20058 Specifications Part 1.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ - 171 - 230000000515
- Issued by
- Crawford County, Michigan
About this file
This document is a set of specifications for the renovation of Armory Building 3 at the Camp Grayling facility in Grayling, Michigan. The project is being managed by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration. The scope of work includes renovating the existing toilet rooms, showers, and lockers, as well as converting remaining space to personal equipment and chair storage. New HVAC systems will be provided throughout the existing armory, and the roofs will be replaced completely. The project is located at 4962 Northwind Drive, Grayling, MI. Bids are due by 2:00 PM ET on 6/12/2023 and must remain open for 90 calendar days. A mandatory pre-bid conference will be held on 6/14/2023 at noon ET at the project site, and a site tour may be conducted immediately following the meeting. The contract includes liquidated damages provisions, and the successful bidder will be required to provide performance and payment bonds. Pricing should include all applicable Michigan sales and use taxes, as well as the cost of all necessary permits, approvals, licenses, and fees.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Michigan Department of Technology, Management and Budget
State Facilities Administration Design and Construction Division
File No. 511/20058.CAK DMVA PJ No. 26B1520017
Department of Military & Veteran Affairs
Renovate Armory Building 3
Camp Grayling Grayling, Michigan
Construction Documents May 19, 2023
Department of Military and Veterans Affairs
3423 N. Martin Luther King Jr. Blvd.
Lansing, Michigan 48906
Michigan Department of Technology, Management and Budget State Facilities Administration, Design & Construction Division
3111 W. St. Joseph Street Lansing, MI 48917
G.H. Forbes Associates Architects, P.C.
816 E. Fourth Street
Royal Oak, Michigan 48067
Peter Basso Associates 5145 Livernois, Suite 100
Troy, Michigan 48098
This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0 Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition.
Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR
STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
MICHSPEC No. 97.0820 00020 THROUGH 97.0820 00440
RELEASED ON NOVEMBER 1, 1997.
Developed from Contract Forms and Conditions of the Contract
FORMSPEC Michigan Model and suggested for use with
Bidding Requirements
File No. 20058.CAK Department/Agency 511
Renovation Armory Building 3 – Michigan Army National Guard
Camp Grayling Grayling, MI
May 19, 2023
1997 Edition/R 03/22 Version
STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS
MICHSPEC DTMB 00010 2 (Rev. 09/2016)
SECTION 00010 TABLE OF CONTENTS
SECTION/PAGE NO.
SUBJECT INDEX
SECTION 00020 GLOSSARY .........................................................................................................................................................00020 - 1 SECTION 00030 ADVERTISEMENT ..............................................................................................................................................00030 - 1 SECTION 00100 INSTRUCTIONS TO BIDDERS ...........................................................................................................................00100 - 1 ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS ..............................................................................................................00100 - 1 ARTICLE 2 QUALIFICATIONS OF BIDDERS.................................................................................................................................00100 - 1 ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS...................................................00100 - 2 ARTICLE 4 INTERPRETATIONS; ADDENDA ................................................................................................................................00100 - 3 ARTICLE 5 BID SECURITY.............................................................................................................................................................00100 - 3 ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES..............................................................................................................00100 - 4 ARTICLE 7 MATERIALS AND EQUIPMENT ..................................................................................................................................00100 - 4 ARTICLE 8 SUBCONTRACTORS...................................................................................................................................................00100 - 5 ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS .............................................................................................................00100 - 5 ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS .............................................................................................................00100 - 6 ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ....................................................................................................................00100 - 6 ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ............................................................................................................00100 - 7 ARTICLE 13 BIDS TO REMAIN OPEN ..............................................................................................................................................00100 - 7 ARTICLE 14 AWARD OF THE CONTRACT ......................................................................................................................................00100 - 7 ARTICLE 15 EXECUTION OF THE AGREEMENT............................................................................................................................00100 - 9 ARTICLE 16 MOBILIZATION PAY ITEM.......................................................................................................................................... 00100 -10 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .............................................00100 -10 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST ...................................................................................................00110 - 1 SECTION 00120 SUPPLEMENTARY INSTRUCTIONS .................................................................................................................00120 - 1 SECTION 00210 INFORMATION FOR BIDDERS ..........................................................................................................................00210 - 1 SECTION 00300 BID SUMMARY ...................................................................................................................................00300 - SUMMARY SECTION 00300 BID FORM ...........................................................................................................................................................00300 - 1 ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER")..............................................................00300 - 1 ARTICLE 2 THE BIDDER'S REPRESENTATIONS............................................................................................................................00300 - 1 ARTICLE 3 TIME OF COMPLETION .................................................................................................................................................00300 - 2 ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID ................................................................................................................00300 - 2 ARTICLE 5 DEFINED TERMS ...........................................................................................................................................................00300 - 2 ARTICLE 6 BID SCHEDULE ..............................................................................................................................................................00300 - 3 ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ..................................................................................................................00300 - 5 ARTICLE 8 BID SUBMITTED ON...................................................................................................................................................... 00300 - 6 SECTION 00310 BID BOND ...........................................................................................................................................................00310 - 1 SECTION 00320 NONCOLLUSION AFFIDAVIT ............................................................................................................................00320 - 1 SECTION 00410 BID BREAKDOWN..............................................................................................................................................00410 - 1 SECTION 00420 QUESTIONNAIRE ...............................................................................................................................................00420 - 1 ARTICLE 1 ORGANIZATION ...........................................................................................................................................................00420 - 1 ARTICLE 2 SPECIALTY CONTRACTOR LICENSES......................................................................................................................00420 - 1 ARTICLE 3 EXPERIENCE................................................................................................................................................................00420 - 1 ARTICLE 4 ADDITIONAL QUALIFICATIONS ..................................................................................................................................00420 - 2 ARTICLE 5 REFERENCES ..............................................................................................................................................................00420 - 2 REFERENCES ATTACHMENT.....................................................................................................................................00420 - 3 SECTION 00430 LIST OF SUBCONTRACTORS...........................................................................................................................00430 - 1 SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT ..............................................................................................00440 - 1 ARTICLE 1 BID MATERIALS AND EQUIPMENT LISTED (NAMED OR SPECIFIED) ITEMS ......................................................00440 - 1 ARTICLE 2 BID MATERIALS AND EQUIPMENT OPEN SPECIFICATIONS ...............................................................................00440 - 3 SECTION 00500 AGREEMENT ......................................................................................................................................................00500 - 1 ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK ..........................................................................................................00500 - 1 ARTICLE 2 CONTRACT DOCUMENTS...........................................................................................................................................00500 - 1 ARTICLE 3 CONTRACT PRICE.......................................................................................................................................................00500 - 2 ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES...............................................................................................................00500 - 2 ARTICLE 5 PAYMENTS TO CONTRACTOR ..................................................................................................................................00500 - 3
MICHSPEC DTMB 00010 3 (Rev. 09/2016)
ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR .....................................................................................................00500 - 3 ARTICLE 7 CONTRACTOR'S REPRESENTATIONS......................................................................................................................00500 - 3 ARTICLE 8 MISCELLANEOUS ........................................................................................................................................................00500 - 3 ARTICLE 9 NOTICE AND SERVICE................................................................................................................................................00500 - 4 SECTION 00520 ATTACHMENT “A” TO AGREEMENT ...............................................................................................................00520 - 1 SECTION 00610 PERFORMANCE BOND ....................................................................................................................................00610 - 1 SECTION 00620 PAYMENT BOND ...............................................................................................................................................00620 - 1 SECTION 00700 GENERAL CONDITIONS ....................................................................................................................................00700 - 1 ARTICLE 1 INTERPRETATIONS .......................................................................................................................................................00700 - 1
1.1 Section 00020 Glossary: ...........................................................................................................................................................00700 - 1
1.2 Intent of the Contract Documents: ............................................................................................................................................00700 - 1
1.3 Priority of the Contract Documents: ..........................................................................................................................................00700 - 2
1.4 Interpretation of Indemnification Provisions: .............................................................................................................................00700 - 2
1.5 Additional Interpretations: .........................................................................................................................................................00700 - 2
1.6 Ownership and Use of the Contract Documents:.....................................................................................................................00700 - 3.
