This is Amendment 0003 to a Request for Quotation (RFQ) for security upgrades at U.S. Government residential properties in Mexico City. The amendment extends the proposal deadline from April 9, 2026, to May 25, 2026, at 17:00 hours Mexico City time, with electronic submissions required to MexicoCityGSOSolicitations@groups.state.gov. The solicitation, issued by American Embassy Mexico's General Services Office/Contracts division and administered by the Regional Security Office, seeks security upgrade services for multiple residential properties, with a lowest-priced technically acceptable evaluation approach and multiple award IDIQ contract award intended.

The scope of work encompasses 27 contract line items (CLINs) in the base year and corresponding items for two option years plus a six-month extension period, covering services such as forced entry window grilles, door grilles, reinforced doors, locks, anti-climb measures, alarm circuits, and scaffold work. The amendment adds new CLIN 028 (base year), 128 (first option year), 228 (second option year), and 328 (six-month period) requiring contractors to provide design plans for each house/apartment, including pattern, color, and overall design of doors/windows/property. Pricing must be submitted in a specified currency across all periods. The amendment includes a questions and answers document clarifying that fencing should be conventional commercial steel rather than stainless steel, and that perimeter structures should be rectangular or profiled tubing for reinforcement. Site visit minutes from March 19, 2026, document that 10 representatives from 5 prospective offerors toured three residential properties (Bosque de Reforma 295, Fray Payo de Rivera 130, and Seneca 142). All offerors must maintain active SAM registration, meet proposal requirements in Sections 3 and 4, and submit best and final offers without expectation of discussions.

View the file

Other files

File Type Posted
0002 - Proposals Extension.pdf PDF
0001 - Proposals Extension.pdf PDF
Work at heights.xlsx XLSX spreadsheet
Vendor Portal4.pdf PDF
Vendor Portal2.pdf PDF
Safety Management Plan.docx DOCX document
Vendor Portal3.pdf PDF
Letter to offerors 19MX5326Q0016 - Security Upgrades_CO Signed.pdf PDF
SF-1449 -19MX5326Q0016.pdf PDF
RFQ 19MX5326Q0016 - Security Upgrades.pdf PDF
Hot Work.doc DOC document
Vendor Portal1.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070 STANDARD FORM 30 (revised 10/83) Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

May 12, 2026

4. REQUISITION/PURCHASE REQ. NO.

PR15453145

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE

American Embassy Mexico

19MX53 7. ADMINISTERED BY (If other than Item 6) CODE American Embassy Mexico

19MX53

General Services Office/Contracts Presa Angostura 225, Irrigación, 11500, CDMX, Mexico

Regional Security Office (RSO) Presa Angostura 225, Irrigación, 11500, CDMX, Mexico

8. NAME AND ADDRESS OF CONTRACTOR (NO., street, city, county, State, and ZIP Code)

X

9a. AMENDMENT OF SOLICITATION NO.

19MX5326Q0016

9b. DATED (SEE ITEM 11) March 6, 2026.

10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

☒ The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers ☐ is extended, ☒ is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor ☐ is not, ☐ is required to sign this document and return ___ original to the issuing office.

1. The purpose of this amendment is:

A) The purpose of this amendment is to extend deadline to receive offers.

B) To include updated requirements in the SOW/Section 1 of the RFQ. (Design plan for each house/apartment) C) To add the Q&A file with information requested by vendors and to provide the Site Visit minutes summary of the walkthrough performed at 3 US Government Residential Properties.

See the enclosed Attachment which is the continuation sheet to this SF-30 with the specific changes to this Solicitation.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Morgan Osborne

Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C.DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C.DATE SIGNED

SBU - CONTRACTING AND ACQUISITIONS

Amendment 0003

Solicitation Number 19MX5326Q0016

1. RFQ: Section 3 A) Subsection 3.7. Submission Date & Address

Deadline to submit proposal is amended from April 9, 2026, to May 25, 2026. Therefore, subsection 3.7. is hereby replaced in its entirety to read as follows:

“3.7. SUBMISSION DATE & ADDRESS

Electronic quotes and offers will be accepted. Submit the complete quotation via e-mail no later than Tuesday May 25, 2026, before 17:00 hours, Mexico City time, to the electronic address indicated below:

MexicoCityGSOSolicitations@groups.state.gov”

2. SF-1449 Box 8. OFFER DUE DATE/ LOCAL TIME:

A. Offer due date in Box 8 is changed from April 9, 2026, by 13:00 (hours) Mexico City time to Tuesday May 25, 2026, 17:00 (hours) local time.

