2.7 - Drawings 7 of 13 - General.pdf
PDF 16 MB Posted
- Solicitation number
- 36C77622B0052
About this file
This document provides details for a federal contract solicitation to renovate the first floor of Building 24 at the Jefferson Barracks VAMC in St. Louis, Missouri. The solicitation seeks a general contractor to provide all labor, materials, equipment, supervision, and other items designated in the contract and specifications to complete the EHRM Training and Administrative Support Space construction project in accordance with VA requirements. The contractor shall demolish existing structures, prepare the site for construction, and furnish all testing, labor, and materials to fully renovate the space for training and administrative support for EHRM activation. The solicitation was issued by the VA Technology Acquisition Center Austin under solicitation number 36C77622B0052.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N or th
AREA OF WORK
BLDG 24
AREA OF WORK
BLDG 25
1CC
101T
60G
60T
51T
1CC
1CC
1CC
1G
25T
3 3T
56G
1CC
Plan North
True North
AREA OF WORK
BLDG 25
AREA OF WORK
BLDG 24
CONSTRUCTION
ZONE
CONSTRUCTION
ZONE
CONSTRUCTION
ZONE
CONSTRUCTION
ZONE
CONSTRUCTION
ZONE
CONSTRUCTION
ZONE
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
VETERANS
HEALTH
ADMINISTRATION
D :\R ev it
\2 1.
_A
R C
H _R
_b va nd er pl oe g.
rv t
7/ 7/
:1
1:
P M
00-GI-001A
COVER EHRM TRAINING AND ADMIN
SPACE SUPPORT
1 JEFFERSON BARRACKS DR ST. LOUIS, MO 63125
657-21-703JB
07/07/2022 MJ JWR
100% BID DOCS
VEG 21.21
U.S. DEPARTMENT OF VETERANS AFFAIRS
1 JEFFERSON BARRACKS DR ST. LOUIS, MO 63125
VAMC PROJECT #: 657-21-703JB
EHRM TRAINING AND ADMIN SPACE SUPPORT
RENDERED IMAGE AREA OF WORK
NTS
AREA OF WORK
OCCUPATIONAL SAFETY/HEALTH DATE
INFECTION PREVENTIONIST DATE
GENERAL MAINTENANCE FOREMAN DATE
ENERGY ENGINEER DATE
CONTRACTING OFFICER'S REPRESENTATIVE DATE
CONTRACTING OFFICER DATE
VA SIGNATURE BLOCK
NOTE: CONSTRUCTION ZONES INDICATED ON THIS CAMPUS
PLAN ARE FOR OTHER PROJECTS AND ARE NOT PART OF
THIS EHRM TRAINING AND ADMIN SPACE SUPPORT
PROJECT.
SEE 00-GI-001B FOR SHEET INDEX
0 100% BID DOCS 07/07/2022
405872
M
OSE JS ACOBS
M
O
PE
07/07/2022
00-GI-001B
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
VETERANS
HEALTH
ADMINISTRATION
D :\R ev it
\2 1.
_A
R C
H _R
_c ur tis rid en ou r.
rv t
7/ 7/
:3
6:
P M
00-GI-001B
INDEX EHRM TRAINING AND ADMIN
SPACE SUPPORT
1 JEFFERSON BARRACKS DR ST. LOUIS, MO 63125
657-21-703JB
07/07/2022 MJ JWR
100% BID DOCS
VEG 21.21
24-AE-532 DETAILS
24-AE-601 SCHEDULES - WALL TYPES
24-AE-611 SCHEDULES - DOORS
24-AE-612 DOOR DETAILS
24-AE-621 SCHEDULES - WINDOWS
24-AE-641 SCHEDULES - ROOM STYLE
24-AE-642 SCHEDULES - ROOM FINISHES
24-AE-643 MATERIALS & FINISHES BOARD
24-AE-901 PERSPECTIVE VIEWS
24-AE-902 PERSPECTIVE VIEWS
24-AE-903 PERSPECTIVE VIEWS CLASSROOMS
24-AE-904 PERSPECTIVE VIEWS CLASSROOMS
24-AE-905 PERSPECTIVE VIEWS CORRIDORS
24-AE-906 EXISTING FLOOR PLAN - FLOOR 01
24-AE-907 HISTORIC PRESERVATION INTERIOR ELEVATIONS
FIRE PROTECTION
24-F-001 FIRE ALARM LEGENDS, NOTES, AND SYMBOLS
24-F-002 FIRE SUPPRESSION LEGENDS, NOTES, AND SYMBOLS
24-FD-110 DEMOLITION PLAN - FLOOR 00
24-FD-111 DEMOLITION PLAN - FLOOR 01
24-FD-112 DEMOLITION PLAN - FLOOR 02
24-FD-113 DEMOLITION PLAN - FLOOR 03
24-FD-120 DEMOLITION RCP - FLOOR 00
24-FD-121 DEMOLITION RCP - FLOOR 01
24-FD-122 DEMOLITION RCP - FLOOR 02
24-FD-123 DEMOLITION RCP - FLOOR 03
24-FA-110 FIRE ALARM PLAN - FLOOR 00
24-FA-111 FIRE ALARM PLAN - FLOOR 01
24-FA-112 FIRE ALARM PLAN - FLOOR 02
24-FA-113 FIRE ALARM PLAN - FLOOR 03
24-FX-110 HAZARD PLAN - FLOOR 00
24-FX-111 HAZARD PLAN - FLOOR 01
24-FX-112 HAZARD PLAN - FLOOR 02
24-FX-113 HAZARD PLAN - FLOOR 03
24-FX-120 FIRE SUPPRESSION RCP - FLOOR 00
24-FX-121 FIRE SUPPRESSION RCP - FLOOR 01
24-FX-122 FIRE SUPPRESSION RCP - FLOOR 02
24-FX-123 FIRE SUPPRESSION RCP - FLOOR 03
PLUMBING
24-P-001 PLUMBING ABBREVIATIONS, SYMBOLS, & LEGENDS
24-PQ-601 EQUIPMENT & FIXTURE SCHEDULES
24-PD-110 DEMOLITION PLAN - FLOOR 00
24-PD-111 DEMOLITION PLAN - FLOOR 01
24-PD-112 DEMOLITION PLAN - FLOOR 02
24-PP-110 DOMESTIC WATER PLAN - FLOOR 00
24-PP-111 DOMESTIC WATER PLAN - FLOOR 01
24-PP-113 PLUMBING PIPING PLAN - FLOOR 03
24-PW-110 DRAIN-WASTE-VENT PLAN - FLOOR 00
24-PW-111 DRAIN-WASTE-VENT PLAN - FLOOR 01
MECHANICAL
24-M-001 MECHANICAL ABBREVIATIONS & NOTES
24-M-002 MECHANICAL SYMBOLS
24-MQ-601 EQUIPMENT SCHEDULES
24-MI-601 CONTROL DIAGRAMS
24-MI-602 CONTROLS DIAGRAMS
24-MI-603 CONTROL DIAGRAMS
24-MD-110 DEMOLITION PLAN - FLOOR 00
24-MD-111 DEMOLITION PLAN - FLOOR 01
24-MD-112 DEMOLITION PLAN - FLOOR 02
24-MD-113 DEMOLITION PLAN - FLOOR 03
24-MH-110 HVAC PLAN - FLOOR 00
24-MH-111 HVAC PLAN - FLOOR 01
24-MH-112 HVAC PLAN - FLOOR 02
24-MH-113 HVAC PLAN - FLOOR 03
24-MP-110 PIPING PLAN - FLOOR 00
24-MP-111 PIPING PLAN - FLOOR 01
24-MP-112 PIPING PLAN - FLOOR 02
24-MP-113 PIPING PLAN - FLOOR 03
24-MK-501 TYPICAL DETAILS
24-MK-502 TYPICAL DETAILS
24-MK-503 TYPICAL DETAILS
ELECTRICAL
24-E-001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES
24-E-002 ELECTRICAL SYMBOLS
24-ED-110 DEMOLITION PLAN - FLOOR 00
24-ED-111 DEMOLITION PLAN - FLOOR 01
24-ED-112 DEMOLITION PLAN - FLOOR 02
24-ED-113 DEMOLITION PLAN - FLOOR 03
24-ED-601 DEMOLITION ONE-LINE DIAGRAM
24-ED-602 DEMOLITION PANEL SCHEDULES
24-EL-110 LIGHTING RCP - FLOOR 00
24-EL-111 LIGHTING RCP - FLOOR 01
24-EL-112 LIGHTING RCP - FLOOR 02
24-EL-113 LIGHTING RCP - FLOOR 03
24-EL-601 LIGHTING SCHEDULES
24-EP-110 POWER PLAN - FLOOR 00
24-EP-111 POWER PLAN - FLOOR 01
24-EP-112 POWER PLAN - FLOOR 02
24-EP-113 POWER PLAN - FLOOR 03
24-EP-601 EQUIPMENT SCHEDULE
24-EP-602 POWER ONE-LINE DIAGRAM
24-EP-603 ELECTRICAL PANEL SCHEDULES
24-ET-110 TELECOMMUNICATION FLOOR PLAN - FLOOR 00
24-ET-111 TELECOMMUNICATION FLOOR PLAN - FLOOR 01
24-ET-112 TELECOMMUNICATION FLOOR PLAN - FLOOR 02
24-ET-400 TELECOMMUNICATION ENLARGED ROOM DETAILS TR-114B
24-EK-501 TYPICAL DETAILS
24-EK-502 TYPICAL DETAILS
25-ES-101 ELECTRICAL SITE PLAN - PARKING LOT
GENERAL
00-GI-001A COVER
00-GI-001B INDEX
00-GI-002 GENERAL ABBREVIATIONS, NOTES, & SYMBOLS
00-GI-003 ACCESSIBILITY STANDARDS
