Sheet1
CONTINUATION OF SF18, PAGE 6, 19RP3825Q0110
| LINE ITEM | DESCRIPTION | QUANTITY | UNIT COST | TOTAL | REMARKS /OFFER |
| | | | | NOTE: Submit photo and specifications of each proposed item/s |
| 1 | Supply, Delivery and Instalaltion of Generator Sets (2) for Coast Guard Vessels at Buliluyan Port, Palawan, Philippines | 2 EACH | | | |
| Specifications: |
| *Max Output: 126kVA |
| *Voltage: 190V-480V |
| *Frequency: 60Hz |
| *Diesel powered |
| *Three-phase |
| *Fuel consumption: 20 Liter/Hr @75% utilization |
| Required Extras: |
| *4-wheeler trailer (each unit) |
| *Battery for electric start |
| *Weatherproof enclosure with salt-corrosion resistance |
| *AC power meter and overspeed protection device |
| *Standard accessories, model-specific maintenance tools (if any), and two years of spare parts |
| *One-Year warranty |
| Suitable product example: Denyo DCA-125SPK3 (https://www.denyo.co.jp/english/products/generator/three-phase-101-300kva/dca-125spk3-2/) or equivalent |
| REQUIRED: Support: Installation service and basic operations and maintenance training are required upon delivery. Training certificate not required. |
| Delivery location: Buliluyan Port, Palawan: https://maps.app.goo.gl/d9kbH4JEgTZDh7cj9 |
2 Supply and Delivery of Generator Set (1) for Coast Guard Station in Palawan 1 EACH
| Specifications: |
| *Max output: 50kWe |
| *Voltage: 208-600V |
| *Frequency: 60 Hz |
| *Diesel-powered |
| *Three-phase |
| *Fuel Consumption: 12.45Liter/Hr @75% Utilization |
| Required Extras: |
| *4-wheeler trailer |
| *Battery for electric start |
| *Weatherproof enclosure with salt-corrosion resistance |
| *AC power meter and overspeed protection device |
| *Standard accessories, model-specific maintenance tools (if any), and two years of spare parts |
| *One-year warranty |
| Suitable product example: Bluestar JD50-03 (https://www.criticalpower.com/product/50-kw-blue-star-power-systems-diesel-generators/) or equivalent |
| REQUIRED: Support: Basic operations and maintenance training are required upon delivery. Training certificate not required. |
| Delivery location: Port of Bataraza, Palawan: https://maps.app.goo.gl/PqZtFLF1oAgZH9wh9 |
3 Supply and Delivery of Generator Sets (6) for Coast Guard Sub-Stations in Palawan 6 EACH
| Specifications: |
| *Maximum output: 7.5kVA |
| *Voltage: 220V |
| *Frequency: 60Hz |
| *Diesel-powered |
| *Single-phase |
| *Fuel Consumption: 2.95 Liter/Hr @75% Utilization |
| Required Extras: |
| *Dolly kit for unit relocation |
| *Battery for electric start |
| *Salt-corrosion resistance |
| *AC power meter |
| *Standard accessories, model-specific maintenance tools (if any), and two years of spare parts |
| *One-year warranty |
| Suitable product example: Winco DP7500HE-03/A (https://www.wincogen.com/product/dp7500-03-b/) or equivalent |
| REQUIRED: Support: Basic operation and maintenance training upon delivery. Training certificate not required. |
| Delivery location: Bataraza Port, Palawan: https://maps.app.goo.gl/UnfL543DEKQ2PTTX6 |
4 Shipping all units to Palawan, Philippines (exact delivery location as state per line item) - Door-to-Door Shipment (INCOTERMS: DDP - Deliveries Duty Paid)
| OTHER REQUIREMENTS: |
| 1. Delivery Lead Time: 30 days upon issuance of Purchase Order. |
| 2. Warranty: Manufacturer or Dealer issued warranty must be applicable in one year in the Philippines, covering parts and services. |
| 3. Noise-level restrictions (dB at 7m) are required for all generators. |
| 4. AVR is required for large and medium sized units - line items 1 & 2. |
| 5. Manual start is acceptable for 7.5 kVA units. – for line item 3. |
| 6. IP55 rating is required. |
| 7. Factory test are acceptable for 7.5 KVA units - for line item 3. |
| 8. Contractor must provide materials to accomplish initial testing and commissioning for larger units only – line items 1 and 2. |
| 9. Contractor should arrange download services at the delivery site. |
| IMPORTANT REMINDER: |
| Quotations will only be evaluated if accompanied by the the necessary proof/evidence of required warrantly and a confirmation that the delivery lead time will be met. |
| ADDITIONAL INFORMATION: |
| 1. Specifications should be provided upon award so end user can prepare/perform accordingly. |
| 2. Manpower is available at the delivery site. |
| 3. End user will accomplish testing and commissioning of smaller units – line item 3. |
| 4. Working Hours - 8:00AM - 5:00PM |