This is a specifications manual for the Detroit Police Department Real-Time Crime Center (RTCC) UPS Replacement project, issued by Peter Basso Associates, Inc. on behalf of the Detroit Building Authority. The document contains comprehensive electrical specifications organized under Division 26 sections, including Electrical General Requirements, Conductors and Cables, Grounding and Bonding, Hangers and Supports for Electrical Systems, Raceways and Boxes, Electrical Identification, Overcurrent Device Coordination Study/Arc Flash Hazard Analysis, and Electrical Testing. The project is identified as Owner Project No. 1638-2025 with PBA Project No. 2025.0383.00 and was issued for bids on April 9, 2026. The specifications establish the standards and requirements for furnishing all labor, materials, equipment, technical supervision, and incidental services necessary to complete, test, and prepare the electrical systems for operation in compliance with applicable federal, state, and local codes, including the National Electrical Code (NEC), NFPA standards, and various IEEE and ANSI standards.

The specifications require all materials to be new and of standard manufacture, with all equipment of the same or similar systems sourced from the same manufacturer unless approved alternates are submitted. Contractors must conduct site inspections prior to bid submission and provide detailed shop drawings, coordination drawings, and operation and maintenance manuals for review and approval before installation. The contractor is responsible for securing all required permits, licenses, inspections, and approvals and must comply with quality assurance requirements including tests and inspections by state and local agencies. A one-year warranty is required from the date of substantial completion, during which the contractor must repair or replace any defective equipment or materials resulting from defects in workmanship or failure to follow contract documents. The contractor must also provide a minimum of eight hours of formal instruction to the owner's designated personnel on operation, adjustment, and maintenance of all electrical equipment and systems before final inspection, and must submit record drawings showing all as-built conditions and deviations from original construction documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications Manual

Detroit Police Department

Real-Time Crime Center (RTCC)

UPS Replacement

Issued for Bids

Owner Project No. 1638-2025

PBA Project No. 2025.0383.00

April 9, 2026

5145 Livernois, Suite 100 Troy, MI 48098-3276

Tel: 248-879-5666

Fax: 248-879-0007 www.PeterBassoAssociates.com

DETROIT BUILDING AUTHORITY PETER BASSO ASSOCIATES, INC.

DPD Real-Time Crime Center (RTCC) PBA Project No. 2025.0383.00 UPS Replacement Issued for Bids Owner Project No. 1638-2025 April 9, 2026

TABLE OF CONTENTS TOC - 1

Division Section Title

SPECIFICATIONS GROUP

Facility Services Subgroup

DIVISION 26 - ELECTRICAL

26 0010 ELECTRICAL GENERAL REQUIREMENTS

26 0519 CONDUCTORS AND CABLES

26 0526 GROUNDING AND BONDING

26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 0533 RACEWAYS AND BOXES

26 0553 ELECTRICAL IDENTIFICATION

26 0573 OVERCURRENT DEVICE COORDINATION STUDY/ARC FLASH HAZARD ANALYSIS

26 0999 ELECTRICAL TESTING

26 3353 STATIC UNINTERRUPTIBLE POWER SUPPLY

END OF TABLE OF CONTENTS

ELECTRICAL GENERAL REQUIREMENTS 26 0010 - 1

SECTION 26 0010 - ELECTRICAL GENERAL REQUIREMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

1.2 SUMMARY

1.3 REFERENCES

1.4 QUALITY ASSURANCE

1.5 CODES, PERMITS AND FEES

1.6 DRAWINGS

1.7 MATERIAL AND EQUIPMENT MANUFACTURERS

1.8 INSPECTION OF SITE

1.9 ITEMS REQUIRING PRIOR APPROVAL

1.10 SHOP DRAWINGS/SUBMITTALS

1.11 COORDINATION DRAWINGS

1.12 OPERATION AND MAINTENANCE INSTRUCTIONAL MANUALS

1.13 RECORD DRAWINGS

1.14 INSTRUCTION OF OWNER PERSONNEL

1.15 WARRANTY

1.16 USE OF EQUIPMENT

1.17 COORDINATION

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION

3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION

3.2 DEMOLITION WORK

3.3 INSTALLATION OF EQUIPMENT

3.4 WORK IN EXISTING BUILDINGS

3.5 CHASES AND RECESSES

3.6 CUTTING, PATCHING AND DAMAGE TO OTHER WORK

3.7 EQUIPMENT CONNECTIONS

3.8 CLEANING

3.9 PROTECTION AND HANDLING OF EQUIPMENT AND MATERIALS

3.10 EXTRA WORK

3.11 DRAWINGS AND MEASUREMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections, apply to work of this section.

1.2 SUMMARY

A. This Section includes electrical general administrative and procedural requirements. The following requirements are included in this Section to supplement the requirements specified in Division 1 Specification Sections.

B. Mechanical and Electrical Specifications have been developed utilizing Construction Specifications Institute MasterFormat and make use of the Facilities Services Subgroup - Divisions 20-28; Site and Infrastructure Subgroup - Division 33; and Process Equipment Subgroup - Divisions 40 and 42.

C. Division 1 Documents and Architectural Specifications in Divisions 2 through 14 have been developed in the MasterFormat 95 Edition and utilize Division 1 through Division 14.