00-GI-004 CODE DATA
24-GI-110 LIFE SAFETY PLAN - FLOOR 00
24-GI-111 LIFE SAFETY PLAN - FLOOR 01
24-GI-112 LIFE SAFETY PLAN - FLOOR 02
24-GI-113 LIFE SAFETY PLAN - FLOOR 03
24-GI-120 DEPARTMENTAL PLAN - FLOOR 00
24-GI-121 DEPARTMENTAL PLAN - FLOOR 01
24-GI-122 DEPARTMENTAL PLAN - FLOOR 02
24-GC-125 PHASING & ICRA BARRIER PLANS
SURVEY
24-VF-100 TOPOGRAPHIC SURVEY
24-VF-101 IMPROVEMENT AND TOPOGRAPHIC SURVEY
25-VF-100 TOPOGRAPHIC SURVEY
25-VF-101 IMPROVEMENT AND TOPOGRAPHIC SURVEY
CIVIL
00-C-001 CIVIL GENERAL NOTES AND LEGENDS
24-CD-101 CIVIL SITE DEMOLITION PLAN
25-CD-101 CIVIL SITE DEMOLITION PLAN
24-CG-101 CIVIL GRADING PLAN BUILDING 24
24-CG-102 EROSION CONTROL PLAN INITIAL BMPS
24-CG-103 EROSION CONTROL PLAN INTERIM BMPS
24-CG-104 EROSION CONTROL PLAN FINAL STABILIZATION
24-CS-101 CIVIL SITE PLAN BUILDING 24
25-CG-101 CIVIL GRADING PLAN BUILDING 25
25-CG-102 CIVIL EXISTING CONDITIONS DRAINAGE PLAN
25-CG-103 CIVIL DEVELOPED DRAINAGE PLAN
25-CG-104 CIVIL BMP DRAINAGE AREA AMP
25-CG-105 EROSION CONTROL PLAN INITIAL BMPS
25-CG-106 EROSION CONTROL PLAN INTERIM BMPS
25-CG-107 EROSION CONTROL PLAN FINAL STABILIZATION
25-CS-101 CIVIL SITE PLAN BUILDING 25
25-CS-501 CIVIL SITE PLAN DETAILS
25-CS-502 CIVIL SITE PLAN DETAILS
25-CU-101 CIVIL OVERALL UTILITY PLAN
25-CU-301 STORM SEWER PLAN AND PROFILE
25-CU-501 STORM DRAINAGE DETAILS
25-CU-502 STORM DRAINAGE DETAILS
25-CU-503 STORM DRAINAGE DETAILS
XX-CG-501 EROSION CONTROL BMP DETAILS
XX-CG-502 EROSION CONTROL BMP DETAILS
XX-CG-601 COORDINATE POINT SCHEDULE
LANDSCAPE
24-L-001 LANDSCAPE ABBREVIATIONS, NOTES & SYMBOLS
24-LS-101 SITE PLAN
24-LS-401 ENLARGED SITE PLAN
24-LP-101 PLANTING PLAN
24-LP-401 ENLARGED PLANTING PLAN
24-LK-501 LANDSCAPE DETAILS
STRUCTURAL
24-S-001 STRUCTURAL NOTES
24-S-002 STRUCTURAL ABBREVIATIONS, NOTES, & SYMBOLS
24-S-003 STRUCTURAL SPECIAL INSPECTIONS SCHEDULE
24-SB-101A STRUCTURAL FLOOR PLAN - FLOOR SB
24-SB-101B STRUCTURAL FLOOR PLAN - FLOOR 00
24-SB-102 STRUCTURAL FLOOR PLAN - FLOOR 01
24-SB-103 STRUCTURAL FLOOR PLAN - FLOOR 02
24-SB-104 STRUCTURAL FLOOR PLAN - FLOOR 03
24-SB-501 FOUNDATION DETAILS
24-SF-301 FRAMING SECTIONS
24-SF-302 FRAMING SECTIONS
24-SF-303 FRAMING SECTIONS
24-SF-410 ENLARGED FRAMING PLANS
24-SF-411 ENLARGED FRAMING PLANS
24-SF-412 ENLARGED FRAMING PLANS
24-SF-413 ENLARGED FRAMING PLANS
24-SF-510 CMU WALL DETAILS
24-SF-511 CMU WALL DETAILS
24-SF-520 FRAMING DETAILS
24-SF-521 FRAMING DETAILS
24-SF-522 CFMF DETAILS
ARCHITECTURAL
24-AD-110A DEMOLITION PLAN - FLOOR SB
24-AD-110B DEMOLITION PLAN - FLOOR 00
24-AD-111 DEMOLITION PLAN - FLOOR 01
24-AD-112 DEMOLITION PLAN - FLOOR 02
24-AD-113 DEMOLITION PLAN - FLOOR 03
24-AD-120 DEMOLITION RCP - FLOOR 00
24-AD-121 DEMOLITION RCP - FLOOR 01
24-AD-122 DEMOLITION RCP - FLOOR 02
24-AD-131 DEMOLITION PLAN - ROOF
24-AS-101 SITE PLAN
24-AE-110A FLOOR PLAN - FLOOR SB
24-AE-110B FLOOR PLAN - FLOOR 00
24-AE-111 FLOOR PLAN - FLOOR 01
24-AE-112 FLOOR PLAN - FLOOR 02
24-AE-113 FLOOR PLAN - FLOOR 03
24-AE-120 REFLECTED CEILING PLAN - FLOOR 00
24-AE-121 REFLECTED CEILING PLAN - FLOOR 01
24-AE-122 REFLECTED CEILING PLAN - FLOOR 02
24-AE-131 ROOF PLAN
24-AE-132 ROOF PLAN ENLARGED - CANTEEN STORAGE
24-AE-202 ELEVATIONS - EXTERIOR
24-AE-211 ELEVATIONS - INTERIOR
24-AE-212 ELEVATIONS - INTERIOR
24-AE-301 SECTIONS - BUILDING
24-AE-302 SECTIONS - STAIRS ELEVATOR
24-AE-531 DETAILS - ROOF
SHEET INDEX
NTS
PROJECT LOCATION
NTS
CONTRACTOR PARKING & LAYOUT AREA
0 100% BID DOCS 07/07/2022
STAMP:
405872
M
OSE JS ACOBS
M
O
A. ALL CONTRACTORS AND THEIR SUPERVISORY PERSONNEL MUST REVIEW THE GENERAL AND
SUPPLEMENTARY CONDITIONS TO THE CONTRACT.
B. ALL WORK MUST CONFORM WITH APPLICABLE BUILDING CODES, REGULATIONS AND ORDINANCES.
C. CONTRACTOR MUST OBTAIN ALL REQUIRED BUILDING AND OCCUPANCY PERMITS.
D. CONTRACTOR MUST BECOME FULLY ACQUAINTED WITH CONDITIONS RELATED TO THE WORK.
E. CONTRACTOR MUST BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
CONSTRUCTION AND THE SAFETY OF ALL CONSTRUCTION PERSONNEL, BUILDING OCCUPANTS, AND
VISITORS.
F. DRAWINGS CONTAINED IN THIS SET MUST NOT BE REPRODUCED FOR SHOP DRAWINGS. COPIES OF THESE DRAWINGS SUBMITTED AS SHOP DRAWINGS WILL BE REJECTED AND RETURNED TO THE CONTRACTOR.
G. EACH INSTALLER MUST EXAMINE SUBSTRATE AND/OR CONDITIONS PERTAINING TO THEIR RESPECTIVE WORK AND REPORT TO THE CONTRACTOR IN WRITING ANY CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY EXECUTION OF THAT INSTALLER'S WORK. DO NOT PROCEED UNTIL CONDITIONS ARE SATISFACTORY.
COMMENCING WITH INSTALLATION WILL CONSTITUTE ACCEPTANCE OF THE SUBSTRATE AND/OR
CONDITIONS.
H. DO NOT SCALE DRAWINGS: FOLLOW WRITTEN DIMENSIONS AND NOTES. CONTACT VHA COR FOR
CLARIFICATIONS, IF REQUIRED.
I. DIMENSIONS SHOWN ON THE FLOOR PLAN ARE TO THE FACE OF GYPSUM WALL BOARD (FOG), FACE OF MASONRY (FOM), FACE OF CONCRETE (FOC) AND COLUMN GRID LINES, UNLESS OTHERWISE NOTED OR
INDICATED.
J. WALL THICKNESSES ARE NOMINAL DIMENSIONS, NOT ACTUAL DIMENSIONS. STUD WALL THICKNESSES ARE
5", UNLESS DIMENSIONED OTHERWISE.
K. MASONRY WALLS ARE 8" THICK (NOMINAL), UNLESS DIMENSIONED OR NOTED OTHERWISE.
L. "TYPICAL", AS USED IN THESE DOCUMENTS, MEANS THAT THE CONDITION, ITEM, OR DIMENSION IS
REPRESENTATIVE OF, OR THE SAME, FOR SIMILAR CONDITIONS OR INDICATED ITEMS.
M. IF THERE IS A DISCREPANCY BETWEEN SMALL SCALE AND LARGE SCALE DRAWINGS, (PLAN, SECTION, & DETAIL DRAWINGS, AND SO FORTH), CONTACT VHA COR FOR CLARIFICATION. FOR BIDDING PURPOSES: THE MOST EXPENSIVE AND/OR STRICTEST REQUIREMENTS MUST GOVERN. FOR CLARIFICATIONS DURING CONSTRUCTION, THE MOST EXPENSIVE AND/OR STRICTEST REQUIREMENTS, AS INDICATED BY THE VHA COR, MUST GOVERN.
N. IF THERE ARE ANY DISCREPANCIES BETWEEN THE DRAWINGS AND SPECIFICATIONS, CONTACT VHA COR FOR CLARIFICATION. FOR BIDDING PURPOSES: THE MOST EXPENSIVE AND/OR STRICTEST REQUIREMENTS MUST GOVERN. FOR CLARIFICATIONS DURING CONSTRUCTION: THE MOST EXPENSIVE AND/OR STRICTEST
REQUIREMENTS, AS INDICATED BY THE VHA COR, MUST GOVERN.
O. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL CONDITIONS MUST BE REPORTED TO THE VHA
COR IN WRITING FOR RESOLUTION, PRIOR TO PROCEEDING WITH THE AFFECTED WORK.