Therefore, Box 8 is hereby replaced in its entirety to read as follows:

8. OFFER DUE DATE/ LOCAL TIME

May 25, 2026, 17:00 hrs. Mexico City time.

3. RFQ: Section 1 - Subsection 1.8 PRICING

FROM:

1.8.1. Base Year Prices

As per paragraph 1.6 above, Base Year Prices are in _______________ [Insert Currency].

CLIN Description of Services Estimated Quantity

Unit of Measure Unit Price Estimated

Total

001 Forced Entry Fixed Window Grille 70 sqm $ $ mailto:MexicoCityGSOSolicitations@groups.state.gov

CLIN Description of Services Estimated Quantity

Unit of Measure Unit Price Estimated

Total 002 Door Grille (Folding/Sliding) 60 sqm $ $

003 Window/Door Grill with Emergency Release 30 sqm $ $

004 Substantial Door – Solid-core wood 4.5cm thick 20 sqm $ $

005 Substantial Door – Metal hollow core 4 sqm $ $

006 Substantial Door – Reinforced with 8ga steel (3mm) sheet 4 sqm $ $

007 Door Frame Reinforcement to the structure – Solid Wood 4 m $ $

008 Door Frame Reinforcement – With Metal Plate/Soldera 15 m

009 Door Viewer (180 degree or more) 6 ea $ $

010 Main Primary Lock 25 ea $ $

011 Auxiliary Lock 25 ea $ $

012 Main Gate Lock 20 ea $ $

013 Main Fence Gate Lock 20 ea $ $

014 Anti-Lever Hingers 20 m $ $

015 Anti-Climb Spikes – Maguey 30 m $ $

016 Anti-Climb Spikes – Razor 25 m $ $

017 Concertina Wire 25 m $ $

018 Cyclonic Mesh 25 m $ $

019 Stainless Steel (Rejaacero) 25 sqm $ $

Anti-Climb Fence with Maguey Spikes on top Railing

– Type

20 sqm $ $

Quantity

Unit of Measure Unit Price Estimated

Total

Anti-Climb Fence with Concertina on top – Railing- Type

20 sqm $ $

022 Safety Pin/Lock 20 ea $ $

023 Security Charley Bar 20 m $ $

024 Reinforcement of Bars Frame with a solera/metal angle 25 m $ $

025 Double Alarm Circuit 30 day $ $

026 Scaffold and PPE for Height Work 5 day $ $

027 Emergency Fee 5 Day $ $

Sub-Total $ VAT (if applicable) $

Total for Base Year Security Upgrades $

1.8.2 First Option Year Prices

As per paragraph 1.6 above, First Option Year Prices are in _____________[Insert Currency].

