1.2 - Specs - Division 02.pdf
PDF 19 MB Posted
- Solicitation number
- 36C77622B0052
About this file
This document provides details for a federal contract solicitation to renovate space at the Jefferson Barracks VAMC. The solicitation seeks a general contractor to complete construction project #657-21-703JB to renovate the first floor of Building B24 to provide training and administrative support space for the EHRM activation. The scope of work includes demolishing existing structures, furnishing all labor, materials and equipment to complete the construction, and preparing the site for building operations. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Interested parties should reference solicitation number 36C77622B0052 for the Y1DZ--EHRM Training and Administrative Support Space B24 Construction project located at the Jefferson Barracks VAMC.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01-01-21
02 21 13 - 1
SECTION 02 21 13
SITE SURVEYS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Researching and collecting documents informing surveys.
2. Performing boundary survey, topographic survey, and utility survey.
3. Creating survey drawings.
1.2 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American Land Title Association and American Congress on Surveying and
Mapping (ALTA-ACSM):
1. Accuracy Standards for ALTA-ACSM Land Title Surveys.
C. Federal Geographic Data Committee (FGDC):
1. STD-007.03-98 - Geospatial Positioning Accuracy Standards Part 3:
National Standard for Spatial Data Accuracy.
2. STD-007.04-02 - Geospatial Positioning Accuracy Standards Part 4:
Standards for Architecture, Engineering, Construction (A/E/C) and
Facility Management.
1.3 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Survey Drawings:
1. Prints: Two sets of black line, full size prints of each drawing.
2. Electronic Files: Consistent with computer-aided design (CAD)
Standards described at www.cfm.va.gov/til/projReq.asp.
1.4 QUALITY ASSURANCE
A. Land Surveyor: One of the following:
1. Experienced professional land surveyor licensed in state in which project is located.
2. Experienced professional civil engineer licensed in state in which project is located and authorized to practice land surveying as civil engineer.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
02 21 13 - 2
PART 2 - PRODUCTS
2.1 ACCESSORIES
A. Monuments: Iron pin, with driven 16 mm (5/8 inch) diameter, minimum
600 mm (24 inches) long to prevent displacement.
B. Stakes: Hardwood.
C. Flagging: Plastic, roll form, highly visible, solid color.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Research public and VA facility records for deeds, maps, monuments, plats, surveys, title certificates or abstracts, rights-of-way, easements, section line, other boundary line locations, and other documents pertaining to project site.
B. Research public and VA facility utility records for aerial, surface, and subgrade structures and utility service lines and easements.
3.2 PREPARATION
A. Coordinate with Contracting Officer's Representative for site access.
B. Coordinate with adjacent property owners when access to adjoining properties is required.
1. Notify Contracting Officer's Representative when access is denied.
1.2 SURVEYS
C. Perform survey on ground according to Accuracy Standards for ALTA-ACSM
Land Title Surveys and FGDC STD-007.3 and FGDC STD-007.4.
1. Provide topo contours at 1’ intervals
D. Boundary Survey:
1. Locate permanent monuments within and along survey boundary.
2. Set permanent monument at property corners when monument is not found.
3. Temporarily mark monument locations with stake and flagging.
4. Reconcile differences between legal description and survey.
E. Topographic Survey:
1. Vertical Control: National Geodetic Survey or existing VA Medical
Center benchmark.
2. Establish minimum three permanent benchmarks plus one permanent benchmark for each 1.6 hectares (4 acres) within survey boundary.
3. Determine project site contours at maximum 300 mm
(1 foot) interval.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 21 13 - 3
4. Determine spot elevations at specified locations.
F. Utility Survey:
1. Locate piped utilities and utility structures. Identify service type, sizes, depths, and pressures. Establish inverts in and out on gravity sewer manholes. If depth is critical and manholes are not available identify depth with ground-penetrating radar (GPR).
2. Locate fire hydrants.
3. Locate wired utilities and utility structures. Identify service type, rated capacities, and elevations above and below grade.
4. Identify each utility authority including contact person and phone number.
G. Locate permanent structures within survey boundary by perpendicular dimension to property lines.
1. Determine structure plan dimensions, heights, and vertical offsets.
2. Determine projections and overhangs beyond structure perimeter at grade.
3. Determine number of stories and primary building materials.
H. Locate rights-of-way and easements within and adjacent to survey boundary by perpendicular dimension to property line.