ELECTRICAL GENERAL REQUIREMENTS 26 0010 - 2

D. Where Division 15 Mechanical or Division 16 Electrical are referenced in Division 1 Documents, or within the Architectural Specifications in Divisions 2 through 14, they should refer to Division 20-28, 33, 40, and

42. For additional cross reference information refer to the Construction Specifications Institute.

1.3 REFERENCES

A. All materials shall be new. The electrical and physical properties of all materials, and the design, performance characteristics, and methods of construction of all items of equipment, shall be in accordance with the latest issue of the various, applicable Standard Specifications of the following recognized authorities:

1. ANSI - American National Standards Institute; www.ansi.org.

2. ASTM - ASTM International; www.astm.org.

3. CSI - Construction Specifications Institute (The); www.csiresources.org.

4. ICEA - Insulated Cable Engineers Association, Inc.; www.icea.net.

5. IEEE - Institute of Electrical and Electronics Engineers, Inc. (The); www.ieee.org.

6. NEC - National Electrical Code

7. NECA - National Electrical Contractors Association; www.necanet.org.

a. NECA 1-2000, “Practices for Good Workmanship in Electrical Contracting (ANSI).”

8. NEMA - National Electrical Manufacturers Association; www.nema.org.

9. NETA - InterNational Electrical Testing Association; www.netaworld.org.

10. UL - Underwriters Laboratories Inc.; www.ul.com.

1.4 QUALITY ASSURANCE

A. Scope of Work: Furnish all labor, material, equipment, technical supervision, and incidental services required to complete, test, and leave ready for operation the electrical systems as specified in the Division 26 Sections and as indicated on Drawings.

1. Contract Documents are complementary, and what is required by one shall be as binding as if required by all. In the event of inconsistencies or disagreements within the Construction Documents bids shall be based on the most expensive combination of quality and quantity of the work indicated.

2. The Contractor understands that the work herein described shall be complete in every detail.

B. Ordinances and Codes: Perform all Work in accordance with applicable Federal, State, and local ordinances and regulations, the Rules and Regulations of NFPA, NECA, and UL, unless otherwise indicated.

1. Notify the Architect/Engineer if revisions to the Drawings or Specifications are required to conform to applicable ordinances, codes, or regulations. Identify the cost associated with these revisions in the bid.

C. Source Limitations: All equipment of the same or similar systems shall be by the same manufacturer.

D. Tests and Inspections: Perform all tests required by state, city, county, and/or other agencies having jurisdiction. Provide all materials, equipment, etc., and labor required for tests.

E. Performance Requirements: Perform all work in a first class and workmanlike manner, in accordance with the latest accepted standards and practices for the trades involved.

F. Sequence and Schedule: Avoid interference with the work of other trades. Remove and relocate any work which in the opinion of the Owner’s Representatives causes interference.

ELECTRICAL GENERAL REQUIREMENTS 26 0010 - 3

1.5 CODES, PERMITS AND FEES

A. Unless otherwise indicated, all required permits, licenses, inspections, approvals, and fees for electrical work shall be secured and paid for by the Contractor. All work shall conform to all applicable codes, rules, and regulations.

B. All work shall be executed in accordance with the rules and regulations outlined in local and state codes.

Prepare any detailed Drawings or diagrams which may be required by the governing authorities. Where the Drawings and/or Specifications indicate materials or construction that exceed code requirements, the Drawings and/or Specifications shall govern.

1.6 DRAWINGS

A. The Drawings show the location and general arrangement of equipment, electrical systems, and related items. They shall be followed as closely as elements of the construction will permit.

B. Examine the Drawings of other trades and verify the conditions governing the work on the job site. Arrange work accordingly, providing such fittings, conduit, junction boxes, and accessories as may be required to meet such conditions.

C. Deviations from the Drawings, apart from minor changes in routing and other such incidental changes that do not affect the functioning or serviceability of the systems, shall not be made without the written approval of the Architect/Engineer.

D. The architectural and structural Drawings take precedence in all matters pertaining to the building structure, mechanical Drawings in all matters pertaining to mechanical trades, and electrical Drawings in all matters pertaining to electrical trades. Where there are conflicts or differences between the Drawings for the various trades, report such conflicts or differences to the Architect/Engineer for resolution.

E. Drawings are not intended to be scaled for rough-in or to serve as shop drawings. Take all field measurements required to complete the Work.

1.7 MATERIAL AND EQUIPMENT MANUFACTURERS

A. All items of equipment shall be furnished complete with all accessories normally supplied with the catalog items listed and all other accessories necessary for a complete and satisfactory operating system. All equipment and materials shall be new, be standard products of manufacturers regularly engaged in the production of electrical equipment and be of the manufacturer's latest design.

B. If an approved manufacturer is other than the manufacturer used as the basis for design, the equipment or product provided shall be equal in size, quality, durability, appearance, capacity, and efficiency through all ranges of operation, shall conform with arrangements and space limitations of the equipment shown on the plans and/or specified, shall be compatible with the other components of the system and shall comply with the requirements for Items Requiring Prior Approval specified in this section of the Specifications. All costs to make these items of equipment comply with these requirements including, but not limited to, electrical work, and building alterations shall be included in the original Bid. Similar equipment shall be by one manufacturer.

C. Where existing equipment is modified to include new switches, circuit breakers, metering, or other components, the new components shall be by the original equipment manufacturer and shall be listed for installation in the existing equipment. Where original equipment manufacturer components are not available, third-party aftermarket components shall be listed for the application and submitted to the engineer for approval. Reconditioned or salvaged components shall not be used unless specifically indicated on the drawings.

ELECTRICAL GENERAL REQUIREMENTS 26 0010 - 4

1.8 INSPECTION OF SITE

A. Visit the site, examine, and verify the conditions under which the Work must be conducted before submitting Proposal. The submitting of a Proposal implies that the Contractor has visited the site and understands the conditions under which the Work must be conducted. No additional charges will be allowed because of failure to make this examination or to include all materials and labor to complete the Work.