CLIN Description of Services Estimated Quantity

Unit of Measure Unit Price Estimated

Total

101 Forced Entry Fixed Window Grille 70 sqm $ $

102 Door Grille (Folding/Sliding) 60 sqm $ $

103 Window/Door Grill with Emergency Release 30 sqm $ $

104 Substantial Door – Solid-core wood 4.5cm thick 20 sqm $ $

105 Substantial Door – Metal hollow core 4 sqm $ $

106 Substantial Door – Reinforced with 8ga steel (3mm) sheet 4 sqm $ $

Quantity

Unit of Measure Unit Price Estimated

Total

107 Door Frame Reinforcement to the structure – Solid Wood 4 m $ $

108 Door Frame Reinforcement – With Metal Plate/Soldera 15 m

109 Door Viewer (180 degree or more) 6 ea $ $

110 Main Primary Lock 25 ea $ $

111 Auxiliary Lock 25 ea $ $

112 Main Gate Lock 20 ea $ $

113 Main Fence Gate Lock 20 ea $ $

114 Anti-Lever Hingers 20 m $ $

115 Anti-Climb Spikes – Maguey 30 m $ $

116 Anti-Climb Spikes – Razor 25 m $ $

117 Concertina Wire 25 m $ $

118 Cyclonic Mesh 25 m $ $

119 Stainless Steel (Rejaacero) 25 sqm $ $

Anti-Climb Fence with Maguey Spikes on top Railing

– Type

20 sqm $ $

Anti-Climb Fence with Concertina on top – Railing- Type

20 sqm $ $

122 Safety Pin/Lock 20 ea $ $

123 Security Charley Bar 20 m $ $

124 Reinforcement of Bars Frame with a solera/metal angle 25 m $ $

125 Double Alarm Circuit 30 day $ $

126 Scaffold and PPE for Height Work 5 day $ $

Quantity

Unit of Measure Unit Price Estimated

Total 127 Emergency Fee 5 Day $ $

Sub-Total $

Total for First Option Year Security Upgrades $

1.8.3 Second Option Year Prices

As per paragraph 1.6 above, Second Option Year Prices are in________________[Insert Currency].

Quantity

Unit of Measure Unit Price Estimated

Total

201 Forced Entry Fixed Window Grille 70 sqm $ $

202 Door Grille (Folding/Sliding) 60 sqm $ $

203 Window/Door Grill with Emergency Release 30 sqm $ $

204 Substantial Door – Solid-core wood 4.5cm thick 20 sqm $ $

205 Substantial Door – Metal hollow core 4 sqm $ $

206 Substantial Door – Reinforced with 8ga steel (3mm) sheet 4 sqm $ $

207 Door Frame Reinforcement to the structure – Solid Wood 4 m $ $

208 Door Frame Reinforcement – With Metal Plate/Soldera 15 m

209 Door Viewer (180 degree or more) 6 ea $ $

210 Main Primary Lock 25 ea $ $

211 Auxiliary Lock 25 ea $ $

212 Main Gate Lock 20 ea $ $

Quantity

Unit of Measure Unit Price Estimated

Total 213 Main Fence Gate Lock 20 ea $ $

214 Anti-Lever Hingers 20 m $ $

215 Anti-Climb Spikes – Maguey 30 m $ $

216 Anti-Climb Spikes – Razor 25 m $ $

217 Concertina Wire 25 m $ $

218 Cyclonic Mesh 25 m $ $

219 Stainless Steel (Rejaacero) 25 sqm $ $

Anti-Climb Fence with Maguey Spikes on top Railing

– Type

20 sqm $ $

Anti-Climb Fence with Concertina on top – Railing- Type

20 sqm $ $

222 Safety Pin/Lock 20 ea $ $

223 Security Charley Bar 20 m $ $

224 Reinforcement of Bars Frame with a solera/metal angle 25 m $ $

225 Double Alarm Circuit 30 day $ $

226 Scaffold and PPE for Height Work 5 day $ $

227 Emergency Fee 5 Day $ $

Sub-Total $

Total for Second Option Year Security Upgrades $

1.8.4 6-Month Period as per 52.217-8 This extended 6-month period will be applicable if the Contracting Officer determines to exercise FAR clause 52.217-8.

As per paragraph 1.6 above, 6 Month period Prices are in_____________[Insert Currency].

Unit of Measure Unit Price Estimated

Total

301 Forced Entry Fixed Window Grille 35 sqm $ $

302 Door Grille (Folding/Sliding) 30 sqm $ $

303 Window/Door Grill with Emergency Release 15 sqm $ $

304 Substantial Door – Solid-core wood 4.5cm thick 10 sqm $ $

305 Substantial Door – Metal hollow core 2 sqm $ $

306 Substantial Door – Reinforced with 8ga steel (3mm) sheet 2 sqm $ $

307 Door Frame Reinforcement to the structure – Solid Wood 2 m $ $

308 Door Frame Reinforcement – With Metal Plate/Soldera 7 m

309 Door Viewer (180 degree or more) 3 ea $ $

310 Main Primary Lock 12 ea $ $

311 Auxiliary Lock 12 ea $ $

312 Main Gate Lock 10 ea $ $

313 Main Fence Gate Lock 10 ea $ $

314 Anti-Lever Hingers 10 m $ $

315 Anti-Climb Spikes – Maguey 15 m $ $

316 Anti-Climb Spikes – Razor 12 m $ $

317 Concertina Wire 12 m $ $

318 Cyclonic Mesh 12 m $ $

Quantity

Unit of Measure Unit Price Estimated

Total 319 Stainless Steel (Rejaacero) 12 sqm $ $

Anti-Climb Fence with Maguey Spikes on top Railing

– Type

10 sqm $ $

Anti-Climb Fence with Concertina on top – Railing- Type

10 sqm $ $

322 Safety Pin/Lock 10 ea $ $

323 Security Charley Bar 10 m $ $

324 Reinforcement of Bars Frame with a solera/metal angle 12 m $ $

325 Double Alarm Circuit 15 day $ $

326 Scaffold and PPE for Height Work 2 day $ $

327 Emergency Fee 2 Day $ $

Sub-Total $

TO:

1.8.1. Base Year Prices

As per paragraph 1.6 above, Base Year Prices are in _______________ [Insert Currency].