P. ANY AND ALL DISCREPANCIES MUST BE REPORTED TO THE VHA COR IN WRITING FOR RESOLUTION, PRIOR TO PROCEEDING WITH THE AFFECTED WORK. IN THESE INSTANCES, NO CHANGE ORDERS OR EXTENSIONS OF TIME WILL BE ALLOWED OR ACCEPTED FOR PROCEEDING WITH THE WORK WITHOUT THE VHA COR'S
WRITTEN DIRECTION AND APPROVAL. ALSO, CONTRACTOR MUST REPAIR AND/OR REPLACE ANY
UNAUTHORIZED WORK, AS INDICATED BY THE VHA COR, AT NO ADDITIONAL COST TO THE OWNER (VHA).
Q. ALL DISSIMILAR METAL MATERIALS MUST BE ISOLATED WITH AN APPROVED NONMETAL ISOLATION MATERIAL.
R. ALL EXTERIOR EXPOSED STEEL MUST BE PAINTED.
S. OPEN EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALL PANELS, AT PENETRATIONS OF UTILITIES THROUGH THE BUILDING ENVELOPE, AND SO FORTH, MUST BE SEALED. PROPER SEALANT, FLASHINGS, OR WEATHER-STRIP DESIGNED SPECIFICALLY FOR
THE PURPOSE AND FOR COMPATIBILITY WITH ADJACENT MATERIALS TO PROVIDE A DURABLE
WEATHERTIGHT SEAL TO ELIMINATE AIR LEAKAGE AND WATER ENTRY.
T. PROVIDE SEALANT AND/OR CAULKING BETWEEN DISSIMILAR ADJOINING INTERIOR MATERIALS. (THAT IS
WINDOW SILLS TO GWB, CEILING FINISHES TO MASONRY WALLS, AND SO FORTH.)
U. DOOR OPENINGS NOT LOCATED BY DIMENSION MUST BE CENTERED IN WALL SHOWN OR LOCATED 2" FROM FINISH WALL TO FINISH JAMB, ALLOWING A MINIMUM OF 18" FROM THE PULL SIDE OF THE DOOR TO THE
INTERSECTING WALL UNLESS SPECIFICALLY INDICATED OTHERWISE.
V. CONTRACTOR MUST VERIFY THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES AND THEIR SERVICE
CONNECTIONS WITH THE PROPER UTILITY COMPANY AND/OR UTILITY LOCATE SERVICE.
W. CONTRACTOR MUST COORDINATE SIZE, LOCATIONS AND NUMBER OF ALL ROOF OPENINGS AND ROOF ACCESSORIES WITH ALL OTHER TRADES. REFER TO THE ARCHITECTURAL, STRUCTURAL, PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS.
X. LOCATIONS AND SIZES OF ALL CONCRETE MECHANICAL AND ELECTRICAL PADS MUST BE COORDINATED BY THE MECHANICAL AND ELECTRICAL CONTRACTORS WITH THE SELECTED EQUIPMENT MANUFACTURER AND/OR SUPPLIER. LOCATIONS AND SIZES MUST BE APPROVED BY THE VHA COR PRIOR TO PROCEEDING
WITH THE WORK.
Y. EXCEPT AT FIRE-RATED PARTITIONS, ALL WALL AND COLUMN GYPSUM BOARD FACING MUST BE HELD AT 5/8"
BELOW ROOF STRUCTURE, UNLESS DETAILED OR NOTED OTHERWISE.
Z. AT ALL TELECOMMUNICATION ROOMS: PROVIDE 3/4" X 8'-0" HIGH FIRE-RETARDANT-TREATED WOOD SHEATHING OR PROVIDE PLYWOOD OVER NON-COMBUSTIBLE SHEATHING, BOTTOM TO BE LOCATED AT 4"
AFF VERIFY LENGTHS AND LOCATIONS WITH ELECTRICAL DRAWINGS.
AA. GLASS DOORS, ADJACENT PANELS AND ALL GLAZED OPENINGS WITHIN 1'-6" OF THE FLOOR OR WITHIN 24" OF A DOOR, AND SO FORTH, MUST BE SAFETY GLAZING, APPROVED FOR IMPACT, PER APPLICABLE BUILDING
CODE AND MUST BE PERMANENTLY LABELED BY THE GLAZING MANUFACTURER AS SUCH.
BB. ALL CEILING HEIGHTS AS SHOWN ON PLANS AND DETAILS ARE FROM FINISHED FLOOR (HARD SURFACE TILE
FINISH OR FLOOR SUNSTRATE IF CARPETED) TO EXPOSED CEILING FINISH.
CC. PROVIDE INDEPENDENT FRAMING AND ATTACHMENTS TO THE STRUCTURE, ADEQUATE TO SUPPORT THE CEILING SYSTEM, LIGHT FIXTURES, DUCTS, DIFFUSERS, SPRINKLER PIPING AND BUS DUCTS.
DD. ALL CLOSETS AND ALCOVES WITHOUT A SPACE IDENTIFICATION NUMBER MUST HAVE THE SAME FINISHES
AS THE RESPECTIVE ADJOINING SPACE (ROOM, CORRIDOR AND SO FORTH).
EE. CONTRACTOR MUST INSTALL WOOD GROUNDS (BLOCKING AND PLYWOOD) AS REQUIRED FOR THE MOUNTING OF ALL TOILET ACCESSORIES, MILLWORK, CASEWORK, AV EQUIPMENT, MEP ITEMS AND
EQUIPMENT, AND SO FORTH.
FF. ALL PROPRIETARY PRODUCTS DESCRIBED AND/OR DRAWN IN THE DOCUMENTS (BUT NOT SPECIFIED) ARE TO
MEET THE MANUFACTURER'S STANDARD CRITERIA WHICH IS NOT LIMITED TO THE FOLLOWING:
PERFORMANCE REQUIREMENTS, QUALITY ASSURANCE REQUIREMENTS, APPLICABLE CODES AND INDUSTRY STANDARDS, FABRICATION, ASSEMBLY, HANDLING, DELIVERY, STORAGE, INSTALLATION, OPERATION, ADJUSTMENTS, AND SO FORTH. PROVIDE THE MANUFACTURER'S STANDARD WARRANTY AND STANDARD FINISH WARRANTY. PROVIDE PRODUCT DATA, SHOP DRAWINGS, SAMPLES AND MAINTENANCE DATA, AS SPECIFIED. DIVISION 01 SPECIFICATION SECTIONS APPLY, SUCH AS SUBSTITUTION PROCEDURES, SUBMITTAL PROCEDURES, QUALITY REQUIREMENTS, REFERENCES, EXECUTION AND CLOSEOUT PROCEDURES. ANY SUBSTITUTIONS MUST MEET THE DESIGN INTENT, AS WELL AS THE CRITERIA DESCRIBED ABOVE.
GG. REFER TO SPECIFICATIONS FOR ALL REQUIRED TESTING AND INSPECTIONS.
GENERAL NOTES
EARTH /
COMPACT FILL
GRAVEL /
GRANULAR FILL
CONCRETE
SAND / MORTAR /
PLASTER / CUT STONE
BRICK
CONCRETE
MASONRY UNIT
STONE (ELEVATION)
BATT INSULATION
RIGID INSULATION
ACOUSTICAL TILE
(SECTION)
GYPSUM BOARD
COVER BOARD
STEEL / METAL
FINISH WOOD
CONTINUOUS WOOD
BLOCKING / ROUGH
FRAMING
CAST STONE
DISCONTINUOUS
WOOD BLOCKING /
SHIM
PLYWOOD / OSB
MASONRY INSULATION
FIREPROOFING
METAL / WALL PANELS
SPANDREL GLASS
MATERIALS LEGEND
PLASTIC LAMINATE
EXISTING
CONSTRUCTION
ROOM NAME
VIEW TITLE EXAMPLE
ELEVATION CALLOUT EXAMPLE
ENLARGED CALLOUT EXAMPLE
SECTION CALLOUT EXAMPLE
SECTION OR DETAIL SYMBOL IDENTIFIERS
DETAIL NAME
DRAWING NUMBER
DESIGNATOR ON SHEET
DRAWING SEQUENCE
NUMBER INDICATES
WHERE DRAWING IS
LOCATED
TWO CHARACTER
DISCIPLINE DESIGNATOR
AE101
DOOR
NUMBER TAG
WALL
TYPE TAG
WINDOW
TYPE TAG
CENTER LINE
COLUMN
BUBBLE
ROOM TAG
MATCH LINE
DETAIL NUMBER
ON SHEET
SHEET NUMBER
DETAIL NUMBER
ON SHEET
SHEET NUMBER
NEW LINE TYPE
EXISTING LINE TYPE
DEMOLITION LINE TYPE
AREA OF DEMOLITION
VIEW NAME
1/8" = 1'-0"
AE101
AE101
AS101
FLOOR PLAN SYMBOLS LEGEND
AE101
EXTERIOR
INTERIOR
## KEYNOTE
REVISION TAG
DRAWING SCALE
MATERIAL
KEYNOTE
FIXTURE
KEYNOTE
DETAIL NUMBER
ON SHEET
SHEET NUMBER
W3
######-A
######-A
A
A2
1-HR FIRE
2-HR FIRE
3-HR FIRE
4-HR FIRE
1-HR FIRE/SMOKE
2-HR FIRE/SMOKE
3-HR FIRE/SMOKE
4-HR FIRE/SMOKE
0-HR SMOKE
0.5-HR SMOKE
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
VETERANS
HEALTH
ADMINISTRATION
D :\R ev it
\2 1.
