This document is a mechanical progress set of architectural and engineering drawings for Caledonia Elementary School, located in Caledonia, Michigan, and commissioned by Caledonia Community Schools. The drawings, dated November 13, 2020, depict the first floor mechanical demolition plans, sheet metal plans, HVAC piping plans, mechanical sections, and mechanical schedules and details for two units (Unit A and Unit B) of the school's mechanical systems. The scope of work includes the removal of existing supply air (SA) and return air (RA) ductwork, blower coils and associated controls, exhaust air (EA) and outside air (OA) ductwork, hot water supply (HWS) and hot water return (HWR) connections, ultraviolet (UV) units with controls, exhaust fans (EF) and associated controls, and supply air diffusers, with the preparation of various piping and louver systems for new installations. The mechanical systems include 22 self-contained vertical unit ventilators (VUV) with varying capacities ranging from 1,000 to 1,400 cubic feet per minute (CFM), five exhaust fans with 150 CFM capacity, and multiple supply air diffusers with CFM ratings between 250 and 350.
The drawings indicate that new equipment will be installed with coordinated layout and clearance requirements, with all piping to avoid locations directly above electrical equipment and low voltage cabling to be run in conduit with exposed conduit painted to match surrounding surfaces. The mechanical installer is responsible for verifying all existing jobsite conditions, fire sealing all penetrations through fire and smoke-rated assemblies, and patching walls, ceilings, and floors where fixtures and equipment have been removed or relocated. The unit ventilators are based on Airedale CMD series models with DX cooling coils providing 80 MBH heating capacity, 2-row configurations, and 0.75 horsepower motors operating at 208/60/3 voltage. The exhaust fans are Greenheck G-095-VG downblast models with 0.167 nominal horsepower and 115/1 voltage. No pricing, award dates, or contract term information is provided in these preliminary, not-for-construction drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT "B"
UNIT "A"
KINDERGARTEN
KINDERGARTEN
READING ROOM
VESTIBULE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOMCLASSROOM
CLASSROOM
CLASSROOM
JAN. CLOSET
JAN. CL.
TOILET TOILET
TOILET TOILET
TOILET TOILET
TOILET TOILET
VESTIBULE
A139
A138
A137
A136
A124
A123
A127
A125
A126
A135
A134 A128
A129
A133
A132
A130
B109
A115
A112
A109 A108
A116 A117
A118
A107
A106
A105 A104
A120 A121
A122
A103
A101
CORRIDOR
A131
CORRIDOR
A111
READING ROOM
STORAGE
STORAGE
STORAGE
4' MB
12' MB4' TB 4' TB
H
R . W
A L L
H
R . W
A L L
H
R . W
A L L
M 310
NOT FOR CONSTRUCTION
PRELIM
IN
ARY
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig a n
-5
.3
.6
P H
O N
E
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R M
E C
H A
N
IC
A L
D E
M O
L
IT
IO
N
P L A
N
U N
IT
A
.2
M D
A N
O V
E M
B E
R
C A
L E
D O
N
IA
E L
E M
E N
T A
R Y
C a le d o n ia
M ic h ig a n
C A
L E
D O
N
IA
C O
M M
U N
IT
Y
S C
H O
O L
S
GENERAL MECHANICAL NOTES
1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE
CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION
DRAWINGS.
2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN
BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL
SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING
THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES
WITHIN THE SPACE PROVIDED.
3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT
WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO
PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY
COMPONENTS, FITTINGS, AND OFFSETS.
4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND
DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE
ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.
5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.
THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.
6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,
CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,
SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR
INSTALLED.
7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL
EQUIPMENT. COORDINATE WITH ELECTRICAL.
8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN
DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL
BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL
BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING
ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY
SUPPORTED WITH COMM HOOKS OR RINGS.
KEYED NOTES - DEMOLITION
1 REMOVE EXIST. SA AND RA DUCTWORK AS INDICATED.
2 REMOVE EXIST. RA GRILLE.
3 REMOVE EXIST. BLOWER COIL AND ASSOCIATED CONTROLS.
4 REMOVE EXIST. EA AND OA DUCTOWRK.
5 REMOVE EXIST. OA MAIN DUCTOWRK.
6 REMOVE EXIST. HWS AND HWR CONNECTIONS TO BLOWER COIL.
PREPARE BRANCH FOR NEW WORK.
7 REMOVE EXIST. UV AND ASSOCIATED CONTROLS. EXIST. EXTERIOR
LOUVER TO REMAIN. BLANK OFF AND SEAL LOUVER WITH 2"
INSULATED METAL PANEL AND FILL REMAINING VOID WITH BATT
INSULATION. PREPARE PIPING FOR EXTENSION TO NEW UV LOCATION.
8 REMOVE EXIST. EA GRILLE AND DUCTWORK AS INDICATED.
9 REMOVE EXIST. SA DIFFUSERS. SALVAGE AND PROTECT FOR
REINSTALLATION.
10 REMOVE EXIST. EF AND ASSOCIATED CONTROLS. EXIST. ROOF CURB
TO REMAIN. PREPARE CURB FOR NEW FAN.
ISSUED FOR DATE
1/8" = 1'-0"
FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT A
ES
C R
ES ES
RE
R E
ESES
ES
IC
6'
OFFICE
STORAGE
OFFICE
TOILET
VESTIBULE
CONF. RM.
VEST.
CORRIDOR
UNIT "B"
UNIT "A"
UNIT "A"
UNIT "B"
B130
B145
B144
B143
B142
B141
B146
B131
B140
B137
B134
B102
B136
B139
B147
B148
VESTIBULE
LOBBY
HEALTH
PRINCIPAL
RECEPTION
LOUNGE
CONFERENCE
ROOM
BF TOILET
BF TOILET
CORRIDOR
STORAGE
JANITOR
HALLWAY
HALLWAY
OFFICE
ELEC.
MECH.
MUSIC ROOMCOMPUTER ROOM
MDF ROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM CLASSROOM
BOY'S
TOILET
TOILET
STORAGE
STORAGE
STORAGE
CL.
CL.
CL.
VEST.
