20-Mar USTS Kennedy 6P DB.pdf

PDF 1 MB Posted

Attached to
T. S. KENNEDY - FY22 Drydocking and ABS Special Survey
Solicitation number
6933A222Q000021
Issued by

About this file

This solicitation seeks quotations for drydocking and ABS special survey services for the T.S. KENNEDY. The U.S. Department of Transportation Maritime Administration intends to award a firm fixed price contract to perform a USCG drydock exam, internal structural exam, and ABS special survey and drydock survey for the T.S. KENNEDY, a 15,500 HP steam ship measuring 536 feet long. The ship will be available for transit to the drydocking facility from September 3rd to November 15th 2022. Questions regarding the solicitation are due by July 20th. Interested contractors may request drawings referenced in the statement of work by July 18th. The solicitation also provides information on the DOT short-term lending program to finance transportation contracts for minority, women-owned, and disadvantaged businesses.

View the file

Other files

File Type Posted
AMENDMENT 0001 - 6933A222Q000021 TS KDY FY22 Drydock and ABS Special Survey.pdf PDF
Attachment 1 6933A222Q000021-AMEND 0001 - QUOTE CLIN PRICING SHEET.xlsx XLSX spreadsheet
TS Kennedy Fire Equipment report- Sept-Oct 2021.pdf PDF
Revised SOW - Amendment 0001.docx DOCX document
Interfine 5703.pdf PDF
SC DOL WD 2015-4427 Rev 22 Dtd 06-27-2022.pdf PDF
171-S11-1-1 SHELL EXP. FWD.pdf PDF
Interspeed 6400NA.pdf PDF
156-S45-01-06 (K) STERN TUBE LUBE OIL SYS. ARRGT.pdf PDF
156-S48-23-01 SEA CHESTS - MN. & AUX. STED. SIDE.pdf PDF
19-Mar USTS Kennedy IBTT.pdf PDF
PA DOL WD 2015-4233 Rev 24 Dtd 06-27-2022.pdf PDF
INTERLAC 665.pdf PDF
FL DOL WD 2015-4571 Rev 18 Dtd 06-27-2022.pdf PDF
AL DOL WD 2015-4605 Rev 18 Dtd 06-27-2022.pdf PDF
156-S11-01-02 (K) SHELL EXP. AFT.pdf PDF
RUDDER STOCK CARRIER and BEARINGS C3-100-S22-1-3.pdf PDF
156-S1-03-10 (K) GEN.ARRGT.UPPER TWEEN DK.AFT..pdf PDF
2022 KDY DD SOW-05-03-2022.docx DOCX document
6933A222Q000021 TS KDY FY22 Drydock and ABS Special Survey.pdf PDF
156-S1-03-08 (K) GEN.ARRGT.LOWER TWEEN DK.AFT..pdf PDF
128-Shaft Alignment Guide_e - Copy.pdf PDF
RUDDER 1-4.pdf PDF
54TV-001-997-01 REV 4 Dry docking.pdf PDF
156-S43-01-01 (K) ARRGT. OF SHAFTING.pdf PDF
Interthane 990 Marine.pdf PDF
156-S11-05-03 BHDS.119 140 143 171 &187.pdf PDF
SHAFTING DETAILS COUPLING 1-3.pdf PDF
RUDDER STOCK CARRIER and BEARINGS.pdf PDF
156-S11-03-09 (K) AFT WEB FRAMES and STRINGERS.pdf PDF
SHAFTING WRENCHES 1-2.pdf PDF
MA DOL WD 2015-4047 Rev 21 Dtd 06-27-2022.pdf PDF
156-S1-03-06 (K) GEN.ARRGT.TANK TOP AFT.pdf PDF
NJ DOL WD 2015-4185 Rev 22 Dtd 06-27-2022.pdf PDF
156-S5-00-04 BODY PLAN.pdf PDF
AIR ESCAPES.xls XLS spreadsheet
156-S48-23-02 AUX. SEA CHESTS PORT SIDE.pdf PDF
TS Kennedy Tanks Log.xls XLS spreadsheet
KDY CAPACITY PLAN.pdf PDF
Intergard 264 (2).pdf PDF
54TV 001 997 01 REV 4 Dry docking.pdf PDF
ARRGT. OF SHAFTING 1-3.pdf PDF
156-S11-03-02 FLOORS AFT..pdf PDF
Attachment 1 6933A222Q000021 - QUOTE CLIN PRICING SHEET.xlsx XLSX spreadsheet
RRF Coatings Guidelines -Apr 2000.pdf PDF
TS Kennedy sea and skin Valves.xlsx XLSX spreadsheet
NC DOL WD 2015-4341 Rev 21 Dtd 06-30-2022.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USTS KENNEDY

USTS1 KENNEDY

ABS Number 7914866 IMO Number 7704930

NO. 6 PORT DISTILLED WATER TANK

MMA Boston, MA

MARCH 2022

Prepared by Nestor Dimaya of:

TABLE OF CONTENTS

GENERAL PARTICULARS

GENERAL ARRANGEMENT

CAPACITY PLAN

SPECIAL INTEREST

NO. 6 PORT DISTILLED WATER TANK

GENERAL PARTICULARS

Name: USTS KENNEDY

ABS Number: 6704200

IMO Number: 6621662

Call Sign: KVMU

Official Number: 509652

Flag: United States of America

Port: Buzzards Bay, MA

Description: School Ship

Vessel Type: Special Purpose Vessel

Keel Laying Date: February 24, 1966

Delivery Date: July 1, 1967

Class Notation: A1, AMS

Additional Notation: Nil

Length Overall LOA 163.6 Meters

Length between Perpendiculars: 157.5 Meters

Tonnage

Design: 5630.1 Tons

Gross: 13886 Tons

CLASS SURVEYS

Annual Hull Survey 4: Due Date: May 27, 2022

Drydocking Survey: Due Date: May 27, 2022

Special Periodical Survey Hull 11: Due Date: May 27, 2023

Tailshaft Survey: Due Date: May 20, 2023

STATUTORY

Annual Load Line Survey 4: Due Date: May 27, 2022

Documentation of damage found in the no. 6 port distilled water tank. Previously discovered buckled floors with a soft curved rolled, slight surface indications found and addressed. Currently being monitored quarterly per annual year to ensure damage does not propagate or progress.

• The Port Engineer Mr. Jeffrey H. Brown and the Chief Engineer was in attendance with the local ABS surveyor and USCG inspectors and a verbal discussion agreed with quarterly monitoring of tank.

• Following report are the documented n.t. floors discovered with slight damage.

This vessel is not in the Alternate Compliance Program (ACP) with the US Coast Guard.

Guidelines for Structural Steel / Outfitting / Piping Assessment criteria were based on ABS rules, Part 7: Survey after construction using substantial diminution and gross defects, survey performed was for targeting steel repairs/renewals.

Inspection grading criteria for the ABS Hull Inspection and Maintenance Program were the guidelines used for criteria of repairs.

The ABS Coating Condition Guide for field surveyors was followed for coating assessment of existing surface coating systems.

ABS minimum wall thickness for steel pipes was followed for tolerance and based repair/s from wall thickness.

Respectfully submitted, Nestor Dimaya

GENERAL ARRANGEMENT

CAPACITY PLAN

WATER BALLAST TANKS 100% full - sp. Gr. 1.025 Tonnes

Cube Metric at 1.0 Kg Port Ctr Stbd

Fore Peak Tank 237 - St. 918.9 31 449 941.8 400 FWD Lower tank 202/204 - 218 678.2 23 950 695.1 410

No. 2 D.B. Wing Tank P 132 - 164 251.5 8 881 257.7 422 No. 2 D.B. Wing Tank S 132 - 164 241.5 8 526 247.7 421 No. 3 D.B. Wing Tank P 98 - 128 519.9 18 361 532.8 432 No. 3 D.B. Wing Tank S 98 - 128 519.9 18 361 532.8 431 No. 4 D.B. Center Tank P 98 - 128 273.0 9 640 279.8 432 No. 4 D.B. Center Tank S 98 - 128 225.8 8 008 232.4 431 No. 1 Lower Wing P 181 - 202 320.5 11 318 338.5 414 No. 1 Lower Wing S 181 - 202 320.5 11 318 328.5 413 No. 2 Lower Wing P 146 - 178 304.7 10 740 312.3 424 No. 2 Lower Wing S 146 - 178 295.2 10 424 302.5 423 No. 3 Lower Wing P 110 - 142 284.2 10 036 291.3 434 No. 3 Lower Wing S 110 - 142 272.9 9 637 279.7 433 No. 4 Lower Wing P 68 - 104 224.3 7 921 229.9 444 No. 4 Lower Wing S 68 - 104 296.6 10 474 304.0 443 No. 1 Upper Wing P 184 -237 734.4 25 935 752.7 416 No. 1 Upper Wing S 184 -237 750.3 26 496 769.0 415 No. 2 Upper Wing P 156 - 176 132.7 4 686 136.0 426 No. 2 Upper Wing S 156 - 176 130.8 4 619 134.0 425 No. 3 Upper Wing P 112 - 140 177.2 6 257 181.6 436 No. 3 Upper Wing S 112 - 140 173.3 6 120 177.6 435 No. 4 Upper Wing P 68 - 98 177.8 6 278 182.2 446 No. 4 Upper Wing S 68 - 98 185.6 6 554 190.2 445

