2_0_Floor_Plans.pdf
PDF 4 MB Posted
- Attached to
- Constructions Services for Staging Space Renovatio Federal contract opportunity
- Solicitation number
- 1305M326Q0271
About this file
This document is a set of architectural construction drawings for the NOAA Pacific Marine Environmental Laboratory Staging Area Renovation located at 7600 Sand Point Way NE, Building 3, 1st Floor, Seattle, WA 98115.
The project encompasses demolition and new work phases affecting laboratory spaces, offices, and hallways. Demolition activities include removal of existing partitions, doors, frames, flooring, wall base, ceilings, windows, electrical fixtures, plumbing, and HVAC components in designated areas. New construction includes installation of metal stud and drywall partitions with epoxy resin countertops and splashes, new metal laboratory casework with epoxy resin finishes, new flooring and wall base, new doors and frames per specifications, and replacement of ceiling systems. The renovation also incorporates new mechanical systems (thermostats, supply air diffusers, return air grilles), plumbing infrastructure (sanitaries, drains, supply lines), electrical work (lighting fixtures, emergency lighting, exit signs, outlets, switches, occupancy sensors), and data/communication systems. Architectural drawings include partial first floor plans for demolition and new work phases, reflected ceiling plans, elevations for laboratory casework and shelving, mechanical and plumbing plans, lighting plans, power plans, and detailed schedules for doors, frames, finishes, and room specifications. Laboratory fixture cut sheets detail specific equipment such as scullery sink faucets, eyewash stations, and emergency shower specifications. The drawings indicate coordination with existing utilities and systems throughout the renovation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1305M326Q0271_Amd_0003.pdf | ||
| 10_Technical_Exhibit_-_Photos_145027-26-0036_0002.pdf | ||
| 9_Questions_from_solicitation_145027-26-0036_0002.pdf | ||
| Sol_1305M326Q0271_Amd_0002.pdf | ||
| 8_Drawing_Set_-_Rev_1_145027-26-0036_0002.pdf | ||
| Sol_1305M326Q0271_Amd_0001.pdf | ||
| Sol_1305M326Q0271.pdf | ||
| 3_Asbestos-Containing_Materials_Certification_1305M326Q0271.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
240'-0" E
270'-0" E
300'-0" E
37'-6"
N
N 0'-0"
DATA ELEC
37'-6"
N
N 0'-0"
240'-0" E
270'-0" E
300'-0" E
DEMOLITION
OFFICE OFFICE
OFFICE
OFFICE
HALL
HALL
270'-0" E
300'-0" E
37'-6"
N
N 0'-0"
DEMOLITION
OFFICE OFFICE
OFFICE OFFICE
HALL
270'-0" E
300'-0" E
37'-6"
N
N 0'-0"
DATA ELEC
NEW WORK
N
N 0'-0"
240'-0" E
270'-0" E
300'-0" E
ELEVATIONS
ELEVATIONS
LABORATORY FIXTURES
CUT SHEETS
4611 Main St.
Lisle, IL 60532 ph: 630/725-9200 - fax: 630/725-9201 www.piilab.com
3/4"R
15"
9"
30"
31"
18" 19"
SECTION VIEW
1/2"
1 1/4"R
3° SLOPE
18" 18 1/2"
TOP VIEW
SCHEDULES
A-401
A-401
A-401
A-401
N
N 0'-0"
240'-0" E
270'-0" E
300'-0" E
270'-0"
300'-0" E
8'-9"
N 0'-0"
S
DATA ELEC
WOMENS
32' 11-1/2"
S
SW
SWSWSWSW SWSWSWSW SWSWSWSW
270'-0" E
300'-0" E
37'-6"
N
N 0'-0"
DEMOLITION
LAB
LAB
BALANCE
LAB LAB
OFFICE
OFFICE OFFICE
OFFICE
OFFICE
HALL
HALL
LAB
N
N 0'-0"
240'-0" E
270'-0" E
300'-0" E
NEW WORK
S S
N
N 0'-0"
240'-0" E
270'-0" E
300'-0" E
| 1_PMEL_G-001 |
| 2_PMEL_G-101 |
| 3_PMEL_AD101 |
| 4_PMEL_AD102 |
| 5_PMEL_A-101 |
| 6_PMEL_A-102 |
| 7_PMEL_A-201 |
| 8_PMEL_A-204 |
| 9_PMEL_A-401 |
| 10_PMEL_A-601 |
| 11_PMEL_M-101 |
| 12_PMEL_P-101 |
| 13_PMEL_ED101 |
| 14_PMEL_EL101 (1) |
| 15_PMEL_EP101 |
File details come from the government source that posted it. Updated .