CLIN Description of Services Estimated Quantity

Unit of Measure Unit Price Estimated

Total

001 Forced Entry Fixed Window Grille 70 sqm $ $

002 Door Grille (Folding/Sliding) 60 sqm $ $

003 Window/Door Grill with Emergency Release 30 sqm $ $

Quantity

Unit of Measure Unit Price Estimated

Total

004 Substantial Door – Solid-core wood 4.5cm thick 20 sqm $ $

005 Substantial Door – Metal hollow core 4 sqm $ $

006 Substantial Door – Reinforced with 8ga steel (3mm) sheet 4 sqm $ $

007 Door Frame Reinforcement to the structure – Solid Wood 4 m $ $

008 Door Frame Reinforcement – With Metal Plate/Soldera 15 m

009 Door Viewer (180 degree or more) 6 ea $ $

010 Main Primary Lock 25 ea $ $

011 Auxiliary Lock 25 ea $ $

012 Main Gate Lock 20 ea $ $

013 Main Fence Gate Lock 20 ea $ $

014 Anti-Lever Hingers 20 m $ $

015 Anti-Climb Spikes – Maguey 30 m $ $

016 Anti-Climb Spikes – Razor 25 m $ $

017 Concertina Wire 25 m $ $

018 Cyclonic Mesh 25 m $ $

019 Stainless Steel (Rejaacero) 25 sqm $ $

Anti-Climb Fence with Maguey Spikes on top Railing

– Type

20 sqm $ $

Anti-Climb Fence with Concertina on top – Railing- Type

20 sqm $ $

022 Safety Pin/Lock 20 ea $ $

Quantity

Unit of Measure Unit Price Estimated

Total 023 Security Charley Bar 20 m $ $

024 Reinforcement of Bars Frame with a solera/metal angle 25 m $ $

025 Double Alarm Circuit 30 day $ $

026 Scaffold and PPE for Height Work 5 day $ $

027 Emergency Fee 5 Day $ $

Design plan for each house/apartment:

pattern, color, plan for the grilling ahead of time.

Overall design of the doors/windows/property

1 Service $ $

Sub-Total $

Total for Base Year Security Upgrades $

1.8.2 First Option Year Prices

As per paragraph 1.6 above, First Option Year Prices are in _____________[Insert Currency].

CLIN Description of Services Estimated Quantity

Unit of Measure Unit Price Estimated

Total

101 Forced Entry Fixed Window Grille 70 sqm $ $

102 Door Grille (Folding/Sliding) 60 sqm $ $

103 Window/Door Grill with Emergency Release 30 sqm $ $

104 Substantial Door – Solid-core wood 4.5cm thick 20 sqm $ $

105 Substantial Door – Metal hollow core 4 sqm $ $

106 Substantial Door – Reinforced with 8ga steel (3mm) sheet 4 sqm $ $

Quantity

Unit of Measure Unit Price Estimated

Total

107 Door Frame Reinforcement to the structure – Solid Wood 4 m $ $

108 Door Frame Reinforcement – With Metal Plate/Soldera 15 m

109 Door Viewer (180 degree or more) 6 ea $ $

110 Main Primary Lock 25 ea $ $

111 Auxiliary Lock 25 ea $ $

112 Main Gate Lock 20 ea $ $

113 Main Fence Gate Lock 20 ea $ $

114 Anti-Lever Hingers 20 m $ $

115 Anti-Climb Spikes – Maguey 30 m $ $

116 Anti-Climb Spikes – Razor 25 m $ $

117 Concertina Wire 25 m $ $

118 Cyclonic Mesh 25 m $ $

119 Stainless Steel (Rejaacero) 25 sqm $ $

Anti-Climb Fence with Maguey Spikes on top Railing

– Type

20 sqm $ $

Anti-Climb Fence with Concertina on top – Railing- Type

20 sqm $ $

122 Safety Pin/Lock 20 ea $ $

123 Security Charley Bar 20 m $ $

124 Reinforcement of Bars Frame with a solera/metal angle 25 m $ $

125 Double Alarm Circuit 30 day $ $

126 Scaffold and PPE for Height

Quantity

Unit of Measure Unit Price Estimated

Total 127 Emergency Fee 5 Day $ $

Design plan for each house/apartment:

pattern, color, plan for the grilling ahead of time.