1. Locate project site access from rights-of-way by dimension from survey monument. Determine site access width.
3.3 SURVEY DRAWING REQUIREMENTS
A. Consult Contracting Officer's Representative to confirm required survey scale and drawing size.
1. Drawing Size: Maximum 760 by 1070 mm (30 by 42 inches).
2. Boundary Survey Scale: Maximum 1 to 35 (1 inch equals 30 feet).
3. Enlarged Detail Areas: Scale as required to present dimensional data and survey information clearly. Maintain orientation aligned with smaller scale view.
4. Plan Orientation: North at top of drawing sheet.
B. Drawing Notations:
1. Land Surveyor: Name, address, telephone number, signature, seal, and registration number.
2. Survey Dates: Date survey was initially completed and subsequent revision dates.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 21 13 - 4
3. Certification: Certify each drawing adjacent to land surveyor's seal:
a. "I hereby certify that all information indicated on this drawing was obtained or verified by actual measurements in the field and that every effort has been made to provide complete and accurate information."
b. Title, number, and total number of drawings on each drawing.
c. Scale in metric and imperial measurement.
d. Graphic scale in metric and imperial measurement.
e. Graphic symbol and abbreviation legends.
f. North arrow for plan view drawings.
g. Benchmark locations.
h. Horizontal and vertical control datum.
i. Adjacent property owner names.
j. Zoning classifications.
k. Building street numbers.
4. Evidence of Possession: Indicate character and location of evidence of possession affecting project site. Notation absence signifies no observable evidence of possession.
C. Vicinity Map: Indicate project site and nearby roadways and intersections.
D. Record Documents Forming Survey Basis: Indicate titles, source, and recording data of documents relied upon to complete survey.
E. Legal Description: Recorded title boundaries.
F. Land Area: Report in sq. m (sf) hectares (acres) as defined by the boundaries of the legal description of the surveyed premises, including legal description of the land.
1. Accuracy: 0.1 sq. m (1 sq. ft.) 0.005 hectares (0.001 acres) .
G. Boundary Lines: Show point of beginning, length and bearing for straight lines, and angle, radius, point of curvature, point of tangency, and length of curved lines.
1. Include bearing basis and data necessary to mathematically close survey.
2. When recorded and measured bearings, angles, and distances differ, indicate both recorded and measured data.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 21 13 - 5
a. Indicate when recorded description does not mathematically close survey.
3. Indicate found and installed monuments establishing basis of survey.
4. Contiguity, Gores, and Overlaps: Identify discrepancies within and along survey boundary.
H. Lots and Parcels: Indicate entire lots and parcels included within and intersected by survey boundary.
I. Roadways: Indicate names and widths of rights-of-way and roadways within and abutting survey boundary.
1. Indicate changes in rights-of-way lines either completed or proposed.
2. Indicate accesses to roadways.
3. Indicate abandoned roadways.
4. Indicated unopened dedicated roadways.
J. Setbacks: Indicate recorded setback and building restriction lines.
K. Structures and Site Improvements: Indicate buildings, walls, fences, signs, and other visible improvements.
1. Indicate each building dimensioned to property lines and other structures.
2. Indicate exterior dimensions of buildings at ground level. Show area of building footprint and gross floor area of entire building.
3. Indicate maximum measured height of buildings above grade, point of measurement, and number of stories.
4. Indicate spot elevations at building entrances, first floor, service docks, corners, steps, ramps, and grade slabs.
5. Indicate structures and site improvements within 1500 mm (5 feet) of survey boundary.
6. Indicate encroachments on project site, adjoining property, easements, rights-of-way, and setback lines from fire escapes, bay windows, windows and doors opening out, flue pipes, stoops, eaves, cornices, areaways, stoops, other building projections, and site improvements.
7. Identify setback, height, and floor space area restrictions set by applicable zoning and building codes and recorded subdivision maps.
Indicate if no restrictions exist.
L. Easements:
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 21 13 - 6
1. Indicate easements evidenced by recorded documents.
a. Indicate when easements cannot be located.
2. Indicate observable easements created by roadways, rights-of-ways, water courses, drains, telephone, telegraph, electric and other wiring, water, sewer, oil, gas, and other pipelines within project site and on adjoining properties when potentially affecting project site.
3. Indicate observable surface improvements of underground easements.
M. Pavements
1. Indicate location, alignment, and dimensions for vehicular and pedestrian pavements.
2. Indicate pavement encroachments from adjacent properties onto project site and onto adjacent properties from project site.
a. Dimension encroachments from survey boundary.