TOILET
TOILET
OFFICE
JAN. CL.
CORRIDOR
CORRIDOR
B106
B105
B103
B104
B101
B128
B112
B125 B124
B122
B121
B120
B123
B110
B109
B111
B113
B119
B117
B118
B116
A112
B115
B114
A110
B129
B126
STORAGE
B108
B107
A113
A114
BOILER ROOM
CUSTODIAN
OFFICE SPEECH
OFFICE
OFFICE
BF
BF
BF
8' MB
M W
A V
E D
IS
H
W
A S
H E
R
REFR.
VENDING
MACH.
F E
C
4' MB
12' MB4' TB 4' TB
4' TB 4' TB
10' T B
NOT FOR CONSTRUCTION
PRELIM
IN
ARY
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R M
E C
H A
N
IC
A L
D E
M O
L
IT
IO
N
P L A
N
U N
IT
B
.2
M D
B N
O V
E M
B E
R
C A
L E
D O
N
IA
E L
E M
E N
T A
R Y
C a le d o n ia
M ic h ig a n
C A
L E
D O
N
IA
C O
M M
U N
IT
Y
S C
H O
O L
S
ISSUED FOR DATE
GENERAL MECHANICAL NOTES
1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE
CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION
DRAWINGS.
2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN
BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL
SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING
THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES
WITHIN THE SPACE PROVIDED.
3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT
WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO
PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY
COMPONENTS, FITTINGS, AND OFFSETS.
4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND
DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE
ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.
5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.
THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.
6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,
CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,
SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR
INSTALLED.
7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL
EQUIPMENT. COORDINATE WITH ELECTRICAL.
8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN
DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL
BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL
BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING
ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY
SUPPORTED WITH COMM HOOKS OR RINGS.
KEYED NOTES - DEMOLITION
1 REMOVE EXIST. SA AND RA DUCTWORK AS INDICATED.
2 REMOVE EXIST. RA GRILLE.
3 REMOVE EXIST. BLOWER COIL AND ASSOCIATED CONTROLS.
4 REMOVE EXIST. EA AND OA DUCTOWRK.
5 REMOVE EXIST. OA MAIN DUCTOWRK.
6 REMOVE EXIST. HWS AND HWR CONNECTIONS TO BLOWER COIL.
PREPARE BRANCH FOR NEW WORK.
7 REMOVE EXIST. UV AND ASSOCIATED CONTROLS. EXIST. EXTERIOR
LOUVER TO REMAIN. BLANK OFF AND SEAL LOUVER WITH 2"
INSULATED METAL PANEL AND FILL REMAINING VOID WITH BATT
INSULATION. PREPARE PIPING FOR EXTENSION TO NEW UV LOCATION.
8 REMOVE EXIST. EA GRILLE AND DUCTWORK AS INDICATED.
9 REMOVE EXIST. SA DIFFUSERS. SALVAGE AND PROTECT FOR
REINSTALLATION.
10 REMOVE EXIST. EF AND ASSOCIATED CONTROLS. EXIST. ROOF CURB
TO REMAIN. PREPARE CURB FOR NEW FAN.
1/8" = 1'-0"
FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT B
1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE
CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION
DRAWINGS.
2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN
BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL
SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING
THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES
WITHIN THE SPACE PROVIDED.
3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT
WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO
PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY
COMPONENTS, FITTINGS, AND OFFSETS.
4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND
DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE
ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.
5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.
THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.
6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,
CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,
SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR
INSTALLED.
7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL
EQUIPMENT. COORDINATE WITH ELECTRICAL.
8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN
DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL
BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL
BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING
ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY
SUPPORTED WITH COMM HOOKS OR RINGS.
1 REMOVE EXIST. SA AND RA DUCTWORK AS INDICATED.
2 REMOVE EXIST. RA GRILLE.
3 REMOVE EXIST. BLOWER COIL AND ASSOCIATED CONTROLS.
4 REMOVE EXIST. EA AND OA DUCTOWRK.
5 REMOVE EXIST. OA MAIN DUCTOWRK.
6 REMOVE EXIST. HWS AND HWR CONNECTIONS TO BLOWER COIL.
PREPARE BRANCH FOR NEW WORK.
7 REMOVE EXIST. UV AND ASSOCIATED CONTROLS. EXIST. EXTERIOR
LOUVER TO REMAIN. BLANK OFF AND SEAL LOUVER WITH 2"
INSULATED METAL PANEL AND FILL REMAINING VOID WITH BATT
INSULATION. PREPARE PIPING FOR EXTENSION TO NEW UV LOCATION.
8 REMOVE EXIST. EA GRILLE AND DUCTWORK AS INDICATED.
9 REMOVE EXIST. SA DIFFUSERS. SALVAGE AND PROTECT FOR
REINSTALLATION.
10 REMOVE EXIST. EF AND ASSOCIATED CONTROLS. EXIST. ROOF CURB
TO REMAIN. PREPARE CURB FOR NEW FAN.
KINDERGARTEN
KINDERGARTEN
READING ROOM
VESTIBULE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
JAN. CLOSET
JAN. CL.
