20058 Drawings Pgs 57-64.pdf
PDF 6 MB Posted
- Solicitation number
- RFQ - 171 - 230000000515
- Issued by
- Crawford County, Michigan
About this file
This document is a technical specification for the Department of Technology, Management and Budget, State of Michigan, Adam P. Lach, RA, Director, State Facilities Administration, Design and Construction Division for the renovation of Building 3 at Camp Grayling. The specification details the digital direct controls (DDC) equipment, wiring, and installation requirements for the project, including a comprehensive equipment schedule with part numbers, quantities, and installation locations. It also includes notes on construction coordination, wiring requirements, and labeling procedures. The project is located in Crawford County, Michigan.
The document does not provide details on pricing, funding sources, or any set-aside requirements. It is focused solely on the technical specifications for the DDC work required for this renovation project.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DM
5145 Livernois, Suite 100
Fax: 248-879-0007 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
CONSULTING ENGINEERS
Peter Basso Associates Inc
PBA Project No.: 2020-0144
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M -8
O
F
DDC-1
DIN RAIL RELAY SOCKET & RELAY AS
REQUIRED AND (1) SPARE
DIN RAIL TERMINAL BLOCKS AS REQUIRED FOR
ALL 24V POWER AND COMMON & (4) SPARE
DIN RAIL CIRCUIT BREAKER FOR EACH
CONTROLLER
4x4x24" WIREWAY
AC/DC CONVERTER, ACDC-1
T-1
ENCLOSURE ENC-1
1.5 X 2.25 SLOTTED WIRE DUCT VERTICAL
1.0 X 1.5 SLOTTED WIRE DUCT HORIZONTAL
DIN RAIL TYP
NEW 3/4" EMT FOR CONTROL WIRES AS
REQUIRED
120VAC CIRCUIT FROM POWER PANEL
T-2 VAV
TRANSFORMER
T-2 VAV
TRANSFORMER DDC-1 DDC-1
NEW 1" EMT FOR CONTROL WIRES TO ROOFTOP
UNITS AS REQUIRED
NOTES:
1. REFER TO DDC EQUIPMENT ELEVATION DETAIL FOR DDC CONTROL ENCLOSURE LAYOUT.
2. REFER TO MECHANICAL DRAWINGS FOR EQUIPMENT LOCATIONS AND QUANTITIES.
1. PRIOR TO ANY INSTALLATION OF DDC EQUIPMENT OR DDC WIRING, CONTRACTOR SHALL REQUEST A DDC
PRECONSTRUCTION MEETING WITH THE GENERAL CONTRACTOR TO DISCUSS CONSTRUCTION
SCHEDULING, PRECISE DDC EQUIPMENT LOCATIONS, STARTUPS, LABELING PROCEDURES, AND
COMMISSIONING. THE GENERAL CONTRACTOR SHALL COORDINATE THIS WITH THE DMVA
REPRESENTATIVE.
2. CONTRACTOR MUST FOLLOW A DDC WIRE COLOR SCHEDULE FOR ALL DDC WIRING INSTALLED. THIS
SCHEDULE SHALL BE AGREED UPON DURING THE PRECONSTRUCTION MEETING.
3. CONTRACTOR SHALL INSTALL MINIMUM 3/4" CONDUIT FOR ALL DDC WIRING. CONTRACTOR IS ALLOWED TO INSTALL J-HOOKS 4' O.C. FOR DDC CONTROL WIRING ONLY IN AREAS ABOVE A SUSPENDED CEILING. ALL
CONDUIT IN WALLS TO BE STUBBED INTO CEILING SPACE.
4. CONTRACTOR SHALL INSTALL A MINIMUM 1" CONDUIT THROUGH ROOFTOP UNIT CURB FOR DDC WIRING.
5. CONTRACTOR SHALL PULL ALL DDC WIRING AS SHOWN ON DDC FLOOR PLAN AND DDC EQUIPMENT
SCHEDULE. ALL WIRES SHALL BE LABELED WITH A LABEL MAKER APPROVED BY DMVA REPRESENTATIVE (COORDINATE WITH THE ARCHITECT). NO HANDWRITTEN LABELS SHALL BE ALLOWED. ALL LABELS LOCATED IN ENCLOSURE ENC-1 MUST BE PLACED 6" DOWN ON WIRE ONCE INSIDE THE ENCLOSURE, DO
NOT LOCATE LABEL AT THE END OF WIRE.