Aft Peak Tank 1 - 17 771.9 27 259 791.1 Total of 25 Tanks TOTAL 9181.6 324 248 9412.1

FRESH WATER TANKS 100% full - sp. Gr. 1.000 Tonnes

Cube Metric at 1.0 Kg Port Ctr Stbd

FWD Upper Side (Port) 202 - 218 287.20 10 142 287 314 FWD Upper Side (Stbd) 202 - 218 287.20 10 142 287 313

Feed water tank 31 - 34 35.20 1 243 35 320 Total Tanks (3) TOTAL 609.60 21 527 609.6

COMPARTMENT FRAMES

CAPACITIES CODE NO.

Cube Feet

COMPARTMENT FRAMES

CAPACITIES CODE NO.

Cube Feet

CAPACITY PLAN

FUEL OIL TANKS 100% full - sp. Gr. 0.95 Tonnes

Cube Metric at 1.0 Kg Port Ctr Stbd

Fore Deep Tank (Port) 218 - 231 570.0 20 129 541.5 102 Fore Deep Tank (Stbd) 218 - 231 579.2 20 454 550.2 101

#1 D.B.T. (Port) 166 - 202 420.7 14 856 399.6 112 #1 D.B.T. (Stbd) 166 - 202 457.2 16 145 434.3 111

#2 D.B.T. (Center/Port) 130 - 166 562.7 19 871 534.5 122 #2 D.B.T. (Center/Stbd) 130 - 166 517.0 18 257 491.1 121

#3 D.B.T. (Port) 96 - 130 285.5 10 82 271.2 132 #3 D.B.T. (Stbd) 96 - 130 321.9 11 367 305.8 131

H.F.O. Settling (Port) 20 - 28 63.0 2 224 59.8 142 H.F.O. Service (Port) 28 - 35 59.0 2 83 56.0 144

#5 D.B. Wing F.O. Sludge (P) 35 - 64 200.0 7 62 190.2 152 #5 D.B. Wing F.O. Overflow (S) F.O. Overflow/Drain (Stbd) 35 - 64 186.3 6 579 176.9 151 Total Tanks (13) TOTAL 4,222.5 149 109 4,011.1

DIESEL OIL TANKS 100% full - sp. Gr. 0.85 Tonnes

Cube Metric at 1.0 Kg Port Ctr Stbd

No. 4 D.B. Wing (Port) 64 - 94 398.7 14 79 338.8 242 No. 4 D.B. Wing (Stbd) 64 - 94 398.7 14 79 338.8 241

D.O. Settling tank (Port) 20 - 24 26.3 928 22.3 262 D.O. Service tank (Stbd) 24 - 27 22.6 798 19.2 264

Total Tanks (4) TOTAL 846.3 29 884 719.3

Cube Feet

COMPARTMENT FRAMES

CAPACITIES CODE NO.

Cube Feet

COMPARTMENT FRAMES

CAPACITY PLAN

OTHER TANKS 100% full Tonnes

Cube Mtr at 1.0 Kg Port Ctr Stbd

L.O. System - sump Tk (Ctr) 35 - 61 72.3 2 553 500 L.O. Tank 1 (Port) 56 - 62 21.2 748 502 L.O. Tank 2 (Port) 56 - 62 21.2 748 504

Gen. Eng. L.O. Tank 1 (Port) 56 - 62 17.6 620 506 Gen. Eng. L.O. Tank 2 (Port) 56 - 62 16.7 589 508 Cyl. Oil Storage Tank 1 (Port) 56 - 62 28.6 1 ## 510 Cyl. Oil Storage Tank 2 (Port) 56 - 62 28.2 995 512 G.E. L.O. Drain Tank (Stbd) 27 - 31 4.9 173

Bilge Tank (Ctr) 20 - 31 86.8 3 65 600 Bilge Water (Stbd) 60 - 64 31.4 1 108 F.W. Drain Tank (Port) 62 - 64 10.0 353

Stern Tank F.W. Cooling (Ctr) 7 - 20 73.7 2 602 Sewage Collection Tank (Port) 39 - 40 21.1 748 632 Sewage Collection Tank (Stbd) 39 - 40 19.9 702 631

Separated Oil (Port) 35 - 36 9.5 335 Blended Oil Tank (Port) 27 - 31 35.5 1 253 D.O. for Truck (Stbd) 9 - 13 26.7 942

COMPARTMENT FRAMES

Cube Feet

SPECIAL INTEREST

AS OF 2012

NO. 6 PORT DISTILLED WATER TANK

Three N.T. Floors were discovered three shipyard special survey prior. Following sketches shows detail and locations of damage and actions performed to ensure detrimental members are within tolerance.