1.9 ITEMS REQUIRING PRIOR APPROVAL

A. Bids shall be based upon manufactured equipment specified. All items that the Contractor proposes to use in the Work that are not specifically named in the Contract Documents must be submitted for review prior to bids. Such items must be submitted in compliance with Division 1 specifications. Requests for prior approval must be accompanied by complete catalog information, including but not limited to, model, size, accessories, complete electrical information, and performance data in the form given in the equipment schedule on the drawings at stated design conditions. Where items are referred to by symbolic designations on the drawings, all requests for prior approval shall bear the same designations.

1. Equipment to be considered for prior approval shall be equal in quality, durability, appearance, capacity, and efficiency through all ranges of operation, shall fulfill the requirements of equipment arrangement and space limitations of the equipment shown on the plans and/or specified and shall be compatible with the other components of the system.

2. All costs incurred to make equipment comply with other requirements, including providing maintenance, clearance, electrical, replacement of other components, and building alterations shall be included in the original bid.

B. Voluntary alternates may be submitted for consideration, with listed addition or deduction to the bid.

1.10 SHOP DRAWINGS/SUBMITTALS

A. Submit project-specific submittals for review in compliance with Division 1.

B. All shop Drawings shall be submitted in groupings of similar and/or related items (lighting fixtures, switchgear, etc.). Incomplete submittal groupings will be returned unchecked.

C. Provide detailed layout shop Drawings on electronic media of all lighting and power distribution systems, routing of conduits, combining of circuits, circuiting, details, and related information necessary for installation and maintenance. After review by the Architect/Engineer, electronic Drawings will be stamped and returned to the Contractor.

D. If deviations (not substitutions) from the Contract Documents are deemed necessary by the Contractor, the details of such deviations, the reason for the deviation, and the resulting changes shall be included with the submittal for approval.

E. Submit for approval shop drawings for electrical systems or equipment indicated in other sections of electrical specs. Where items are referred to by symbolic designation on the Drawings and Specifications, all submittals shall bear the same designation (light fixtures).

1.11 COORDINATION DRAWINGS

A. Submit project specific coordination drawings for review in compliance with Division 1 Specification Sections.

ELECTRICAL GENERAL REQUIREMENTS 26 0010 - 5

1.12 OPERATION AND MAINTENANCE INSTRUCTIONAL MANUALS

A. Submit project specific Operation and Maintenance Instructional Manuals for review in compliance with Division 01 Specification Sections.

B. Provide complete operation and maintenance instructional manuals covering all electrical equipment herein specified, together with parts lists. Maintenance and operating instructional manuals shall be job specific to this project. Generic manuals are not acceptable. Manual shall be provided on electronic media. All literature shall be combined in one document and shall be properly bookmarked with all applicable sections.

Maintenance and operating instructional manuals shall be provided when construction is approximately 75% complete.

C. The operating and maintenance instructions shall include a brief, general description for all electrical systems including, but not limited to:

1. Routine maintenance procedures.

2. Trouble-shooting procedures.

3. Contractor's telephone numbers for warranty repair service.

4. Submittals.

5. Recommended spare parts list.

6. Names and telephone numbers of major material suppliers and subcontractors.

7. System schematic drawings on 8-1/2" x 11" sheets.

1.13 RECORD DRAWINGS

A. Submit record drawings in compliance with Division 01.

B. Contractor shall submit to the Architect/Engineer, record drawings on electronic media which have been neatly marked to represent as-built conditions for all new electrical work. Modifications to original drawings shall be marked with a contrasting color so the marks are readily apparent.

C. The Contractor shall keep accurate note of all deviations from the construction documents and discrepancies in the underground concealed conditions and other items of construction on field drawings as they occur.

The marked up field documents shall be available for review by the Architect, Engineer, and Owner at their request during construction.

1.14 INSTRUCTION OF OWNER PERSONNEL

A. Before final inspection, instruct Owner's designated personnel in operation, adjustment, and maintenance of electrical equipment and systems at agreed upon times. A minimum of 8 hours of formal instruction to Owner's personnel shall be provided for each building. Additional hours are specified in individual specification sections.

B. Use operation and maintenance manuals as basis for instruction. Review contents of manual with personnel in detail to explain all aspects of operation and maintenance.

C. In addition to individual equipment training provide overview of each electrical system. Utilize the as-built documents for this overview.

D. Prepare and insert additional data in operation and maintenance manual when need for such data becomes apparent during instruction, or as requested by Owner.

ELECTRICAL GENERAL REQUIREMENTS 26 0010 - 6

1.15 WARRANTY

A. Warranty: Comply with the requirements in Division 01 Specification Sections. Contractor shall warranty that the electrical installation is free from defects and agrees to replace or repair, to the Owner’s satisfaction, any part of this electrical installation which becomes defective within a period of one year (unless specified otherwise in other Division 26 sections) from the date of substantial completion following final acceptance, provided that such failure is due to defects in the equipment, material, workmanship, or failure to follow the contract documents.

B. Contractor shall be responsible for any temporary services including equipment and installation required to maintain operation as a result of any equipment failure or defect during warranty period.

C. File with the Owner all warranties from the equipment manufacturers including the operating conditions and performance capacities they are based on.

1.16 USE OF EQUIPMENT

A. The use of any equipment, or any part thereof for purposes other than testing even with the Owner's consent, shall not be construed to be an acceptance of the work on the part of the Owner, nor be construed to obligate the Owner in any way to accept improper work or defective materials.

B. Do not use Owner's lamps for temporary lighting except as allowed and directed by the Owner. Equip lighting fixtures with new lamps when the project is turned over to the Owner.

1.17 COORDINATION

A. Coordinate arrangement, mounting, and support of electrical equipment:

1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated.

