156-S1-03-10 (K) GEN.ARRGT.UPPER TWEEN DK.AFT..pdf

PDF 733 KB Posted

Attached to
T. S. KENNEDY - FY22 Drydocking and ABS Special Survey
Solicitation number
6933A222Q000021
Issued by

About this file

This solicitation seeks quotations for drydocking and survey services for the training ship T.S. KENNEDY. The U.S. Department of Transportation Maritime Administration intends to award a firm fixed price contract to accomplish a U.S. Coast Guard drydock exam and internal structural exam, ABS special survey and drydock survey for a non-tanker cargo ship over 15 years of age, as well as various machinery, equipment, structural repairs and coatings work. The T.S. KENNEDY is a 15,500 HP steam ship measuring 536 feet long with a beam of 76 feet and gross tonnage of 13,886. Offerors must be able to perform the work between September 3rd and November 15th 2022 while the ship is in Buzzards Bay, Massachusetts. Questions are due by July 20th and drawings may be requested by July 18th. The solicitation is set aside for minority, women and disadvantaged owned businesses.

View the file

Other files

File Type Posted
AMENDMENT 0001 - 6933A222Q000021 TS KDY FY22 Drydock and ABS Special Survey.pdf PDF
Attachment 1 6933A222Q000021-AMEND 0001 - QUOTE CLIN PRICING SHEET.xlsx XLSX spreadsheet
TS Kennedy Fire Equipment report- Sept-Oct 2021.pdf PDF
Revised SOW - Amendment 0001.docx DOCX document
Interfine 5703.pdf PDF
SC DOL WD 2015-4427 Rev 22 Dtd 06-27-2022.pdf PDF
171-S11-1-1 SHELL EXP. FWD.pdf PDF
Interspeed 6400NA.pdf PDF
156-S45-01-06 (K) STERN TUBE LUBE OIL SYS. ARRGT.pdf PDF
156-S48-23-01 SEA CHESTS - MN. & AUX. STED. SIDE.pdf PDF
19-Mar USTS Kennedy IBTT.pdf PDF
PA DOL WD 2015-4233 Rev 24 Dtd 06-27-2022.pdf PDF
INTERLAC 665.pdf PDF
FL DOL WD 2015-4571 Rev 18 Dtd 06-27-2022.pdf PDF
AL DOL WD 2015-4605 Rev 18 Dtd 06-27-2022.pdf PDF
156-S11-01-02 (K) SHELL EXP. AFT.pdf PDF
RUDDER STOCK CARRIER and BEARINGS C3-100-S22-1-3.pdf PDF
20-Mar USTS Kennedy 6P DB.pdf PDF
2022 KDY DD SOW-05-03-2022.docx DOCX document
6933A222Q000021 TS KDY FY22 Drydock and ABS Special Survey.pdf PDF
156-S1-03-08 (K) GEN.ARRGT.LOWER TWEEN DK.AFT..pdf PDF
128-Shaft Alignment Guide_e - Copy.pdf PDF
RUDDER 1-4.pdf PDF
54TV-001-997-01 REV 4 Dry docking.pdf PDF
156-S43-01-01 (K) ARRGT. OF SHAFTING.pdf PDF
Interthane 990 Marine.pdf PDF
156-S11-05-03 BHDS.119 140 143 171 &187.pdf PDF
SHAFTING DETAILS COUPLING 1-3.pdf PDF
RUDDER STOCK CARRIER and BEARINGS.pdf PDF
156-S11-03-09 (K) AFT WEB FRAMES and STRINGERS.pdf PDF
SHAFTING WRENCHES 1-2.pdf PDF
MA DOL WD 2015-4047 Rev 21 Dtd 06-27-2022.pdf PDF
156-S1-03-06 (K) GEN.ARRGT.TANK TOP AFT.pdf PDF
NJ DOL WD 2015-4185 Rev 22 Dtd 06-27-2022.pdf PDF
156-S5-00-04 BODY PLAN.pdf PDF
AIR ESCAPES.xls XLS spreadsheet
156-S48-23-02 AUX. SEA CHESTS PORT SIDE.pdf PDF
TS Kennedy Tanks Log.xls XLS spreadsheet
KDY CAPACITY PLAN.pdf PDF
Intergard 264 (2).pdf PDF
54TV 001 997 01 REV 4 Dry docking.pdf PDF
ARRGT. OF SHAFTING 1-3.pdf PDF
156-S11-03-02 FLOORS AFT..pdf PDF
Attachment 1 6933A222Q000021 - QUOTE CLIN PRICING SHEET.xlsx XLSX spreadsheet
RRF Coatings Guidelines -Apr 2000.pdf PDF
TS Kennedy sea and skin Valves.xlsx XLSX spreadsheet
NC DOL WD 2015-4341 Rev 21 Dtd 06-30-2022.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

156-S1-03-10 (K) GEN.ARRGT.UPPER TWEEN DK.AFT. - 01

156-S1-03-10 (K) GEN.ARRGT.UPPER TWEEN DK.AFT. - 02
156-S1-03-10 (K) GEN.ARRGT.UPPER TWEEN DK.AFT. - 03
156-S1-03-10 (K) GEN.ARRGT.UPPER TWEEN DK.AFT. - 04

File details come from the government source that posted it. Updated .