1. NOT TIGHT FLOOR 151 in way of the lightening hole Inboard. Section between the inner bottom tanktop and the bottom plate has a slight soft buckle ≈24" x 18" x 1/2". Adjacent Inner bottom longitudinal stiffener and the bottom longitudinal stiffener along with the vertical flatbar does not have any sign of deflection. Bottom plate in way of the floor does not have any indication of contact or inset. Damaged floor is surveyed quarterly by the Chief engineer to monitor if the damage has any propagation.

Defect/flaws found

- Floor cutout wrap weld to the inner bottom tanktop was fractured 1" outboard of the Inner Bottom

Long'l #1. Fractured was peened and NDE performed, found wrap weld was acceptable and no indication exist.

- Floor Web fractured 1" in way of the cutout radius for IBL #1, not a thru fracture. Fractured was peened and NDE performed found wrap weld was acceptable and no indication exist.

- Floor rat hole snipe wrap weld inboard to the bottom plate was fractured 1-1/4" just outboard of Bottom Long'l #1. Fractured was peened and NDE performed, found wrap weld was acceptable and no indication exist.

NO. 6 PORT DISTILLED WATER TANK

2. NOT TIGHT FLOOR 154 in way of the lightening hole Inboard. Section between the inner bottom tanktop and the bottom plate has a slight soft buckle ≈38" x 26" x 1/2". Adjacent Inner bottom longitudinal stiffener and the bottom longitudinal stiffener along with the vertical flatbar does not have any sign of deflection. Bottom plate in way of the floor does not have any indication of contact or inset. Damaged floor is surveyed quarterly by the Chief engineer to monitor if the damage has any propagation.

Defect/flaws found

- Floor cutout wrap weld to the inner bottom tanktop was fractured 1-1/2" outboard of the Inner

Bottom Long'l #1. Fractured was peened and NDE performed, found wrap weld was acceptable and no indication exist.

- Floor Web fractured 1-1/2" in way of the cutout radius for IBL #1, not a thru fracture. Fractured was peened and NDE performed found wrap weld was acceptable and no indication exist.

- Floor rat hole snipe wrap weld inboard to the bottom plate was fractured 1" just outboard of Bottom Long'l #1. Fractured was peened and NDE performed, found wrap weld was acceptable and no indication exist.

- Floor rat hole snipe wrap weld outboard to the bottom plate was fractured 1/2" just outboard of Bottom Long'l #1. Fractured was peened and NDE performed, found wrap weld was acceptable and no indication exist.

3. NOT TIGHT FLOOR 157 in way of the lightening hole Inboard. Section between the inner bottom tanktop and the bottom plate has a slight soft buckle ≈16" x 18" x 1/2". Adjacent Inner bottom longitudinal stiffener and the bottom longitudinal stiffener along with the vertical flatbar does not have any sign of deflection. Bottom plate in way of the floor does not have any indication of contact or inset. Damaged floor is surveyed quarterly by the Chief engineer to monitor if the damage has any propagation.

Defect/flaws found

- Floor cutout wrap weld to the inner bottom tanktop was fractured 1" outboard of the Inner Bottom

Long'l #1. Fractured was peened and NDE performed, found wrap weld was acceptable and no indication exist.

- Floor Web fractured 1/2" in way of the cutout radius for IBL #1, not a thru fracture. Fractured was peened and NDE performed found wrap weld was acceptable and no indication exist.

- Floor rat hole snipe wrap weld inboard to the bottom plate was fractured 1" just outboard of Bottom Long'l #1. Fractured was peened and NDE performed, found wrap weld was acceptable and no indication exist.

See following sketch for location and more details.

GENERAL PARTICULARS 3
GENERAL ARRANGEMENT 5
CAPACITY PLAN 6
SPECIAL INTEREST 9
GENERAL PARTICULARS
GENERAL ARRANGEMENT
CAPACITY PLAN
SPECIAL INTEREST
NO. 6 PORT DISTILLED WATER TANK

File details come from the government source that posted it. Updated .