_A
R C
H _R
_b va nd er pl oe g.
rv t
7/ 7/
:1
1:
P M
00-GI-002
GENERAL ABBREVIATIONS, NOTES,
& SYMBOLS
EHRM TRAINING AND ADMIN
SPACE SUPPORT
1 JEFFERSON BARRACKS DR ST. LOUIS, MO 63125
657-21-703JB
07/07/2022 MJ JWR
100% BID DOCS
VEG 21.21
S
S SOUTH
SAN SANITARY SEWER
SATC SUSPENDED ACOUSTICAL TILE CEILING
SC SOLID CORE
SCH SCHEDULE
SCRN SCREEN
SECT SECTION
SF SQUARE FOOT (SQFT)
SHT SHEET
SIM SIMILAR
SOG SLAB ON GRADE
SPEC SPECIFICATION (S)
SPKLR SPRINKLE
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
STC SOUND TRANSMISSION COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURE / STRUCTURAL
SUSP SUSPENDED
SY SQUARE YARD (SQ YD)
SYM SYMMETRICAL / SYMBOL
SYS SYSTEM
T
T TREAD
TEL TELEPHONE
TEMP TEMPORARY / TEMPERED
TG TONGUE & GROOVE
THK THICK (NESS)
THRU THROUGH
TKBD TACK BOARD
TO TOP OF
TOC TOP OF CURB / CONCRETE
TOD TOP OF DECK
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOR TOP OF ROOF
TOS TOP OF STEEL
TOW TOP OF WALL
TPO THERMOPLASTIC POLYOLEFIN
TRANSF TRANSFORMER
TV TELEVISION
TYP TYPICAL
TZ TERRAZZO
U
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
V
VA VETERANS ADMINISTRATION
VB VAPOR BARRIER (VPR BR)
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VHA VETERANS HEALTH ADMINISTRATION
VIF VERIFY IN FIELD
VNR VENEER
VTR VENT THROUGH ROOF
VWC VINYL WALLCOVERING
W
W WEST, WIDTH, WIDE
W/ WITH
W/IN WITHIN
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WDW WINDOW
WH WALL HYDRANT / WATER HEATER
WP WATERPROOFING / WORKING POINT
WR WEATHER RESISTANT
WSF WELDED SEAM SHEET FLOORING
WT WEIGHT
WWF WELDED WIRE FABRIC
X, Y, Z, MISC
& AND
@ AT
XPS EXTRUDED POLYSTYRENE
YD YARD
N
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NSF NET SQUARE FEET
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD / OPPOSITE HAND
OIT OFFICE OF INFORMATION TECHNOLOGY
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
OZ OUNCE
P
PA PUBLIC ADDRESS
PB PUSH BUTTON
PC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PERF PERFORATE (D)
PERM PERMANENT
PERP PERPENDICULAR
PL PLATE / PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLY POLYETHYLENE
PR PAIR
PREFAB PREFABRICATE (D)
PREFIN PREFINISHED
PRELIM PRELIMINARY
PREP PREPARE (D)
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PTN PARTITION
PVC POLYVINYL CHLORIDE
PVG PAVING
Q
QT QUARRY TILE
QTB QUARRY TILE BASE
QTY QUANTITY
R
R RISER / RADIUS
RA RETURN AIR
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFRIGERATOR
REINF REINFORCE (D), (ING)
REQD REQUIRED
REV REVISED/ REVISION
RFG ROOFING
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RESTROOM
RSF RESILIENT SHEET FLOORING
RTU ROOF TOP UNIT
H
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDBD HARDBOARD
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HK HOOK
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING / VENTILATING / AIR CONDITIONING
HW HOT WATER
HYD HYDRANT
I
IBC INTERNATIONAL BUILDING CODE
ICRA INFECTION CONTROL RISK ASSESSMENT
ID INSIDE DIAMETER
ILSM INTERIM LIFE SAFETY MEASURES
IN INCH
INCL INCLUDE (D), (ING)
INFO INFORMATION
INST INSTALL / INSTALLATION
INSUL INSULATE / INSULATION
INT INTERIOR
INV INVERT
J
JAN JANITOR
JB JUNCTION BOX
JST JOIST
JT JOINT
K
KIT KITCHEN
KO KNOCKOUT
KPL KICK PLATE
L
L LONG / LENGTH
LAB LABORATORY
LAM LAMINATE (D)
LAV LAVATORY
LBS POUNDS
LF LINEAR FOOT (FEET)
LH LEFT HAND
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LPT LOW POINT
LRG LARGE
LT LIGHT
LTG LIGHTING
LVR LOUVER
LVT LUXURY VINYL TILE
LWC LIGHTWEIGHT CONCRETE
M
MAS MASONRY
MAX MAXIMUM
MBR MEMBER
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFG MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODULAR
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
D
DBL DOUBLE
DEMO DEMOLISH / DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DMT DEMOUNTABLE
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
E
E EAST
EA EACH
EF EXHAUST FAN
EHRM ELECTRONIC HEALTH RECORDS
MODERNIZATION
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
ESC ESCALATOR
EST ESTIMATE
ETR EXISTING TO REMAIN
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION / EXPOSED
EXT EXTERIOR
F
FA FIRE ALARM
FAB FABRIC
FB FACE BRICK
FBO FURNISHED BY OWNER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF&E FIXTURES, FURNITURE & EQUIPMENT
FFE FINISH FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH / FINISHED
FIXT FIXTURE
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOG FACE OF GYPSUM BOARD / WALL
FOM FACE OF MASONRY
FOS FACE OF STUDS
FR FIRE RATED
FRMG FRAMING
FRP FIBER REINFORCED PANEL
FS FLOOR SINK
FT FOOT/ FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED CONCRETE
GL GLASS / GLAZING
GOVT GOVERNMENT
GPM GALLON PER MINUTE
GSF GROSS SQUARE FEET
GWB GYPSUM WALL BOARD
GYP GYPSUM
A
ABA ARCHITECTURAL BARRIERS ACT
AC AIR CONDITIONING
ACP ACOUSTICAL CEILING PANEL
ACST ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADJ ADJUSTABLE / ADJACENT
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
AP ACCESS PANEL
APC ARCH PRECAST CONCRETE
APPROX APPROXIMATE
ARCH ARCHITECT / ARCHITECTURAL
ATTEN ATTENUATION
AUTO AUTOMATIC
AV AUDIO / VISUAL
AVG AVERAGE
AWP ACOUSTICAL WALL PANEL
B
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BM BENCH MARK / BEAM
BO BOTTOM OF
BOC BACK OF CURB
BOT BOTTOM
BRG BEARING
BRK BRICK
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BVL BEVELED
C
C COURSE
CAB CABINET
CAP CAPACITY
CB CATCH BASIN
CCTV CLOSED CIRCUIT TV
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLOS CLOSET
CLR CLEAR / CLEARANCE
CMP CORRUGATED METAL PIPE
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONN CONNECTION / CONNECT
CONST CONSTRUCT / CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CORR CORRIDOR / CORRUGATED
CP CONCRETE PIPE
CPT CARPET
CR CLASSROOM
CS COUNTERSINK
CSMT CASEMENT
CT CERAMIC TILE
CU CUBIC
CW COLD WATER
ARCHITECTURAL ABBREVIATIONS
0 100% BID DOCS 07/07/2022
405872
M
OSE JS ACOBS
M
O
A. ALL DIMENSIONS ARE MEASURED FROM THE FINISH FLOOR AND THE FINISH WALL, UNLESS NOTED OTHERWISE. ACCESSIBILITY GUIDELINES ARE BASED ON “PG-18-13 VA BARRIER FREE DESIGN
STANDARD” AND THE “ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS).”
B. ACCESSIBLE UNOBSTRUCTED REACH RANGES:
1. FORWARD REACH = 15" MIN TO 48" MAX
2. SIDE REACH = 15" MIN TO 48" MAX
C. DOOR HARDWARE (TO CENTER OF HARDWARE):
STANDARD MOUNTING HEIGHTS:
1. PUSH PLATES = 42"
2. PULL HANDLES = 42"
3. KNOBS / LEVERS = 40"
4. PANIC DEVICE = 42" CL OF BAR
5. KICKPLATES:
a. WIDTH = DOOR WIDTH MINUS 2"
