20167.2_-_KETTLE_LAKE_ELEMENTARY_MECHANICAL_PROGRESS_SET_FOR_REFERENCE_ONLY_2020_11_13.pdf

PDF 1 MB Posted

Attached to
Bid Pack 1 Bleachers and Vertical Unit Ventilators
Solicitation number
RFP CCS 210000000462 1
Issued by
Kent County, Burt CDP, Michigan

About this file

This document comprises preliminary mechanical design and construction drawings for Kettle Lake Elementary School in Caledonia, Michigan, prepared by Caledonia Community Schools. The project involves comprehensive mechanical system upgrades across three building units (Units A, B, and C) on the first floor, including demolition, sheet metal work, HVAC piping installation, and equipment specifications. The scope includes removal of existing ultraviolet (UV) systems, exhaust fans, cooling coils, and associated controls, with preparation for new system installations. The mechanical work encompasses 22 vertical unit ventilators with capacities ranging from 750 to 1,500 CFM, direct expansion (DX) cooling coils, supply air diffusers in multiple sizes (SA-1, SA-2, SA-3 models), and associated ductwork throughout the facility. The drawings are dated November 13, 2020, and marked as preliminary for reference purposes only, indicating active design development.

The document specifies detailed installation requirements and coordination responsibilities for the mechanical contractor, including verification of existing conditions, fire sealing of all penetrations through rated assemblies, patching of walls and ceilings following equipment removal, and coordination with electrical trades regarding piping placement and low-voltage cabling routing. Equipment specifications detail unit ventilators operating at various air flow rates with capacities between 1,000 and 1,500 CFM, DX cooling with 80 MBH total capacity and 2-row configurations, heating coils rated at 80 MBH, and electrical requirements of 208/60/3 voltage at 0.75 horsepower. The contractor is responsible for providing study packages, duct shrouds, and ensuring all ductwork is sealed according to SMACNA standards and leak-tested at specified pressures. General mechanical notes emphasize that details illustrate design intent rather than fabrication specifications, requiring contractors to coordinate layout and clearance requirements for all equipment installations within the spaces provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOILET

CLOSET CLOSET

GYMNASIUM

GIRL'S

TOILET

BOY'S

TOILET

CORRIDOR

VESTIBULE

CLASSROOMCLASSROOM

JANITOR VESTIBULE

TOILET TOILET

CLOSET

KINDERGARTEN

CHANGING

OFFICE

CORRIDOR

GYM EQUIP.

STORAGE

A101

A104

A103

A102

A112

A113

A114

A115

A108 A107

A106

A105

A110 A109

A116A121

A111

A117

A120

A119 A118

1 1

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig a n

-5

.3

.6

P H

O N

E

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

F

IR

S T

F L

O O

R M

E C

H A

N

IC

A L

D E

M O

L

IT

IO

N

P L A

N

U N

IT

A

.2

M D

A

/1

/2

K E

T T

L E

L A

K E

E L

E M

E N

T A

R Y

C a le d o n ia

M ic h ig a n

C A

L E

D O

N

IA

C O

M M

U N

IT

Y

S C

H O

O L

S

GENERAL MECHANICAL NOTES

1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE

CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION

DRAWINGS.

2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN

BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO

COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL

SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING

THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES

WITHIN THE SPACE PROVIDED.

3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT

WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO

PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY

COMPONENTS, FITTINGS, AND OFFSETS.

4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND

DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE

ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.

5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.

THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.

6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,

CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,

SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR

INSTALLED.

7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL

EQUIPMENT. COORDINATE WITH ELECTRICAL.

8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN

DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL

BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL

BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING

ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY

SUPPORTED WITH COMM HOOKS OR RINGS.

KEYED NOTES - DEMOLITION

1 REMOVE EXIST. UV AND ASSOCIATED CONTROLS. EXIST. EXTERIOR

LOUVER TO REMAIN. BLANK OFF AND SEAL LOUVER WITH 2"

INSULATED METAL PANEL AND FILL REMAINING VOID WITH BATT

INSULATION. PREPARE PIPING FOR EXTENSION TO NEW UV LOCATION.

2 REMOVE EXIST. EF, SHEET METAL, AND ASSOCIATED CONTROLS.

EXIST. ROOF CURB TO REMAIN. PROVIDE INSULATED CURB CAP TO

SEAL CURB.

3 REMOVE EXIST. EF AND ASSOCIATED CONTROLS. EXIST. ROOF CURB

TO REMAIN. PREPARE CURB FOR NEW FAN.

4 REMOVE EXIST. EA GRILLE AND DUCTWORK AS INDICATED.

5 REMOVE EXIST. CHILLED WATER COOLING COIL. PREP FOR NEW

COOLING COIL.

ISSUED FOR DATE

1/8" = 1'-0"

FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT A

jkegeler Text Box

NOVEMBER 13, 2020

UNIT "A"

UNIT "B"

UNIT

"B

UNIT

"A

CONF.

ROOM

WORK ROOM

CLOSET CLOSET

TOILET

TOILET

TOILET

TOILET

CLOSET

TOILET

CLASSROOMCLASSROOMCLASSROOMCLASSROOM

TOILET

CLOSET

CLOSET

CLASSROOM

TOILET

CORRIDORVESTIBULE

ART/MUSIC

CONFERENCE

COMPUTER

ROOM

CORRIDOR

CORRIDOR

KINDERGARTEN

JANITOR

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDORCORRIDOR

LIBRARY

JANITOR OFFICE OFFICE

STORAGE

BF TOILET

BOY'S

TOILET

READING

ROOM

GIRL'S

TOILET

LOBBY

MEN'S

WOMEN'S

STORAGE

A/V

STORAGE

TIME-OUT

13 27

B145

B143

A156

A159

A110

A121A122A127A128

A132

A133

A135A134

A154

A131

A130

A129

A125 A124

A126

A123

A136

A150

A149

A151

A160

A161

A157

A152

A137

A139

A138

B113

B142

A163

A162

A140 A145

A146

A147

A143A142A141

A148

A158

A155

A153

1 1 1 1

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

F

IR

S T

F L

O O

R M

E C

H A

N

IC

A L

D E

M O

L

IT

IO

N

P L A

N

U N

IT

B

.2

M D

B

/1

/2

K E

T T

L E

L A

K E

E L

E M

E N

T A

R Y

C a le d o n ia

M ic h ig a n

C A

L E

D O

N

IA

C O

M M

U N

IT

Y

S C

H O

O L

S

ISSUED FOR DATE

GENERAL MECHANICAL NOTES

1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE

CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION

DRAWINGS.