TOILET TOILET
TOILET TOILET
TOILET TOILET
TOILET TOILET
VESTIBULE
A139
A137
A136
A124
A123
A127
A125
A126
A128
A129
A130
B109
A115
A112
A109 A108
A116 A117
A118
A107
A106
A105 A104
A120 A121
A122
A103
A101
CORRIDOR
A131
CORRIDOR
A111
READING ROOM
STORAGE
STORAGE
STORAGE
4' MB
12' MB4' TB 4' TB
H
R . W
A L L
H
R . W
A L L
H
R . W
A L L
12"x10" SA
16"x12" SA
10"ø SA10"ø SA
10"ø SA10"ø SA
12"x10" SA
16"x12" SA
10"ø SA 10"ø SA
10"ø SA10"ø SA
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
12"x10" SA
16"x12" SA
10"ø SA10"ø SA
10"ø SA10"ø SA
12"x10" SA
16"x12" SA
10"ø SA10"ø SA
10"ø SA10"ø SA
12"x10" SA
16"x12" SA
10"ø SA10"ø SA
10"ø SA10"ø SA
12"x10" SA
10"ø SA10"ø SA
10"ø SA10"ø SA
12"x10" SA
16"x12" SA
10"ø SA 10"ø SA
10"ø SA10"ø SA
12"x10" SA
16"x12" SA
10"ø SA 10"ø SA
10"ø SA10"ø SA
16"x14" SA
14"x12" SA
10"x10" SA
16"x12" SA
16"x12" SA
12"x10" SA
8"x8" SA
8"ø SA
8"ø SA
8"ø SA
8"ø SA
8"ø SA
8"ø SA 8"ø SA
8"ø SA 8"ø SA
8"ø SA
SA-1
300 CFM
(TYP. OF 4)
SA-1
300 CFM
(TYP. OF 4)
SA-1
300 CFM
(TYP. OF 4)
SA-1
300 CFM
(TYP. OF 4)
SA-2
260 CFM
(TYP. OF 5)
SA-2
260 CFM
(TYP. OF 5)
SA-1
300 CFM
(TYP. OF 4)
SA-1
300 CFM
(TYP. OF 4)
SA-1
300 CFM
(TYP. OF 4)
SA-1
300 CFM
(TYP. OF 4)
VUV-A132
VUV-A133
VUV-A134
VUV-A135
VUV-A138
VUV-A127
VUV-A128
VUV-A129
VUV-A130
VUV-A115
VUV-A118
VUV-A119
VUV-A122
VUV-A103
VUV-A106
VUV-A107
VUV-A110
SA-3
250 CFM
(TYP. OF 4)
SA-3
250 CFM
(TYP. OF 4)
SA-3
250 CFM
(TYP. OF 4)
SA-3
300 CFM
(TYP. OF 4)
SA-3
250 CFM
(TYP. OF 4)
SA-3
250 CFM
(TYP. OF 4)
SA-3
350 CFM
(TYP. OF 4)
M 310
EF-3
EF-1
EF-4
BC-01
NOT FOR CONSTRUCTION
PRELIM
IN
ARY
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R S
H E
E T
M E
T A
L P
L A
N
U N
IT
A 2
.2
M
A N
O V
E M
B E
R
C A
L E
D O
N
IA
E L
E M
E N
T A
R Y
C a le d o n ia
M ic h ig a n
C A
L E
D O
N
IA
C O
M M
U N
IT
Y
S C
H O
O L
S
GENERAL MECHANICAL NOTES
1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE
CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION
DRAWINGS.
2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN
BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL
SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING
THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES
WITHIN THE SPACE PROVIDED.
3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT
WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO
PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY
COMPONENTS, FITTINGS, AND OFFSETS.
4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND
DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE
ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.
5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.
THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.
6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,
CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,
SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR
INSTALLED.
7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL
EQUIPMENT. COORDINATE WITH ELECTRICAL.
8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN
DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL
BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL
BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING
ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY
SUPPORTED WITH COMM HOOKS OR RINGS.
KEYED NOTES - MECHANICAL
1 INSTALL SALVAGED SA DIFFUSER.
2 ROUTE DUCTWORK WITHIN BULKBEAD. COORDINATE WITH VERTICALLY
STACKED HVAC PIPING AND DATA CABLE TRAY.
ISSUED FOR DATE
FIRST FLOOR SHEET METAL PLAN - UNIT A
R
ES ES
RE
R E
ESES
ES
IC
6'
OFFICE
STORAGE
OFFICE
TOILET
VESTIBULE
CONF. RM.
VEST.
CORRIDOR
UNIT "B"
UNIT "A"
UNIT "A"
UNIT "B"
B130
B145
B144
B143
B142
B141
B146
B131
B140
B137
B134
B102
B136
B139
B147
B148
VESTIBULE
LOBBY
HEALTH
PRINCIPAL
RECEPTION
LOUNGE
CONFERENCE
ROOM
BF TOILET
BF TOILET
CORRIDOR
STORAGE
JANITOR
HALLWAY
HALLWAY
OFFICE
ELEC.
MECH.
MUSIC ROOMCOMPUTER ROOM
MDF ROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM CLASSROOM
BOY'S
TOILET
TOILET
STORAGE
STORAGE
STORAGE
CL.
CL.
CL.
VEST.
TOILET
TOILET
OFFICE
JAN. CL.
CORRIDOR
CORRIDOR
B106
B105
B103
B104
B101
B128
B112
B125 B124
B122
B121
B120
B123
B110
B109
B111
B113
B119
B117
B118
B116
A112
B115
B114
A110
B129
B126
STORAGE
B108
B107
A113
A114
BOILER ROOM
CUSTODIAN
OFFICE SPEECH
OFFICE
OFFICE
BF
BF
BF
8' MB
M W
A V
E D
IS
H
W
A S
H E
R
REFR.
VENDING
MACH.
F E
C
4' MB
12' MB4' TB 4' TB
4' TB 4' TB
10' T B
VUV-B119 VUV-B116
VUV-A115
SA-3
250 CFM
(TYP. OF 4)
SA-3
250 CFM
(TYP. OF 4)
EF-3
EF-2
EF-5
CC-01
NOT FOR CONSTRUCTION
PRELIM
IN
ARY
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R S
H E
E T
M E
T A
L P
L A
N
U N
IT
B 2
.2
M
B N
O V
E M
B E
R
C A
L E
D O
N
IA
E L
E M
E N
T A
R Y
C a le d o n ia
M ic h ig a n
C A
L E
D O
N
IA
C O
M M
U N
IT
Y
S C
H O
O L
S
ISSUED FOR DATE
GENERAL MECHANICAL NOTES
1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE
CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION
DRAWINGS.
2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN
BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL
SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING
THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES
WITHIN THE SPACE PROVIDED.
3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT
WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO
PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY
COMPONENTS, FITTINGS, AND OFFSETS.
4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND
DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE
ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.
5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.
THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.
6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,
CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,
SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR
INSTALLED.
7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL
EQUIPMENT. COORDINATE WITH ELECTRICAL.