3. Indicate roadway centerlines with true bearings and lengths by 15 m
(50 feet) stationing.
a. Describe curves by designating points of curvature and tangency.
Include curve data and location of radius and vertex points.
b. Indicate elevations at station points along roadway centerlines, roadway edges, and top and bottom of curbs.
4. Indicate parking areas, parking striping, and total parking spaces.
a. Identify accessible, fuel efficient, and electric vehicle parking spaces.
5. Indicate curb cuts, driveways, and other accesses to public ways.
N. Indicate cemetery and burial ground boundaries.
O. Waterways:
1. Indicate boundaries of ponds, lakes, springs, and rivers bordering on or running through project site. Note date of measurement and that boundary is subject to change due to natural causes.
2. Indicate flood plain location and elevation.
3. Indicate watershed extent affecting project site.
P. Indicate topographic contours.
Q. Flood Zone: Indicate applicable flood zone from Federal Flood Insurance
Rate Maps, by scaled map location and graphic plotting.
R. Public and Private Utilities:
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 21 13 - 7
1. Indicate information source and operating authority for each utility.
2. Indicate utilities existing on or serving project site.
3. Indicate fire hydrants on project site and within 150 m (500 feet) of survey boundary.
4. Indicate manholes, catch basins, inlets, vaults, and other surface indications of subgrade services.
5. Indicate depths or invert elevations, sizes, materials, and pressures of utility pipes.
6. Indicate wires and cables serving, crossing, and adjacent to project site.
7. Indicate exterior lighting, traffic control facilities, security, and communications systems.
8. Indicate utility poles on project site and within 3 m (10 feet) of survey boundary.
9. Indicate dimensions of cross-wires or overhangs affecting project site.
S. Observable Evidence:
1. Indicate in-progress and recently completed earth moving work, building construction, and building additions.
2. Indicate in-progress and recently completed pavement construction and repairs.
3. Indicate areas used as solid waste dump, sump, and sanitary landfill.
T. Trees:
1. Indicate individual trees with minimum 150 mm (6 inches) diameter measured at 400 mm (48 inches) above grade.
2. Indicate wooded area perimeter outline and description of predominant vegetation.
- - - E N D - - -
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 21 13 - 8
INTENTIONALLY LEFT BLANK
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
08-01-17
02 41 00 - 1
SECTION 02 41 00
SELECTIVE DEMOLITION
1.1 DESCRIPTION:
A. This section specifies demolition and removal of buildings, portions of buildings, utilities, other structures and debris from trash dumps shown.
1.2 RELATED WORK:
A. Demolition and removal of roads, walks, curbs, and on-grade slabs outside buildings to be demolished: Section 31 20 00, EARTH MOVING.
B. Safety Requirements: Section 01 35 26 Safety Requirements Article, ACCIDENT PREVENTION PLAN (APP).
C. Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.
D. Reserved items that are to remain the property of the Government:
Section 01 00 00, GENERAL REQUIREMENTS.
E. Asbestos Removal: Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.
F. Lead Paint: Section 02 83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.
G. Environmental Protection: Section 01 57 19, TEMPORARY ENVIRONMENTAL
CONTROLS.
H. Construction Waste Management: Section 01 74 19 CONSTRUCTION WASTE
MANAGEMENT.
I. Infectious Control: Section 01 35 26, SAFETY REQUIREMENTS.
1.3 PROTECTION:
A. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.
Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT
PREVENTION.
B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations.
Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 41 00 - 2
C. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.
D. Provide enclosed dust chutes with control gates from each floor to carry debris to truck beds and govern flow of material into truck.
Provide overhead bridges of tight board or prefabricated metal construction at dust chutes to protect persons and property from falling debris.
E. Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to: ice, flooding, or pollution. Vacuum and dust the work area daily.
F. In addition to previously listed fire and safety rules to be observed in performance of work, include following:
1. No wall or part of wall shall be permitted to fall outwardly from structures.
2. Maintain at least one stairway in each structure in usable condition to highest remaining floor. Keep stairway free of obstructions and debris until that level of structure has been removed.
3. Wherever a cutting torch or other equipment that might cause a fire is used, provide and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers.
4. Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 4500 mm (15 feet) of fire hydrants.
G. Before beginning any demolition work, the Contractor, accompanied by the COR, shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the
Medical Center ; any damaged items shall be repaired or replaced as approved by the COR. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 41 00 - 3 increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements.