2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN

BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO

COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL

SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING

THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES

WITHIN THE SPACE PROVIDED.

3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT

WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO

PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY

COMPONENTS, FITTINGS, AND OFFSETS.

4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND

DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE

ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.

5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.

THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.

6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,

CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,

SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR

INSTALLED.

7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL

EQUIPMENT. COORDINATE WITH ELECTRICAL.

8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN

DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL

BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL

BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING

ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY

SUPPORTED WITH COMM HOOKS OR RINGS.

KEYED NOTES - DEMOLITION

1 REMOVE EXIST. UV AND ASSOCIATED CONTROLS. EXIST. EXTERIOR

LOUVER TO REMAIN. BLANK OFF AND SEAL LOUVER WITH 2"

INSULATED METAL PANEL AND FILL REMAINING VOID WITH BATT

INSULATION. PREPARE PIPING FOR EXTENSION TO NEW UV LOCATION.

2 REMOVE EXIST. EF, SHEET METAL, AND ASSOCIATED CONTROLS.

EXIST. ROOF CURB TO REMAIN. PROVIDE INSULATED CURB CAP TO

SEAL CURB.

3 REMOVE EXIST. EF AND ASSOCIATED CONTROLS. EXIST. ROOF CURB

TO REMAIN. PREPARE CURB FOR NEW FAN.

4 REMOVE EXIST. EA GRILLE AND DUCTWORK AS INDICATED.

5 REMOVE EXIST. CHILLED WATER COOLING COIL. PREP FOR NEW

COOLING COIL.

1/8" = 1'-0"

FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT B

jkegeler

S

E S

IC

M

M

M

M

R

E

R

E S

E S

UNIT "A"

UNIT "B"

VENDING

MACHINE

REF.

UNDER

CTR.

REF.

W/D

CLASSROOM

STORAGE

BOOK

STORAGE

CORRIDOR

VESTIBULE

RECEPTION

CORRIDOR

BF TOILET

WORK ROOM

STORAGE

LOBBY

CLASSROOM

LOBBY

MEN'S

WOMEN'S

STOR.

STOR.

OFFICE OFFICE

STAGE

OFFICE

TOILET

TOILET

TOILET

CLASSROOM

MULTI-PURPOSE

ROOM

CORRIDOR CORRIDOR

CLASSROOM

TOILET

TOILET

CLASSROOM

TOILET

CLASSROOM

CLASSROOM

COOLER

STORAGE

YARD

STORAGE

KITCHEN

TOILET

TOILET

CLASSROOMCLASSROOM

VESTIBULE VESTIBULE

TOILET

STORAGE

STORAGE

WAITING

STORAGE

B137

B138

B157 B158

B139

B148

B149

B152

B151

B145

B143

B111

B107

B106

B103

B102

B126 B127

B125

B123

B124

B122

B112 B130

B121

B120

B115

B114

B116 B117

B113

B110

B109

B108

B105

B104

B101 B129

B132

B134

B135

B131

B133

B136

B118

B141

B142

B100

B128

B156

B159

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

F

IR

S T

F L

O O

R M

E C

H A

N

IC

A L

D E

M O

L

IT

IO

N

P L A

N

U N

IT

C

.2

M D

C

/1

/2

K E

T T

L E

L A

K E

E L

E M

E N

T A

R Y

C a le d o n ia

M ic h ig a n

C A

L E

D O

N

IA

C O

M M

U N

IT

Y

S C

H O

O L

S

ISSUED FOR DATE

1/8" = 1'-0"

FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT C

GENERAL MECHANICAL NOTES

1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE

CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION

DRAWINGS.

2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN

BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO

COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL

SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING

THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES

WITHIN THE SPACE PROVIDED.

3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT

WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO

PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY

COMPONENTS, FITTINGS, AND OFFSETS.

4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND

DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE

ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.

5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.

THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.

6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,

CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,

SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR

INSTALLED.

7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL

EQUIPMENT. COORDINATE WITH ELECTRICAL.

8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN

DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL

BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL

BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING

ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY

SUPPORTED WITH COMM HOOKS OR RINGS.

KEYED NOTES - DEMOLITION

1 REMOVE EXIST. UV AND ASSOCIATED CONTROLS. EXIST. EXTERIOR

LOUVER TO REMAIN. BLANK OFF AND SEAL LOUVER WITH 2"

INSULATED METAL PANEL AND FILL REMAINING VOID WITH BATT

INSULATION. PREPARE PIPING FOR EXTENSION TO NEW UV LOCATION.

2 REMOVE EXIST. EF, SHEET METAL, AND ASSOCIATED CONTROLS.

EXIST. ROOF CURB TO REMAIN. PROVIDE INSULATED CURB CAP TO

SEAL CURB.

3 REMOVE EXIST. EF AND ASSOCIATED CONTROLS. EXIST. ROOF CURB

TO REMAIN. PREPARE CURB FOR NEW FAN.