6. INSTALL TEMPERATURE SENSOR: TEMP-1, 60" AFF, COORDINATED WITH OTHER TRADES.
7. INSTALL OCCUPANCY SENSOR: OCC-1, 6" FROM CEILING.
8. INSTALL OAT-1/OAH-1: ON NORTH FACING EXTERIOR WALL, MAKE WEATHERTIGHT.
9. PRINT COPY OF DDC WIRE COLOR SCHEDULE AND SCHEMATIC AND SECURE TO THE BACK OF THE DOOR
IN ENC-1.
10. PROVIDE AND INSTALL ALL END DEVICES SHOWN.
DDC EQUIPMENT SCHEDULE
MARK LABEL DESCRIPTION BASIS OF DESIGN SERVICE LOCATION QTY / WIRE SIZE
TO EQUIPMENT NOTES
ENC-1 ENC-1 DDC ENCLOSURE KELE - RET2620 DDC EQUIPMENT ENCLOSURE MECHANICAL ROOM - NO SUBSTITUTIONS
ENC-2 ENC-2 DDC ENCLOSURE KELE - RET2620 DDC EQUIPMENT ENCLOSURE MECHANICAL ROOM - NO SUBSTITUTIONS
ENC-3 ENC-3 DDC ENCLOSURE KELE - RET2620 DDC EQUIPMENT ENCLOSURE MECHANICAL ROOM - NO SUBSTITUTIONS
DDC-1 DDC-1 PROGRAMMABLE CONTROLLER SMART CONTROLS - EC240 OR CIRCON EQUIVALENT DDC DDC ENCLOSURE - OR APPROVED EQUAL
DDC-2 CATNET CATNET INTERFACE W/ LON CARD CATNET or divioTECH - CLI-FT ENC-1 ONE PER BUILDING, ENC-1 - NO SUBSTITUTIONS
DDC-3 WEBSERVER CATNET WEBSERVER CATNET - HMI CH-2 or divioTECH - CH-2 WEB SERVER ENC-1 ONE PER BUILDING, ENC-1 - NO SUBSTITUTIONS
DDC-4 MODBUS INTERFACE MODBUS CATNET - CMI-485 ENC-1 DDC ENCLOSURE - NO SUBSTITUTIONS
T-1 T-1-ENC# TRANSFORMER w/ OUTLET AIR PROD. & CONTROLS or divioTECH - T-PB-202-0 DDC ENCLOSURE EQUIPMENT DDC ENCLOSURE -
T-2 T-2-ENC# TRANSFORMER RIB - PSH200A-LVC VAV CONTROLLERS DDC ENCLOSURE -
TEMP-1 TEMP-1-AREA DDC ROOM TEMPERATURE SENSOR BAPI - BA/10K-3-B4 or divioTECH SAP-10K-3-R ROOM TEMP SEE LAYOUT, WALL MOUNTED 60" AFF 3 CONDUCTOR / 18 GA.