1.7 Copies of the Contract Documents: ...........................................................................................................................................00700 - 3
ARTICLE 2 THE OWNERGENERAL PROVISIONS ......................................................................................................................00700 - 3
2.1 Availability of Lands, Areas, Properties and Facilities: .............................................................................................................00700 - 3
2.2 Reference Points; Base Lines and Benchmarks:......................................................................................................................00700 - 3
2.3 Stop Work Order: .....................................................................................................................................................................00700 - 3.
2.4 Limitations on the Owner’s Responsibilities:............................................................................................................................00700 - 4
2.5 Additional General Provisions:..................................................................................................................................................00700 - 4
2.6 Partnering Charter: ..................................................................................................................................................................00700 - 4.
ARTICLE 3 THE PROFESSIONAL GENERAL PROVISIONS......................................................................................................00700 - 4
3.1 Owner’s Representative:..........................................................................................................................................................00700 - 4
3.2 Clarifications and Interpretations: .............................................................................................................................................00700 - 4
3.3 Minor Variations and No-Cost Changes; Minor Delays: ...........................................................................................................00700 - 5
3.4 Determinations by the Professional: .......................................................................................................................................00700 - 5
3.5 Limitations on the Professional’s Responsibilities: ...................................................................................................................00700 - 5
ARTICLE 4 CONTROL OF WORK GENERAL PROVISIONS ......................................................................................................00700 - 5
4.1 Review of the Contract Documents: .........................................................................................................................................00700 - 5
4.2 Management, Supervision, and Personnel: ..............................................................................................................................00700 - 5
4.3 Materials and Equipment: .........................................................................................................................................................00700 - 6
4.4 Concerning Control of Work:....................................................................................................................................................00700 - 6.
4.5 Patent Fees and Royalties: .......................................................................................................................................................00700 - 7
4.6 Use of Premises:.......................................................................................................................................................................00700 - 7
4.7 Record Documents: ..................................................................................................................................................................00700 - 7
4.8 Emergencies: ............................................................................................................................................................................00700 - 8
4.9 Indemnification: .........................................................................................................................................................................00700 - 8
ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS......................................................................................................................00700 - 8
5.1 Employment of Subcontractors: ................................................................................................................................................00700 - 8
5.2 "Or Equal" and Substitute Materials and Equipment: ...............................................................................................................00700 - 9
5.3 The Contractor’s Continuing Responsibilities: ........................................................................................................................00700 - 9
ARTICLE 6 SUBMITTALS ................................................................................................................................................................00700 - 9
6.1 Shop Drawing, Sample and Other Technical Submittals: .........................................................................................................00700 - 9
6.2 Review and Return of Technical Submittals: .........................................................................................................................00700 - 10.
6.3 Progress Schedule Submittals: ...............................................................................................................................................00700 - 10
6.4 Review and Return of Progress Schedule Submittals: ..........................................................................................................00700 - 10.
6.5 Additional Provisions Concerning Submittals: .......................................................................................................................00700 - 10.
ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ....................................................................................................................00700 - 11
7.1 Laws; Permits (Which Include Approvals and Licenses): ......................................................................................................00700 - 11.
7.2 Sales and Use Tax and Other Similar Taxes:........................................................................................................................00700 - 12.
7.3 Safety and Protection:.............................................................................................................................................................00700 - 12
7.4 Bonds and Insurance - General Requirements:......................................................................................................................00700 - 12
7.5 The Contractor’s Liability Insurance:.....................................................................................................................................00700 - 12
7.6 Pollution Liability Insurance: ...................................................................................................................................................00700 - 13
7.7 Property Insurance (Builder's All Risk Insurance):..................................................................................................................00700 - 13
7.8 Waiver of Rights:.....................................................................................................................................................................00700 - 13
7.9 Receipt and Application of Proceeds: .....................................................................................................................................00700 - 13
MICHSPEC DTMB 00010 4 (Rev. 09/2016)
7.10 Unfair Labor Practice: .............................................................................................................................................................00700 - 13
7.11 Michigan Right-To-Know Law: ...............................................................................................................................................00700 - 13.
7.12 Nondiscrimination: ..................................................................................................................................................................00700 - 14
7.13 Michigan Residency for Employees:.......................................................................................................................................00700 - 14
ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION .......................................................................................................00700 - 15
8.1 Starting the Work: ..................................................................................................................................................................00700 - 15.