4 REMOVE EXIST. EA GRILLE AND DUCTWORK AS INDICATED.

5 REMOVE EXIST. CHILLED WATER COOLING COIL. PREP FOR NEW

COOLING COIL.

jkegeler

CLOSET CLOSET

GYMNASIUM

GIRL'S

TOILET

BOY'S

TOILET

CORRIDOR

VESTIBULE

CLASSROOMCLASSROOM

JANITOR VESTIBULE

TOILET TOILET

CLOSET

KINDERGARTEN

CHANGING

OFFICE

CORRIDOR

GYM EQUIP.

STORAGE

A101

A104

A103

A102

A112

A113

A114

A115

A108 A107

A106

A105

A110 A109

A116A121

A111

A117

A120

A119 A118

VUV-A121 VUV-A116

VUV-A156

VUV-A105

VUV-A162

14"ø SA12"ø SA

SA-1

275 CFM

(TYP. OF 4)

14"ø SA12"ø SA

SA-1

275 CFM

(TYP. OF 4)

1 1

SA-2

375 CFM

(TYP. OF 4)

16"ø SA12"ø SA

SA-2

375 CFM

(TYP. OF 4)

"ø S

A

"ø

S A

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

F

IR

S T

F L

O O

R S

H E

E T

M E

T A

L P

L A

N

U N

IT

A 2

.2

M

A

/1

/2

K E

T T

L E

L A

K E

E L

E M

E N

T A

R Y

C a le d o n ia

M ic h ig a n

C A

L E

D O

N

IA

C O

M M

U N

IT

Y

S C

H O

O L

S

GENERAL MECHANICAL NOTES

1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE

CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION

DRAWINGS.

2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN

BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO

COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL

SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING

THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES

WITHIN THE SPACE PROVIDED.

3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT

WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO

PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY

COMPONENTS, FITTINGS, AND OFFSETS.

4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND

DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE

ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.

5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.

THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.

6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,

CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,

SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR

INSTALLED.

7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL

EQUIPMENT. COORDINATE WITH ELECTRICAL.

8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN

DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL

BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL

BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING

ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY

SUPPORTED WITH COMM HOOKS OR RINGS.

KEYED NOTES - MECHANICAL

2 INSTALL NEW DX COOLING COIL IN EXIST. AHU.

ISSUED FOR DATE

1/8" = 1'-0"

FIRST FLOOR SHEET METAL PLAN - UNIT A

jkegeler

UNIT

"B

UNIT

"A

CORRIDOR

CONF.

ROOM

WORK ROOM

CLOSET CLOSET

TOILET

TOILET

TOILET

TOILET

CLOSET

TOILET

CLASSROOMCLASSROOMCLASSROOMCLASSROOM

TOILET

CLOSET

CLOSET

CLASSROOM

TOILET

CORRIDORVESTIBULE

ART/MUSIC

CONFERENCE

COMPUTER

ROOM

CORRIDOR

CORRIDOR

KINDERGARTEN

JANITOR

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDORCORRIDOR

LIBRARY

JANITOR OFFICE OFFICE

STORAGE

BF TOILET

BOY'S

TOILET

READING

ROOM

GIRL'S

TOILET

LOBBY

MEN'S

WOMEN'S

STORAGE

A/V

STORAGE

TIME-OUT

13 27

B145

B144

B143

A156

A159

A110

A121A122A127A128

A132

A133

A135A134

A154

A131

A130

A129

A125 A124

A126

A123

A136

A150

A149

A151

A160

A161

A157

A152

A137

A139

A138

B113

B142

A163

A162

A140 A144 A145

A146

A147

A143A142A141

A148

A158

A155

A153

14"ø SA

VUV-A138

VUV-A137

VUV-A136

VUV-A132

VUV-A128 VUV-A127 VUV-A122

VUV-A156

VUV-A162

VUV-A163

12"ø SA

SA-1

275 CFM

(TYP. OF 4)

14"ø SA12"ø SA

SA-1

275 CFM

(TYP. OF 4)

14"ø SA12"ø SA

SA-1

275 CFM

(TYP. OF 4)

14"ø SA12"ø SA

SA-1

275 CFM

(TYP. OF 4)

1 11 1

"ø S

A

"ø

S A

SA-3

300 CFM

(TYP. OF 4)

"ø S

A

"ø

S A

SA-3

300 CFM

(TYP. OF 4)

SA-1

250 CFM

(TYP. OF 4)

"ø S

A

"ø

S A

"ø S

A

"ø

S A

SA-1

250 CFM

(TYP. OF 4)

"ø S

A

SA-1

250 CFM

(TYP. OF 4)

"ø S

A

"ø

S A

SA-2

375 CFM

(TYP. OF 4)

"ø S

A

"ø

S A

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

F

IR

S T

F L

O O

R S

H E

E T

M E

T A

L P

L A

N

U N

IT

B 2

.2

M

B

/1

/2

K E

T T

L E

L A

K E

E L

E M

E N

T A

R Y

C a le d o n ia

M ic h ig a n

C A

L E

D O

N

IA

C O

M M

U N

IT

Y

S C

H O

O L

S

ISSUED FOR DATE

1/8" = 1'-0"

FIRST FLOOR SHEET METAL PLAN - UNIT B

GENERAL MECHANICAL NOTES

1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE

CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION

DRAWINGS.

2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN

BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO

COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL

SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING

THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES

WITHIN THE SPACE PROVIDED.

3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT

WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO

PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY

COMPONENTS, FITTINGS, AND OFFSETS.

4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND

DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE

ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.

5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.

THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.

6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,

CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,

SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR

INSTALLED.

7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL

EQUIPMENT. COORDINATE WITH ELECTRICAL.

8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN

DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL

BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL

BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING

ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY

SUPPORTED WITH COMM HOOKS OR RINGS.

KEYED NOTES - MECHANICAL

2 INSTALL NEW DX COOLING COIL IN EXIST. AHU.

jkegeler

E S

IC

M

M

M

M

R

E

E

R

E S

E S

UNIT "A"

UNIT "B"

VENDING

MACHINE

REF.

