2-Part G - Attachment F - Subcontractor List.pdf
PDF 149 KB Posted
- Solicitation number
- 2031
- Issued by
- Alexandria City, Virginia
About this file
This is a Subcontractor List attachment (Attachment F) for the City of Alexandria's Invitation to Bid (ITB 2031) for Swimming Pool Maintenance, Cleaning, and Repair Operations and Maintenance Services. The document serves as a template for bidders to identify their prime contractor status and all first-tier subcontractors who will perform work under the resulting contract. Bidders are required to list each subcontractor's SWaM/DBE (Small, Women-owned, and Minority/Disadvantaged Business Enterprise) designation, type of work to be performed, and the approximate percentage of total work allocated to each entity. The prime contractor may also perform a portion of the work with their own forces as specified in the bid documents. All listed entities must collectively account for 100 percent of the bid amount.
The document requires bidders to complete fields identifying vendor names, SWaM/DBE selections, work classifications, and work percentages for both the prime contractor and all first-tier subcontractors. The attachment must be signed and dated by an authorized signatory with their printed name and title provided. This subcontractor documentation is essential for bid evaluation and contract oversight, ensuring transparency regarding the organizations responsible for delivering pool opening and closing, cleaning, repair, and whitecoat services for the City of Alexandria's indoor and outdoor swimming facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 11-Part A - ITB Solicitation General Information.docx | DOCX document | |
| 10-Part H - Exhibit A - Definitions.docx | DOCX document | |
| 1-Part G - Attachment G - No Response Form.pdf | ||
| 5-Part G - Attachment C - Required Information Form.pdf | ||
| 3-Part G - Attachment E - References.pdf | ||
| 6-Part G - Attachment A - Authorized Signatory Statement.pdf | ||
| 13-Part C - ITB STC F.docx | DOCX document | |
| 8-Part E - ITB Instructions to Bidders.docx | DOCX document | |
| 9-Part F - ITB Eval and Method of Award.docx | DOCX document | |
| 7-Part D - Global GTC.docx | DOCX document | |
| 4-Part G - Attachment D - Certifications.pdf | ||
| 12-Part B - ITB Scope of Work.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Alexandria
Attachment F
Subcontractors List
The following list provides the name of the Prime Contractor and their 1st Tier Sub-Contractors who shall perform the Work in reference to the Solicitation referenced at the top of this page and its resulting Contract. The general type of work to be performed and the approximate percentage of the total work per Prime and 1st Tier Sub-Contractor shall be annotated. (Note: The Prime Contractor may be required to perform a percentage of the total work with their own forces as required in the bid documents).
Vendor Name SWaM/DBE
Select & Enter Number
Type of Work % of Total Work
Prime Contractor
1st Tier Subcontractors
Total % of Bid Amount 100%
Bidder/Offeror Name:_________________________Date: _____________________________
Signature of Authorized Signatory: _________________________________________________
Name & Title of Authorized Signatory: ______________________________________________
No.:
| SWaMDBE Select Enter NumberPrime Contractor: |
| Prime ContractorRow1: |
| SWaMDBE Select Enter NumberRow2: |
| Type of WorkRow2: |
| of Total WorkRow2: |
| 1st Tier SubcontractorsRow1: |
| SWaMDBE Select Enter NumberRow4: |
| Type of WorkRow4: |
| of Total WorkRow4: |
| 1st Tier SubcontractorsRow2: |
| SWaMDBE Select Enter NumberRow5: |
| Type of WorkRow5: |
| of Total WorkRow5: |
| 1st Tier SubcontractorsRow3: |
| SWaMDBE Select Enter NumberRow6: |
| Type of WorkRow6: |
| of Total WorkRow6: |
| 1st Tier SubcontractorsRow4: |
| SWaMDBE Select Enter NumberRow7: |
| Type of WorkRow7: |
| of Total WorkRow7: |
| 1st Tier SubcontractorsRow5: |
| SWaMDBE Select Enter NumberRow8: |
| Type of WorkRow8: |
| of Total WorkRow8: |
| 1st Tier SubcontractorsRow6: |
| SWaMDBE Select Enter NumberRow9: |
| Type of WorkRow9: |
| of Total WorkRow9: |
| BidderOfferor Name: |
| Date: |
| Signature10_es_:signer:signature: |
| Signature11_es_:signer:signature: |
| Text13: ITB: |
| Text11: Invitation to Bid |
| Text15: ITB: |
| Text14: 2031 |
| Text12: SWIMMING POOL MAINTENANCE, CLEANING, AND REPAIR (O&M) SERVICES |
File details come from the government source that posted it. Updated .