b. CENTER HEIGHT = 16" FROM BO DOOR
6. THRESHOLDS:
a. STANDARD = 1/2" MAX
b. EXTERIOR SLIDING DOORS = 3/4" MAX
D. DRINKING FOUNTAINS & ELECTRICAL WATER COOLERS (TO SPOUT):
1. STANDARD = 38" MIN TO 43" MAX
2. ACCESSIBLE = 36" MAX (27" MIN CLEAR KNEE SPACE)
E. COUNTERTOPS (TO SINK RIM / COUNTERTOP):
1. ACCESSIBLE = 28" MIN TO 34" MAX
F. WATER CLOSETS (TO TOP OF SEAT):
1. STANDARD = 14" TO 15"
2. ACCESSIBLE (TO TOP OF SEAT) = 17" TO 19"
3. ACCESSIBLE FLUSH CONTROLS = 44" MAX
G. URINALS (TO RIM):
1. STANDARD = 24" MAX
2. ACCESSIBLE = 17" MAX
3. ACCESSIBLE FLUSH CONTROLS = 44" MAX
H. LAVATORIES (TO SINK RIM / COUNTERTOP):
1. STANDARD = 36" MAX
2. ACCESSIBLE = 34" MAX (29" MIN CLEAR KNEE SPACE)
I. MIRRORS:
1. TO B/O REFLECTIVE SURFACE:
a. STANDARD = VARIES
b. ACCESSIBLE = 40" MAX
2. TO T/O REFLECTIVE SURFACE:
a. STANDARD = VARIES
b. ACCESSIBLE = 74" MIN
J. GRAB BARS - ACCESSIBLE (TO TOP OF BAR):
1. WATER CLOSETS = 33" MIN TO 36" MAX
2. SHOWERS = 33" MIN TO 36" MAX (FROM BO SHOWER)
3. BATHTUBS:
a. TOP BAR = 33" MIN TO 36" MAX
b. BOTTOM BAR = 9" ABOVE TOP OF TUB
K. SHOWER HEADS (FROM FLOOR TO HEAD):
1. STANDARD = 72" TO 84"
2. ACCESSIBLE = SPRAY UNIT WITH HOSE 60" LONG MIN
3. ACCESSIBLE FIXED SHOWER HEAD = 48" AFF
L. SHOWER CONTROLS (TO CONTROL AREA):
1. STANDARD = 48" MAX (TO TOP)
2. ACCESSIBLE = 38" MIN TO 48" MAX
M. SHOWER ROD (FROM FLOOR TO CL): STANDARD = 78" MAX
N. TOILET PARTITIONS:
1. TO BOTTOM = 12"
2. TO TOP = 70"
O. URINAL PARTITIONS:
1. TO BOTTOM = 18"
2. TO TOP = 60"
P. TOILET PAPER DISPENSER (TO CL OF OUTLET):
1. STANDARD = 24"
2. ACCESSIBLE = 15" MIN TO 48" MAX
Q. WALL MOUNTED SOAP DISPENSER (TO CL OF PUSH BUTTON):
1. STANDARD = 40"
2. ACCESSIBLE = VARIES (REFER TO OBSTRUCTED AND UNOBSTRUCTED REACH RANGES)
3. ACCESSIBLE SIDE REACH = 46" MAX ABOVE SINK IN COUNTER
R. PAPER TOWEL DISPENSER / WASTE RECEPTACLE (TO TOWEL SLOT):
1. STANDARD = 40" MAX
2. ACCESSIBLE FORWARD REACH = 48" MAX & 15" MIN
3. ACCESSIBLE SIDE REACH = 48" MAX & 15" MIN
S. WARM AIR HAND DRYER (TO PUSH SWITCH):
1. STANDARD = 44" MAX
2. ACCESSIBLE FORWARD REACH = 48" MAX & 15" MIN
3. ACCESSIBLE SIDE REACH = 48" MAX & 15" MIN
T. SANITARY NAPKIN DISPENSER (TO CL OF COIN SLOT):
1. STANDARD = 40" MAX
2. ACCESSIBLE FORWARD REACH = 48" MAX & 15" MIN
3. ACCESSIBLE SIDE REACH = 48" MAX & 15" MIN
U. SANITARY NAPKIN DISPOSAL (TO TOP OF UNIT):
1. STANDARD = 28" MAX
2. ACCESSIBLE = 19" MIN TO 24" MAX (TO OPENING).
V. TOILET SEAT COVER DISPENSERS (TO OPENING):
1. STANDARD = 40" MAX
2. ACCESSIBLE FORWARD REACH = 48" MAX & 15" MIN
3. ACCESSIBLE SIDE REACH = 48" MAX & 15" MIN
W. SHELVES: ACCESSIBLE = 48" MAX
X. COAT HOOKS:
1. STANDARD = 68"
2. ACCESSIBLE = 48" MAX
Y. CHALKBOARDS, TACKBOARDS & MARKERBOARDS:
1. STANDARD = 32" TO 39" (TO BO BOARD OR CHALK TRAY)
2. STANDARD = 80" (RECOMMENDED, TO TOP OF BOARD)
Z. THERMOSTATS & CONTROL DEVICES (TO TOP):
1. ACCESSIBLE FORWARD REACH = 48" MAX
2. ACCESSIBLE SIDE REACH = 48" MAX
AA. LIGHT SWITCHES & CARD READERS (TO CL):
1. LOCATE 6" FROM DOOR JAMB
2. ACCESSIBLE = 48" MAX
BB. CONVENIENCE RECEPTACLES / ELECTRICAL / TELEPHONE / DATA (TO CL):
1. STANDARD = 18"
2. ACCESSIBLE = 15" MIN
CC. EXIT LIGHTS - WALL MOUNTED:
1. 2" BELOW CEILING
2. 2" MIN ABOVE DOOR FRAME EQUAL SPACE FROM CEILING TO TOP OF FRAME
DD. FIRE EXTINGUISHERS (TO TOP UNLESS NOTED OTHERWISE):
1. GROSS WT 40 LBS OR LESS = 60" MAX
2. GROSS WT MORE THAN 40 LBS = 42" MAX
3. ACCESSIBLE = 40" MAX (TO BO CABINET)
EE. FIRE ALARM PULL STATION (TO LEVER):
1. STANDARD = 48" MAX
2. ACCESSIBLE FORWARD REACH = 48" MAX
3. ACCESSIBLE SIDE REACH = 48" MAX
FF. SMOKE AND / OR HEAT DETECTORS:
1. STANDARD = CEILING HEIGHT
GG. HORN / SPEAKER / VISUAL SIGNALS:
1. STANDARD = 80" AFF OR 6" BELOW CEILING - WHICHEVER IS LOWER
HH. ROOM SIGNAGE (TO CL):
1. STANDARD = 60" HIGH AFF & WITHIN 18" OF LATCH SIDE OF DOOR
II. REFER TO SHEET 24-AE-532 FOR WALL REINFORCEMENT DETAILS REQUIRED BETWEEN WALL
FRAMING STUDS FOR MOUNTING GRAB BARS AND OTHER ACCESSORIES TO WALLS.
GENERAL NOTES
CLEAR FLOOR SPACE,
PARALLEL APPROACH HIGH AND LOW SIDE REACH MAXIMUM SIDE REACH OVER OBSTRUCTIONS
M
IN
30" MIN
M A
X
10" TO 24" MAX
M A
X
M A
X
CLEAR FLOOR SPACE, ALCOVE,
FORWARD APPROACH
36" MIN
X
4"
GRAB BAR
T O
P O
F O
P E
N
IN
G
M A
X
DISPENSER
M
IN
1/
2" B
O O
P E
N
IN
G
M
IN
54" MIN
T O
T O
P O
F B
A R
T O
6"
MAX
12" 42" MIN
7" TO 9"
ELEVATION
SIDE WALL
ACCESSIBLE WATER CLOSET
SIDE WALL
GRAB BAR
WATER CLOSET FLUSH
HANDLES SHALL BE
LOCATED ON THE TRANSFER
SIDE OF THE STOOL
24" MIN
18" MAX
16" MIN
DISPENSER
T O
T O
P O
F B
A R
T O
6"
12" MIN
ELEVATION
T O
P O
F S
E A
T
M
IN
T
O
7" M
A
X BACK WALL
ACCESSIBLE WATER CLOSET
BACK WALL
N F
P A
IN
S
T A
LL
P
E R
FIRE EXTINGUISHER
CABINET
N F
P A
IN
S
T A
LL
P
E R
TYPICAL MOUNTING HEIGHTS
FIRE EXTINGUISHER CABINET
FIRE
EXTINGUISHER
& STANDARD
BRACKET
N F
P A
IN
S
T A
LL
P
E R
N F
P A
IN
S
T A
LL
P
E R
TYPICAL MOUNTING HEIGHTS
FIRE EXTINGUISHER
NOSINGS - RADIUS
1/2" MAX
1 1/2" OD HANDRAIL
12" MIN
T O
T O
P O
F H
A N
D R
A
IL
M
IN
T O
4"
M A
X
T O
T O
P O
F H
A N
D R
A
IL
M
IN
T O
4"
M A
X
1 1/2" MAX
TREAD 11" MIN
12" MIN
T O
T O
P O
F H
A N
D R
A
IL
M
IN
T O
4"
M A
X
4" M
IN
T
O
M
A X
VA/ABAAS STANDARDS
1/
2" M
IN
1 1/4" TO 2"
4 1/2" MAX
1 1/2" MIN
4 1/2" MAX
1 1/2" MIN
HANDRAIL CLEARANCE
LIGHT SWITCH
M A
X
4'
MAX
1' - 0"
2"
THERMOSTAT
M
IN
1'
RECEPTACLE
TYPICAL MOUNTING HEIGHTS
DOOR SWITCH
4" TYP
12" MIN
18" MIN
PULL SIDE
PUSH SIDE
X
M
IN
M
IN
24" MIN
24" MIN
PULL SIDE
PUSH SIDE48
M
IN
M
IN
22" MIN
36" MIN
PULL SIDE
PUSH SIDE
M
IN
M
IN
22" MIN
42" MIN
PULL SIDE
PUSH SIDE 48
M
IN
M
IN
A P
P R
O A
C H
A P
P R
O A
C H
A P
P R
O A
C H
A P
P R
O A
C H
A P
P R
O A
C H
A P
P R
O A
C H
APPROACH
APPROACH
MANEUVERING CLEARANCES
DOOR PROVIDED W/ CLOSER
DOOR PROVIDED W/ CLOSER
DOOR PROVIDED W/ CLOSER & LATCH
HINGE APPROACH
HINGE APPROACH
HINGE APPROACH
DOOR PROVIDED W/ CLOSER
& LATCH
FRONT APPROACH
X
SANITARY
NAPKIN
DISPOSAL
TOILET PAPER
DISPENSER
1'
M
IN
SOAP DISPENSER
( 4" MAX PROJ)
MIRROR
SANITARY
NAPKIN
DISPENSER
INTEGRAL WASTE
DISPOSAL WHERE
APPLICABLE
( 4" MAX PROJECTION)
TOWEL
DISPENSER
PAPER TOWEL
DISPENSER
(4" MAX PROJECTION)
BABY CHANGING
STATION
PASS-THRU
PAPER TOWEL DISPENSER
(4" MAX PROJECTION)
R E
F
LE
C T
IV
E
S U
R F
A C
E
3'
M A
X T
O B
O
4'
M A
X
4'
M A
X
S E
E N
O T
E
4'
R E
F
LE
C T
IV
E
S U
R F
A C
E
6'
M
IN
T O
T O
P O
F
TYPICAL MOUNTING HEIGHTS
I I. PORTABLE FIRE EXTINGUISHERS
1. PLACEMENT
A. INSTALLATION HEIGHT
1. FIRE EXTINGUISHERS HAVING A GROSS WEIGHT NOT EXCEEDING 40 LB SHALL BE
INSTALLED SO THE THE TOP OF THE FIRE EXTINGUISHER IS NOT MORE THAN 5 FT
ABOVE THE FLOOR.
2. FIRE EXTINGUISHERS HAVING A GROSS WEIGHT GREATER THAN 40 LB (EXCEPT
WHEELED TYPES) SHALL BE INSTALLED SO THAT THE TOP OF THE FIRE
EXTINGUISHER IS NOT MORE THAN 3 1/2 FT ABOVE THE FLOOR.
3. IN NO CASE SHALL THE CLEARANCE BETWEEN THE BOTTOM OF THE HAND PORTABLE
FIRE EXTINGUISHER AND THE FLOOR BE LESS THAN 4 IN.