UNDER

CTR.

REF.

W/D

CLASSROOM

STORAGE

BOOK

STORAGE

CORRIDOR

VESTIBULE

RECEPTION

CORRIDOR

BF TOILET

CORRIDOR

WORK ROOM

STAFF LOUNGE

STORAGE

STORAGE

MECHANICAL

LOBBY

CLASSROOM

LOBBY

MEN'S

WOMEN'S

STOR.

STOR.

OFFICE OFFICE

STAGE

OFFICE

TOILET

TOILET

TOILET

CLASSROOM

MULTI-PURPOSE

ROOM

CORRIDOR CORRIDOR

CLASSROOM

TOILET

TOILET

CLASSROOM

TOILET

CLASSROOM

CLASSROOM

COOLER

STORAGE

YARD

STORAGE

BOILER

ROOM

KITCHEN

TOILET

TOILET

CLASSROOMCLASSROOM

VESTIBULE VESTIBULE

MULTI-PURPOSE

STORAGE

TOILET

STORAGE

STORAGE

WAITING

STORAGE

D.W.

B137

B138

B155B154

B157 B158

B139

B148

B149

B152

B151

B150

B145

B144

B140

B143

B111

B107

B106

B103

B102

B126 B127

B125

B123

B124

B122

B112 B130

B121

B119 B120

B115

B114

B116 B117

B113

B110

B109

B108

B105

B104

B101 B129

B132

B134

B135

B131

B133

B136

B118

B141

B142

B100

B128

B156

B159

VUV-B102

VUV-B103

VUV-B106

VUV-B107

VUV-B111

VUV-A138

VUV-B137

VUV-B136

VUV-B133

VUV-B131

"ø S

A

"ø

S A

SA-3

315 CFM

(TYP. OF 4)

SA-1

250 CFM

(TYP. OF 4)

"ø S

A

"ø

S A

"ø S

A

"ø

S A

SA-1

250 CFM

(TYP. OF 4)

"ø S

A

"ø

S A

SA-1

250 CFM

(TYP. OF 4)

"ø S

A

"ø

S A

SA-1

250 CFM

(TYP. OF 4)

SA-1

250 CFM

(TYP. OF 3)

14"ø SA

"ø S

A

"ø

S A

"ø S

A

SA-1

250 CFM

(TYP. OF 4)

"ø S

A

"ø

S A

SA-1

250 CFM

(TYP. OF 4)

"ø S

A

"ø

S A

SA-1

250 CFM

(TYP. OF 4)

"ø S

A

"ø S

A

CC-01

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

F

IR

S T

F L

O O

R S

H E

E T

M E

T A

L P

L A

N

U N

IT

C 2

.2

M

C

/1

/2

K E

T T

L E

L A

K E

E L

E M

E N

T A

R Y

C a le d o n ia

M ic h ig a n

C A

L E

D O

N

IA

C O

M M

U N

IT

Y

S C

H O

O L

S

ISSUED FOR DATE

1/8" = 1'-0"

FIRST FLOOR SHEET METAL PLAN - UNIT C

GENERAL MECHANICAL NOTES

1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE

CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION

DRAWINGS.

2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN

BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO

COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL

SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING

THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES

WITHIN THE SPACE PROVIDED.

3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT

WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO

PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY

COMPONENTS, FITTINGS, AND OFFSETS.

4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND

DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE

ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.

5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.

THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.

6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,

CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,

SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR

INSTALLED.

7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL

EQUIPMENT. COORDINATE WITH ELECTRICAL.

8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN

DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL

BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL

BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING

ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY

SUPPORTED WITH COMM HOOKS OR RINGS.

KEYED NOTES - MECHANICAL

2 INSTALL NEW DX COOLING COIL IN EXIST. AHU.

jkegeler

CLOSET CLOSET

GYMNASIUM

GIRL'S

TOILET

BOY'S

TOILET

CORRIDOR

VESTIBULE

CLASSROOMCLASSROOM

JANITOR VESTIBULE

TOILET TOILET

CLOSET

KINDERGARTEN

CHANGING

OFFICE

CORRIDOR

GYM EQUIP.

STORAGE

A101

A104

A103

A102

A112

A113

A114

A115

A108 A107

A106

A105

A110 A109

A116A121

A111

A117

A120

A119 A118

VUV-A121 VUV-A116

VUV-A156

VUV-A105

VUV-A162

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

F

IR

S T

F L

O O

R H

V A

C P

IP

IN

G P

L A

N

U N

IT

A 2

.2

M

A

/1

/2

K E

T T

L E

L A

K E

E L

E M

E N

T A

R Y

C a le d o n ia

M ic h ig a n

C A

L E

D O

N

IA

C O

M M

U N

IT

Y

S C

H O

O L

S

1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE

CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION

DRAWINGS.

2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN

BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO

COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL

SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING

THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES

WITHIN THE SPACE PROVIDED.

3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT

WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO

PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY

COMPONENTS, FITTINGS, AND OFFSETS.

4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND

DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE

ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.

5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.

THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.

6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,

CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,

SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR

INSTALLED.

7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL

EQUIPMENT. COORDINATE WITH ELECTRICAL.

8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN

DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL

BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL

BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING

ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY

SUPPORTED WITH COMM HOOKS OR RINGS.

KEYED NOTES - HVAC PIPING

GENERAL MECHANICAL NOTES

1 HVAC

2 PIPING

3 NOTE

ISSUED FOR DATE

1/8" = 1'-0"

FIRST FLOOR HVAC PIPING PLAN - UNIT A

jkegeler

UNIT

"B

UNIT

"A

CORRIDOR

CONF.