8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN
DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL
BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL
BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING
ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY
SUPPORTED WITH COMM HOOKS OR RINGS.
KEYED NOTES - MECHANICAL
1 INSTALL SALVAGED SA DIFFUSER.
2 ROUTE DUCTWORK WITHIN BULKBEAD. COORDINATE WITH VERTICALLY
STACKED HVAC PIPING AND DATA CABLE TRAY.
1/8" = 1'-0"
FIRST FLOOR SHEET METAL PLAN - UNIT B
1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE
CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION
DRAWINGS.
2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN
BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL
SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING
THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES
WITHIN THE SPACE PROVIDED.
3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT
WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO
PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY
COMPONENTS, FITTINGS, AND OFFSETS.
4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND
DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE
ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.
5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.
THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.
6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,
CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,
SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR
INSTALLED.
7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL
EQUIPMENT. COORDINATE WITH ELECTRICAL.
8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN
DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL
BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL
BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING
ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY
SUPPORTED WITH COMM HOOKS OR RINGS.
1 INSTALL SALVAGED SA DIFFUSER.
2 ROUTE DUCTWORK WITHIN BULKBEAD. COORDINATE WITH VERTICALLY
STACKED HVAC PIPING AND DATA CABLE TRAY.
KINDERGARTEN
KINDERGARTEN
READING ROOM
VESTIBULE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOMCLASSROOM
CLASSROOM
CLASSROOM
JAN. CLOSET
JAN. CL.
TOILET TOILET
TOILET TOILET
TOILET TOILET
TOILET TOILET
VESTIBULE
A139
A138
A137
A136
A124
A123
A127
A125
A126
A135
A134 A128
A129
A133
A132
A130
B109
A115
A112
A109 A108
A116 A117
A118
A107
A106
A105 A104
A119
A120 A121
A122
A103
A101
CORRIDOR
A131
CORRIDOR
A111
READING ROOM
STORAGE
STORAGE
STORAGE
BFBF
4' MB
12' MB4' TB 4' TB
H
R . W
A L L
H
R . W
A L L
H
R . W
A L L
3/4" HR
3/4" HS
3/4" HR
3/4" HS
3/4" HR
3/4" HR
3/4" HS
3/4" HR
3/4" HS
3/4" HS
3/4" HR
3/4" HS
3/4" HR
3/4" HR
3/4" HR
3/4" HR
3/4" HS
3/4" HS
3/4" HS
3/4" HS
M 310
VUV-A130
6 GPM
VUV-A129
6 GPM
VUV-A132
6 GPM
VUV-A133
6 GPM
VUV-A134
6 GPM
VUV-A135
6 GPM
VUV-A138
6 GPM
VUV-A123
6 GPM
VUV-A127
6 GPM
VUV-A128
6 GPM
VUV-A115
6 GPM
VUV-A118
6 GPM
VUV-A119
6 GPM
VUV-A122
6 GPM
VUV-A103
6 GPM
VUV-A106
6 GPM
VUV-A107
6 GPM
VUV-A110
6 GPM
VUV-NEW
ADDITION
16 GPM
VUV-NEW
ADDITION
26 GPM
NOT FOR CONSTRUCTION
PRELIM
IN
ARY
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R H
V A
C P
IP
IN
G P
L A
N
U N
IT
A 2
.2
M
A N
O V
E M
B E
R
C A
L E
D O
N
IA
E L
E M
E N
T A
R Y
C a le d o n ia
M ic h ig a n
C A
L E
D O
N
IA
C O
M M
U N
IT
Y
S C
H O
O L
S
1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE
CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION
DRAWINGS.
2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN
BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL
SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING
THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES
WITHIN THE SPACE PROVIDED.
3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT
WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO
PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY
COMPONENTS, FITTINGS, AND OFFSETS.
4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND
DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE
ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.
5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.
THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.
6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,
CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,
SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR
INSTALLED.
7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL
EQUIPMENT. COORDINATE WITH ELECTRICAL.
8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN
DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL
BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL
BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING
ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY
SUPPORTED WITH COMM HOOKS OR RINGS.
KEYED NOTES - HVAC PIPING
GENERAL MECHANICAL NOTES
1 CONNECT TO EXISTING HWS AND HWR BRANCH PIPING.
ISSUED FOR DATE
FIRST FLOOR HVAC PIPING PLAN - UNIT A
R
ES ES
RE
R E
ESES
ES
IC
6'
RECEPTION
OFFICE
STORAGE
OFFICE
TOILET
VESTIBULE
STORAGE
CONF. RM.
VEST.
VEST.
CORRIDOR
UNIT "B"
UNIT "A"
UNIT "A"
UNIT "B"
B130
B145
B144
B143
B142
B141
B146
B131
B140
B137
B134
B102
B133
B135
B136
B138
B139
B147
B148
VESTIBULE
LOBBY
HEALTH
PRINCIPAL
RECEPTION
LOUNGE
CONFERENCE
ROOM
BF TOILET WORK
ROOM
BF TOILET
CORRIDOR
STORAGE
JANITOR
HALLWAY
HALLWAY
OFFICE
ELEC.
MECH.
IDF
MUSIC ROOMCOMPUTER ROOM
MDF ROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM CLASSROOM
GIRL'S
BOY'S
TOILET
TOILET
STORAGE
STORAGE
STORAGE
CL.
CL.
CL.
VEST.
TOILET
TOILET
OFFICE
JAN. CL.
CORRIDOR
CORRIDOR
B106
B105
B103
B104
B101
B128
B112
B125 B124
B122
B121
B120
B123
B110
B109
B111
B113
B119
B117
B118
B116
A112
B115
B114
A110
B129
B126
STORAGE
B108
B107
A113
A114
BOILER ROOM
CUSTODIAN
OFFICE SPEECH
OFFICE
OFFICE
BF
BFBF
BF
BF
8' MB
M W
A V
E D
IS
H
W
A S
H E
R
REFR.
VENDING
MACH.