CLEAR
FLOOR
SPACE
NOTE: PARTITION DOOR IS
TO BE LOCATED OPPOSITE
OF WC LOCATION
5' - 6" CLEAR
6'
C
LE
A R
ACCESSIBLE WATER CLOSET
APPROACH
A P
P R
O A
C H
LAVATORIES
5' - 7" MIN
CLEAR
FLOOR SPACE
(36" CLEAR IN
FORWARD
APPROACH
ALCOVE)
M A
X
M A
X
M A
X
M A
X
PLAN
30" MIN
M
IN
ELEVATIONS
/2
M
IN
ACCESSIBLE URINAL
CLEAR
FLOOR
SPACE
9" M
IN
M
IN
25" MAX
17" MIN
M A
X
30" MIN
M
IN
M A
X
PLAN
KNEE CLEARANCE
MEASURED TO
THE HIGHER OF
COUNTER OR SINK
11" MIN6" MAX
8" MIN
SECTION
ACCESSIBLE LAVATORY AT COUNTER
M
IN
PLAN
60" MIN
X
5"
M A
X
M
IN
15" MIN
30"x 48" MIN
CLEAR ACCESS
SPACE
ACCESSIBLE
FOUNTAIN
STANDARD
FOUNTAIN
DUAL ACCESSIBLE DRINKING
FOUNTAIN FORWARD
APPROACH
SPOUT SHALL BE WITHIN
5" OF FRONT AND SHALL
DIRECT FLOW PARALLEL
TO FRONT. FLOW SHALL
BE A MIN OF 4" HIGH.
M A
X
M
IN
9" M
IN
6" MAX
8" MIN
5" MAX
15" MIN
SECTION
ACCESSIBLE DRINKING
FOUNTAIN SECTION
ACCESSIBLE
FOUNTAIN
STANDARD
FOUNTAIN
ELEVATION
T O
S P
O U
T
M A
X
C
LE
A R
M
IN
T O
S P
O U
T
M
IN
T O
3"
M A
X
DUAL ACCESSIBLE DRINKING
FOUNTAIN
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
VETERANS
HEALTH
ADMINISTRATION
D :\R ev it
\2 1.
_A
R C
H _R
_b va nd er pl oe g.
rv t
7/ 7/
:1
1:
P M
00-GI-003
ACCESSIBILITY STANDARDS EHRM TRAINING AND ADMIN
SPACE SUPPORT
1 JEFFERSON BARRACKS DR ST. LOUIS, MO 63125
657-21-703JB
07/07/2022 MJ JWR
100% BID DOCS
VEG 21.21
GENERAL NOTES (CONT.)
0 100% BID DOCS 07/07/2022
405872
M
OSE JS ACOBS
M
O
PE
07/07/2022
Issue Date
07/07/2022
Issue Date
07/07/2022
Issue Date
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
VETERANS
HEALTH
ADMINISTRATION
C :\U se rs
\V .B
.S .1
\D oc um en ts \2
1.
_A R
C H
_R
_j ra th 3W
JH
G
.r vt
5/
/2
:2 4:
A
M
00-GI-004
CODE DATA EHRM TRAINING AND ADMIN
SPACE SUPPORT
1 JEFFERSON BARRACKS DR ST. LOUIS, MO 63125
657-21-703JB
05/12/2022 MJ TW
100% BID DOCS
VEG 21.21
Notice to Proceed = 05.06.21
ASME Code for Pressure Piping
ASME A17.1 Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (2019)
VB
V (000)
0-Hrs
0-Hrs
0-Hrs
0-Hrs
0-Hrs
0-Hrs
Not Applicable
Not Applicable
Fully
0-Hrs
1-Hr (Connecting 3 or Less Stories)
NA
NA
1-Hr (Connecting 3 or Less Stories)
1-Hr (Connecting 3 or Less Stories)
NA
Sprinklered
Required/Provided based on New Assembly
Class B
Class B
Class C
Class I or Class II
PG-18-4 VA Standard Details
PG-18-5 Equipment Guide List (12.2019)
H-18-8 Seismic Design Requirements (05.01.20)
PG-18-9 Space Planning Criteria (02.21.21)
Architectural Design Manual (08.01.14)
Electrical Design Manual (12.01.19)
Renovation (2021)
VA DESIGN MANUALS (DM)
VA Fire Protection Design Manual (8th Edition - 06.01.21)
VA PROGRAM GUIDES (PG-#-#)
PG-18-1 VA Master Specifications
PG-18-3 Design & Construction Procedure (07.01.21)
PG-18-13 VA BIM & CAD Standards (02.2017)
PG-18-14 Room Finishes, Door, & Hardware Schedule (04.10.17)
PG-18-15 A/E Design Submission Requirements (Volume C - Minor and NRM Projects)
PG-18-17 Environmental Planning Guidance - NEPA Interim Guidance ‐ Projects (09.30.10)
VA DESIGN GUIDES (DG)
PG-18-9: Space Planning Criteria - Office of Information and Technology (OIT) - Chapter 232 (02.01.11)
Lighting Design Manual (12.01.15)
HVAC Design Manual (11.01.17)
Interior Design Manual (11.01.20)
Physical Security and Resiliency Design Manual (09.01.21)
Plumbing Design Manual (05.01.21)
VA Signage Design Guide (09.01.21)
PG-18-12 Office of Information and Technology Design Guide (02.2011)
PG-18-10 Telecommunications and Special Telecom Systems Design Manual (02.2016)
NFPA 13 Standard for the Installation of Sprinkler Systems - 2019
NFPA 54, National Fuel Gas Code, 2021
NFPA 72, National Fire Alarm and Signaling Code - 2019
NFPA 80, Standard for Fire Doors and Other Opening Protectives - 2019
NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems, 2021
NFPA 90B, Standard for the Installation of Warm Air Heating and Air-Conditioning Systems, 2021
National Fire Protection Association (NFPA)
NFPA National Fire Codes (Exceptions : NFPA 5000 and NFPA 900)
NFPA 101 Life Safety Code - 2021 (LSC)
Referenced Publications (Applicable but not all inclusive)
NFPA 1 Fire Code - 2021
NFPA 10 Standard for Portable Fire Extinguishers - 2018
Architectural Barriers Act Accessibility Standards (ABAAS) 2015
ASHRAE
ASHRAE Standard 15 Safety Code for Mechanical Refrigeration
ASHRAE Standard 34 Designation and Safety Classification of Refrigerants
ASHRAE Standard 90.1
NFPA 70 National Electrical Code - 2020 (NEC)
International Code Council (ICC)
International Building Code - 2021 (IBC)
International Plumbing Code - 2021 (IPC)
Accessibility
PG-18-13 VA Sustainable Design Manual (01.01.17, revised 11.01.18)
Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings (AISC)
PROJECT SCOPE
ASME
ASME Boiler and Pressure Vessel Code
Miscellaneous
Occupational, Safety and Health Administration (OSHA) Standards
Building Code Requirements for Reinforced Concrete, ACI and Commentary (ACI 318)
Addition to Existing (AD)
Modification (MD)
IBC
Addition to Existing (AD)
Renovation to Existing
Alteration Level 3 (A3)
Change of Occupancy (CO)
LSC
Change of Use (CU)
Change of Occupancy Classification (CO)
B U
IL
D
IN
G
P L
A N
N
IN
G
USE AND OCCUPANCY CLASSIFICATION
Existing Building (2021) - Story 02
Occupancy(s) - Main
Accessory Occupancies
A D
M
IN
IS
T
R A
T
IO
N
PROJECT INFORMATION
Owner / Tenant
VA ST. LOUIS HEALTH CARE SYSTEM - JEFFERSON BARRACKS DIVISION
1 JEFFERSON BARRACKS DR ST. LOUIS, MO 63125
Project / Building
EHRM TRAINING AND ADMINISTRATION SPACE SUPPORT (21.21)
BUILDING 24
REGULATORY
Existing Building (1936)
See "OCCUPANCY CLASSIFICATION" Matrix
See "OCCUPANCY CLASSIFICATION" Matrix
See "DESIGN NARRATIVE"
Number of Stories
Non-Separated (Mixed)
BUILDING DATA
Building Area
Building Height
Floor Construction & Secondary Members
Roof Construction & Secondary Members
(X) Notes
Fire Separation Distance (FSD)
F
IR
E P
R O
T E
C T
IO
N
CONSTRUCTION CLASSIFICATION
Construction Classification (IBC)
Construction Classification (LSC)
Building Elements FRR (Hours)
Primary Structural Frame
Bearing Walls - Interior
Nonbearing Walls - Interior
Projections
FIRE PROTECTION SYSTEMS
Automatic Sprinkler System
FIRE-RESISTANCE RATINGS (FRR)
Corridors
Elevator Hoistways
Shafts (Mechanical)
Special Rooms or Spaces
Corridor Enclosure FRR (Hours)
Interior Exit Stairway (IES)
Occupancy Separations
Control Areas (Hazardous Materials)
Vertical Openings (VO)
Corridors and Exit Access Stairway Enclosures
Rooms and Enclosed Spaces
Interior Floor Finish and Floor Covering
INTERIOR FINISHES
Wall and Ceiling Finishes
Interior Wall and Ceiling Finish Materials
Interior Exit Stairways & Ramps
Type of Construction (IBC)
Type of Construction (LSC)
Automatic Sprinkler System (ASPS)
A# (SF) % A# (SF) % A# (SF) %
Assembly
A-2 (Restaurants) • 4311 43.9% 0.0% 0.0% 18,000 2 Y N
A-3 (Conference Rooms) • 0 0.0% 1104 14.0% 0.0% 18,000 2 N Y
Business (B) • 2014 20.5% 6784 86.0% 4351 100.0% 27,000 3 N Y Y N Y N
Factory and Industrial
F-1 (Moderate Hazard) • 550 5.6% 0.0% 0.0% 25,500 2 N N
Mercantile (M) • 1740 17.7% 0.0% 0.0% 27,000 2 N Y
Storage
S-1 (Moderate Hazard) • 1194 12.2% 0.0% 0.0% 27,000 2 N Y
9809 100.0% 7888 100.0% 4351 100.0%
Assembly (New/Existing) - Ch 12/13
< 300 • 2
Business (New/Existing) - Ch 38/39 • NA
Industrial - Ch 40
General Purpose • NA
Mercantile (New/Existing) - Ch 37/38
Regular • NA
Storage - Ch 42
Low & Ordinary Hazard • NA
EHRM TRAINING AND ADMIN SPACE SUPPORT (21.21)
OCCUPANCY CLASSIFICATIONS : STORY(S) 00, 01, & 02VB
V (000)
Y
Use and Occupancy Classification
IB
C
C h
L S
C
C h
ACTUALS (Story 00) ACTUALS (Story 01) Story 01 Compliant? Story 02 Compliant?