8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ...............................................................................................................00700 - 15
8.3 Compliance with Contract Time Requirements:......................................................................................................................00700 - 15
8.4 Substantial Completion: ..........................................................................................................................................................00700 - 15
8.5 Partial Use: .............................................................................................................................................................................00700 - 16
8.6 Division of Responsibilities: ....................................................................................................................................................00700 - 16
8.7 Suspension of Work: ...............................................................................................................................................................00700 - 16
8.8 Sharing of Total Float on Non-Critical Paths:..........................................................................................................................00700 - 16
ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND
APPROVALS; CORRECTION OF WORK...................................................................................................................00700 - 17
9.1 Warranty: ...............................................................................................................................................................................00700 - 17
9.2 Tests, Inspections and Approvals: .........................................................................................................................................00700 - 17
9.3 Uncovering Work: ..................................................................................................................................................................00700 - 17
9.4 Correction of Work: ................................................................................................................................................................00700 - 17
9.5 Special Correction Period Requirements:..............................................................................................................................00700 - 18
9.6 Special Maintenance Requirements: .....................................................................................................................................00700 - 18
ARTICLE 10 CHANGES .................................................................................................................................................................00700 - 19
10.1 Changes in the Work: ............................................................................................................................................................00700 - 19
10.2 Differing Subsurface or Physical Site Conditions:.................................................................................................................00700 - 19.
10.3 Responsibilities for Underground Utilities: .............................................................................................................................00700 - 20
10.4 Hazardous Material Conditions:.............................................................................................................................................00700 - 20
10.5 Incidents with Archaeological Features: ................................................................................................................................00700 - 20
10.6 Unit Price Work: .....................................................................................................................................................................00700 - 21
10.7 Cash Allowances; Provisionary Allowances: .........................................................................................................................00700 - 21
10.8 Change Orders; Change Authorizations: ...............................................................................................................................00700 - 21
ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN
CONTRACT TIME .....................................................................................................................................................00700 - 22
11.1 General Provisions:................................................................................................................................................................00700 - 22
11.2 Changes in Contract Time: ....................................................................................................................................................00700 - 22
11.3 Methods for Making Adjustments in Contract Price: .............................................................................................................00700 - 22.
11.4 Labor, Subcontract and Material/Equipment Costs: ..............................................................................................................00700 - 23
11.5 Construction Equipment Costs: .............................................................................................................................................00700 - 23
11.6 Rented or Leased Construction Equipment: ..........................................................................................................................00700 - 23
11.7 Owned Construction Equipment: ...........................................................................................................................................00700 - 24
11.8 General Conditions Costs: .....................................................................................................................................................00700 - 24
11.9 Limitations on Allowable Costs: .............................................................................................................................................00700 - 24
11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ..................................00700 - 24.
11.11 Limits on the Fee for the Work Involved: ...............................................................................................................................00700 - 25.
11.12 Fee for Unabsorbed Home Office Overhead: .........................................................................................................................00700 - 25
11.13 Changes in Contract Time for Early Completion:....................................................................................................................00700 - 25
11.14 Access to Records: .................................................................................................................................................................00700 - 26
11.15 Price Reduction for Defective Cost and Pricing Data: ............................................................................................................00700 - 26
ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ...........................................................................................................00700 - 26
12.1. Schedule of Values: ...............................................................................................................................................................00700 - 26
12.2 Requests for Payment: ..........................................................................................................................................................00700 - 27
12.3 Review of Request for Payment; Intent of Review:................................................................................................................00700 - 27
12.4 Refusal to Make or to Recommend Payment: ......................................................................................................................00700 - 27.