F E
C
4' MB
12' MB4' TB 4' TB
4' TB 4' TB
10' T B
VUV-A115
6 GPM
VUV-B119
6 GPM
VUV-B116
6 GPM
NOT FOR CONSTRUCTION
PRELIM
IN
ARY
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R H
V A
C P
IP
IN
G P
L A
N
U N
IT
B 2
.2
M
B N
O V
E M
B E
R
C A
L E
D O
N
IA
E L
E M
E N
T A
R Y
C a le d o n ia
M ic h ig a n
C A
L E
D O
N
IA
C O
M M
U N
IT
Y
S C
H O
O L
S
ISSUED FOR DATE
1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE
CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION
DRAWINGS.
2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN
BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL
SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING
THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES
WITHIN THE SPACE PROVIDED.
3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT
WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO
PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY
COMPONENTS, FITTINGS, AND OFFSETS.
4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND
DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE
ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.
5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.
THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.
6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,
CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,
SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR
INSTALLED.
7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL
EQUIPMENT. COORDINATE WITH ELECTRICAL.
8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN
DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL
BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL
BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING
ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY
SUPPORTED WITH COMM HOOKS OR RINGS.
KEYED NOTES - HVAC PIPING
GENERAL MECHANICAL NOTES
1 CONNECT TO EXISTING HWS AND HWR BRANCH PIPING.
1/8" = 1'-0"
FIRST FLOOR HVAC PIPING PLAN - UNIT B
1 DETAILS SHOWN ILLUSTRATE DESIGN INTENT, NOT ALL POSSIBLE
CONDITIONS. DRAWINGS ARE NOT TO BE CONSIDERED FABRICATION
DRAWINGS.
2 IF THE CONTRACTOR ELECTS TO PROVIDE EQUIPMENT OTHER THAN
BASIS OF DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE THE LAYOUT AND CLEARANCE REQUIREMENTS IN ALL
SPACES CONTAINING EQUIPMENT AND PROVIDE EQUIPMENT MEETING
THE SPECIFICATIONS AND ACHIEVING CODE REQUIRED CLEARANCES
WITHIN THE SPACE PROVIDED.
3 COORDINATE ALL NEW CONSTRUCTION WORK OR ACTIVITY WITH THAT
WHICH IS REQUIRED BY OTHER TRADES OR INSTALLERS IN ORDER TO
PROVIDE A COMPLETE SYSTEM INCLUDING ALL NECESSARY
COMPONENTS, FITTINGS, AND OFFSETS.
4 INSTALLER SHALL VERIFY ALL EXISTING JOBSITE CONDITIONS AND
DIMENSIONS AND BE RESPONSIBLE FOR THE SAME. NOTIFY THE
ENGINEER OF DISCREPANCIES PRIOR TO COMMENCING WORK.
5 FIRE SEAL ALL PENETRATIONS, SUCH AS PIPES, DUCTS, CONDUIT, ETC.
THROUGH FIRE AND/OR SMOKE RATED ASSEMBLIES.
6 MECHANICAL INSTALLER IS RESPONSIBLE FOR PATCHING OF WALLS,
CEILINGS, AND FLOORS WHERE FIXTURES, MECHANICAL EQUIPMENT,
SHEET METAL, OR PIPING HAS BEEN REMOVED, RELOCATED, OR
INSTALLED.
7 ALL PIPING SHALL AVOID LOCATIONS DIRECTLY ABOVE ALL ELECTRICAL
EQUIPMENT. COORDINATE WITH ELECTRICAL.
8 ALL LOW VOLTAGE CABLING SHALL BE RUN IN CONDUIT BETWEEN
DEVICE AND CABLE TRAY OR TECHNOLOGY RACK. NO CABLING SHALL
BE VISIBLE IN EXPOSED CEILING SPACES. EXPOSED CONDUIT SHALL
BE PAINTED TO MATCH SURFACE IT IS SUPPORTED FROM. WIRING
ROUTED IN ACCESSIBLE CEILING SPACES SHALL BE INDEPENDENTLY
SUPPORTED WITH COMM HOOKS OR RINGS.
1 CONNECT TO EXISTING HWS AND HWR BRANCH PIPING.
FIRST FLOOR
100' - 0" (X' - X")
FIRST FLOOR
100' - 0" (X' - X")
SECOND FLOOR
110' - 0"
SECOND FLOOR
110' - 0"
NOT FOR CONSTRUCTION
PRELIM
IN
ARY
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
M E
C H
A N
IC
A
L S
E C
T
IO
N S
.2
M
N O
V E
M B
E R
C A
L E
D O
N
IA
E L
E M
E N
T A
R Y
C a le d o n ia
M ic h ig a n
C A
L E
D O
N
IA
C O
M M
U N
IT
Y
S C
H O
O L
S
ISSUED FOR DATE
1/4" = 1'-0"M 310
1 VUV SECTION
ABBREVIATIONS
BRITISH THERMAL UNIT PER HOUR
AUTOMATIC CONTROL DAMPER
BRITISH THERMAL UNIT PER HOUR
CALIBRATED BALANCING VALVE
CUBIC FEET PER MINUTE
ENTERING AIR TEMPERATURE
EXTERNAL STATIC PRESSURE
ELECTRIC WATER COOLER
ENTERING WATER TEMPERATURE
LEAVING AIR TEMPERATURE
LEAVING WATER TEMPERATURE
MIXED AIR TEMPERATURE
FIELD INSTALLEDF.I.
MBH
M.B.
(THOUSANDS)
MOP BASIN
L.A.T.
L.W.B
L.W.T.
M.A.
M.A.T.
MAX.
LAV.
L.D.B.
LOUV.
G.P.M.
H.B.
HP
I.E.
F.M.
F.P.M.
F.R.
LAVATORY
LEAVING DRY BULB
LEAVING WET BULB
MIXED AIR
MAXIMUM
LOUVER
FLOOR MOUNTED
FEET PER MINUTE
FIN RADIATION
GALLONS PER MINUTE
HOSE BIBB
HORSE POWER
INVERT ELEVATION
CONTROL VALVEC.V.
F.C.
F.D.
(FD)
F.H.C.
E.W.B.
E.W.C.
E.W.T.