AREA
S to rie s
AREA
S to rie s
AREA
S to rie s
ACTUALS (Story 02)
H ei gh t (
F ee t)
C om pl ia nt
H ei gh t
ALLOWABLES Story 00 Compliant?
A re a (S
F
S to rie s
H ei gh t (
F ee t)
P re do m in an t
A cc es so ry
S ep ar at ed
N on
-S ep ar at ed
A re a (S
F
A ll S to rie s
S to rie s
1 2 3 53 Y
A cc es so ry
S ep ar at ed
N on
-S ep ar at ed
A re a (S
F
A ll S to rie s
S to rie s
P re do m in an t
A cc es so ry
S ep ar at ed
N on
-S ep ar at ed
A re a (S
F
A ll S to rie s
S to rie s
P re do m in an t
Y
TOTALS : Areas + Percentages Y
Y Y
N Y
Y60
N Y
Y Y
N
1 2 3 Y Y Y
0.3
0.2
A Stair 0.3 44 44 / 0.30 146 44 44 / 0.30 146 44 44 / 0.30 146 44 44 / 0.30 146
B Door (into Stairway) 0.2 36 33.5 / 0.20 = 167 36 33.5 / 0.20 = 167 36 33.5 / 0.20 = 167 36 33.5 / 0.20 = 167
C Door (into Stairway) 0.2 36 33.5 / 0.20 = 167 36 33.5 / 0.20 = 167
D EP Door (Exit Discharge) 0.2 36 33.5 / 0.20 = 167
E Door (Exit Discharge) 0.2 36 33.5 / 0.20 = 167
A Stair 0.3 60 60 / 0.30 200 60 60 / 0.30 200 60 60 / 0.30 200
B Door (into Stairway) 0.2 42 39.5 / 0.20 = 197 42 39.5 / 0.20 = 197 42 39.5 / 0.20 = 197
C Door (Exit Discharge) 0.2 42 39.5 / 0.20 = 197
A Door (to Stairway) 0.2 36 33.5 / 0.20 = 167
B Door (Exit Discharge) 0.2 69 69 / 0.20 = 345
A Door (to Stairway) 0.2 36 33.5 / 0.20 = 167
B Door (Exit Discharge) 0.2 69 69 / 0.20 = 345
A Door (to Stairway) 0.2 36 33.5 / 0.20 = 167
B Door (Exit Discharge) 0.2 69 69 / 0.20 = 345
A Door (to Stairway) 0.2 36 33.5 / 0.20 = 167
B Door (Exit Discharge) 0.2 69 69 / 0.20 = 345
A Door (to Stairway) 0.2 36 33.5 / 0.20 = 167
B Door (Exit Discharge) 0.2 69 69 / 0.20 = 345
A Door (to Stairway) 0.2 36 33.5 / 0.20 = 167
B Door (Exit Discharge) 0.2 69 69 / 0.20 = 345
A Door (to Stairway) 0.2 36 33.5 / 0.20 = 167
B Door (Exit Discharge) 0.2 69 69 / 0.20 = 345
Exit Exit Stairway (EES-Story.4) EES-00.4
Exit Discharge C (ED-Story.C)
ED-00.B
Exit Exit Stairway (EES-Story.3)
ED-00.C
EES-00.2
343 343 146
Occ Load Demand (Calculated) 233 211 24 3
1,512Occ Load Capacity (Calculated)
EES-00.3
Exit Discharge A (ED-Story.A) ED-00.A
Exit Discharge B (ED-Story.B)
Interior Exit Stairway #1 (IES-Story.1)
146 146 146
Interior Exit Stairway C (IES-Story.2)
197 197 197
IES-00.1 IES-01.1 IES-02.1
Exit Exit Stairway (EES-Story-1)
Exit Exit Stairway (EES-Story.2)
EES-00.1
IES-00.2 IES-01.2 IES-02.2
S iz e (I n
C lr
W id th
In
M u lt ip lie r
O cc u p an ts
L o w es t O
L
IES-03.1
L o w es t O
L
M u lt ip lie r
C lr
W id th
In
M u lt ip lie r
O cc u p an ts
L o w es t O
L
S iz e (I n
C lr
W id th
In
EHRM TRAINING AND ADMIN SPACE SUPPORT (21.21)
Exit Components
M u lt ip lie r
Story 00 Story 01 Story 02 Penthouse
S iz e (I n
C lr
W id th
In
O cc u p an ts
M u lt ip lie r
O cc u p an ts
L o w es t O
L
S iz e (I n
Stair Multiplier
Door Multiplier
OL
Assembly (Restaurants, Banquet Rooms, & Food Courts) A-2b 131 66 0.9 0.9 0.3 0.3 0.3
Assembly (Auditoriums, Lecture Halls & Libraries) A-3a 195 98 0.8 1.5 0.5 0.5 0.4
Business B 80 40 1.6 1.6 1.0 1.0 0.8
Mercantile M 55 28 0.1 0.1 0.0 0.0 0.1
Storage S-1/2 10 5 0.1 0.1 0.1 0.1 0.0
471 237
3.4 4.1 1.9 1.9 1.5
4 5 2 2 2
3 3 2 2
2 2 2 2
TOTALS (Required) : WCs + LAVs + DFs
EHRM TRAINING AND ADMIN SPACE SUPPORT (21.21)
Classification (Description)
Plumbing Fixtures (IBC Table 2902.1)
STORIES 01-03
T O
T A
L O
L
WC Lav
DF
(M)(F) (M) (F) (M) (F)
TOTALS : Areas, Occupant Loads & Egress Widths
TOTALS : WCs + LAVs + DFs
TOTALS (Provided) : UNISEX
TOTALS (Provided) : WCs + LAVs + DFs
0 0
2TOTALS (Provided) : WCs + LAVs + DFs
OL OL OL OL
ACCESSORY
MECHANICAL 0 sf ● ● F-1/2 887 sf 0 515 sf 0 403 sf 0 1,168 sf 0 2,973 sf 12.6% 0 0.0% 0
STORAGE 300 sf ● ● S-1/2 1,615 sf 6 79 sf 1 835 sf 3 0 sf 0 2,529 sf 10.7% 10 2.1% 10
ASSEMBLY W/O FIXED SEATS
ASSEMBLY - UNCONCENTRATED (CHAIRS & TABLES)
RESTAURANTS 15 sf ● ● A-2b 1,958 sf 131 0 sf 0 0 sf 0 0 sf 0 1,958 sf 8.3% 131 27.8% 131
AUDITORIUMS 15 sf ● ● A-3a 0 sf 0 2,789 sf 186 0 sf 0 0 sf 0 2,789 sf 11.8% 186 39.5% 186
ASSEMBLY - STANDING SPACES
ELEVATOR CAB 5 sf ● ● A-3a 42 sf 9 0 sf 0 0 sf 0 0 sf 0 42 sf 0.2% 9 1.9% 9
BUSINESS USE 150 sf ● ● ● B 1,592 sf 11 3,520 sf 24 3,113 sf 21 318 sf 3 8,543 sf 36.2% 59 12.5% 59
KITCHENS 100 sf ● ● B 2,087 sf 21 0 sf 0 0 sf 0 0 sf 0 2,087 sf 8.8% 21 4.5% 21
MERCANTILE
BASEMENT & GRADE FLOOR AREAS 30 sf ● ● ● M 1,639 sf 55 0 sf 0 0 sf 0 0 sf 0 1,639 sf 6.9% 55 11.7% 55
NON-NET FLOOR AREA 38 sf 985 sf 0 sf 0 sf 1,023 sf 4.3%
9,858 sf 233 7,888 sf 211 4,351 sf 24 1,486 sf 3 23,583 sf 100% 471 100% 471
42 37 181 495 50
DT
TOTALS : Gross Floor Area (GFA) & Occupant Loads (OL)
AVERAGE OL FACTOR
Total Area
BT% CT%
Total
OL
A re a/ O cc
G ro ss
Area Area Area Area
FUNCTION OF SPACE
Total Occupant Load (MOE)
EHRM TRAINING AND ADMIN SPACE SUPPORT (21.21) STORY 00 STORY 01 STORY 02 PENTHOUSE TOTALS
Total
OL
(PF)
NFPA 101 LSC (2021) Table 7.3.1.2 Occupant Load Calc Occupant Load Calc Occupant Load Calc Occupant Load Calc
C2 B3 C3
C la ss ifi ca tio n
N et
IB
C BT CT
L S
CA B0 C0 B1 C1 B2
Mech (0)
Storage (300)
Assembly T&C (15)
Business Areas (150)
Non-Net (0)
Business Areas (50)
Assembly Stand (5)
Merc @ Gr (30)
Kitchen Comm (200)
F5 OCCUPANT LOAD PLANS - STORIES 00, 01, & 02, & PENTHOUSE
NO SCALE F9 OCCUPANCY CLASSIFICATIONS PLANS - STORIES 00 & 01
NO SCALE
E1 OCCUPANCY CLASSIFICATIONS MATRIX - STORIES 00, 01, & 02
NO SCALE
B3 MEANS OF EGRESS CAPACITY
NO SCALE
C3 PLUMBING FIXTURE CALCULATION
NO SCALE
F1 OCCUPANT LOAD MATRIX - STORIES 00, 01, 02 & PENTHOUSE
NO SCALE
See "OCCUPANT LOAD MATRIX"
See "PLUMBING FIXTURE MATRIX"
Yes
Yes - Corridors, Interior Exit Stairways, Public
Restrooms (>300 SF)
0.3 inches / occupant
0.2 inches / occupant
250 Feet New Assembly (Story
300 Feet New/Existing Business
75 Feet New Assembly
100 Feet New/Existing Business
20 Feet New Assembly
50 Feet
44 Inches (LSC)
60 Inches (VA Barrier Free Design Standard)
96 Inches - Not Applicable
24 Inches
72 Inches - Not Applicable
32 Inches
41.5 Inches - Bed Movement : Not Applicable
No
No
Yes
44 Inches (Minimum)
36”
44"
Yes
Not Applicable
Not Applicable
See "MEANS OF EGRESS - CAPACITY"
Yes - Stories 00, 01, & 02
Yes - Stories 00 & 01
Yes
Yes
Yes
Yes
Yes
See "MEANS OF EGRESS - CAPACITY"
See "MEANS OF EGRESS - CAPACITY"
O C
C U
P A
N T
N E
E D
S OCCUPANT LOAD (OL)
PLUMBING FIXTURES (PF)
M E
A N
S O
F E
G R
E S
S
GENERAL MEANS OF EGRESS
Means of Egress - Illumination
Power Source - Normal
Power Source - Emergency Electrical System
Occupant Multiplier Factor (Inches/Occupant)
Dead-End Corridors (DEC)
N/E Assembly & Groups A-2 & A-3
N/E Business & Group B
Corridor Requirements
Corridor Width (Inches)
Stairways
Other Means of Egress (Doors, Corridors, Aisles, Ramps)
EXIT ACCESS
Travel Distance Requirements
Exit Access Travel Distance (EATD)
Common Path of Egress Travel Distance (CPOETD)
Stretcher - Outpatient Medical
Other Means of Egress
Corridor Width - Minimum Clear
Bed Movement - Health Care
MEP Equipment Access
Electrically Locked Egress Doors?
