RFI Official Responses - 1.pdf
PDF 131 KB Posted
- Solicitation number
- 127EAW23R0002
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P00003 - RFIs Round 2.pdf | ||
| A00002 - RFIs and Lead Report.pdf | ||
| Lead Based Paint Report_4-28-2021.pdf | ||
| Amendment A00001 - Revised Solicitation.pdf | ||
| Amendment A00001 - Revised Solicitation.pdf | ||
| 127EAW23R0002 - Revised 21 Nov.pdf | ||
| 3. Fire Plan.pdf | ||
| 7. Davis-Bacon Act WD # CA20220007.pdf | ||
| 127EAW23R0002.pdf | ||
| 2. Schedule.docx | DOCX document | |
| 1. Statement of Work.pdf | ||
| 8. RFI Form.docx | DOCX document | |
| 6. NEPA Report.pdf | ||
| 4. Project Plans.pdf | ||
| 5. Location Plan.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES
127EAW23R0002 - Hirz Mountain Lookout Restoration
RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov
Telephone requests for information will not be accepted or returned.
RFI #1 – Will contractor be allowed to park a self contained, trailer on the government provided, staging area.
USFS Response – Yes, please refer to page 13 under section 5.1 Mobilization.
RFI #2 – Please provide copy of Hirz Mountain Lookout Restoration, “Lead-Based Paint
Report” prepared by Guzi-West, dated April 28, 2021
USFS Response – See attached document titled “Lead Based Paint Report_4-28-2021”
RFI #3 – Is the gate to the lookout locked? Sounds like the gate is about ¼ mile from the lookout.
USFS Response – The gate will be unlocked by the end of Nov 28th. However, as stated in Section
2.0 Background and Location: “Due to the steep grade, abrupt switchbacks and loose rock, the
Contractor shall consider the use of alternative four-wheel drive transport such as ATVs and/or
UTVs for transport to the lookout from the staging area/gated entrance. In any event, the contractor is responsible for understanding the access conditions and appropriate modes of transport to the work site.” We recommend walking the hill before attempting any drive up the hill from the gate. Also, there has been winter weather lately in the area. Use caution and be advised that there may be snow, especially in the shaded areas of the road.