2. To provide for ease of disconnecting the equipment with minimum interference to other installations.

3. To allow right of way for piping and conduit installed at required slope.

4. To ensure that connecting raceways, cables, wireways, cable trays, and busways will be clear of obstructions; and to maintain the working and access space of other equipment.

B. Coordinate installation of required supporting devices and set sleeves in cast-in-place concrete, masonry walls, and other structural components as they are constructed.

C. Coordinate location of access panels and doors for electrical items that are behind finished surfaces or otherwise concealed. Access doors and panels are specified in Division 8 Section "Access Doors and Frames."

D. Coordinate electrical testing of electrical, mechanical, and architectural items, so equipment and systems that are functionally interdependent are tested to demonstrate successful interoperability.

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION

3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Comply with NECA 1.

ELECTRICAL GENERAL REQUIREMENTS 26 0010 - 7

B. Measure indicated mounting heights to bottom of unit for suspended items and to center of unit for wall-mounting items.

C. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange, and install components and equipment to provide maximum possible headroom consistent with these requirements.

D. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.

E. Right of Way: Give to raceways and piping systems installed at a required slope.

3.2 DEMOLITION WORK

A. All demolition of existing electrical equipment and materials will be done by this Contractor unless otherwise indicated. Include all items related to the existing systems that are being removed such as, but not limited to, electrical equipment, cabinets, devices, lighting fixtures, conduit, fittings, boxes, wiring, and supports. No abandoned components of the electrical systems indicated to be removed shall remain.

1. Where electrically powered equipment is included in the demolition scope of other trades, disconnect electrical wiring connections and remove circuit wiring complete.

B. In general, demolition work is indicated on the Drawings. However, the Contractor shall visit the job site to determine the full extent and character of this work.

C. Unless specifically noted otherwise, removed materials shall not be reused in the work.

1. Materials indicated to be salvaged shall be carefully removed, stored, and protected from damage.

2. Salvaged materials intended to be re-used shall be thoroughly cleaned, refurbished if necessary, and determined to be fully functional prior to placing back into service.

3. Salvaged materials of value that are not to be reused shall remain the property of the Owner unless such ownership is waived. Items that the Owner has waived ownership shall become the property of the Contractor, who shall remove and legally dispose of same, away from the premises.

D. All electrical work in altered and unaltered areas shall be run concealed wherever possible. Use of surface raceway or exposed conduits will be permitted only where specifically indicated on the drawings or approved by the Architect/Engineer.

3.3 INSTALLATION OF EQUIPMENT

A. Install all equipment in strict accordance with all directions and recommendations furnished by the manufacturer. Where such directions conflict with the Drawings and Specifications, report such conflicts to the Architect/Engineer for resolution.

B. Device Location:

1. Allow for wiring devices, control devices, and fire alarm devices to be relocated within a 10’ radius to accommodate final coordination with furnishings and other finish elements. Devices relocated prior to installation shall be done without additional cost to the project.

3.4 WORK IN EXISTING BUILDINGS

A. The Owner will provide access to existing buildings as required. Access requirements to occupied buildings shall be identified on the project schedule. The Contractor, once Work is started in the existing building, shall complete same without interruption to return work areas as soon as possible to Owner.

ELECTRICAL GENERAL REQUIREMENTS 26 0010 - 8

B. Adequately protect and preserve all existing and newly installed Work. Promptly repair any damage to same at Contractor's expense.

C. Consult with the Owner’s Representative as to the methods of carrying on the Work so as not to interfere with the Owner's operation any more than necessary. Accordingly, all service lines shall be kept in operation as long as possible and the services shall only be interrupted at such time as will be designated by the Owner's Representative.

D. Prior to starting work in any area, obtain approval for doing so from a qualified representative of the Owner who is designated and authorized by the Owner to perform testing and abatement of all hazardous materials including but not limited to, asbestos. The Contractor shall not perform any inspection, testing, containment, removal, or other work that is related in any way whatsoever to hazardous materials under the Contract.

3.5 CHASES AND RECESSES

A. Provided by the architectural trades, but the Contractor shall be responsible for their accurate location and size.

3.6 CUTTING, PATCHING AND DAMAGE TO OTHER WORK

A. Refer to General Conditions for requirements.

B. All cutting, patching, and repair work shall be performed by the Contractor through approved, qualified subcontractors. Contractor shall include full cost of same in bid.

3.7 EQUIPMENT CONNECTIONS

A. Make connections to equipment and other items included in the work in accordance with the approved shop Drawings and rough-in measurements furnished by the manufacturers of the particular equipment furnished.

All additional connections not shown on the Drawings, but called out by the equipment manufacturer's shop Drawings shall be provided.

3.8 CLEANING

A. All debris shall be removed daily as required to maintain the work area in a neat, orderly condition.

B. Final cleanup shall include, but not be limited to, washing of fixture lenses or louvers, switchboards, substations, motor control centers, panels, etc. Fixture reflectors and lenses or louvers shall be left with no water marks or cleaning streaks.

3.9 PROTECTION AND HANDLING OF EQUIPMENT AND MATERIALS

A. Equipment and materials shall be protected from theft, injury, or damage.

B. Protect conduit openings with temporary plugs or caps.

C. Provide adequate storage for all equipment and materials delivered to the job site. Location of the space will be designated by the Owner's representative or Architect/Engineer. Equipment set in place in unprotected areas must be provided with temporary protection.

ELECTRICAL GENERAL REQUIREMENTS 26 0010 - 9

3.10 EXTRA WORK

A. For additional electrical work which may be proposed or requested, furnish an itemized cost breakdown of material and labor required to complete the work. Proceed only after receiving a written authorization.