TEMP-2 TEMP-2-AHU# or RTU# DUCT/EQUIP TEMPERATURE SENSOR BAPI - BA/10K-3-D-18" or divioTECH SAP-10K-3-D-18"-MB 18" AIRSTREAM TEMP - POINT SENSOR DUCT/AHU/RTU - OA, RA, OR SA 3 CONDUCTOR / 18 GA. 18 INCHES, TEMP. AVERAGING
BAPI - BA/10K-3-RA-18" or divioTECH SAP-10K-3-RA-18"-MB 18" AIRSTREAM TEMP /RIGID AVERAGING DUCT/AHU/RTU - MA OR AFTER COIL 3 CONDUCTOR / 18 GA. 18 INCHES, TEMP. AVERAGING
BAPI - BA/10K-3-RA-24" or divioTECH SAP-10K-3-RA-24"-MB 24" AIRSTREAM TEMP /RIGID AVERAGING DUCT/AHU/RTU - MA OR AFTER COIL 3 CONDUCTOR / 18 GA. 24 INCHES, TEMP. AVERAGING
" " BAPI - BA/10K-3-RA-36" or divioTECH SAP-10K-3-RA-36"-MB 36" AIRSTREAM TEMP /RIGID AVERAGING DUCT/AHU/RTU - MA OR AFTER COIL 3 CONDUCTOR / 18 GA. 36 INCHES, TEMP. AVERAGING
TEMP-3 TEMP-3-AHU# or RTU# PIPE TEMPERATURE SENSOR BAPI - BA/10K3-S or divioTECH SAP-10K-3-I-4"-MB WATER TEMP PIPE 3 CONDUCTOR / 18 GA. ORDER WELL BASED ON PIPE MATERIAL
TEMP-4 TEMP-4-GREASE HOOD EXHAUST COLLAR THERMOSTAT VULCAN - Calstat 1E2B9-85 EXHAUST AIR HIGH LIMIT TEMP SENSOR HOOD EXHAUST DUCT 2 CONDUCTOR / 18 GA.
TEMP-5 TEMP-5-AREA LON ROOM SENSOR ENGENUITY or divioTECH - SI-40-L-THCV ROOM TEMP / CO2 / HUMIDITY / VOC SEE LAYOUT, WALL MOUNTED 60" AFF 4 CONDUCTOR / 18 GA. PROVIDE 24VAC FROM DDC PANEL
HUM-1 HUMIDITY-1-AREA NAME DDC ROOM HUMIDITY SENSOR BAPI - BA/H200-R or divioTECH - SAP-H200-R-SP ROOM HUMIDITY SEE LAYOUT, WALL MOUNTED 60" AFF 3 CONDUCTOR / 18 GA.
HUM-2 HUMIDITY-1-AHU# DDC DUCT HUMIDITY SENSOR BAPI BA/H200-D-WP or divioTECH - SAP-H200-D DUCT HUMIDITY VARIES 3 CONDUCTOR / 18 GA.
FR-1 FR-1-AHU# or RTU# FREEZESTAT ACI or divioTECH - FS-4 MECH EQUIPMENT COOLING COIL 3 CONDUCTOR / 18 GA.
OAT-1 OAT-1 OUTDOOR AIR TEMP SENSOR BAPI - BA/10K-3-O-EU or divioTECH - SAP-10K-3-O-RDO OA TEMPERATURE BLDG EXTERIOR 4 CONDUCTOR / 18 GA.
OATH-1 OATH-1 OUTDOOR AIR TEMP / HUMIDITYSENSOR BAPI - BA/T1K[0 TO 100F]-H210-O-BB OA TEMPERATURE & HUMIDITY BLDG EXTERIOR 4 CONDUCTOR / 18 GA.
CS-1 CS-1-(DEVICE NAME) CURRENT SWITCH ACI - A/MSCS or divioTECH - MSCS AHU/PUMPS/EXHAUST FANS VARIES 3 CONDUCTOR / 18 GA.
CO2-1 CO2-1-AHU# DUCT CO2 SENSOR VERIS or divioTECH - CDE CO2 RETURN DUCT 3 CONDUCTOR / 18 GA.
CO2-2 CO2-2-AREA ROOM CO2 SENSOR VERIS or divioTECH - CDE CO2 SEE LAYOUT, WALL MOUNTED 60" AFF 3 CONDUCTOR / 18 GA.
SD-1 SD-1 SMOKE DETECTOR AIR PRODUCTS & CONTROLS - SL-2000-P AHU/RTU RETURN DUCT BEFORE FRESH AIR - SEE DETAILS FOR EXACT LOCATION
DIN RAIL - DIN RAIL KELE - BAM-1000 MECHANICAL EQUIP DDC ENCLOSURE / RTU - SEE DETAILS FOR EXACT LOCATION
WIRE
DUCT - SLOTTED WIRE DUCT IBOCO - T1E-2222W MECHANICAL EQUIP DDC ENCLOSURE 2 CONDUCTOR / 18 GA.
