2. Schedule.docx

DOCX document 16 KB Posted

Attached to
127EAW23R0002 - Hirz Mountain Lookout Restoration
Solicitation number
127EAW23R0002
Issued by

View the file

Other files

File Type Posted
P00003 - RFIs Round 2.pdf PDF
A00002 - RFIs and Lead Report.pdf PDF
RFI Official Responses - 1.pdf PDF
Lead Based Paint Report_4-28-2021.pdf PDF
Amendment A00001 - Revised Solicitation.pdf PDF
Amendment A00001 - Revised Solicitation.pdf PDF
127EAW23R0002 - Revised 21 Nov.pdf PDF
3. Fire Plan.pdf PDF
7. Davis-Bacon Act WD # CA20220007.pdf PDF
127EAW23R0002.pdf PDF
1. Statement of Work.pdf PDF
8. RFI Form.docx DOCX document
6. NEPA Report.pdf PDF
4. Project Plans.pdf PDF
5. Location Plan.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION – BIL FUNDING)

Item
Construction Items
Qty
UOI
Total Price
0001
Lead-Based Paint Material Abatement and Disposal
1
Lump Sum

OPTION 1

0002
Lower Siding Lead-Based Paint Material Abatement and Disposal
1
Lump Sum

OPTION 2

0003
Sash Zone Lead-Based Paint Material Abatement and Disposal
1
Lump Sum

BIL FUNDING TOTAL: __________

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION – GAOA FUNDING)

Item
Construction Items
Qty
UOI
Total Price
0001
Mobilization/Demobilization
1
Lump Sum
0002
Demolish Roof to Expose Rafters
1
Lump Sum
0003
Replace Rafters, Outriggers, and Upper Siding
1
Lump Sum
0004
Replace Roof
1
Lump Sum

OPTION 1

0005
Construct and Install Shutters & Door Cover
1
Lump Sum

OPTION 2

0006
Replace Deck Railing Fence & Install Railing Fence on Stairway
1
Lump Sum

OPTION 3

0007
Replace Stair Flight and Landing Treads
1
Lump Sum

OPTION 4

0008
Window Replacement, Repairs, & Improvements
1
Lump Sum

OPTION 5

0009
Replace Lower Siding
1
Lump Sum

OPTION 6

00010
Sash Zone Trim and Door Threshold
1
Lump Sum

GAOA FUNDING TOTAL: __________

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.