B. Before providing an itemized break-down for additional electrical work, submit unit prices for the following items: 3/4", 1", 1-1/2" EMT conduit; #12, #10, #8, #6, #2 building wire; duplex receptacles, and other common electrical work which may be anticipated for any future revisions. These unit costs, once agreed to, shall be applied to additions and deducts for all project change orders.

3.11 DRAWINGS AND MEASUREMENTS

A. The Drawings are not intended to be scaled for rough-in measurements nor to serve as Shop Drawings.

Field measurements necessary for ordering materials and fitting the installation to the building construction and arrangement are the Contractor’s responsibility. The Contractor shall check latest Architectural Drawings and locate light switches from same where door swings are different from Electrical Drawings.

END OF SECTION 26 0010

CONDUCTORS AND CABLES 26 0519 - 1

SECTION 26 0519 - CONDUCTORS AND CABLES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

1.2 SUMMARY

1.3 ACTION SUBMITTALS

1.4 INFORMATIONAL SUBMITTALS

1.5 QUALITY ASSURANCE

PART 2 - PRODUCTS

2.1 COPPER BUILDING WIRE

2.2 CONNECTORS AND SPLICES

PART 3 - EXECUTION

3.1 CONDUCTOR MATERIAL APPLICATIONS

3.2 INSTALLATION OF CONDUCTORS AND CABLES

3.3 CONNECTIONS

3.4 IDENTIFICATION

3.5 FIRESTOPPING

3.6 FIELD QUALITY CONTROL

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes:

1. Building wires and cables rated 600V and less.

2. Connectors, splices, and terminations rated 600 V and less.

1.3 ACTION SUBMITTALS

A. Submit letter of compliance (intent) for copper and aluminum building wire.

1.4 INFORMATIONAL SUBMITTALS

A. Field Quality-Control Test Reports.

1.5 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. Comply with NFPA 70.

CONDUCTORS AND CABLES 26 0519 - 2

PART 2 - PRODUCTS

2.1 COPPER BUILDING WIRE

A. Description: Flexible, insulated and uninsulated, drawn copper current-carrying conductor with an overall insulation layer or jacket, or both, rated 600 V or less.

B. Standards:

1. Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and use.

2. Conductor and Cable Marking: Comply with wire and cable marking according to UL's "Wire and Cable Marking and Application Guide."

C. Conductors: Copper, complying with ASTM B 3 for bare annealed copper and with ASTM B 8 for stranded conductors.

D. Conductor Insulation:

1. Type THHN/THWN-2: Comply with UL 83.

2.2 CONNECTORS AND SPLICES

A. Description: Factory-fabricated connectors and splices of size, ampacity rating, material, type, and class for application and service indicated.

PART 3 - EXECUTION

3.1 CONDUCTOR MATERIAL APPLICATIONS

A. Refer to application schedule on the drawings

B. Feeders and Branch Circuits: Solid or stranded for No. 12 AWG and smaller; stranded for No. 10 AWG and larger.

C. Each feeder shall be of the same conductor and insulation material (phase, neutral, and parallel).

D. Where equipment is listed for use with copper conductors only, use copper conductors for the entire length of feeder.

3.2 INSTALLATION OF CONDUCTORS AND CABLES

A. Conceal cables in finished walls, ceilings, and floors, unless otherwise indicated.

B. Complete raceway installation between conductor and cable termination points according to Section 26 0533 "Raceways and Boxes for Electrical Systems" prior to pulling conductors and cables.

C. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.

CONDUCTORS AND CABLES 26 0519 - 3

D. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips, that will not damage cables or raceway.

E. Install exposed cables parallel and perpendicular to surfaces of exposed structural members, and follow surface contours where possible.

F. Support cables according to Division 26 Section "Hangers and Supports for Electrical Systems."

G. Neatly train and lace wiring inside boxes, equipment, and panelboards.

H. Provide a separate neutral conductor for each circuit unless multi-wire branch circuits are specifically indicated on the drawings.

I. Electrical Contractor shall be responsible for de-rating of conductors as required by N.E.C. when more than three current carrying conductors are installed in a single raceway or cable. Neutral conductors shall be considered current carrying conductors.

J. AC/MC cable shall not be used.

K. Between support, hangers and termination no more than 3" deflection from the bottom of the cable to a horizontal line between the support/hanger or termination.

3.3 CONNECTIONS

A. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values.

If manufacturer's torque values are not indicated, use those specified in UL 486A.

B. Make splices and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than un-spliced conductors.

C. Clean conductor surfaces before installing lugs and connectors.

D. Make splices, taps, and terminations to carry full ampacity of conductors with no perceptible temperature rise.

E. Use solderless pressure connectors with insulating covers for copper conductor splices and taps, 8 AWG and larger.

F. Use Sta-Kon connectors to terminate stranded conductors #10 AWG and smaller to screw terminals.

G. Use insulated spring wire connectors with plastic caps (wire nuts) for copper conductor splices and taps, 10 AWG and smaller. Push-in style connectors are not permitted.

H. Provide lugs suitable for bussing and conductor material used.

I. Use appropriately sized compression pin adapters to make terminations at equipment where equipment lugs cannot accommodate conductors that are oversized for voltage drop or similar conditions.

3.4 IDENTIFICATION

A. Identify and color-code conductors and cables according to Section 26 0553 "Identification for Electrical Systems."

B. Identify each spare conductor at each end with identity number and location of other end of conductor, and identify as spare conductor.

CONDUCTORS AND CABLES 26 0519 - 4

3.5 FIRESTOPPING

A. Apply firestopping to electrical penetrations of fire-rated floor and wall assemblies to restore original fire-resistance rating of assembly according to Division 07 Section "Penetration Firestopping”.

3.6 FIELD QUALITY CONTROL

A. Perform the following field quality control tests in accordance with Division 26 Section “Electrical Testing”.

1. Description: Test all feeders rated 100 A and above.

2. Visual and Mechanical Inspection

a. Inspect cables for physical damage and proper connection in accordance with the one line diagram.

b. Test cable mechanical connections with an infrared survey.

c. Check cable color-coding against project Specifications and N.E.C. requirements.

3. Electrical Tests

a. Perform insulation resistance test on each conductor with respect to ground and adjacent conductors. Applied potential to be 1000 volts dc for 1 minute.

b. Perform continuity test to insure proper cable connection.

4. Test Values

a. Minimum insulation resistance values shall be not less than fifty mega-ohms.

B. Test Reports: Prepare a written report to record the following:

1. Test procedures used.

2. Test results that comply with requirements.

3. Test results that do not comply with requirements and corrective action taken to achieve compliance with requirements.

END OF SECTION 26 0519

GROUNDING AND BONDING 26 0526 - 1

SECTION 26 0526 - GROUNDING AND BONDING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

1.2 SUMMARY

1.3 REFERENCES

1.4 CLOSEOUT SUBMITTALS

1.5 QUALITY ASSURANCE

PART 2 - PRODUCTS

2.1 GROUNDING CONDUCTORS

2.2 CONNECTOR PRODUCTS

PART 3 - EXECUTION

3.1 EQUIPMENT GROUNDING

3.2 CONNECTIONS

3.3 INSTALLATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes grounding of electrical systems and equipment. Grounding requirements specified in this Section may be supplemented by special requirements of systems described in other Sections.

B. Related Sections include the following:

1. Division 26 Section “Electrical General Requirements”.

2. Division 26 Section “Conductors and Cables”.

1.3 REFERENCES

A. ASTM B 3: Specification for Soft or Annealed Copper Wire.

B. ASTM B 8: Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard or Soft.

C. ASTM B 33: Specification for Tinned Soft or Annealed Copper Wire for Electrical Purposes.

D. ASTM B 187: Specification for Copper, Bus Bar, Rod, and Shapes and General Purpose Rod, Bar, and Shapes.

E. IEEE 81: Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System.

F. IEEE 142: Grounding of Industrial and Commercial Power Systems.

G. IEEE 837: Qualifying Permanent Connections Used in Substation Grounding.

H. IEEE 1100 – 1992: Recommended Practice for Powering and Grounding Sensitive Electronic Equipment.

GROUNDING AND BONDING 26 0526 - 2

I. IEEE C2: National Electrical Safety Code.

J. NETA MTS – 2001: Maintenance Testing Specifications.

K. NFPA 70: National Electrical Code.

L. NFPA 70B: Recommended Practice for Electrical Equipment Maintenance.

M. NFPA 99: Health Care Facilities.

N. NFPA 780: Lightning Protection Code.

O. TIA/EIA 607: Commercial Building Grounding and Bonding Requirements Standard.

P. UL 96: Lightning Protection Components.

Q. UL 467: Grounding and Bonding Equipment.

R. UL 486 A: Wire Connectors and Soldering Lugs for Use with Copper Conductors.

S. UL 486B: Wire Connectors for Use with Aluminum Conductors.

1.4 CLOSEOUT SUBMITTALS

A. Project Record Documents

1. Submit under provisions of Division 26 “Electrical General Requirements”.

1.5 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

1. Comply with UL 467.

PART 2 - PRODUCTS

2.1 GROUNDING CONDUCTORS

A. For insulated conductors, comply with Division 26 Section "Conductors and Cables."

B. Material: Copper.

C. Equipment Grounding Conductors: Insulated with green-colored insulation.

2.2 CONNECTOR PRODUCTS

A. Comply with IEEE 837 and UL 467; listed for use for specific types, sizes, and combinations of conductors and connected items.

GROUNDING AND BONDING 26 0526 - 3

PART 3 - EXECUTION

3.1 EQUIPMENT GROUNDING

A. Comply with NFPA 70, Article 250, for types, sizes, and quantities of equipment grounding conductors, unless specific types, larger sizes, or more conductors than required by NFPA 70 are indicated.

B. In raceways, use insulated equipment grounding conductors. Install equipment grounding conductors in all feeders and circuits. Terminate each end on suitable lugs, bus or bushing.

1. Where existing branch circuits are using conduit as equipment grounding conductor and are extended, provide grounding bushing on existing conduit and provide new equipment grounding conductor with new branch circuit.

C. Install equipment grounding conductors in all feeders and circuits. Terminate each end on suitable lugs, bus or bushing.

D. Verify specific equipment grounding requirements with the manufacturer’s recommendations.

3.2 CONNECTIONS

A. Equipment Grounding Conductor Terminations

1. Use solderless pressure connectors with insulating covers for copper conductor splices and taps, 8 AWG and larger.

2. Use insulated spring wire connectors with plastic caps for copper conductor splices and taps, 10 AWG and smaller.

B. Tighten screws and bolts for grounding and bonding connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in

UL 486A.

3.3 INSTALLATION

A. Equipment Grounding: Provide a permanent and continuous bonding of conductor enclosures, equipment frames, power distribution equipment ground busses, cable trays, metallic raceways, and other non-current carrying metallic parts of the electrical system.

END OF SECTION 26 0526

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 0529 - 1

SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

1.2 SUMMARY

1.3 DEFINITIONS

1.4 PERFORMANCE REQUIREMENTS

1.5 ACTION SUBMITTALS

1.6 QUALITY ASSURANCE

1.7 COORDINATION

PART 2 - PRODUCTS

2.1 SUPPORT, ANCHORAGE, AND ATTACHMENT COMPONENTS

2.2 FABRICATED METAL EQUIPMENT SUPPORT ASSEMBLIES

PART 3 - EXECUTION

3.1 APPLICATION

3.2 SUPPORT INSTALLATION

3.3 INSTALLATION OF FABRICATED METAL SUPPORTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Hangers and supports for electrical equipment and systems.