RELAY-1 (VARIES ON DEVICE) RELAY RIB - RIBU1C MECHANICAL EQUIP VARIES - SINGLE POLE DOUBLE THROW 10A
RELAY-2 (VARIES ON DEVICE) DIN RAIL RELAY SOCKET / SPDT RELAY VERIS - VBD1B-F WITH VMD1B-F24A MECHANICAL EQUIP MECH ROOM 2 CONDUCTOR / 18 GA. SINGLE POLE DOUBLE THROW 15A
RELAY-3 (VARIES ON DEVICE)
RELAY-4 (VARIES ON DEVICE) RELAY W/OVERRIDE RIB - RIB2421SB AHU/RTU FANS & ALL PUMPS VARIES - SINGLE POLE DOUBLE THROW 20A
TBLCK - TERMINAL BLOCK KELE - CDU4N MECHANICAL EQUIP DDC ENCLOSURE / RTU 2 CONDUCTOR / 18 GA. SEE DETAILS FOR EXACT LOCATION
BRKR - CIRCUIT BREAKER FOR CONTROLLER CBI ELECTRIC - QL-2 PROGRAMMABLE CONTROLLER DDC ENCLOSURE / RTU 4 CONDUCTOR / 18 GA. SHIELDED/ PWR-SIGNAL
ACT-1-FS ACT-1-(DEVICE NAME) DAMPER ACTUATOR / FAILSAFE KMC CONTROLS - MEP-7552 DAMPERS VARIES 4 CONDUCTOR / 18 GA. SHIELDED/ PWR-SIGNAL
ACT-1-NFS ACT-1-(DEVICE NAME) DAMPER ACTUATOR / NON-FAILSAFE KMC CONTROLS - MEP-7802 DAMPERS VARIES 4 CONDUCTOR / 18 GA. SHIELDED/ PWR-SIGNAL
ACT-2-2W ACT-2-(DEVICE NAME) 1
2" & 34" VALVE ACTUATOR; 2W VALVE KMC CONTROLS - MEP-4252V CONTROL VALVES VARIES 4 CONDUCTOR / 18 GA. SHIELDED/ PWR-SIGNAL
ACT-2-3W ACT-2-(DEVICE NAME) 1
2" & 34" VALVE ACTUATOR; 3W VALVE KMC CONTROLS - MEP-4252V CONTROL VALVES VARIES 4 CONDUCTOR / 18 GA. SHIELDED/ PWR-SIGNAL
ACT-3-2W ACT-3-(DEVICE NAME) 1" - 3" VALVE ACTUATOR; ; 2W VALVE KMC CONTROLS - MEP-4552V CONTROL VALVES VARIES 4 CONDUCTOR / 18 GA. SHIELDED/ PWR-SIGNAL
ACT-3-3W ACT-3-(DEVICE NAME) 1" - 3" VALVE ACTUATOR; ; 3W VALVE KMC CONTROLS - MEP-4552V CONTROL VALVES VARIES 4 CONDUCTOR / 18 GA. SHIELDED/ PWR-SIGNAL
OCC-1 OCC-1-RM# OCCUPANCY SENSOR WATTSTOPPER - CX100 ROOM OCCUPANCY SEE LAYOUT, WALL MOUNTED 6" FROM CEILING 4 CONDUCTOR / 18 GA. SHIELDED/ PWR-SIGNAL
ACDC-1 ACDC-1 AC TO DC VOLTAGE CONVERTER ACI - PS1.5 OCCUPANCY SENSORS DDC ENCLOSURE
VAV-1-20 VAV-#-LOCATION TERMINAL UNIT CONTROLLER CIRCON - VAV-332-IMV HVAC EQUIP SEE MECHANICAL SHEETS 2 CONDUCTOR / 18 GA. PWR NO SUBSTITUTIONS, POWER WIRE FROM T-2
DP-1 DP-1 DUCT DIFFERENTIAL PRESSURE SENSOR ACI - A/LP2-3-10 MECHANICAL EQUIP MAIN SUPPLY DUCT 4 CONDUCTOR / 18 GA.