ROOM

WORK ROOM

CLOSET CLOSET

TOILET

TOILET

TOILET

TOILET

CLOSET

TOILET

CLASSROOMCLASSROOMCLASSROOMCLASSROOM

TOILET

CLOSET

CLOSET

CLASSROOM

TOILET

CORRIDORVESTIBULE

ART/MUSIC

CONFERENCE

COMPUTER

ROOM

CORRIDOR

CORRIDOR

KINDERGARTEN

JANITOR

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDORCORRIDOR

LIBRARY

JANITOR OFFICE OFFICE

STORAGE

BF TOILET

BOY'S

TOILET

READING

ROOM

GIRL'S

TOILET

LOBBY

MEN'S

WOMEN'S

STORAGE

A/V

STORAGE

TIME-OUT

13 27

B145

B144

B143

A156

A159

A110

A121A122A127A128

A132

A133

A135A134

A154

A131

A130

A129

A125 A124

A126

A123

A136

A150

A149

A151

A160

A161

A157

A152

A137

A139

A138

B113

B142

A163

A162

A140 A145

A146

A147

A143A142A141

A148

A158

A155

A153

VUV-A138

VUV-A137

VUV-A136

VUV-A132

VUV-A128 VUV-A127 VUV-A122

VUV-A156

VUV-A162

VUV-A163

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

F

IR

S T

F L

O O

R H

V A

C P

IP

IN

G P

L A

N

U N

IT

B 2

.2

M

B

/1

/2

K E

T T

L E

L A

K E

E L

E M

E N

T A

R Y

C a le d o n ia

M ic h ig a n

C A

L E

D O

N

IA

C O

M M

U N

IT

Y

S C

H O

O L

S

ISSUED FOR DATE

1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE

CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION

DRAWINGS.

2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN

BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO

COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL

SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING

THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES

WITHIN THE SPACE PROVIDED.

3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT

WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO

PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY

COMPONENTS, FITTINGS, AND OFFSETS.

4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND

DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE

ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.

5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.

THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.

6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,

CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,

SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR

INSTALLED.

7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL

EQUIPMENT. COORDINATE WITH ELECTRICAL.

8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN

DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL

BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL

BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING

ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY

SUPPORTED WITH COMM HOOKS OR RINGS.

KEYED NOTES - HVAC PIPING

GENERAL MECHANICAL NOTES

1 HVAC

2 PIPING

3 NOTE

1/8" = 1'-0"

FIRST FLOOR HVAC PIPING PLAN - UNIT B

jkegeler

E S

IC

M

M

M

M

R

E

E

R

E S

E S

UNIT "A"

UNIT "B"

VENDING

MACHINE

REF.

UNDER

CTR.

REF.

W/D

CLASSROOM

STORAGE

BOOK

STORAGE

CORRIDOR

VESTIBULE

RECEPTION

CORRIDOR

BF TOILET

CORRIDOR

WORK ROOM

STAFF LOUNGE

STORAGE

STORAGE

LOBBY

CLASSROOM

LOBBY

MEN'S

WOMEN'S

STOR.

STOR.

OFFICE OFFICE

STAGE

OFFICE

TOILET

TOILET

TOILET

CLASSROOM

MULTI-PURPOSE

ROOM

CORRIDOR CORRIDOR

CLASSROOM

TOILET

TOILET

CLASSROOM

TOILET

CLASSROOM

CLASSROOM

COOLER

STORAGE

YARD

STORAGE

KITCHEN

TOILET

TOILET

CLASSROOMCLASSROOM

VESTIBULE VESTIBULE

TOILET

STORAGE

STORAGE

WAITING

STORAGE

D.W.

B137

B138

B155B154

B157 B158

B139

B148

B149

B152

B151

B150

B145

B144

B140

B143

B111

B107

B106

B103

B102

B126 B127

B125

B123

B124

B122

B112 B130

B121

B120

B115

B114

B116 B117

B113

B110

B109

B108

B105

B104

B101 B129

B132

B134

B135

B131

B133

B136

B118

B141

B142

B100

B128

B156

B159

1 2 3

VUV-B102

VUV-B103

VUV-B106

VUV-B107

VUV-B111

VUV-A138

VUV-B137

VUV-B136

VUV-B133

VUV-B131

ACCU-1

ON ROOF

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

F

IR

S T

F L

O O

R H

V A

C P

IP

IN

G P

L A

N

U N

IT

C 2

.2

M

C

/1

/2

K E

T T

L E

L A

K E

E L

E M

E N

T A

R Y

C a le d o n ia

M ic h ig a n

C A

L E

D O

N

IA

C O

M M

U N

IT

Y

S C

H O

O L

S

ISSUED FOR DATE

1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE

CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION

DRAWINGS.

2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN

BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO

COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL

SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING

THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES

WITHIN THE SPACE PROVIDED.

3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT

WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO

PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY

COMPONENTS, FITTINGS, AND OFFSETS.

4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND

DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE

ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.

5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.

THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.

6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,

CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,

SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR

INSTALLED.

7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL

EQUIPMENT. COORDINATE WITH ELECTRICAL.

8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN

DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL

BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL

BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING

ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY

SUPPORTED WITH COMM HOOKS OR RINGS.

KEYED NOTES - HVAC PIPING

GENERAL MECHANICAL NOTES

1 HVAC

2 PIPING

3 NOTE

1/8" = 1'-0"

FIRST FLOOR HVAC PIPING PLAN - UNIT C

jkegeler

ABBREVIATIONS

BRITISH THERMAL UNIT PER HOUR

AUTOMATIC CONTROL DAMPER

BRITISH THERMAL UNIT PER HOUR

CALIBRATED BALANCING VALVE

CUBIC FEET PER MINUTE

ENTERING AIR TEMPERATURE

EXTERNAL STATIC PRESSURE

ELECTRIC WATER COOLER

ENTERING WATER TEMPERATURE

LEAVING AIR TEMPERATURE

LEAVING WATER TEMPERATURE

MIXED AIR TEMPERATURE

FIELD INSTALLEDF.I.

MBH

M.B.