Special Doors
Door Requirements
Door - Clear Width (Minimum)
Hardware
Stairway Requirements
Stairway Width (Inches)
Stairway Width - Minimum Clear
Occupant Load < 50 Occupants
Power-Operated Doors?
Security Grilles?
Ramp Requirements
Occupant Load > 50 Occupants
Stairway Vertical Rise between Landings <12 Feet
Specialty Stairways
Number of Means of Egress
OL = 1 - 500 Occupants = (2) Exits or Exit Access
Maximum OL of Space (Sprinklered)
(2) Means of Egress - Minimum
Maximum OL of Story
Accessible Means of Egress (2 per Story)
Accessible Means of Egress Components
Accessible Route (AR)
OL > (50) occupants (Groups A, B, E, F, M, U)
Two-Way Communication (AoR or EAAR)
EXITS
Number of Exits
Elevators
Exit Access Stairways (IES)
EXIT DISCHARGE
Number of Exit Discharges
OTHER MEANS OF EGRESS
UP
DN DN
UP
DN
S101
STAIR 1
G01C
HOISTWAY
G02A
TELECOM
G03A
STORAGE
G01C
EXT VESTIBULE
G01
CANTEEN
DINING
AREAG01A
FOOD
SERVICE
G09
FOOD
PREP
G01B
ELEV
LOBBY
G07
KITCHEN
G06
KITCHEN
STORAGE
G05
FOOD
PREP
G05A
FOOD
PREP
G10
CANTEEN /
STORAGE
G10A
STORAGE
G15
MECHANICAL
RM
H001
CORRIDOR
G03
CANTEEN
STORE
G11A
OFFICE
G11
OFFICE
G08
HAC
G12
TOILET
FEMALE
G13
TOILET
MALE
Mech (0) 65 sf
Storage (300) 906 sf
Assembly Stand (5) 42 sf
9 Occupants
GFA
9,858 sf Mech (0)
208 sf
Storage (300) 279 sf
Merc @ Gr (30) 1,639 sf
55 Occupants
Assembly T&C (15) 1,958 sf
131 Occupants
Non-Net (0) 38 sf
Kitchen Comm (200) 2,087 sf
Mech (0) 614 sf
Storage (300) 161 sf
Storage (300) 233 sf
1 Occupant
Storage (300) 36 sf
S101
STAIR 1
G01C
HOISTWAY
ATTIC
GSF
1,486 sf
Mech (0) 1,168 sf
DN
UP
UP
UP
CORRIDOR
G01C
HOISTWAY
OFFICE
RESTROOM
OFFICE
STORAGE
S101
STAIR 1
S201
STAIR 2
OFFICE
OFFICE
205A
TELECOM
CORRIDOR
ELEV LOBBY
218A
PASSAGE
STORAGE
216A
STORAGE
201B
CORRIDOR
201A
OFFICE
CLOS
X200
MECH CHASE
Mech (0) 208 sf
Mech (0) 111 sf
Mech (0) 84 sf
Storage (300) 440 sf
Storage (300) 342 sf
Storage (300) 30 sf
Storage (300) 23 sf
GFA
4,351 sf
DN
UP
DN
DN
CR-2
CR-3
CR-5
CR-4
103A
CORRIDOR
CORRIDOR
103B
CORRIDOR
JAN
MEN
WOMEN
102A
LOD TRAINING
OFFICE
LOD OFFICE
114B
TELECOM
MECH
ELEV LOBBY
VESTS201
STAIR 2
STORAGE
107A
STORAGE
107B
STORAGE
104B
LOD PHOTO
S101
STAIR 1
G01C
HOISTWAY
CR-1
PHOTO STUDIO
H002
CORRIDOR
STORAGE
ROOF
Assembly T&C (15) 517 sf
35 Occupants
Assembly T&C (15) 563 sf
38 Occupants
Non-Net (0) 535 sf
Assembly T&C (15) 329 sf
23 Occupants
Assembly T&C (15) 541 sf
39 Occupants
Storage (300) 46 sf
Non-Net (0) 434 sf
Mech (0) 208 sf
Mech (0) 234 sf
Assembly T&C (15) 313 sf
22 Occupants Assembly T&C (15)
526 sf
39 Occupants
Non-Net (0) 16 sf
GFA
7,888 sf
Storage (300) 33 sf
Mech (0) 73 sf
UP
DN DN
UP
DN
S101
STAIR 1
G01C
HOISTWAY
G02A
TELECOM
G03A
STORAGE
G01C
EXT VESTIBULE
G01
CANTEEN
DINING
AREAG01A
FOOD
SERVICE
G09
FOOD
PREP
G01B
ELEV
LOBBY
G07
KITCHEN
G06
KITCHEN
STORAGE
G05
FOOD
PREP
G05A
FOOD
PREP
G10
CANTEEN /
STORAGE
G10A
STORAGE
G15
MECHANICAL
RM
H001
CORRIDOR
G03
CANTEEN
STORE
G11A
OFFICE
G11
OFFICE
G08
HAC
G12
TOILET
FEMALE
G13
TOILET
MALE
Storage & Group S-1 1,194 sf
Existing Business (EB) & Group B 610 sf
Exist Mercantile (EM) & Group M 1,740 sf
Exist Assembly (EA) & Group A-2 4,311 sf
Industrial & Group F-1 590 sf
Existing Business (EB) & Group B 195 sf
Existing Business (EB) & Group B 1,204 sf
DN
UP
DN
DN
CR-2
CR-3
CR-5
CR-4
103A
CORRIDOR
CORRIDOR
103B
CORRIDOR
JAN
MEN
WOMEN
102A
LOD TRAINING
OFFICE
LOD OFFICE
114B
TELECOM
MECH
ELEV LOBBY
VESTS201
STAIR 2
STORAGE
107A
STORAGE
107B
STORAGE
104B
LOD PHOTO
S101
STAIR 1
G01C
HOISTWAY
CR-1
PHOTO STUDIO
H002
CORRIDOR
STORAGE
ROOF
New/Existing Business (NEB) & Group B Business
New Assembly (NE) & Group A-3 1,105 sf
405872
M
OSE JS ACOBS
05/12/2022
405872
M
OSE JS ACOBS
M
O
P 07/07/2022
Issue Date
07/07/2022
Issue Date
0 100% BID DOCS 07/07/2022
UP
DN DN
UP
DN
S101
STAIR 1
G01D
HOISTWAY
G02A
TELECOM
G03A
STORAGE
G01C
EXT VESTIBULE
G01
CANTEEN
DINING
AREAG01A
FOOD
SERVICE
G09
FOOD
PREP
G01B
ELEV
LOBBY
G07
KITCHEN
G06
KITCHEN
STORAGE
G05
FOOD
PREP
G05A
FOOD
PREP
G10
CANTEEN /
STORAGE
G10A
STORAGE
G15
MECHANICAL
RM
H001
CORRIDOR
G03
CANTEEN
STORE
G11A
OFFICE
G11
OFFICE
G08
HAC
G12
TOILET
FEMALE
G13
TOILET
MALE
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
VETERANS
HEALTH
ADMINISTRATION
C :\U se rs
\V .B
.S .1
\D oc um en ts \2
1.
_A R
C H
_R
_j ra th 3W
JH
G
.r vt
5/
/2
:2 4:
A
M
24-GI-110
LIFE SAFETY PLAN - FLOOR 00 EHRM TRAINING AND ADMIN
SPACE SUPPORT
1 JEFFERSON BARRACKS DR ST. LOUIS, MO 63125
657-21-703JB
05/12/2022 MJ TW
100% BID DOCS
VEG 21.21
24'12'6'3'1'-6"0'
Plan North
True North
3/16" = 1'-0"
LIFE SAFETY PLAN - FLOOR 00
LOBBY
EP-00.01
EES-00.1
ED
IES-00.01
E D
E D
E X
EX
E X
E D
EES-00.2
EES-00-1
EES-00-2
ED-00.A
ED-00.B
EES-00.3
E D
EX
EES-00.4
EDEES-00-4
E A
E X
1F B
1F B
1F B
1F B
1F B
1FB 1FB 1FB 1FB 1FB 1FB 1FB 1FB 1FB
1F B
1F B
1F B
1F B
1F B
1FB 1FB 1FB 1FB 1FB 1FB 1FB 1FB 1FB 1FB 1FB
1F B
1F B
1F B
1F B
1F B
1F B
1FB1FB1FB1FB1FB1FB1FB1FB1FB1FB1FB
EX
1SE
1SE
1SE
1SE
1SE
1SE 1SE 1SE 1SE 1SE 1SE
1S E
1S E
1S E
1S E
1S E
HAZ
HAZ
1E W
1E W
1E W
1E W
1E W
1E W
1E W
1E W
1E W
1E W
1E W
1E W
1E W
1E W
ED
EXISTING EXIT DISCHARGE
EX
0S P
0S P
0S P
0S P
0S P
0S P
0S P
0S P
0S P
0S P
0S P
0SP 0SP 0SP 0SP
0S P
0S P
0S P
0SP 0SP 0SP
0S P
0S P
0S P
0S P
0S P
0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP0SP
LEGEND - LIFE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .