This is a Pricing Sheet template in Excel format designed for construction cost estimation and project management. The sheet is structured as a division summary with totals page for building repair work, organized by CSI (Construction Specifications Institute) divisions including General Conditions, Site Construction, Wood & Plastics, Doors & Windows, Finishes, Special Construction, and Mechanical. The pricing template includes columns for labor hours, material costs, subcontractor costs, equipment costs, and other expenses, with calculated fields for job cost, overhead, profit, subtotal, bond, and estimate total. The sheet appears to be formatted to capture both detailed line-item costs and summary totals across cost categories and project phases.
This pricing sheet template would be used by contractors responding to the solicitation W91QF426BA009 for the installation of thirteen ELKAY water bottle filling stations at Presidio of Monterey, California. The solicitation is a requirements-type contract issued by the Department of the Army Materiel Command, Mission and Installation Contracting Command at Fort Eustis, set aside 100% for small businesses. Contractors would use this sheet to submit detailed cost estimates covering labor, materials, subcontractor services, and equipment necessary for the installation of water bottle fillers in eleven buildings, including plumbing work and removal/disposal of non-essential materials. The pricing format supports the structured cost estimation required for this type of government construction contracting submission.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
~tpl1f2e
| Division Summary with Totals Page | Repair Building 305 | |||||||
| Division Summary | ||||||||
| CSI | Division | Labor | Mat | Subs | Equip | Other | User | Grand |
| Total | Total | Total | Total | Total | Total | Total | ||
| 1 | General Conditions | |||||||
| 2 | Site Construction | |||||||
| 6 | Wood & Plastics | |||||||
| 8 | Doors & Windows | |||||||
| 9 | Finishes | |||||||
| 13 | Special Construction | |||||||
| 15 | Mechanical | |||||||
| Grand Total | ||||||||
| Totals Page | ||||||||
| Percent | Amount | Category | Hours | Job Cost Phase | ||||
| --- Base Estimate --- Totals | ||||||||
| Labor | ||||||||
| Material | ||||||||
| Subcontractor | ||||||||
| Equipment | ||||||||
| Other | ||||||||
| User |
| Net Costs |
| Overhead |
| Profit |
| Subtotal |
| Bond |
| Total --- Base Estimate --- |
Estimate Total