2- Pricing Sheet.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Installation of Equipment- 13 Water Bottle Filling
Solicitation number
W91QF426BA009
Issued by

About this file

This is a Pricing Sheet template in Excel format designed for construction cost estimation and project management. The sheet is structured as a division summary with totals page for building repair work, organized by CSI (Construction Specifications Institute) divisions including General Conditions, Site Construction, Wood & Plastics, Doors & Windows, Finishes, Special Construction, and Mechanical. The pricing template includes columns for labor hours, material costs, subcontractor costs, equipment costs, and other expenses, with calculated fields for job cost, overhead, profit, subtotal, bond, and estimate total. The sheet appears to be formatted to capture both detailed line-item costs and summary totals across cost categories and project phases.

This pricing sheet template would be used by contractors responding to the solicitation W91QF426BA009 for the installation of thirteen ELKAY water bottle filling stations at Presidio of Monterey, California. The solicitation is a requirements-type contract issued by the Department of the Army Materiel Command, Mission and Installation Contracting Command at Fort Eustis, set aside 100% for small businesses. Contractors would use this sheet to submit detailed cost estimates covering labor, materials, subcontractor services, and equipment necessary for the installation of water bottle fillers in eleven buildings, including plumbing work and removal/disposal of non-essential materials. The pricing format supports the structured cost estimation required for this type of government construction contracting submission.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

~tpl1f2e

Division Summary with Totals PageRepair Building 305
Division Summary
CSIDivisionLaborMatSubsEquipOtherUserGrand
TotalTotalTotalTotalTotalTotalTotal
1General Conditions
2Site Construction
6Wood & Plastics
8Doors & Windows
9Finishes
13Special Construction
15Mechanical
Grand Total
Totals Page
PercentAmountCategoryHoursJob Cost Phase
--- Base Estimate --- Totals
Labor
Material
Subcontractor
Equipment
Other
User
Net Costs
Overhead
Profit
Subtotal
Bond
Total --- Base Estimate ---

Estimate Total

File details come from the government source that posted it. Updated .