(THOUSANDS)

MOP BASIN

L.A.T.

L.W.B

L.W.T.

M.A.

M.A.T.

MAX.

LAV.

L.D.B.

LOUV.

G.P.M.

H.B.

HP

I.E.

F.M.

F.P.M.

F.R.

LAVATORY

LEAVING DRY BULB

LEAVING WET BULB

MIXED AIR

MAXIMUM

LOUVER

FLOOR MOUNTED

FEET PER MINUTE

FIN RADIATION

GALLONS PER MINUTE

HOSE BIBB

HORSE POWER

INVERT ELEVATION

CONTROL VALVEC.V.

F.C.

F.D.

(FD)

F.H.C.

E.W.B.

E.W.C.

E.W.T.

EXIST.

E.A.

E.A.T.

E.D.B.

E.F.

E.S.P.

D.F.

D.S.

DN.

ENTERING WET BULB

FLEXIBLE CONNECTION

FLOOR DRAIN

FIRE DAMPER

FIRE HOSE CABINET

EXISTING

DRINKING FOUNTAIN

DOWN SPOUT

EXHAUST AIR

ENTERING DRY BULB

EXHAUST FAN

DOWN

C.B.

C.H.

C.I.

C.M.

C.O.

C.B.V.

C.F.H.

C.F.M.

B.D.D.

B.F.

BTUH

B.V.

B.D.

A.F.F.

A.G.

A.P.D.

CATCH BASIN

CUBIC FEET PER HOUR

CABINET HEATER

CAST IRON

CEILING MOUNTED

CLEAN OUT

BALANCING DAMPER

ABOVE FINISHED FLOOR

ABOVE GRADE

AIR PRESSURE DROP

BACKDRAFT DAMPER

BARRIER FREE

BALANCING VALVE

A.C.D.

TEMPERATURE RISET.R.

TOTAL STATIC PRESSURE

TERMINAL UNIT BOX

TEPID WATER CONNECTION

VIBRATION ISOLATORS

WATER PRESSURE DROP

W.SK. WASH SINK

V.

T.S.

T.S.P.

T.U.

T.W.C.

U.H.

URN.

VEL.

V.I.

V.I.F.

V.S.

V.T.R.

W.

W.C.

W.M.

W.P.D.

VELOCITY

VERIFY IN FIELD

VENT STACK

VENT THRU ROOF

WASTE

WATER CLOSET

WALL MOUNTED

TIP SPEED

UNIT HEATER

URINAL

VENT

MANUFACTURER(S)MFR.(S)

BACKFLOW PREVENTER

MANUAL AIR VENT

NORMALLY CLOSED

NON-FREEZE WALL HYDRANT

NOT IN CONTRACT

OUTSIDE AIR INTAKE

POST INDICATOR VALVE

PRESSURE REDUCING VALVE

PRESSURE / TEMPERATURE TAPPING

RELATIVE HUMIDITY

REVOLUTIONS PER MINUTE

REDUCED PRESSURE PRINCIPAL

STATIC PRESSURE

RETURN AIRR.A.

S.O.V.

R.D.

R.H.

R.I.O.

R.P.M.

RPPBP

R.V.

S.A.

SENS.

SHR.

SK.

S.P.

S.SK.

TEMP.

TOT.

SHUT-OFF VALVE

SENSIBLE

SHOWER

SERVICE SINK

TEMPERATURE

TOTAL

SINK

ROOF DRAIN

ROUGH IN ONLY

RELIEF VALVE

SUPPLY AIR

M.H.

MIN.

MTG.

M.V.

N.C.

N.F.W.H.

N.I.C.

N.O.

O.A.

O.A.I.

OCT.

P.A.

P.D.

P.I.V

P.R.V.

P.T.

OUTSIDE AIR

OCTAVE

PIPE ANCHOR

PRESSURE DROP

MANHOLE

MINIMUM

MOUNTING

NORMALLY OPEN

TEPID WATER

TEPID WATER RETURNTWR

TW

HUMIDISTAT

SYMBOLS

PRESSURE GAUGE

OXYGEN

REDUCED PRESSURE PRINCIPLE BACKFLOW

PUMPED CONDENSATE

PRIMARY HEATING HOT WATER SUPPLY

PRIMARY HEATING HOT WATER RETURN

PRESSURE / TEMPERATURE TAPPING

PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

OUTSIDE STEM AND YOKE VALVE

SMOKE DAMPER

SHUT-OFF VALVE

STEAM

SOFT HOT WATER

SPRING CHECK VALVE

SOFT HOT WATER RETURN

SOFT COLD WATER

SANITARY SEWER (BELOW FLOOR)

SANITARY SEWER (ABOVE FLOOR)

PREVENTER

O2

PHR

PC

PHS

SAN

SAN

SHW

SHWR

S

STM (#)

SCW

THERMOMETER

STRAINER

THROTTLING VALVE

THERMOSTAT

TRIPLE DUTY VALVE (STRAIGHT)

TRIPLE DUTY VALVE (ANGLE)

THREE-WAY CONTROL VALVE

STORM (BELOW FLOOR)

STORM SEWER (ABOVE FLOOR)

VENT

VACUUM BREAKER

VACUUM

UNION

ST

ST

VAC

V

STEAM TRAPT

AW

CAP

AWV

CR

CWR

CWS

CS

A

CD

COND

CTR

CTS

FP

FS

FD

GAS

FOR

FOS

HR

G

HS

HPR

HPS

CONTROL VALVE

HOT WATER SUPPLY (DOMESTIC)

HOT WATER RETURN (DOMESTIC)

HEAT PUMP SUPPLY

HEAT PUMP RETURN

HEATING HOT WATER SUPPLY

HEATING HOT WATER RETURN

GAS COCK

FUEL OIL SUPPLY

FUEL OIL RETURN

FOOTING DRAIN

FLOW SWITCH

FLOW METER (WAFER TYPE)

FLOW METER (PROBE TYPE)

FIRE PROTECTION

FIRE/SMOKE DAMPER

FIRE DAMPER (VERTICAL)

FIRE DAMPER (HORIZONTAL)

COOLING TOWER SUPPLY

COOLING TOWER RETURN

CONDENSATE DRAIN

CONDENSATE

COLD WATER (DOMESTIC)

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CHECK VALVE

CALIBRATED BALANCING VALVE

BUTTERFLY VALVE

BALANCING VALVE

ACID WASTE VENT

ACID WASTE

COMPRESSED AIR

CHILLER RETURN

CHILLER SUPPLY

TEMPERATURE SENSOR

STORM SEWER (OVERFLOW SYSTEM)ST (OF)

MVAC MEDICAL VACUUM

MEDICAL AIRMA

S

S

T

H

TS

DUCTWORK GENERAL NOTES

90° TEELO-LOSS TEE CONICAL TEE

45° CONICAL TEE MITERED ELBOW45° LATERAL

ENLARGEMENT ANGLE TO BE

22 1/2° OR LESS. CONTRACTION

ANGLE TO BE 45° OR LESS

90° SECTIONED ELBOW

9"~ AND LARGER

SPIRAL DUCT

WELDED OR GROOVED SEAMS

COLLAR BRUSHED W/ SEAL.

COMPOUND BEFORE ASS'T

TRANSITION

RECT. OR OVAL DUCT

ORIFICE

(R) REDUCER

(W/ OR W/OUT ORIFICE)

DIE STAMPED ELBOW

8"~ AND SMALLER

0°-35°

36°-71°

72°-90°

SLICE IN ROUND DUCT

USE SLICES RATHER THAN

ROUND - RECT. - ROUND

WHERE d/D IS GREATER

THAN 2/3

22 1/2° MAX.

d

ROUND - RECT. - ROUND

W=750

OFFSET

NO. OF SECTIONSANGLE

1. ALL JOINTS, CORNERS AND SEAMS TO BE FULLY

SEALED WITH SMACNA APPROVED DUCTWORK

SEALANT.

2. ALL DUCTWORK IS TO BE LEAK TESTED AT PRESSURES

SPECIFIED.

3. ALL RADIUS ELBOWS SHALL HAVE MINIMUM 1.5

CENTERLINE RADIUS

4. USE MITERED ELBOW WITH TURNING VANES WHEN

CENTERLINE RADIUS IS LESS THAN 1.5.

D d

22.50° MAX

D

MAX.

3d

D D d

MIN.

2D

NOTES:

REFER TO PLANS & SCHEDULE FOR DIFFUSERS

H (NOTE 1)

A

FRAME LENGTH

F R A M

E

W

ID

T H

H (N

OTE

A

60° B

ARREL

ROTA

TIO

N

DIMENSION "H" EQUALS HEIGHT OF DAMPER BLADE

PLUS 2" (MIN.) TO ALLOW FOR INSTALLATION OF

DAMPER WITHOUT DAMPER BLADE PROTRUDING INTO

STREAM OF BRANCH MAIN DUCT.

SEAL (SUITABLE FOR PAINTING) ALL SEAMS AND

JOINTS AIR TIGHT (TYP.)

2.

1.

PAINT TO MATCH SUPPLY DUCTWORK

RECTANGULAR S.A. BOX WITH

END FACE FOR MOUNTING

FRAME OF S.A. GRILLE.

ROUND/OVAL S.A. DUCT

SEE PLANS FOR SIZE

NOTE 2

(TYP)

NEOPRENE MEMBRANE

ANTI-VIBRATION PAD

FLOOR

DUCT SHROUD BY UNIT

VENT. MFG. TO BE FIELD

MEASURED AND CUT BY THE

INSTALLING CONTRACTOR.

IT IS RECOMMENDED TO

PENETRATE CEILING BY AT

LEAST 1"

VERIFY CEILING TYPE WITH

ARCH CEILING PLANS

UNION

SUPPLY AIR PLENUM

KEYED MANUAL AIR VENT

FLEXIBLE DUCT

UNIT CONNECTION

1" "ARMAFLEX" INSULATION

ON ALL O.A.I DUCTWORK

PITCH BOTTOM OF O.A.I. DUCT

TOWARDS EXT. WALL LOUVER.

COORDINATE EXTERIOR WALL

PENETATION WITH G.C.

PROVIDE AND INSTALL UNIT

VENT. PER EQUIPMENT MFG'S

RECOMMENDATIONS. GASKET

SEAL AND CAULK ALL UNIT

OPENINGS AND DUCT SEAMS.

PACK ANY VOIDS WITH

BATT INSULATION. (TYP.)

GRADE LEVEL

E.A.

O.A.

4" DRAINABLE BLADE LOUVER,

PROVIDED BY OTHERS, CAULK

AT TOP AND SIDES

REAR EXTENSION BY

UNIT VENT. MFG.

EXTERIOR WALL

COPPER CONDENSATE

DRAIN TUBE, DRILL/CORE

FROM OUTSIDE BUILDING

TO AVOID SPAULING OF

FACEBRICK

CONDENSATE DRAIN TUBE SIZING:

3/4" UP TO 2 TON

1" UP TO 5 TON

ENERGY SHIELD INSULATION

1' THICK-TOP & BOTH SIDES

OF OPENING, 1" THICK

TAPERED BOTTOM, FRICTION

FIT INTO OPENING, BY

MECHANICAL INSTALLER

HS & HRMANUAL SHUTOFF

BALL VALVE

PROVIDE CONTINIOUS

SHEET METAL CLOSURE

PLATES FROM MFG

MATCHING UV COLOR AND

FINISH FOR SIDES, TOP

AND BASE TO CONCEAL

INSTALLATION

PACK ANY VOIDS, TOP SIDES

AND BOTTOM, WITH BATT

INSULATION.

