8_Drawing_Set_-_Rev_1_145027-26-0036_0002.pdf

PDF 5 MB Posted

Attached to
Constructions Services for Staging Space Renovatio
Solicitation number
1305M326Q0271
Issued by

About this file

This is a set of architectural construction drawings for the NOAA Pacific Marine Environmental Laboratory Staging Area Renovation located at 7600 Sand Point Way NE, Building 3, 1st Floor, Seattle, WA 98115.

The project involves comprehensive renovation work including demolition and new construction phases. Demolition activities include removal of freezer compartments, wall and door casements, flooring and wall base, partitions, doors and frames, fixtures, ceilings, and various mechanical and electrical systems. New work encompasses installation of laboratory casework with epoxy resin countertops, metal partitions and framing, new flooring and wall base, doors and frames, painting, and new mechanical, plumbing, and electrical systems. The design includes laboratory fixtures such as scullery sinks with faucets, emergency eyewash stations, and open shelving units. Interior spaces are designated as office areas, laboratory spaces, halls, balance lab, mechanical room, and utility areas. The drawings provide detailed floor plans at partial scale showing existing conditions for demolition (sheets AD101-AD102), new work layouts (sheets A-101 to A-102), reflected ceiling plans (sheets A-102), mechanical plans (sheet M-101), plumbing plans (sheet P-101), electrical and lighting plans (sheets ED101, EL101, EP101), elevations and laboratory fixture details (sheet A-204), interior details (sheet A-403), schedules for materials and finishes (sheet A-601), and various equipment cut sheets for laboratory fixtures and casework specifications. The project appears to be in the design development or construction document phase with comprehensive technical specifications for all building systems and finishes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER SHEET

240'-0" E

270'-0" E

300'-0" E

37'-6"

N

N 0'-0"

DATA ELEC

37'-6"

N

N 0'-0"

240'-0"

E 270'-0"

E 300'-0"

E

DEMOLITION

OFFICE OFFICE

OFFICE

OFFICE

HALL

270'-0" E

300'-0" E

37'-6"

N

N 0'-0"

DEMOLITION

OFFICE OFFICE

OFFICE OFFICE

HALL

270'-0"

E 300'-0"

E

37'-6"

N

N 0'-0"

DATA ELEC

NEW WORK

N

N 0'-0"

240'-0" E

270'-0" E

300'-0" E

ELEVATIONS

LABORATORY FIXTURES

CUT SHEETS

4611 Main St.

Lisle, IL 60532 ph: 630/725-9200 - fax: 630/725-9201 www.piilab.com

3/4"R

15"

9"

30"

31"

18" 19"

SECTION VIEW

1/2"

1 1/4"R

3° SLOPE

18" 18 1/2"

TOP VIEW

INTERIOR DETAILS

SCHEDULES

A-401

A-401

A-401

A-401

N

N 0'-0"

240'-0" E

270'-0" E

300'-0" E

270'-0"

300'-0"

E

8'-9"

N 0'-0"

S

J

DATA ELEC

WOMENS

VENDING

AP

EAST

MECHANICAL

32' 11-1/2"

S

AP

SWSW

S W

S W

S W

S W

S W

S W

S W

S W

SWSWSWSWSW SWSWSWSW SWSWSWSW

S W

SW

270'-0" E

300'-0" E

37'-6"

N

N 0'-0"

DEMOLITION

LAB

LAB

BALANCE

LAB LAB

OFFICE

OFFICE OFFICE

OFFICE

OFFICE

HALL

HALL

LAB

N

N 0'-0"

240'-0" E

270'-0" E

300'-0" E

NEW WORK

S

S

N

N 0'-0"

240'-0" E

270'-0" E

300'-0" E

File details come from the government source that posted it. Updated .