Provide new supports and reinforcement for existing construction weakened by demolition or removal works. Repairs, reinforcement, or structural replacement must have COR’s approval.
H. The work shall comply with the requirements of Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.
I. The work shall comply with the requirements of Section 01 00 00, GENERAL REQUIREMENTS and Section 01 35 26, SAFETY REQUIREMENTS.
1.4 UTILITY SERVICES:
A. Demolish and remove outside utility service lines shown to be removed.
B. Remove abandoned outside utility lines that would interfere with installation of new utility lines and new construction.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 HISTORIC PRESERVATION:
A. The work of this project includes historic preservation. The existing
Auditorium and Stage are some of the last remnants of a bygone era in
VA Medical Center history. As such, it is the intent of the project to maintain and preserve as much of the character of these spaces as possible given the changing use and modernization of the spaces.
Demolition work must take into account the following practices for safeguarding and preserving the designated features of those specific spaces.
1. Removing damaged or deteriorated paint only to the next sound layer using the gentlest method possible (e.g., hand scraping) prior to repainting.
2. Repairing plaster by removing the damaged material and patching with new plaster that duplicates the old in strength, composition, color, and texture.
3. Using chemical strippers primarily to supplement other methods such as hand scraping, hand sanding, and thermal devices.
4. Using biodegradable or environmentally-safe cleaning or paint removal products.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 41 00 - 4
5. Limited Replacement in Kind: Replacing in kind extensively deteriorated or missing components of windows when there are surviving prototypes, such as frames or sash, or when the replacement can be based on documentary or physical evidence. The new work should match the old in material, design, scale, color, and finish.
6. Protecting and maintaining historic materials (including plaster, masonry, wood, and metals) which comprise interior features through appropriate surface treatments, such as cleaning, paint removal, and reapplication of protective coating systems.
7. Repairing interior features and finishes by patching, splicing, consolidating, or otherwise reinforcing the materials using recognized preservation methods.
8. Replacing in kind an entire window or other feature that is too deteriorated to repair (if the overall form and detailing are still evident) using the physical evidence as a model to reproduce the feature or when the replacement can be based on historic documentation. If using the same kind of material is not feasible, then a compatible substitute material may be considered.
9. Designing and installing a new window or its components, such as frames, sash, and glazing, when the historic feature is completely missing. It may be an accurate restoration based on documentary and physical evidence, but only when the historic feature to be replaced coexisted with the features currently on or in the building.
10. Identifying, retaining, and preserving features, and finishes that are important in defining the overall historic character of the building. Color, texture, and pattern are important characteristics of features and finishes, which can include such elements as columns, plaster walls and ceilings, flooring, trim, fireplaces and mantels, paneling, light fixtures, hardware, decorative radiators, ornamental grilles and registers, windows, doors, and transoms;
plaster, paint, wallpaper and wall coverings, and special finishes, such as marbleizing and graining; and utilitarian (painted or unpainted) features, including wood, metal, or concrete exposed columns, beams, and trusses and exposed load-bearing brick, concrete, and wood walls.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 41 00 - 5
3.2 SELECTIVE DEMOLITION:
A. Demolish portions of the building indicated, including all appurtenances related or connected thereto, unless specifically indicated otherwise, and as noted below:
1. As required for installation of new utility service lines.
2. To full depth within an area defined by hypothetical lines located
1500 mm (5 feet) outside building lines.
B. Debris, including brick, concrete, stone, metals and similar materials shall become property of Contractor except as identified by the COR.
Debris shall be disposed of daily, off the Medical Center property to avoid accumulation of debris on the project site. Materials that cannot be removed daily shall be stored in areas specified by the COR.
Contractor shall dispose of debris in compliance with applicable federal, state or local permits, rules and/or regulations.
C. Remove and legally dispose of all materials, other than earth to remain as part of project work off of the VAMC site. Materials removed shall become property of contractor, except as selected by the COR and shall be disposed of in compliance with applicable federal, state, and local permits, rules and/or regulations. All demolished materials shall be included as part of the lump sum compensation for the work of this section. Materials that are not otherwise identified but discovered to be hazardous, shall be handled as unforeseen. The removal of hazardous material shall be referred to Hazardous Materials specifications.
D. Remove existing utilities as indicated or uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the COR. When Utility lines are encountered that are not indicated on the drawings, the COR shall be notified prior to further work in that area.
E. Materials that are indicated to be removed and not reinstalled and selected by the COR shall be delivered to locations on the VAMC
Jefferson Barracks site as directed by the COR.