12.5 Final Request for Payment: ...................................................................................................................................................00700 - 27
12.6 Final Payment and Acceptance: ............................................................................................................................................00700 - 28
12.7 Contractor’s Continuing Obligation: .....................................................................................................................................00700 - 28
12.8 Waiver of Claims:...................................................................................................................................................................00700 - 28
ARTICLE 13 OTHER WORK ..........................................................................................................................................................00700 - 28
13.1 Related Work at Site: .............................................................................................................................................................00700 - 28
13.2 Coordination Requirements: ..................................................................................................................................................00700 - 29
13.3 Claims Between the Contractor and Other Parties: .............................................................................................................00700 - 29
MICHSPEC DTMB 00010 5 (Rev. 09/2016)
ARTICLE 14 TERMINATION ..........................................................................................................................................................00700 - 29
14.1 Notice Requiring Assurance of Due Performance: ...............................................................................................................00700 - 29.
14.2 Contractor Default and Termination for Cause:....................................................................................................................00700 - 30
14.3 Surety Default: .......................................................................................................................................................................00700 - 31
14.4 Termination for Convenience of the Owner:..........................................................................................................................00700 - 31
14.5 The Contractor May Suspend Work: ..................................................................................................................................00700 – 31.
ARTICLE 15 DISPUTES.................................................................................................................................................................00700 - 31
15.1 Claims Under This Article: .....................................................................................................................................................00700 - 31
15.2 Requirement for Certification of Contractor Claims:.............................................................................................................00700 - 32
15.3 Recommendations or Decisions from the Professional: ......................................................................................................00700 - 32
15.4 Determinations by the Director-DCD: ...................................................................................................................................00700 - 32
15.5 Supplements to AAA Arbitration: ...........................................................................................................................................00700 - 33
15.6 Interest on a Judgment; Payment of Judgment: ....................................................................................................................00700 - 33
15.7 Venue; Flow-Through Provision:............................................................................................................................................00700 - 33
SECTION 00800 SUPPLEMENTARY CONDITIONS ...................................................................................................................00800 - 1
Appendix I Special Working Conditions……………………………………………………………………………………00800 - 3 Appendix II Special Project Procedures……………………………………………………………………………………00800 - 5
Soil Erosion and Sedimentation Control Demolition/Remodeling Project Procedures Hazardous Material Project Procedures Asbestos Abatement Project Procedures Lead Abatement Project Procedures
Appendix III Federal Funding Requirement …………………………………………………..…………………………00800 - 17
SECTION 01310 PROGRESS SCHEDULE ..................................................................................................................................01310 - 1
TECHNICAL SPECIFICATIONS
DIVISION 2 – SITE WORK PAGES
02 41 19 Selective Structure Demolition 1 – 2
DIVISION 3 – CONCRETE PAGES
03 30 00 Cast-in-Place Concrete 1 – 9
DIVISION 4 – MASONRY PAGES
04 01 20 Brick Masonry Repair and Repointing 1 – 8 04 22 00 Concrete Unit Masonry 1 – 12
DIVISION 5 – METALS PAGES
REFER TO DRAWINGS FOR STRUCTURAL SPECIFICATIONS
DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES PAGES
06 10 53 Miscellaneous Rough Carpentry 1 – 2 06 61 16 Solid Surfacing Fabrications 1 – 3
DIVISION 7 – THERMAL AND MOISTURE PROTECTION PAGES
07 42 65 Rigid Foam Board Insulation 1 – 7 07 53 23 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing 1 – 6 07 62 00 Sheet Metal Flashing and Trim 1 – 3 07 84 13 Penetration Firestopping 1 – 7
MICHSPEC DTMB 00010 6 (Rev. 09/2016)
07 92 00 Joint Sealants 1 – 2
DIVISION 8 – OPENINGS_________________________________________________ PAGES
08 06 71 Door Hardware Schedule 1 – 8 08 11 13 Hollow Metal Doors and Frames 1 – 12 08 71 00 Door Hardware 1 – 18 08 91 19 Fixed Louvers 1 – 1
DIVISION 9 – FINISHES PAGES
09 22 16 Non-Structural Metal Framing 1 – 2 09 29 00 Gypsum Board 1 – 2 09 30 13 Porcelain Tiling 1 – 4 09 51 23 Acoustical Tile Ceilings 1 – 5 09 65 13 Resilient Base and Accessories 1 – 3 09 65 19 Resilient Tile Flooring 1 – 2 09 67 23 Resinous Flooring 1 – 8 09 91 23 Painting 1 – 4
DIVISION 10 – SPECIALTIES PAGES
10 14 00 Signage 1 – 2 10 21 13 Plastic Toilet Compartments 1 – 4 10 28 00 Toilet Accessories 1 – 3 10 51 43 Lockers and Benches 1 – 2
DIVISION 20 PAGES
20 05 00 Mechanical General Requirement 1 – 12 20 05 10 Basic Mechanical Materials and Methods 1 – 23 20 05 13 Motors 1 – 10 20 05 16 Pipe Flexible Connectors, Expansions Fittings, and Loops 1 – 11 20 05 19 Meters and Gages 1 – 13 20 05 29 Hangers and Supports 1 – 17 20 05 47 Mechanical Vibration Controls 1 – 10 20 05 53 Mechanical Identification 1 – 8 20 07 00 Mechanical Insulation 1 – 26 20 29 23 Variable Frequency Controllers 1 – 9
DIVISION 22 – PLUMBING PAGES
22 05 23 General Duty Valves for Plumbing 1 – 9 22 11 16 Domestic Water Piping 1 – 9 22 11 19 Domestic Water Piping Specialties 1 – 14 22 11 23 Domestic Water Circulation Pumps 1 – 7 22 13 16 Sanitary Waste and Vent Piping 1 – 11 22 13 19 Drainage Piping Specialties 1 – 14 22 14 13 Storm Drainage Piping 1 – 6 22 35 00 Domestic Water Heat Exchangers 1 – 6 22 42 00 Plumbing Fixtures 1 – 13 22 47 00 Drinking Fountains, Water Coolers and Cuspidors 1 – 6
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) PAGES
23 05 00 Common Work Results for HVAC 1 – 7 23 05 23 General-duty Valves for HVAC 1 – 10 23 05 93 Testing, Adjusting and Balancing 1 – 23
MICHSPEC DTMB 00010 7 (Rev. 09/2016)
23 09 00 HVAC Instrumentation and Controls 1 – 15 23 11 23 Fuel Gas Piping 1 – 10 23 21 13 Hydronic Piping 1 – 16 23 21 23 Hydronic Pumps 1 – 12 23 23 00 Refrigerant Piping 1 – 6 23 31 13 Metal Ducts 1 – 16 23 33 00 Duct Accessories 1 – 17 23 34 23 Power Ventilators 1 – 8 23 37 13 Diffusers, Registers, and Grilles 1 – 3 23 37 23 Air Intake and relief Hoods 1 – 7 23 51 00 Breeching, Chimneys and Stacks 1 – 4 23 52 16 Condensing Boilers 1 – 8 23 54 16 Gas-fired Furnace 1 – 9 23 63 13 Air-Cooled Refrigerant Condensers 1 – 6 23 72 10 Light Commercial Air-to-Air Energy Recovery Equipment 1 – 9 23 73 39 Direct-Fired H&V Units 1 – 9 23 74 13 Modular and Semi-Custom Central-Station Air-handling Units 1 – 12 23 81 21 Commercial Rooftop Air Conditioners 1 – 10 23 82 16 Heating and Cooling Coils 1 – 4 23 82 19 Fan-Coil Units 1 – 8 23 82 40 Centrifugal Fan Cabinet Unit Heaters (Hot Water) 1 – 5
DIVISION 26 – ELECTRICAL PAGES
26 00 10 Electrical General Requirements 1 – 12 26 05 19 Conductors and Cables 1 – 7 26 05 26 Grounding and Bonding 1 – 11 26 05 29 Hangers and Supports for Electrical Systems 1 – 8 26 05 33 Raceways and Boxes 1 – 16 26 05 53 Electrical Identification 1 – 8 26 05 73 Overcurrent Device Coordination Study/Arc Flash Hazard Analysis 1 – 10 26 09 23 Lighting Control Devices 1 – 10 26 09 43 Lighting Control Systems 1 – 13 26 09 99 Electrical Testing 1 – 6 26 24 16 Panelboards 1 – 10 26 27 13 Electricity Metering 1 – 3 26 27 26 Wiring Devices 1 – 9 26 28 13 Fuses 1 – 4 26 28 16 Enclosed Switches and Circuit Breakers 1 – 6 26 29 13 Enclosed Controllers 1 – 9 26 32 13 Packaged Engine Generators 1 – 16 26 33 23 Central Battery Inverters 1 – 9 26 36 00 Transfer Switches 1 – 8 26 51 19 LED Interior Lighting 1 – 10 26 56 00 Exterior Lighting 1 – 9 26 57 00 Luminaire Product Data 1 – 44
DIVISION 27 – COMMUNICATIONS PAGES
27 05 00 Telecommunications General Requirements 1 – 6
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY PAGES
28 31 00 Fire Alarm 1 – 15
APPENDIX PAGES
A Lead and Asbestos Survey Report 1 – 72
MICHSPEC DTMB 00010 8 (Rev. 09/2016)
SPECIFICATION DRAWINGS
TITLE SHEETS G-001 thru G-003
STRUCTURAL S-001, S-102, S-103
S-201, and S-202
ARCHITECTURAL AD-101 thru AD-105, AD-401, A-101 thru A-107, A-201 thru A-204, A-301, A-302, A-401, A-501, A-502, A-601
MECHANICAL M-001, MD-201, MD-202,
MD-301, MD-302,
MD-401, MD-402,
M-201, M-202, M-301, M-302, M-401, M-402, M-501, M-502, M-601 thru M-605, M-701 thru M-705, M801 thru M-808
ELECTRICAL E-001, E-002, ED-101,
ED-102, E-201, E-202, E-301 thru E-303, E-501, E-502, E-701
STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY
MICHSPEC DTMB 00020 - 1 (R 03/22)
SECTION 00020 GLOSSARY
1.1 Defined Terms:
1.1.1. The following terms or relative pronouns used in
Division 0 of the Specifications have these intent and meanings:
Activity An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.
Addenda Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents.
An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.
Agreement The written agreement between the Owner and Contractor covering the Work to be furnished and performed.
Alternate Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.
Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates.
Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.
Archaeological Feature Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.
As-Planned Schedule The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.
Authorized Technical Data Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph 3.0 of Section 00210 Information for Bidders.
Bar Chart Schedule Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
STATE OF MICHIGAN MODEL
Developed from FORMSPEC Michigan Model.
Bid Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates.
The term Bid includes a Rebid.
Bidder The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.
Bidding Documents The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.
Bid Price The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.
Bid Security A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.
Bidding Requirements The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.
*AD Board The Administrative Board of the State of Michigan.
Bonds Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.
Business Day Any Day except Saturdays, Sundays and holidays observed by the Owner.
Bulletin A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.
Calendar Day Every day shown on the calendar, Saturdays, Sundays, and holidays included.
Cash Allowance An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents. Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently
MICHSPEC DTMB 00020 - 2 (R 03/22)
detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.
Change Authorization A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.
Change Order A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.
Contact Person Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.
Contract Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by the Contract Documents.
Contract Award The official action of the Board, the Director- SFA or the Director-DCD awarding the Contract to the Contractor.
Contract Documents Those documents itemized or designated in paragraphs 2.2 through 2.4 of Section 00500 Agreement.
Contract Float Calendar Days between the Contractor's anticipated date for early completion of the Work, or of a specified portion of the Work, if any, and the corresponding Contract Time.
Contract Price The Contract price for the Work, or a designated portion of the Work, as designated in Section 00500 Agreement or elsewhere in the Contract Documents, is the total compensation, including authorized adjustments, payable by the Owner to the Contractor (subject to provisions for Unit Price Work).
Contract Times The Contract Times for the entire Work are the periods allowed, including authorized adjustments, for Substantial Completion and final completion of the Work. The Contract Times for a designated portion of the Work are the periods allowed for Substantial Completion and final completion of any such portion of the Work, as specified in the Contract Documents.
Contractor Person named "the Contractor" in Section 00500 Agreement with whom the Owner has entered into the Contract.
Correction Period The period during which the Contractor shall, in accordance with the Contract Documents, (a) correct or, if rejected, remove, and replace Defective Work, and (b) maintain warranties for materials and equipment in full force and effect.
Cost of the Work Involved The sum of all costs that would be, or were, necessarily incurred by the Contractor in providing any
Work Involved with the related change, less the costs that would be, or would have been, incurred by the Contractor to provide…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .