upsizing water line and connecting to 12” water line 200’ from building 100 employees at 10 gallons per day per employee = 1,000 GPD

Existing electric line size/capacity Recommend running new service off main line and connecting 150’ from building 480 Volt Service at 800 amps

Fire service water supply should be capable of delivering 3,500 GPM at 25 psi

D R A F T

R unw ay 18C

/36C R unw ay

18C /36C

R unw ay 18C

/36C

Taxiw ay D

Taxiw ay E

Taxiw ay D

Taxiw ay E

Taxiw ay D

Taxiw ay E

80,200 SF Facility 8,020 SF Mezzanine Office

76 Parking Stalls

24 Truck Docks

213,500 SF GSE Staging, Storage, or Maintenance Areas

85’ Clearance for Nose Loading Operations

Three B747-8F Parking Positions

167.5’

Sign Shop to Remain

8,020 SF Mezzanine Office 76 Parking Stalls

85’ Clearance for Nose Loading Operations

Three B747-8F RON Positions

167.5’

Sign Shop to be Demolished

80,200 SF Facility

8,020 SF Mezzanine Office

76 Parking Stalls

24 Truck Docks

237,300 SF GSE Staging, Storage, or Maintenance Areas

25’ 167.5’

Sign Shop to Remain

24 Truck Docks

80,200 SF Facility

25’

Three B747-8F RON or Cargo Parking Positions

Three B767-300F Parking Positions

Three B747-8F Parking Positions

Potential Utility Corridor Area

Potential Utility Corridor Area

Potential Utility Corridor Area

110,500 SF GSE Staging, Storage, or Maintenance Areas

Facility ($M)

Sitework ($M)

Design Evolution

($M)

Markups ($M)

Soft Costs ($M) Total

Alternative 1 $16.1 $2.0 $3.6 $3.6 $3.9 $29,150,380

Alternative 2 $16.1 $7.8 $4.8 $4.8 $5.1 $38,653,093

Alternative 3 $16.1 $3.0 $3.8 $3.9 $4.1 $30,852,282

North Cargo Feasibility Assessment – Temporary Structure Overview | May 2022

Alternative 1

Alternative 2

Alternative 3

D R A F T

R unw ay 18C

/36C R unw ay

18C /36C

R unw ay 18C

/36C

Taxiw ay D

Taxiw ay E

Taxiw ay D

Taxiw ay E

Taxiw ay D

Taxiw ay E

56,000 SF

Temporary Landside

Temporary Landside Connection

Two B747-8F Cargo Positions

167.5’

Sign Shop to Remain

167.5’

Sign Shop to be Demolished

167.5’

Sign Shop to Remain

Three B767-300F Cargo Positions

Three B747-8F Cargo Positions

69,300 SF

Temporary Structure

80,200 SF

Permanent Structure

140’

150’

150’

150’

534.65’

495’ Temporary Loss of One Cargo Position

Temporary Landside Connection

Two B747-8F RON Positions

80,200 SF

Permanent Structure

140’

150’

150’150’

534.65’

575’

Temporary Loss of One RON Position

Temporary Landside Connection

Two B747-8F RON/Cargo Positions

80,200 SF

Permanent Structure

140’

150’

150’

150’

300’

Temporary Loss of One RON/Cargo Position

80,500 SF

Temporary Structure

75,000 SF

Temporary Landside

42,000 SF

Temporary Structure

66,000 SF

Temporary Landside

Facility ($M)

Sitework ($M)

Design Evolution

($M)

Markups ($M)

Soft Costs ($M) Total

Alternative 1 $14.2 $2.0 $3.2 $3.3 $3.5 $26,054,812

Alternative 2 $14.2 $7.8 $4.4 $4.4 $4.7 $35,539,665

Alternative 3 $14.2 $3.0 $3.4 $3.5 $3.7 $27,738,853

Sprung Interior Finishes/Lining Options

140’ Wide Structure Cross Section

ROM Cost Estimate (Based on Sprung Option 1)

*Savings of approximately $3.1M compared to permanent structures

Sprung Cost Detail

Detail Purchase Price

36-month Rental

Freight to Site

Technical Consultant

Option 1

Insulated w/ interior liner Flat ends 15-year membrane Daylight panels

$4,455,000 $113,000/ month $120,000 $75,500

Option 2

Insulated w/o interior liner Flat ends 15-year membrane Daylight panels

$4,135,000 $104,000/ month $120,000 $50,000

Overview Lifespan – exterior fabric types 15–18-year membrane 28–30-year membrane

Interior options Insulated (9” R-30) or non-insulated Interior liner or no interior liner White polypropylene or foil shell backing with insulation exposed

Rental opportunities 1-year minimum 5-year maximum Break even point at approximately three years Opportunity to purchase (60% of payments applied to purchase price)

Engineering and Manufacturing Timelines Engineering

Structural only (base plate up) Does not include mechanical, electrical, plumbing, etc.

Minimal engineering deposit required to initiate drawings 15-20 working days to complete drawings

Manufacturing 8-10 weeks from final signed drawing and 50% deposit

Construction duration Option 1 – insulation with interior liner

14-person crew 8-hour workdays/5 days a week 172 total workdays

Option 2 – insulation without interior liner 14-person crew 8-hour workdays/5 days a week 107 total workdays

Expedite by 10-hour workdays, six-day work weeks, or two crews

Quality/Maintenance Architectural membrane provides tough, durable, flexible performance Engineered for extreme climates – winds, snow, seismic, heat, cold Engineered as permanent but designed for long term flexibility R25 – R30 blanket insulation to provide optimal heating/cooling control Designed to stand alone or enhance/expand existing facilities with connecting corridors or a direct connection to a hard structure Pressure washing/cleaning structure approximately one time per year is virtually the only maintenance necessary

N o r t h C a r g o F e a s i b i l i t y As s e s s m e n t – S h a d o w S t u d y | M a y 2 0 2 2

Alternative 1

Alternative 2

Alternative 3

D R A F T

R unw ay 18C

/36C

Taxiw ay D

Taxiw ay E

20’ Shadow 40’ Long

Three B767-300F Cargo Positions

13’ Shadow 12’ Long

6’ Shadow 67’ Long

6’ Shadow 55’ Long

6’ Shadow 62’ Long

32’ Shadow 190’ Long

30’ Shadow 160’ Long

32’ Shadow 175’ Long

13’ Shadow 12’ Long

20’ Shadow 40’ Long

3’ Shadow 18’ Long

29’ Shadow 115’ Long

29’ Shadow 100’ Long

26’ Shadow 72’ Long

11’ Shadow 12’ Long

21’ Shadow 30’ Long

13’ Shadow 33’ Long

12’ Shadow 10’ Long

3’ Shadow 41’ Long

4’ Shadow 28’ Long

29’ Shadow 116’ Long

28’ Shadow 105’ Long

28’ Shadow 98’ Long

13’ Shadow 12’ Long

20’ Shadow 40’ Long

27’ Shadow 67’ Long

25’ Shadow 62’ Long

27’ Shadow 60’ Long

18’ Shadow 16’ Long

Taxiw ay C

Three B747-8F RON or Cargo Positions

Alternative 3b Rotated 30° CW

R unw ay 18C

/36C

Taxiw ay D

Taxiw ay E

Three B767-300F Cargo Positions

Taxiw ay C

Three B747-8F RON or Cargo Positions

Alternative 2b Rotated 30° CW

R unw ay 18C

/36C

Taxiw ay D

Taxiw ay E

Three B747-8F Cargo Positions

Taxiw ay C

Three B747-8F RON Positions

Alternative 1b 50’ Shift East

R unw ay 18C

/36C

Taxiw ay D

Taxiw ay E

Taxiw ay C

Three B747-8F Cargo Positions

R unw ay 18C

/36C

Taxiw ay D

Taxiw ay E

Three B747-8F Cargo Positions

Taxiw ay C

Three B747-8F RON Positions

R unw ay 18C

/36C

Taxiw ay D

Taxiw ay E

Taxiw ay C

Three B747-8F Cargo Positions

Aircraft ADG Length Wingspan Tail Height

A300-600 IV 177.43 147.10 54.66

A310-200F IV 153.08 144.00 52.33

A319neo III 111.02 117.45 39.73 A320neo III 123.26 117.45 39.63

A321-200 III 146.03 111.88 39.70

A330-200F V 192.98 197.85 57.12 A330-900 V 208.95 209.97 56.20

MD-90 III 152.56 107.84 31.17

B737 MAX 7 III 116.67 117.85 41.01

B737 MAX 8 III 129.53 117.85 40.85

B737 MAX 9 III 138.16 117.85 40.68

B747-400F V 231.86 212.99 64.11

B747-8F VI 250.16 224.41 64.17

B757-200 IV 155.25 124.81 45.08

B757-300 IV 178.58 124.83 44.75

B767-200 IV 159.19 156.07 52.92

B767-300F IV 180.18 156.07 52.92

B777F V 209.09 212.60 62.30 B787-8 V 186.09 197.24 56.07

CRJ-200 II 87.82 69.65 20.73

CRJ-700 II 106.56 76.27 24.84

CRJ-900 III 118.90 81.53 24.11

Embraer ERJ 145 II 98.00 65.75 22.34 Embraer E170 STD III 98.10 85.30 32.25 Embraer E175 STD III 103.94 85.30 32.12 Embraer E190 STD III 118.90 94.23 34.68

ATCT Location Map

R unw ay 18C /36C

R unw ay 18R /36L

R unw ay 18L/36R

Runway 9/27

North Cargo Alternatives Site

Air Traffic Control Tower

Slide Number 1
Slide Number 2
Slide Number 3

File details come from the government source that posted it. Updated .