3.3 CLEAN-UP:
A. On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to COR. Clean-up shall include removal of all debris and rubbish generated by demolition operations off the Medical Center campus and proper disposal of all
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 41 00 - 6 demolished items and materials not required to remain property of the
Government.
- - - E N D - - -
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 82 11 - 1
SECTION 02 82 11
TRADITIONAL ASBESTOS ABATEMENT
1.1 SUMMARY OF THE WORK
A. Contract Documents and Related Requirements: Drawings, general provisions of the contract, including general and supplementary conditions and other Division 01 specifications, shall apply to the work of this section. The contract documents show or describe the work to be done under the contract and related requirements and conditions impacting the project. Related requirements and conditions include applicable codes and regulations, notices and permits, existing site conditions and restrictions on use of the site, requirements for partial owner occupancy during the work, coordination with other work and the phasing of the work. In the event the Asbestos Abatement
Contractor discovers a conflict in the contract documents and/or requirements or codes, the conflict must be brought to the immediate attention of the Contracting Officer for resolution. Whenever there is a conflict or overlap in the requirements, the most stringent shall apply. Any actions taken by the Contractor without obtaining guidance from the Contracting Officer shall become the sole risk and responsibility of the Asbestos Abatement Contractor. All costs incurred due to such action are also the responsibility of the Asbestos
Abatement Contractor.
B. Extent of Work:
1. Below is a brief description of the estimated quantities of asbestos containing materials to be abated. These quantities are for informational purposes only and are based on the best information available at the time of the specification preparation. The
Contractor shall satisfy themselves of the actual quantities to be abated. Nothing in this section may be interpreted as limiting the extent of work otherwise required by this contract and related documents.
2. Removal, clean-up and disposal of asbestos containing materials
(ACM) and asbestos/waste contaminated elements or debris in an appropriate regulated area for the following approximate quantities;
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 82 11 - 2
( ) linear meters (feet) of <50 mm (2 inches) diameter pipe insulation.
( ) linear meters (feet) of 50 - 150 mm (2 inches - 6 inches) diameter pipe insulation.
( ) linear meters (feet) of >150 mm (6 inches) diameter pipe insulation.
( ) fittings (including saddle blocks) 50 - 150 mm (2 inches - 6 inches) in diameter.
( ) square meters (feet) of boiler/tank insulation.
( ) square meters (feet) of duct insulation.
( ) square meters (feet) of plaster ceiling/wall.
( ) square meters (feet) of drywall and/or drywall joint compound.
( ) square meters (feet) of miscellaneous material.
3. Encapsulation of ACM in the following quantities
4. Enclosure of ACM in the following quantities
C. Related Work:
1. Section 07 84 00, FIRESTOPPING
2. Section 02 41 00, DEMOLITION
3. Division 09, FINISHES
4. Division 22, PLUMBING
5. Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING
6. Section 22 05 19, METERS AND GAUGES FOR PLUMBING PIPING
7. Section 22 05 19, METERS AND GAGES FOR PLUMBING PIPING
8. Section 22 05 23, GENERAL-DUTY VALVES FOR PLUMBING PIPING
9. Section 22 05 33, HEAT TRACING FOR PLUMBING PIPING
10. Section 22 11 00, FACILITY WATER DISTRIBUTION
11. Section 22 13 00, FACILITY SANITARY AND VENT PIPING SEWERAGE
12. Section 23 05 11, COMMON WORK RESULTS FOR HVAC
13. Section 22 13 23, SANITARY WASTE INTERCEPTORS
14. Section 22 14 00, FACILITY STORM DRAINAGE
15. Section 22 66 00, CHEMICAL-WASTE SYSTEMS FOR LABORATORY AND
HEALTHCARE FACILITIES
16. Section 23 07 11, HVAC AND BOILER PLANT INSULATION
17. Section 23 11 23, FACILITY NATURAL-GAS PIPING
18. Section 23 21 13, HYDRONIC PIPING
19. Section 23 22 13, STEAM AND CONDENSATE HEATING PIPING
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 82 11 - 3
20. Section 23 31 00, HVAC DUCTS AND CASINGS
21. Section 23 37 00, AIR OUTLETS AND INLETS
D. Tasks:
1. The work tasks are summarized briefly as follows:
a. Pre-abatement activities including pre-abatement meeting(s), inspection(s), notifications, permits, submittal approvals, regulated area preparations, emergency procedures arrangements, and standard operating procedures for asbestos abatement work.
b. Abatement activities including removal, encapsulation, enclosure, clean-up and disposal of ACM waste, recordkeeping, security, monitoring, and inspections.
c. Cleaning and decontamination activities including final visual inspection, air monitoring and certification of decontamination.
E. Contractors Use of Premises:
2. The Contractor and Contractor's personnel shall cooperate fully with the VA representative/consultant to facilitate efficient use of buildings and areas within buildings. The Contractor shall perform the work in accordance with the VA specifications, drawings, phasing plan and in compliance with any/all applicable Federal, State and
Local regulations and requirements.
3. The Contractor shall use the existing facilities in the building strictly within the limits indicated in contract documents as well as the approved VA Design and Construction Procedures. VA Design and
Construction Procedures drawings of partially occupied buildings will show the limits of regulated areas; the placement of decontamination facilities; the temporary location of bagged waste
ACM; the path of transport to outside the building; and the temporary waste storage area for each building/regulated area. Any variation from the arrangements shown on drawings shall be secured in writing from the VA representative through the pre-abatement plan of action. The following limitations of use shall apply to existing facilities shown on drawings:
1.2 VARIATIONS IN QUANTITY
A. The quantities and locations of ACM as indicated on the drawings and the extent of work included in this section are estimated which are limited by the physical constraints imposed by occupancy of the
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 82 11 - 4 buildings and accessibility to ACM. Accordingly, minor variations (+/-
10 percent) in quantities of ACM within the regulated area are considered as having no impact on contract price and time requirements of this contract. Where additional work is required beyond the above variation, the contractor shall provide unit prices for newly discovered ACM and those prices shall be used for additional work required under the contractor.
1.3 STOP ASBESTOS REMOVAL
A. If the Contracting Officer; their field representative; the facility
Safety Officer/Manager or their designee, or the VA Professional
Industrial Hygienist/Certified Industrial Hygienist (VPIH/CIH) presents a verbal Stop Asbestos Removal Order, the Contractor/Personnel shall immediately stop all asbestos removal and maintain HEPA filtered negative pressure air flow in the containment and adequately wet any exposed ACM. If a verbal Stop Asbestos Removal Order is issued, the VA shall follow-up with a written order to the Contractor as soon as it is practicable. The Contractor shall not resume any asbestos removal activity until authorized to do so in writing by the VA Contracting
Officer. A stop asbestos removal order may be issued at any time the VA
Contracting Officer determines abatement conditions/activities are not within VA specification, regulatory requirements or that an imminent hazard exists to human health or the environment. Work stoppage will continue until conditions have been corrected to the satisfaction of the VA. Standby time and costs for corrective actions will be borne by the Contractor, including the VPIH/CIH time. The occurrence of any of the following events shall be reported immediately by the Contractor’s competent person to the VA Contracting Office or field representative using the most expeditious means (e.g., verbal or telephonic), followed up with written notification to the Contracting Officer as soon as practical. The Contractor shall immediately stop asbestos removal/disturbance activities and initiate fiber reduction activities if:
4. Airborne PCM analysis results equal to or greater than 0.01 f/cc above background levels inside the building but outside the regulated area;
5. breach or break in regulated area containment barrier(s);
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 82 11 - 5
6. less than –0.02 inch WCG pressure in the regulated area;
7. serious injury/death at the site;
8. fire/safety emergency at the site;
9. respiratory protection system failure;
10. power failure or loss or inadequate use of wetting agent;
11. any visible emissions observed outside the regulated area; or
12. failure to follow project specification requirements.
1.4 DEFINITIONS
A. General: Definitions and explanations here are neither complete nor exclusive of all terms used in the contract documents, but are general for the work to the extent they are not stated more explicitly in another element of the contract documents. Drawings must be recognized as diagrammatic in nature and not completely descriptive of the requirements indicated therein.
B. Glossary:
Abatement - Procedures to control fiber release from asbestos-containing materials. Includes removal, encapsulation, enclosure, demolition, and renovation activities related to asbestos containing materials (ACM).
Adequately wet - Sufficiently mixed or penetrated with liquid to prevent the release of particulates. If visible emissions are observed coming from the ACM, then that material has not been adequately wetted.
Aerosol - Solid or liquid particulate suspended in air.
Aggressive method - Removal or disturbance of building material by sanding, abrading, grinding, or other method that breaks, crumbles, or disintegrates intact ACM.
Aggressive air sampling - EPA AHERA defined clearance sampling method using air moving equipment such as fans and leaf blowers to aggressively disturb and maintain in the air residual fibers after abatement.
AHERA - Asbestos Hazard Emergency Response Act. Asbestos regulations for schools issued in 1987.
Aircell - Pipe or duct insulation made of corrugated cardboard which contains asbestos.
Air monitoring - The process of measuring the fiber content of a known volume of air collected over a specified period of time. The NIOSH 7400
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 82 11 - 6
Method, Issue 3, Fifth Edition is used to determine the fiber levels in air. For personal samples, area air samples and clearance air testing using Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402
(Issue 2, Fourth Edition) can be used when it is necessary to confirm fibers counted by PCM as being asbestos. The AHERA TEM analysis may be used for background, area samples and clearance samples when required by this specification, or at the discretion of the VPIH/CIH as appropriate.
Air sample filter - The filter used to collect fibers which are then counted. The filter is made of mixed cellulose ester (MCE) membrane for
PCM (Phase Contrast Microscopy, 25 mm, 3-piece with 2 inches Static
Extension Cowl, 0.8 micron pore size) and MCE for TEM (Transmission
Electron Microscopy, 25 mm, 3-piece with 2 inches Static Extension
Cowl, 0.45 micron pore size).
Amended water - Water to which a surfactant (wetting agent) has been added to increase the penetrating ability of the liquid.
Asbestos - Includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos, and any of these minerals that have been chemically treated or altered. Asbestos also includes PACM, as defined below.
Asbestos Hazard Abatement Plan (AHAP) - Asbestos work procedures required to be submitted by the contractor before work begins.
Asbestos-containing material (ACM) - Any material containing more than one percent of asbestos.
Asbestos contaminated elements (ACE) - Building elements such as ceilings, walls, lights, or ductwork that are contaminated with asbestos.
Asbestos-contaminated soil (ACS) – Soil found in the work area or in adjacent areas such as crawlspaces or pipe tunnels which is contaminated with asbestos-containing material debris and cannot be easily separated from the material.
Asbestos-containing waste (ACW) material - Asbestos-containing material or asbestos contaminated objects requiring disposal.
Asbestos Project Monitor – Some states require that any person conducting asbestos abatement air sampling, clearance inspections and clearance air sampling be licensed as an asbestos project monitor.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 82 11 - 7
Asbestos waste decontamination facility - A system consisting of drum/bag washing facilities and a temporary storage area for cleaned containers of asbestos waste. Used as the exit for waste and equipment leaving the regulated area. In an emergency, it may be used to evacuate personnel.
Authorized person - Any person authorized by the VA, the Contractor, or government agency and required by work duties to be present in regulated areas.
Authorized visitor - Any person approved by the VA; the contractor; or any government agency representative having jurisdiction over the regulated area (e.g., OSHA, Federal and State EPA).
Barrier - Any surface that isolates the regulated area and inhibits fiber migration from the regulated area.
Containment Barrier - An airtight barrier consisting of walls, floors, and/or ceilings of sealed plastic sheeting which surrounds and seals the outer perimeter of the regulated area.
Critical Barrier - The barrier responsible for isolating the regulated area from adjacent spaces, typically constructed of 2-layers of 6-mil independently installed plastic sheeting (Polyethylene) secured in place at openings such as doors, windows, penetrations or any other opening into the regulated area.
Primary Barrier – Plastic barriers placed over critical barriers and exposed directly to abatement work or to secondary barrier.
Secondary Barrier - Any additional plastic barriers used to isolate and provide protection from debris during abatement work.
Breathing zone - The hemisphere forward of the shoulders with a radius of about 150 - 225 mm (6 - 9 inches) from the worker's nose.
Bridging encapsulant - An encapsulant that forms a layer on the surface of the ACM.
Building/facility owner - The legal entity, including a lessee, which exercises control over management and recordkeeping functions relating to a building and/or facility in which asbestos activities take place.
Bulk testing - The collection and analysis of suspect asbestos containing materials.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 82 11 - 8
Certified Industrial Hygienist (CIH) - A person certified in the comprehensive practice of industrial hygiene by the American Board of
Industrial Hygiene.
Class I asbestos work - Activities involving the removal of Thermal
System Insulation (TSI) and surfacing ACM and Presumed Asbestos
Containing Material (PACM).
Class II asbestos work - Activities involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic.
