P00003 - RFIs Round 2.pdf

PDF 264 KB Posted

Attached to
127EAW23R0002 - Hirz Mountain Lookout Restoration
Solicitation number
127EAW23R0002
Issued by

View the file

Other files

File Type Posted
A00002 - RFIs and Lead Report.pdf PDF
RFI Official Responses - 1.pdf PDF
Lead Based Paint Report_4-28-2021.pdf PDF
Amendment A00001 - Revised Solicitation.pdf PDF
Amendment A00001 - Revised Solicitation.pdf PDF
127EAW23R0002 - Revised 21 Nov.pdf PDF
3. Fire Plan.pdf PDF
7. Davis-Bacon Act WD # CA20220007.pdf PDF
127EAW23R0002.pdf PDF
2. Schedule.docx DOCX document
1. Statement of Work.pdf PDF
8. RFI Form.docx DOCX document
6. NEPA Report.pdf PDF
4. Project Plans.pdf PDF
5. Location Plan.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00003

GREGORY L. CUNNINGHAM

The purpose of this solicitation amendment is to post the document repond to RFI's

Documents title "RFI Official Responses - 2" are hereby incorporated in this solicitation and subsequent award.

USDA FOREST SERVICE

PROCUREMENT & PROPERTY SERVICES (PPS)

CONTRACT SERVICE AREA (CSA) 6 – CONSTRUCTION

3237 PEACEKEEPER WAY, SUITE 101

MCCLELLAN PARK, CA 95652

ALL INTERESTED VENDORS 127EAW23R0002

1 2

12/13/2022

11/18/2022

FOR OFFICIAL USE ONLY

REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES

127EAW23R0002 - Hirz Mountain Lookout Restoration

RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov

Telephone requests for information will not be accepted or returned.

RFI #1 – Please be aware that the floor hatch to the catwalk is chained and locked preventing access to the catwalk and fire lookout. Making it impossible to perform a proper stie inspection.

USFS Response – We keep the lookout locked due to prevent vandalism. We apologize for the inconvenience. Overall, the photos in the Plans portray the conditions and the SOW provide ample detail. Most of all, it’s best for the Contractor to understand the site access and the last ¼ mile up the hill. We did try to send someone up today to unlock it, but the snow coming down was too much on the mountain to get up there safely. If you would like to try again, please request the key from the Shasta Lake District Office on Monday.

RFI #2 – Would it be acceptable to remove the roof structure above the windows in its entirety. Construct as new roof structure complete with roofing, siding and interior finishes, on the ground at the landing area near the gate. Then airlift the new roof assembly and attach it to the existing building in place.

USFS Response – I don’t completely understand what you’re proposing when you say “new roof structure complete with roofing, siding and interior finishes”—that sounds like you’re proposing to demolish the entire historic “cab” and build a new one. What is described in the Statement of Work and the Plans is all the has been included in our budget. We did not include the cost of airlifting.

Removing the roofing materials to access the rafters that are a part of the “Shutter Assembly” system is all that is needed. The remaining rafters that do not protrude into the Shutter Assembly are to remain. The Shutter Assembly rafters are dry-rotted. There are only a few boards on each side.

ADP9B68.tmp
REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES

File details come from the government source that posted it. Updated .