EXIST.
E.A.
E.A.T.
E.D.B.
E.F.
E.S.P.
D.F.
D.S.
DN.
ENTERING WET BULB
FLEXIBLE CONNECTION
FLOOR DRAIN
FIRE DAMPER
FIRE HOSE CABINET
EXISTING
DRINKING FOUNTAIN
DOWN SPOUT
EXHAUST AIR
ENTERING DRY BULB
EXHAUST FAN
DOWN
C.B.
C.H.
C.I.
C.M.
C.O.
C.B.V.
C.F.H.
C.F.M.
B.D.D.
B.F.
BTUH
B.V.
B.D.
A.F.F.
A.G.
A.P.D.
CATCH BASIN
CUBIC FEET PER HOUR
CABINET HEATER
CAST IRON
CEILING MOUNTED
CLEAN OUT
BALANCING DAMPER
ABOVE FINISHED FLOOR
ABOVE GRADE
AIR PRESSURE DROP
BACKDRAFT DAMPER
BARRIER FREE
BALANCING VALVE
A.C.D.
TEMPERATURE RISET.R.
TOTAL STATIC PRESSURE
TERMINAL UNIT BOX
TEPID WATER CONNECTION
VIBRATION ISOLATORS
WATER PRESSURE DROP
W.SK. WASH SINK
V.
T.S.
T.S.P.
T.U.
T.W.C.
U.H.
URN.
VEL.
V.I.
V.I.F.
V.S.
V.T.R.
W.
W.C.
W.M.
W.P.D.
VELOCITY
VERIFY IN FIELD
VENT STACK
VENT THRU ROOF
WASTE
WATER CLOSET
WALL MOUNTED
TIP SPEED
UNIT HEATER
URINAL
VENT
MANUFACTURER(S)MFR.(S)
BACKFLOW PREVENTER
MANUAL AIR VENT
NORMALLY CLOSED
NON-FREEZE WALL HYDRANT
NOT IN CONTRACT
OUTSIDE AIR INTAKE
POST INDICATOR VALVE
PRESSURE REDUCING VALVE
PRESSURE / TEMPERATURE TAPPING
RELATIVE HUMIDITY
REVOLUTIONS PER MINUTE
REDUCED PRESSURE PRINCIPAL
STATIC PRESSURE
RETURN AIRR.A.
S.O.V.
R.D.
R.H.
R.I.O.
R.P.M.
RPPBP
R.V.
S.A.
SENS.
SHR.
SK.
S.P.
S.SK.
TEMP.
TOT.
SHUT-OFF VALVE
SENSIBLE
SHOWER
SERVICE SINK
TEMPERATURE
TOTAL
SINK
ROOF DRAIN
ROUGH IN ONLY
RELIEF VALVE
SUPPLY AIR
M.H.
MIN.
MTG.
M.V.
N.C.
N.F.W.H.
N.I.C.
N.O.
O.A.
O.A.I.
OCT.
P.A.
P.D.
P.I.V
P.R.V.
P.T.
OUTSIDE AIR
OCTAVE
PIPE ANCHOR
PRESSURE DROP
MANHOLE
MINIMUM
MOUNTING
NORMALLY OPEN
TEPID WATER
TEPID WATER RETURNTWR
TW
HUMIDISTAT
SYMBOLS
PRESSURE GAUGE
OXYGEN
REDUCED PRESSURE PRINCIPLE BACKFLOW
PUMPED CONDENSATE
PRIMARY HEATING HOT WATER SUPPLY
PRIMARY HEATING HOT WATER RETURN
PRESSURE / TEMPERATURE TAPPING
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
OUTSIDE STEM AND YOKE VALVE
SMOKE DAMPER
SHUT-OFF VALVE
STEAM
SOFT HOT WATER
SPRING CHECK VALVE
SOFT HOT WATER RETURN
SOFT COLD WATER
SANITARY SEWER (BELOW FLOOR)
SANITARY SEWER (ABOVE FLOOR)
PREVENTER
O2
PHR
PC
PHS
SAN
SAN
SHW
SHWR
S
STM (#)
SCW
THERMOMETER
STRAINER
THROTTLING VALVE
THERMOSTAT
TRIPLE DUTY VALVE (STRAIGHT)
TRIPLE DUTY VALVE (ANGLE)
THREE-WAY CONTROL VALVE
STORM (BELOW FLOOR)
STORM SEWER (ABOVE FLOOR)
VENT
VACUUM BREAKER
VACUUM
UNION
ST
ST
VAC
V
STEAM TRAPT
AW
CAP
AWV
CR
CWR
CWS
CS
A
CD
COND
CTR
CTS
FP
FS
FD
GAS
FOR
FOS
HR
G
HS
HPR
HPS
CONTROL VALVE
HOT WATER SUPPLY (DOMESTIC)
HOT WATER RETURN (DOMESTIC)
HEAT PUMP SUPPLY
HEAT PUMP RETURN
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
GAS COCK
FUEL OIL SUPPLY
FUEL OIL RETURN
FOOTING DRAIN
FLOW SWITCH
FLOW METER (WAFER TYPE)
FLOW METER (PROBE TYPE)
FIRE PROTECTION
FIRE/SMOKE DAMPER
FIRE DAMPER (VERTICAL)
FIRE DAMPER (HORIZONTAL)
COOLING TOWER SUPPLY
COOLING TOWER RETURN
CONDENSATE DRAIN
CONDENSATE
COLD WATER (DOMESTIC)
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CHECK VALVE
CALIBRATED BALANCING VALVE
BUTTERFLY VALVE
BALANCING VALVE
ACID WASTE VENT
ACID WASTE
COMPRESSED AIR
CHILLER RETURN
CHILLER SUPPLY
TEMPERATURE SENSOR
STORM SEWER (OVERFLOW SYSTEM)ST (OF)
MVAC MEDICAL VACUUM
MEDICAL AIRMA
S
S
T
H
TS
RETURN/EXHAUST AIR
SUPPLY AIR
VD
MAIN DUCT
BRANCH DUCT
TAPERED CONNECTION 45° ANGLE (IF MAIN DUCT
IS RECTANGULAR) OR CONICAL CONNECTION (IF
MAIN DUCT IS ROUND) L=1/4 W; 4" MIN
W
L
SUPPLY DUCTWORK DUCT INSULATION,
REFER TO SPECIFICATIONS
SUPPLY DUCT BOOT
TEE W/ END CAP
MAXIMUM OF 3 FEET
OF INSULATED FLEX
DUCT
SUPPLY AIR DIFFUSER,
REFER TO SCHEDULE
MANUAL BALANCE DAMPER
WITH QUAD. LOCK
ROUND DIFFUSER THROAT
VERIFY CEILING TYPE WITH
ARCH CEILING PLANS
DUCTWORK GENERAL NOTES
90° TEELO-LOSS TEE CONICAL TEE
45° CONICAL TEE MITERED ELBOW45° LATERAL
ENLARGEMENT ANGLE TO BE
22 1/2° OR LESS. CONTRACTION
ANGLE TO BE 45° OR LESS
90° SECTIONED ELBOW
9"~ AND LARGER
SPIRAL DUCT
WELDED OR GROOVED SEAMS
COLLAR BRUSHED W/ SEAL.
COMPOUND BEFORE ASS'T
TRANSITION
RECT. OR OVAL DUCT
ORIFICE
(R) REDUCER
(W/ OR W/OUT ORIFICE)
DIE STAMPED ELBOW
8"~ AND SMALLER
0°-35°
36°-71°
72°-90°
SLICE IN ROUND DUCT
USE SLICES RATHER THAN
ROUND - RECT. - ROUND
WHERE d/D IS GREATER
THAN 2/3
22 1/2° MAX.
d
ROUND - RECT. - ROUND
W=750
OFFSET
NO. OF SECTIONSANGLE
1. ALL JOINTS, CORNERS AND SEAMS TO BE FULLY
SEALED WITH SMACNA APPROVED DUCTWORK
SEALANT.
2. ALL DUCTWORK IS TO BE LEAK TESTED AT PRESSURES
SPECIFIED.
3. ALL RADIUS ELBOWS SHALL HAVE MINIMUM 1.5
CENTERLINE RADIUS
4. USE MITERED ELBOW WITH TURNING VANES WHEN
CENTERLINE RADIUS IS LESS THAN 1.5.
D d
22.50° MAX
D
MAX.
3d
D D d
MIN.
2D
VOLUME CONTROL
DAMPER
45° TAKEOFF COLLAR
WITHOUT DAMPER
RECTANGULAR LOW
PRESSURE DUCT
ROUND LOW
PRESSURE DUCT
NEOPRENE MEMBRANE
ANTI-VIBRATION PAD
FLOOR
DUCT SHROUD BY UNIT
VENT. MFG. TO BE FIELD
MEASURED AND CUT BY THE
INSTALLING CONTRACTOR.
IT IS RECOMMENDED TO
PENETRATE CEILING BY AT
LEAST 1"
VERIFY CEILING TYPE WITH
ARCH CEILING PLANS
UNION
SUPPLY AIR DUCTWORK,
REFER TO PLANS FOR SIZE
KEYED MANUAL AIR VENT
FLEXIBLE DUCT
UNIT CONNECTION
1" "ARMAFLEX" INSULATION
ON ALL O.A.I DUCTWORK
PITCH BOTTOM OF O.A.I. DUCT
TOWARDS EXT. WALL LOUVER.
COORDINATE EXTERIOR WALL
PENETATION WITH G.C.
PROVIDE AND INSTALL UNIT
VENT. PER EQUIPMENT MFG'S
RECOMMENDATIONS. GASKET
SEAL AND CAULK ALL UNIT
OPENINGS AND DUCT SEAMS.
PACK ANY VOIDS WITH
BATT INSULATION. (TYP.)
GRADE LEVEL
E.A.
O.A.
4" DRAINABLE BLADE LOUVER,
PROVIDED BY OTHERS, CAULK
AT TOP AND SIDES
REAR EXTENSION BY
UNIT VENT. MFG.
EXTERIOR WALL
COPPER CONDENSATE
DRAIN TUBE, DRILL/CORE
FROM OUTSIDE BUILDING
TO AVOID SPAULING OF
FACEBRICK
CONDENSATE DRAIN TUBE SIZING:
3/4" UP TO 2 TON
1" UP TO 5 TON
ENERGY SHIELD INSULATION
1' THICK-TOP & BOTH SIDES
OF OPENING, 1" THICK
TAPERED BOTTOM, FRICTION
FIT INTO OPENING, BY
MECHANICAL INSTALLER
HS & HR
MANUAL SHUTOFF
BALL VALVE
PROVIDE CONTINIOUS
SHEET METAL CLOSURE
PLATES FROM MFG
MATCHING UV COLOR AND
FINISH FOR SIDES, TOP
AND BASE TO CONCEAL
INSTALLATION
PACK ANY VOIDS, TOP SIDES
AND BOTTOM, WITH BATT
INSULATION.
REFRIGERATION PIPING
IN PIPE ENCLOSURE
REFRIGERATION PIPING
CONDENSATE SPILL
CONDENSATE PIPE
SWEAT CONNECTIONS
SLEEVES & FLASHING
WALL OR CHASE
CONDENSATE PUMP
WHERE INDICATED
SLIP SHEET
ROOF
FLOOR
PACKAGED TERMINAL
AIR CONDITIONER
OUTDOOR CONDENSING
UNIT
DX COOLING COIL
COMPOSITE PAD
15"
ELEVATIONPLAN
MINIMUM OF (8) EIGHT
S.S. FASTENING SCREWS
PER ROOF CURB
LIQUID LINE
SUCTION LINE
ELECTRICAL
FEEDERS
(TYP.)
FLASH AND SEAL NEW CURB AND
PENETRATION TO MATCH
ROOFING SYSTEM
"PATE" OR EQUIVALENT, PCA-1,
8" HIGH STANDARD ROOF
CURB WITH 1" THICK
FIBERGLASS INSULATION
2"x2" TREATED WOOD NAILER
"PATE" OR EQUIVALENT, PCC-1
ACRYLIC CLAD A.B.S.
THERMOPLASTIC CURB CAP
GRADUATED PVC BOOT WITH
TWO STAINLESS STEEL CLAMPS
NOT FOR CONSTRUCTION
PRELIM
IN
ARY
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
M E
C H
A N
IC
A
L S
C H
E D
U L E
S A
N D
D E
T A
IL
S
.2
M
N O
V E
M B
E R
C A
L E
D O
N
IA
E L
E M
E N
T A
R Y
C a le d o n ia
M ic h ig a n
C A
L E
D O
N
IA
C O
M M
U N
IT
Y
S C
H O
O L
S
ISSUED FOR DATE
GRILLES, REGISTERS, & DIFFUSERS BASED ON PRICE
MARK PANEL SIZE FACE SIZE
NECK
SIZE
MODEL
CFM
RANGE
VCD THROW MATERIAL FINISH INSTALLATION REMARKS
SA-3 12"x6" 12"x6" 12"x6" 640 115-390 YES 14-20-28 ALUMINUM WHITE SURFACE
SCALE: NONEM 501
3 BRANCH TAKE OFFS DETAIL
SCALE: NONEM 501
4 CEILING MOUNTED SUPPLY DIFFUSER DETAIL - TYPICAL
SCALE: NONEM 501
6 DUCTWORK FITTING DETAILS - ROUND/OVAL
SCALE: NONEM 501
7 TAKEOFF DETAIL - RECTANGULAR TO ROUND
SCALE: NONEM 501
8 UNIT VENTILATOR DETAIL - VERTICAL
SCALE: NONEM 501
5 PACKAGED TERMINAL UNIT PIPING DETAIL
SCALE: NONEM 501
9 PIPING PORTAL / CURB DETAIL
SELF-CONTAINED VERTICAL UNIT VENTILATORS BASED ON AIREDALE
MARK MODEL TYPE
AIR FLOW
(CFM)
OA (CFM)
E.S.P. (IN
WC)
COOLING COIL HEATING COIL ELECTRICAL
Ceiling Height
REMARKS
TOTAL
CAPACITY
(MBH)
SENSIBLE
CAPACITY
(MBH)
TYPE
TOTAL
CAPACITY
(MBH)
WPD (FT)
FLOW
RATE
(GPM)
ROWS HP UV EER VOLTAGE
VUV-A103 CMD48 VERTICAL 1400 450 0.5 46.8 31.5 DX 80 5.77 6 2-ROW 0.75 11.6 208/60/3 8' - 6" 1, 2, 3
VUV-A106 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3
VUV-A107 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3
VUV-A110 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3
VUV-A115 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3
VUV-A118 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3
VUV-A119 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3
VUV-A122 CMD48 VERTICAL 1400 460 0.5 46.8 31.5 DX 80 5.77 6 2-ROW 0.75 11.6 208/60/3 8' - 6" 1, 2, 3
VUV-A123 CMD48 VERTICAL 1300 450 0.5 46.8 31.5 DX 80 5.77 6 2-ROW 0.75 11.6 208/60/3 9' - 6" 1, 2, 3
VUV-A127 CMD36 VERTICAL 1200 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 6" 1, 2, 3
VUV-A128 CMD36 VERTICAL 1200 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 6" 1, 2, 3
VUV-A129 CMD36 VERTICAL 1200 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 6" 1, 2, 3
VUV-A130 CMD36 VERTICAL 1200 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 6" 1, 2, 3
VUV-A132 CMD36 VERTICAL 1200 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 6" 1, 2, 3
VUV-A133 CMD36 VERTICAL 1200 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 6" 1, 2, 3
VUV-A134 CMD36 VERTICAL 1200 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 6" 1, 2, 3
VUV-A135 CMD36 VERTICAL 1200 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 6" 1, 2, 3
VUV-A138 CMD48 VERTICAL 1300 450 0.5 46.8 31.5 DX 80 5.77 6 2-ROW 0.75 11.6 208/60/3 9' - 6" 1, 2, 3
VUV-B116 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3
VUV-B119 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 0" 1, 2, 3
VUV-NEW ADDITION 1 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 6" 1, 2, 3
VUV-NEW ADDITION 2 CMD36 VERTICAL 1000 400 0.5 34.0 24.3 DX 80 5.77 6 2-ROW 0.75 11.0 208/60/3 9' - 6" 1, 2, 3
Grand total: 22
EXHAUST FANS BASED ON GREENHECK
MARK MODEL TYPE
AIR FLOW
(CFM)
ESP (IN
WC)
LOUDNESS
(SONES)
MOTOR
REMARKSEC MOTOR
NOMINAL
HP BRAKE HP RPM VOLTAGE
EF-1 G-095-VG DOWNBLAST 150 0.04 0.3 Yes 0.167 0.002 420 115/1
EF-2 G-095-VG DOWNBLAST 150 0.04 0.3 Yes 0.167 0.002 420 115/1
EF-3 G-095-VG DOWNBLAST 150 0.04 0.3 Yes 0.167 0.002 420 115/1
EF-4 G-095-VG DOWNBLAST 150 0.04 0.3 Yes 0.167 0.002 420 115/1
EF-5 G-095-VG DOWNBLAST 150 0.04 0.3 Yes 0.167 0.002 420 115/1
NOTES:
1. PROVIDE STUDY PACKAGE.
2 PROVIDE DUCT SHROUD FROM TOP OF UNIT TO CEILING.
3 HEATING CAPACITY BASED ON 90°F ATR, 140°F EWT, 120°F LWT.
| Sheets |
| MD 101A - FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT A |
| MD 101B - FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT B |
| M 101A - FIRST FLOOR SHEET METAL PLAN - UNIT A |
| M 101B - FIRST FLOOR SHEET METAL PLAN - UNIT B |
| M 201A - FIRST FLOOR HVAC PIPING PLAN - UNIT A |
| M 201B - FIRST FLOOR HVAC PIPING PLAN - UNIT B |
| M 310 - MECHANICAL SECTIONS |
| M 501 - MECHANICAL SCHEDULES AND DETAILS |