Clean room/Changing room - An uncontaminated room having facilities for the storage of employee's street clothing and uncontaminated materials and equipment.
Clearance sample - The final air sample taken after all asbestos work has been done and visually inspected. Performed by the VA's professional industrial hygiene consultant/Certified Industrial
Hygienist (VPIH/CIH).
Closely resemble - The major workplace conditions which have contributed to the levels of historic asbestos exposure, are no more protective than conditions of the current workplace.
Competent person - In addition to the definition in 29 CFR 1926.32(f), one who is capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, as specified in 29 CFR 1926.32(f); in addition, for
Class I and II work who is specially trained in a training course which meets the criteria of EPA's Model Accreditation Plan (40 CFR 763) for supervisor.
Contractor's Professional Industrial Hygienist (CPIH/CIH) - The asbestos abatement contractor's industrial hygienist. The industrial hygienist must meet the qualification requirements of a PIH and may report to a certified industrial hygienist (CIH).
Count - Refers to the fiber count or the average number of fibers greater than five microns in length with a length-to-width (aspect) ratio of at least 3 to 1, per cubic centimeter of air.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 82 11 - 9
Crawlspace – An area which can be found either in or adjacent to the work area. This area has limited access and egress and may contain asbestos materials and/or asbestos contaminated soil.
Decontamination area/unit - An enclosed area adjacent to and connected to the regulated area and consisting of an equipment room, shower room, and clean room, which is used for the decontamination of workers, materials, and equipment that are contaminated with asbestos.
Demolition - The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.
Disposal bag - Typically 6-mil thick sift-proof, dustproof, leak-tight container used to package and transport asbestos waste from regulated areas to the approved landfill. Each bag/container must be labeled/marked in accordance with EPA, OSHA and DOT requirements.
Disturbance – Asbestos Operations and Maintenance Activities (OSHA
Class III) that disrupt the matrix of ACM or PACM, crumble or pulverize
ACM or PACM, or generate visible debris from ACM or PACM. Disturbance includes cutting away small amounts of ACM or PACM, no greater than the amount that can be contained in one standard sized glove bag or waste bag in order to access a building component. In no event shall the amount of ACM or PACM so disturbed exceed that which can be contained in one glove bag or disposal bag, which shall not exceed 60 inches in length or width.
Drum - A rigid, impermeable container made of cardboard fiber, plastic, or metal which can be sealed in order to be sift-proof, dustproof, and leak-tight.
Employee exposure - The exposure to airborne asbestos that would occur if the employee were not wearing respiratory protection equipment.
Encapsulant - A material that surrounds or embeds asbestos fibers in an adhesive matrix and prevents the release of fibers.
Encapsulation - Treating ACM with an encapsulant.
Enclosure - The construction of an air-tight, impermeable, permanent barrier around ACM to control the release of asbestos fibers from the material and also eliminate access to the material.
JEFFERSON BARRACKS VA MEDCAL CENTER
EHRM Training and Admin Space St. Louis, MO
May 12, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022 100% Bid Documents
Project No. 657-21-703JB
JEFFERSON BARRACKS VA MEDICAL CENTER
EHRM Training & Admin Space St. Louis, MO
July 07, 2022
02 82 11 - 10
Equipment room - A contaminated room located within the decontamination area that is supplied with impermeable bags or containers for the disposal of contaminated protective clothing and equipment.
Fiber - A particulate form of asbestos, 5 microns or longer, with a length to width (aspect) ratio of at least 3 to 1.
Fibers per cubic centimeter (f/cc) - Abbreviation for fibers per cubic centimeter, used to describe the level of asbestos fibers in air.
Filter - Media used in respirators, vacuums, or other machines to remove particulate from air.
Firestopping - Material used to close the open parts of a structure in order to prevent a fire from spreading.
Friable asbestos containing material - Any material containing more than one (1) percent asbestos as determined using the method specified in 40 CFR 763, Polarized Light Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Glovebag - Not more than a 60 x 60 inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which materials and tools may be handled.
High efficiency particulate air (HEPA) filter – An ASHRAE MERV 17 filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.
HEPA vacuum - Vacuum collection equipment equipped with a HEPA filter system capable of collecting and retaining asbestos fibers.
Homogeneous area - An area of surfacing, thermal system insulation or miscellaneous ACM that is uniform in color, texture and date of application.
HVAC - Heating, Ventilation and Air Conditioning
Industrial hygienist (IH) - A professional qualified by education, training, and…