SUPPLY AIR DUCTWORK,

REFER TO PLANS FOR SIZE

MOUNT AS HIGH AS POSSIBLE

NOT FOR CONSTRUCTION

PRELIM

IN

ARY

E a s t

K a la m a z o o A v e n u e

S u it e

K a la m a z o o

M ic h ig

-5

.3

.6

P H

O

.3

.6

F A

X

T O

W E

R P

IN

K

S T

E R

.C O

M

A L L R

IG

H

T S

R E

S E

R V

E D

E a s t

F u lt o n S tr e e t, S u it e

G ra n d R a p id s

M ic h ig a n

.4

.9

P H

O

.4

.5

F A

X

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

M E

C H

A N

IC

A

L S

C H

E D

U L E

S A

N D

D E

T A

IL

S

.2

M

/1

/2

K E

T T

L E

L A

K E

E L

E M

E N

T A

R Y

C a le d o n ia

M ic h ig a n

C A

L E

D O

N

IA

C O

M M

U N

IT

Y

S C

H O

O L

S

ISSUED FOR DATE

GRILLES, REGISTERS, & DIFFUSERS BASED ON PRICE

MARK PANEL SIZE FACE SIZE

NECK

SIZE

MODEL

CFM

RANGE

VCD THROW MATERIAL FINISH INSTALLATION REMARKS

SA-1 12"x6" 12"x6" 12"x6" SDG 117-468 YES 15-22-31 ALUMINUM CLR ANODIZED DUCT MOUNTED

SA-2 12"x8" 12"x8" 12"x8" SDG 180-720 YES 13-23-36 ALUMINUM CLR ANODIZED DUCT MOUNTED

SA-3 10"x8" 10"x8" 10"x8" SDG 138-552 YES 16-24-34 ALUMINUM CLR ANODIZED DUCT MOUNTED

SCALE: NONEM 501

3 DUCTWORK FITTING DETAILS - ROUND/OVAL

SCALE: NONEM 501

4 DUCT MOUNTED DIFFUSER DETAIL

SCALE: NONEM 501

5 UNIT VENTILATOR DETAIL - VERTICAL

SELF-CONTAINED VERTICAL UNIT VENTILATORS BASED ON AIREDALE

MARK MODEL TYPE

AIR FLOW

(CFM)

OA (CFM)

E.S.P. (IN

WC)

COOLING COIL HEATING COIL ELECTRICAL

Ceiling Height

REMARKS

TOTAL

CAPACITY

(MBH)

SENSIBLE

CAPACITY

(MBH)

TYPE

TOTAL

CAPACITY

(MBH)

WPD (FT)

FLOW

RATE

(GPM)

ROWS HP EER VOLTAGE

VUV-A105 CMD48 VERTICAL 1500 480 0.5 46.8 31.5 DX 80 5.77 6 2-ROW 0.75 11.6 208/60/3 9' - 0" 1, 2, 3

VUV-A116 CMD36 VERTICAL 1100 420 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-A121 CMD36 VERTICAL 1100 420 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-A122 CMD36 VERTICAL 1100 420 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-A127 CMD36 VERTICAL 1100 420 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-A128 CMD36 VERTICAL 1100 420 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-A132 CMD48 VERTICAL 1200 430 0.5 46.8 31.5 DX 80 5.77 6 2-ROW 0.75 11.6 208/60/3 9' - 0" 1, 2, 3

VUV-A136 CMD48 VERTICAL 1200 430 0.5 46.8 31.5 DX 80 5.77 6 2-ROW 0.75 11.6 208/60/3 9' - 0" 1, 2, 3

VUV-A137 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-A138 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-A156 CMD48 VERTICAL 1500 480 0.5 46.8 31.5 DX 80 5.77 6 2-ROW 0.75 11.6 208/60/3 9' - 0" 1, 2, 3

VUV-A162 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-A163 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-B102 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-B103 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-B106 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-B107 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-B111 CMD48 VERTICAL 1260 440 0.5 46.8 31.5 DX 80 5.77 6 2-ROW 0.75 11.6 208/60/3 9' - 0" 1, 2, 3

VUV-B131 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-B133 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-B136 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3

VUV-B137 CMD24 VERTICAL 750 400 0.5 24.4 17.5 DX 80 5.77 6 2-ROW 0.75 12.1 208/60/3 9' - 0" 1, 2, 3

Grand total: 22

NOTES:

1. PROVIDE STUDY PACKAGE.

2 PROVIDE DUCT SHROUD.

3 HEATING CAPACITY BASED ON 90°F ATR, 140°F, 120°F LWT.

EXHAUST FANS BASED ON GREENHECK

MARK MODEL TYPE

AIR FLOW

(CFM)

ESP

(IN WC)

LOUDNESS

(SONES)

MOTOR

REMARKSEC MOTOR

NOMINAL

HP BRAKE HP RPM VOLTAGE

COOLING COIL BASED ON DAIKIN

MARK MODEL

AIR FLOW

(CFM)

E.S.P.

(IN WC)

COOLING COIL (1)

REMARKS

TOTAL

CAPACITY

(MBH) EAT (°F) LAT (°F) WPD (FT)

FLOW

RATE

(GPM)

CC-01 1, 2, 3

jkegeler

Sheets
MD 101A - FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT A
MD 101B - FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT B
MD 101C - FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT C
M 101A - FIRST FLOOR SHEET METAL PLAN - UNIT A
M 101B - FIRST FLOOR SHEET METAL PLAN - UNIT B
M 101C - FIRST FLOOR SHEET METAL PLAN - UNIT C
M 201A - FIRST FLOOR HVAC PIPING PLAN - UNIT A
M 201B - FIRST FLOOR HVAC PIPING PLAN - UNIT B
M 201C - FIRST FLOOR HVAC PIPING PLAN - UNIT C
M 501 - MECHANICAL SCHEDULES AND DETAILS

File details come from the government source that posted it. Updated .