2. Construction requirements for concrete bases.

1.3 DEFINITIONS

A. EMT: Electrical metallic tubing.

B. IMC: Intermediate metal conduit.

C. RMC: Rigid metal conduit.

1.4 PERFORMANCE REQUIREMENTS

A. Delegated Design: Design supports for multiple raceways, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.

B. Design supports for multiple raceways capable of supporting combined weight of supported systems and its contents.

C. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 0529 - 2

D. Rated Strength: Adequate in tension, shear, and pullout force to resist maximum loads calculated or imposed for this Project, with a minimum structural safety factor of five times the applied force.

1.5 ACTION SUBMITTALS

A. Product Data: For the following:

1. Steel slotted support systems.

1.6 QUALITY ASSURANCE

A. Welding: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."

B. Comply with NFPA 70.

1.7 COORDINATION

A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified in Division 03.

B. Coordinate installation of roof curbs, equipment supports, and roof penetrations. These items are specified in Division 07 Section "Roof Accessories."

PART 2 - PRODUCTS

2.1 SUPPORT, ANCHORAGE, AND ATTACHMENT COMPONENTS

A. Steel Slotted Support Systems: Comply with MFMA-4, factory-fabricated components for field assembly.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Allied Tube & Conduit; a part of Atkore International.

b. B-Line, by Eaton.

c. GS Metals Corp.

d. Pentair Electrical & Fastening Solutions.

e. Thomas & Betts Corporation.

f. Unistrut; a part of Atkore International.

g. Wesanco, Inc.

2. Metallic Coatings: Hot-dip galvanized after fabrication and applied according to MFMA-4.

3. Painted Coatings: Manufacturer's standard painted coating applied according to MFMA-4.

4. Channel Dimensions: Selected for applicable load criteria.

B. Raceway and Cable Supports: As described in NECA 1 and NECA 101.

C. Conduit and Cable Support Devices: Steel hangers, clamps, and associated fittings, designed for types and sizes of raceway or cable to be supported.

D. Support for Conductors in Vertical Conduit: Factory-fabricated assembly consisting of threaded body and insulating wedging plug or plugs for non-armored electrical conductors or cables in riser conduits. Plugs

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 0529 - 3

shall have number, size, and shape of conductor gripping pieces as required to suit individual conductors or cables supported. Body shall be malleable iron.

E. Structural Steel for Fabricated Supports and Restraints: ASTM A 36/A 36M, steel plates, shapes, and bars; black and galvanized.

F. Mounting, Anchoring, and Attachment Components: Items for fastening electrical items or their supports to building surfaces include the following:

1. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete, steel, or wood, with tension, shear, and pullout capacities appropriate for supported loads and building materials where used.

a. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1) Hilti Inc.

2) ITW Ramset/Red Head; a division of Illinois Tool Works, Inc.

3) MKT Fastening, LLC.

4) Simpson Strong-Tie Co., Inc.; Masterset Fastening Systems Unit.

2. Mechanical-Expansion Anchors: Insert-wedge-type, zinc-coated steel, for use in hardened portland cement concrete with tension, shear, and pullout capacities appropriate for supported loads and building materials in which used.

a. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1) B-Line by Eaton.

2) Empire Tool and Manufacturing Co., Inc.

3) Hilti Inc.

4) ITW Ramset/Red Head; a division of Illinois Tool Works, Inc.

5) MKT Fastening, LLC.

3. Concrete Inserts: Steel or malleable-iron, slotted support system units similar to MSS Type 18;

complying with MFMA-4 or MSS SP-58.

4. Clamps for Attachment to Steel Structural Elements: MSS SP-58, type suitable for attached structural element.

5. Through Bolts: Structural type, hex head, and high strength. Comply with ASTM A 325.

6. Toggle Bolts: All-steel springhead type.

7. Hanger Rods: Threaded steel.

2.2 FABRICATED METAL EQUIPMENT SUPPORT ASSEMBLIES

A. Description: Welded or bolted, structural-steel shapes, shop or field fabricated to fit dimensions of supported equipment.

B. Materials: Comply with requirements in Division 05 Section "Metal Fabrications" for steel shapes and plates.

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 0529 - 4

PART 3 - EXECUTION

3.1 APPLICATION

A. Comply with NECA 1 and NECA 101 for application of hangers and supports for electrical equipment and systems except if requirements in this Section are stricter.

B. Maximum Support Spacing and Minimum Hanger Rod Size for Raceway: Space supports for EMT, IMC, and RMC as required by NFPA 70. Minimum rod size shall be 1/4 inch in diameter.

C. Multiple Raceways or Cables: Install trapeze-type supports fabricated with steel slotted support system, sized so capacity can be increased by at least 25 percent in future without exceeding specified design load limits.

1. Secure raceways and cables to these supports with:

a. Two-bolt conduit clamps

b. Single-bolt conduit clamps

c. Single-bolt conduit clamps using spring friction action for retention in support channel.

D. Spring-steel clamps designed for supporting single conduits without bolts may be used for 1-1/2-inch and smaller raceways serving branch circuits and communication systems above suspended ceilings and for fastening raceways to trapeze supports.

E. Support single runs of MC cable using spring-steel clamps from suspended ceiling hangers, hanger wire or building structure at intervals not to exceed three feet. Do not support MC cable from ceiling grid.

3.2 SUPPORT INSTALLATION

A. Comply with NECA 1 and NECA 101 for installation requirements except as specified in this Article.

B. Raceway Support Methods: In addition to methods described in NECA 1, EMT may be supported by openings through structure members, as permitted in NFPA 70.

C. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified loading limits. Minimum static design load used for strength determination shall be weight of supported components plus 200 lb.

D. Mounting and Anchorage of Surface-Mounted Equipment and Components: Anchor and fasten electrical items and their supports to building structural elements by the following methods unless otherwise indicated by code:

1. To Wood: Fasten with lag screws or through bolts.

2. To New Concrete: Bolt to concrete inserts.

3. To Masonry: Approved toggle-type bolts on hollow masonry units and expansion anchor fasteners on solid masonry units.

4. To Existing Concrete: Expansion anchor fasteners.

5. Instead of expansion anchors, powder-actuated driven threaded studs provided with lock washers and nuts may be used in existing standard-weight concrete 4 inches thick or greater. Do not use for anchorage to lightweight-aggregate concrete or for slabs less than 4 inches thick.

6. To Steel:

a. Welded threaded studs complying with AWS D1.1/D1.1M, with lock washers and nuts.

b. Beam clamps (MSS Type 19, 21, 23, 25, or 27) complying with MSS SP-69

c. Spring-tension clamps.

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 0529 - 5

7. To Light Steel: Sheet metal screws.

8. Items Mounted on Hollow Walls and Nonstructural Building Surfaces: Mount cabinets, panelboards, disconnect switches, control enclosures, pull and junction boxes, transformers, and other devices on slotted-channel support systems attached to substrate.

E. Slotted support systems applications:

1. Indoor dry and damp Locations: Painted Steel

F. Drill holes for expansion anchors in concrete at locations and to depths that avoid reinforcing bars.

G. Do not fasten supports to floor decks, roof decks, pipes, ducts, mechanical equipment, or conduit.

H. Obtain permission from Architect/Engineer before using powder-actuated anchors.

I. Obtain permission from Architect/Engineer before drilling or cutting structural members.

J. Fabricate supports from structural steel or steel channel. Rigidly weld members or use hexagon head bolts to present neat appearance with adequate strength and rigidity. Use spring lock washers under all nuts.

K. Use sheet metal channel to bridge studs above and below cabinets and panelboards recessed in hollow partitions.

L. The Contractor shall replace all supports and channels that sag, twist, and/or show signs of not providing proper structural support, to the equipment, it is intended for, as determined by the Owner and Architect/Engineer. All costs associated with replacing supports and steel channels shall be incurred by the Contractor.

3.3 INSTALLATION OF FABRICATED METAL SUPPORTS

A. Comply with installation requirements in Division 05 Section "Metal Fabrications" for site-fabricated metal supports.

B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor electrical materials and equipment.

C. Field Welding: Comply with AWS D1.1/D1.1M.

END OF SECTION 26 0529

RACEWAYS AND BOXES 26 0533 - 1

SECTION 26 0533 - RACEWAYS AND BOXES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

1.2 SUMMARY

1.3 DEFINITIONS

1.4 ACTION SUBMITTALS

1.5 QUALITY ASSURANCE

1.6 COORDINATION

PART 2 - PRODUCTS

2.1 METAL CONDUIT AND TUBING

2.2 BOXES, ENCLOSURES, AND CABINETS

2.3 SLEEVES FOR RACEWAYS

PART 3 - EXECUTION

3.1 RACEWAY APPLICATION

3.2 INSTALLATION

3.3 SLEEVE INSTALLATION FOR ELECTRICAL AND COMMUNICATIONS PENETRATIONS

3.4 PROTECTION

3.5 CLEANING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes raceways, fittings, boxes, enclosures, and cabinets for electrical wiring.

B. Related Sections include the following:

1. Division 26 “Hangers and Supports for Electrical Systems” for concrete bases.

1.3 DEFINITIONS

A. EMT: Electrical metallic tubing.

B. ENT: Electrical nonmetallic tubing.

C. FMC: Flexible metal conduit.

D. IMC: Intermediate metal conduit.

E. LFMC: Liquidtight flexible metal conduit.

F. LFNC: Liquidtight flexible nonmetallic conduit.

G. RNC: Rigid nonmetallic conduit.

H. PVC: Polyvinyl Chloride.

RACEWAYS AND BOXES 26 0533 - 2

I. HDPE: High Density Polyethylene.

J. RTRC: Reinforced Thermosetting Resin Conduit

1.4 ACTION SUBMITTALS

A. Product Data: For surface raceways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

1.5 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. Comply with NFPA 70.

C. All work in natatoriums, pool areas and fountain structures shall be in accordance with N.E.C. article 680, “Swimming Pools, Fountains, and Similar Installations.”

1.6 COORDINATION

A. Coordinate layout and installation of raceways, boxes, enclosures, cabinets, and suspension system with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment, fire-suppression system, and partition assemblies.

PART 2 - PRODUCTS

2.1 METAL CONDUIT AND TUBING

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. AFC Cable Systems, Inc.

2. Alflex Inc.

3. Allied Tube Triangle Century.

4. Anamet Electrical, Inc.; Anaconda Metal Hose.

5. International Metal Hose.

6. Electri-Flex Co

7. Grinnell Co./Tyco International; Allied Tube and Conduit Div.

8. LTV Steel Tubular Products Company – Manhattan/CDT/Cole-Flex.

9. Maverick.

10. O-Z Gedney; unit of General Signal.

11. Wheatland.

B. Rigid Steel Conduit: ANSI C80.1.

C. EMT: ANSI C80.3.

D. Fittings for Conduit (Including all Types and Flexible and Liquidtight), EMT, and Cable: NEMA FB 1; listed for type and size raceway with which used, and for application and environment in which…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .