2.0 Price Proposal Form-R2.pdf

PDF 171 KB Posted

Attached to
Batavia Road Asphalt Overlay
Solicitation number
ISD_367912_CB
Issued by

About this file

This Request for Proposal (RFP) ISD_367912_CB is for the Batavia Road Asphalt Overlay project at Fermi National Accelerator Laboratory. The solicitation seeks a contractor to provide labor, equipment, materials, transportation, and related services for road overlay work. The Base Work includes 12 line items covering bituminous materials, pavement removal, surface course installation, aggregate shoulders, mobilization, and thermoplastic pavement markings. The estimated quantities range from 20 hours of traffic flagging to 9,062 square yards of pavement removal and 1,200 tons of hot-mix asphalt surface course. The proposal is valid for 90 days after the August 12, 2025 opening date, with unit pricing to be used for progress payments and change order evaluations.

View the file

Other files

File Type Posted
Amend 2_QA_20250924.pdf PDF
Exhibit A.1_Atch 1 to SOW_MUTCD Figure 10C-5.png PNG image
Amendment 02 to RFP ISD_367912_CB_20250924s.pdf PDF
Exhibit A.2_Atch 2 to SOW_MUTCD Figure 10C-6.png PNG image
Exhibit A SOW_Batavia Rd Asphalt Overlay_R2_20250924c.pdf PDF
2.0 Price Proposal Form-R3_20250924c.pdf PDF
Amendment 01 to RFP ISD_367912_CB_20250922s.pdf PDF
Exhibit A SOW_Batavia Rd Asphalt Overlay_R1.pdf PDF
Exhibit C 013100_ESH_Requirements_04-2025 FFDG.pdf PDF
Exhibit J Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit S Summary of Required Solicitation Documents.pdf PDF
1.0 Request for Proposal_ISD_367912_CB.pdf PDF
Exhibit B 010010_General_Requirements_3_2025 FFDG_R1.pdf PDF
Exhibit D 014100 Quality Requirements - March 2025 FermiForward.pdf PDF
Exhibit G Bid Bond FL-41 (Rev 01.25).pdf PDF
Exhibit I Performance Bond FL-40_FFDG (Rev. 01.25).pdf PDF
Exhibit Q Map_Batavia_Road_Overlay.pdf PDF
Exhibit T Business Visitor Registration Instructions and Directions.pdf PDF
Exhibit E FFDG General TandCs for Construction (01.2025).pdf PDF
Exhibit F 2025 Construction Insurance Requirements.pdf PDF
Exhibit K Statement and Acknowledgment SF1413 (Rev 10-23).pdf PDF
Exhibit L Proposal Certifications PUR-466_R2_06.03.25.pdf PDF
Exhibit M SARC_Subcontractor Annual RepsCerts Rev 4.pdf PDF
Exhibit R FL-11_Rev1.pdf PDF
Exhibit H Payment Bond FL-42_FFDG (Rev 01.25).pdf PDF
Exhibit N Davis Bacon Wage Rates IL20250011 dated 07_18_2025 Mod6.pdf PDF
Exhibit O Sample Subcontract.pdf PDF
Exhibit P Fermilab Site Map-Batavia Road.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL (RFP) ISD_367912_CB

PRICE PROPOSAL FORM

August 12, 2025

PROJECT: Batavia Road Asphalt Overlay

In accordance with the Request for Proposal dated August 12, 2025 the undersigned hereby proposes to furnish all labor, equipment, materials, transportation, overhead, bonding costs, insurance, safety oversight, QC oversight, and supervision to perform all work necessary for the subject project in strict accordance with the Specifications, Drawings, and other solicitation documents.

Unit pricing shall be provided for the Base Work such that each unit price multiplied by the corresponding estimated quantity sums to the Base Work Total. Unit pricing shall only apply for confirmation of progress payments and evaluation of change orders. Quantities per unit are only a general guide and are not intended to define the full scope of work.

This proposal may be accepted for ninety (90) days after the opening date unless the offeror specifies a longer acceptance period than Fermilab’s minimum requirement.

The abbreviations in the pricing tables below are as follows:

Ac Acre CY Cubic Yard EA Each Ft Linear foot Lb Pound LS Lump Sum SY Square Yard Tn Ton Hrs Hours

Company Name

Signature

Name & Title of Individual

Date

BASE WORK

Item No. Description Unit Estimated

Quantity Unit Price Total

1 Bituminous Materials (Tack Coat) Lb 5830 $ $ 2 Longitudinal Joint Sealant Ft 40 $ $ 3 Hot-Mix Asphalt Surface Removal – Butt Joint SY 27 $ $

4 Hot-Mix Asphalt Surface Course, IL-9.5, Mix “D”, N50 (3”) Tn 1200 $ $

5 Pavement Removal (full 3” grind) SY 9062 $ $ 6 Saw Cuts Ft 40 $ $ 7 Aggregate Shoulders, Type B Ft 6600 $ $ 8 Mobilization LS 1 $ $ 9 Thermoplastic Pavement Marking – Line 4” (white) Ft 6600 $ $

10 Thermoplastic Pavement Marking – Line 4” (yellow) Ft 5200 $ $ 11 Thermoplastic Pavement Marking – Line 18” Ft 70 $ $ 12 Two Traffic Flaggers Hrs 20 $ $

Base Work Total: $_________________________________________________________________