SHIELD
DP-2 DP-2 WATER DIFFERENTIAL PRESSURE SENSOR ACI - WPR MECHANICAL EQUIP HWH SUPPLY/RETURN PIPING 4 CONDUCTOR / 18 GA.
SHIELD
NOTES:
1. CONTRACTOR TO FURNISH AND INSTALL MATERIALS IN SCHEDULE. WIRE SHOWN TO BE PULLED INTO ENCLOSURES, LABELED AND COILED AT EACH END.
2. SUBSTITUTIONS SHALL BE REVIEWED AND APPROVED BY DMVA REPRESENTATIVE PRIOR TO INSTALLATION.
3. ACTUATOR ACT-1-FS & ACT-1-NFS MODEL NUMBER DEPENDS ON DEVICE SIZE. INSTALL PROPERLY SIZED TORQUE ACTUATOR BASED ON MANUFACTURER'S RECOMMENDATIONS.
5145 Livernois, Suite 100
Fax: 248-879-0007 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
CONSULTING ENGINEERS
Peter Basso Associates Inc
PBA Project No.: 2020-0144
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M -8
O
Bo ile r S up pl y
(4
Bo ile r R et ur n
(4
B-st at us
(2
B-al ar m
(2
HWS
HWR
TE
M
P-
TE
M
P-
BOILER
B-001
B-st at us
(2
B-al ar m
(2
BOILER
B-002
B-
Em er g
Sh ut do w n (4
HWHP-4
Em er g Pu sh bu tto n
St at us (4
HWHP-1
B-
Em er g
Sh ut do w n (4
HWHP-2
H W
H S
Te m pe ra tu re
(4
H W
H R
T em pe ra tu re
(4
TE
M
P-
TE
M
P-
HWHR
HWHP-3
HWHS
R
EL
AY
-2
R
EL
AY
-2
R
EL
AY
-2
HWHR
HWHS
H W
H S ys te m L oo p
D iff er en tia l P re ss ur e
(4
D P-
O
AT
H -1
O A
Te m p/ H um id ity (6
H W
H S ys te m L oo p
D iff er en tia l P re ss ur e
(4
D P-
2H W
H P-
St at us
(2
C S-
H W
H P-
O n/ O ff/ Sp ee d
0/ vd c
(2
H W
H P-
St at us
(2
C S-
H W
H P-
O n/ O ff/ Sp ee d
0/ vd c
(2
Bo ile r S eq ue nc e Pa ne l a la rm
(2
H W
H S
Te m p Se tp oi nt
/1 0v dc (4
H W
H S
Sy st em E na bl e (4
R
EL
AY
-1
DDC-4
5145 Livernois, Suite 100
Fax: 248-879-0007 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
CONSULTING ENGINEERS
Peter Basso Associates Inc
PBA Project No.: 2020-0144
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M -8
O
SA
T em pe ra tu re (4
TE
M P-
RA
FA
SA
D
X C lg C oi l
D X
C oo lin g
St ag e
(4
R
EL
AY
-4
Fa n
St ar t/S to p (4
Fa n
St at us (2
C
S-
R
EL
AY
-4
R oo m T em p
(4
G as
-fi re d H tg G as -fi re d
H X
St ag e
(4
R
EL
AY
-4
Fi lte r
TE
M
P-
O A da m pe r (
4) R
EL
AY
-1
AC
T-
Fr ee ze st at (2
H W
H C oi l V al ve
M od
. 0 /1
0v dc
(4
M A
Te m pe ra tu re
(4
TE
M
P-
2 FR
-1
RA
H tg
C oi l
FA
SA
D am pe r %
O pe n (4
AC
T-
R A
H um id ity
(4
H U
M -1
Fa n
B St at us
(2
C S-
Fa n
A O n/ O ff/ Sp ee d
0/ vd c
(2
R em ot e
Sa fe ty S hu td ow n
(4
R
EL
AY
-2
R oo m T em p
(4
TE
M
P-
AC
T-
2- 2W
SA
T em pe ra tu re (4
TE
M P-
EA RELIEF
HOOD
D am pe r O pe n/
C lo se (4
AC
T-
R
EL
AY
-2
D X
C lg
C oi l
D X
C oo lin g
St ag e
(4
R
EL
AY
-2
D X
C oo lin g
M od
/1
0v dc
(2
Fa n
B St at us
(2
C S-
Fa n
B O n/ O ff/ Sp ee d
0/ vd c
(2
ACCU
R
EL
AY
-2
Fa n
St at us (2
C
S-
Fa n
O n/
O ff
(4
DM
ACT-1
Sa fe ty A la rm
(2
TERMINALS
Fi lte r
R oo m te m pe ra tu re
TE
M P-
R oo m s et po in t
R
AD
. O pe n/ C lo se d (4
RAD. VALVE
AC
T-
2- 2W
R A
Te m pe ra tu re
(4
TE
M
P-
5145 Livernois, Suite 100
Fax: 248-879-0007 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
CONSULTING ENGINEERS
Peter Basso Associates Inc
PBA Project No.: 2020-0144
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M -8
O em pe ra tu re (4
Fr ee ze st at (2
H C
-1 V al ve
O pe n
(4
Sm ok e D et ec to r (
2)
SD
-1
FR
-1
TE
M
P-
AC
T-
2- 3W
H W
H H tg C oi l H
C -1
SA
R A
Te m pe ra tu re
(4
EA
R A
H um id ity
(4
Fa n
St ar t/S to p (4
Fa n
St at us (2
Fa n
Sp ee d 0/ vd c (2
Fa n
VF
C
A la rm (2
Fa n
St ar t/S to p (4
Fa n
St at us
Fa n
Sp ee d 0/ vd c (2
Fa n
VF
C
A la rm (2
Sa fe ty S hu td ow n
(4
Sa fe ty S hu td ow n
(4
R oo m T em p
(4
Sa fe ty A la rm
(2
RA
H X
Le av in g
Ai r T em pe ra tu re (4
TE
M P-
OA
Fi lte r
Fi lte r
D X
C oo lin g
St ag e
(4
H G
R H
C oi l
H G
R H
E na bl e
(4
H G
R H
C oi l V al ve
/1 0v dc (4
D X
Le av in g
Ai r
Te m pe ra tu re
(4
O A
D am pe r L im it
Sw itc h
LS
-1
O A
D am pe r C on tro l ( 4)
DX
Cooling
Coil
R A
D am pe r L im it
Sw itc h
LS
-1
R A
D am pe r C on tro l ( 4)
TE
M
P-
H U
M -1
H C
-1 C
P-
St ar t/S to p (4
H C
-1 C
P-
St at us (2
COIL
PUMP
R
EL
AY
-4
C S-
TE
M
P-
Fa ce
/B yp as s
D am pe r 0
/1 0v dc (2
R
EL
AY
-4
R
EL
AY
-4
R
EL
AY
-4
R
EL
AY
-1
C S-
R
EL
AY
-4
R
EL
AY
-1
C S-
TE
M
P-
R
EL
AY
-4
R
EL
AY
-4
AC
T-
3- 3W
Fr ee ze st at (2
H W
H C oi l V al ve
O pe n
(4
M A
Te m pe ra tu re
(4
TE
M
P-
FR
-1
RA
H tg
C oi l
FA
SA
D am pe r %
O pe n (4
AC
T-
R A
H um id ity
(4
H U
M -1
Fa n
St at us
C
S-
Fa n
O n/
O ff/
Sp ee d 0/ vd c (2
Sa fe ty S hu td ow n
(4
R
EL
AY
-2
R oo m T em p
(4
TE
M
P-
AC
T-
2- 2W
SA
T em pe ra tu re (4
TE
M P-
EA
RELIEF
HOOD
D am pe r O pe n/
C lo se (4
AC
T-
R
EL
AY
-2
Fi lte r
R A
Te m pe ra tu re
(4
TE
M
P-
M A te m pe ra tu re
(4
TE
M
P-
CP-8
Pu m p C
P-
St ar t/S to p
Pu m p C
P-
St at us C
S-
R
EL
AY
-4
5145 Livernois, Suite 100
Fax: 248-879-0007 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
CONSULTING ENGINEERS
Peter Basso Associates Inc
PBA Project No.: 2020-0144
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M -8
O
D A
Te m pe ra tu re
(4
Fr ee ze st at (2
H C
-2
3, -4 V al ve
O pe n
(4
M A
Te m pe ra tu re
(4
RA
H tg
C oi l
FA
SA
D X
C lg
C oi l
R A
Te m pe ra tu re
(4
D am pe r %
O pe n (4
EA
R A
H um id ity
(4
D X
C oo lin g
St ag e
(4
Fa n
St ar t/S to p (4
Fa n
St at us (2
Fa n
Sp ee d 0/ vd c (4
Fa n
VF
C
A la rm (2
Fa n
St at us (2
Fa n
O n/
O ff/
Sp ee d 0/ vd c (4
Sa fe ty S hu td ow n
(4
Sa fe ty S hu td ow n
(4
D X
M od ul at io n
0/ vd c
(4
Zo ne
T em p (4
Sa fe ty A la rm
(2
ZONE SA
FOR EACH ZONE HEATING COIL
TE
M
P-
2 FR
-1
C O
2-
AC
T-
TE
M
P-
H U
M -1
R
EL
AY
-1
C S-
R
EL
AY
-2
AC
T-
2- 2W
R
EL
AY
-4
R
EL
AY
-2
C S-
1 TE
M
P-
D X
C oo lin g
St ag e
(4
R
EL
AY
-1
Pu m p R
TU
-1
C P-
X St ar t/S to p
(4
Pu m p R
TU
-1
C P-
X St at us
(2
COIL
PUMP
R
EL
AY
-4
Sm ok e D et ec to r (
2)
SD
-1
FT
R
O pe n/ C lo se d (4
AC
T- 2-
2W
FTR VALVEFi lte r
C S-
SA
T em pe ra tu re (4
TE
M P-
Zo ne
C O
(4
TE
M P-
5145 Livernois, Suite 100
Fax: 248-879-0007 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
CONSULTING ENGINEERS
Peter Basso Associates Inc
PBA Project No.: 2020-0144
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M -8
O em pe ra tu re (4
G as
-fi re d H
X C on tro l 0 /1
0v dc
(2
) TE
M P-
OA
G as fi re d H
X
SA
Fa n
St at us
C
S-
FS
S
Sh ut do w n (4
R
EL
AY
-2
FS
S
Al ar m (2
(E F-
4) F an S ta tu s (2
C
S-
TEMP-4
R
EL
AY
-2
Fa n
St at us (2
C
S-
Fa n
O n/
O ff
(4
ACT-1
MAU-1
(E)EF-8
(E)EF-4
Fi lte r
ACT-1
Ki tc he n
Te m p (4
TE
M P-
OA
INTAKE
HOOD
Fa n
Sp ee d Si gn al
/1
0v dc
(2
D D
C S
/S re la y
(4
R
EL
AY
-2
Sm ok e D et ec to r (
2)
SD
-1
Fa n
VF
C o n/ of f (
4) R
EL
AY
-4
5145 Livernois, Suite 100
Fax: 248-879-0007 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
CONSULTING ENGINEERS
Peter Basso Associates Inc
PBA Project No.: 2020-0144
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M -8
O
O A
T em p (4
TE
M P-
O A
H um
(4
H U
M -1
5145 Livernois, Suite 100
Fax: 248-879-0007 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
CONSULTING ENGINEERS
Peter Basso Associates Inc
PBA Project No.: 2020-0144
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M -8
O
File details come from the government source that posted it. Updated .