Overall design of the doors/windows/property

1 Service

Sub-Total $

Total for First Option Year Security Upgrades $

1.8.3 Second Option Year Prices

As per paragraph 1.6 above, Second Option Year Prices are in________________[Insert Currency].

Unit of Measure Unit Price Estimated

Total

201 Forced Entry Fixed Window Grille 70 sqm $ $

202 Door Grille (Folding/Sliding) 60 sqm $ $

203 Window/Door Grill with Emergency Release 30 sqm $ $

204 Substantial Door – Solid-core wood 4.5cm thick 20 sqm $ $

205 Substantial Door – Metal hollow core 4 sqm $ $

206 Substantial Door – Reinforced with 8ga steel (3mm) sheet 4 sqm $ $

207 Door Frame Reinforcement to the structure – Solid Wood 4 m $ $

208 Door Frame Reinforcement – With Metal Plate/Soldera 15 m

209 Door Viewer (180 degree or more) 6 ea $ $

Quantity

Unit of Measure Unit Price Estimated

Total 210 Main Primary Lock 25 ea $ $

211 Auxiliary Lock 25 ea $ $

212 Main Gate Lock 20 ea $ $

213 Main Fence Gate Lock 20 ea $ $

214 Anti-Lever Hingers 20 m $ $

215 Anti-Climb Spikes – Maguey 30 m $ $

216 Anti-Climb Spikes – Razor 25 m $ $

217 Concertina Wire 25 m $ $

218 Cyclonic Mesh 25 m $ $

219 Stainless Steel (Rejaacero) 25 sqm $ $

Anti-Climb Fence with Maguey Spikes on top Railing

– Type

20 sqm $ $

Anti-Climb Fence with Concertina on top – Railing- Type

20 sqm $ $

222 Safety Pin/Lock 20 ea $ $

223 Security Charley Bar 20 m $ $

224 Reinforcement of Bars Frame with a solera/metal angle 25 m $ $

225 Double Alarm Circuit 30 day $ $

226 Scaffold and PPE for Height

227 Emergency Fee 5 Day $ $

Quantity

Unit of Measure Unit Price Estimated

Total

Design plan for each house/apartment:

pattern, color, plan for the grilling ahead of time.

Overall design of the doors/windows/property

1 Service

Sub-Total $

1.8.4 6-Month Period as per 52.217-8 This extended 6-month period will be applicable if the Contracting Officer determines to exercise FAR clause 52.217-8.

As per paragraph 1.6 above, 6 Month period Prices are in_____________[Insert Currency].

Unit of Measure Unit Price Estimated

Total

301 Forced Entry Fixed Window Grille 35 sqm $ $

302 Door Grille (Folding/Sliding) 30 sqm $ $

303 Window/Door Grill with Emergency Release 15 sqm $ $

304 Substantial Door – Solid-core wood 4.5cm thick 10 sqm $ $

305 Substantial Door – Metal hollow core 2 sqm $ $

306 Substantial Door – Reinforced with 8ga steel (3mm) sheet 2 sqm $ $

307 Door Frame Reinforcement to the structure – Solid Wood 2 m $ $

308 Door Frame Reinforcement – With Metal Plate/Soldera 7 m

309 Door Viewer (180 degree or more) 3 ea $ $

Quantity

Unit of Measure Unit Price Estimated

Total 310 Main Primary Lock 12 ea $ $

311 Auxiliary Lock 12 ea $ $

312 Main Gate Lock 10 ea $ $

313 Main Fence Gate Lock 10 ea $ $

314 Anti-Lever Hingers 10 m $ $

315 Anti-Climb Spikes – Maguey 15 m $ $

316 Anti-Climb Spikes – Razor 12 m $ $

317 Concertina Wire 12 m $ $

318 Cyclonic Mesh 12 m $ $

319 Stainless Steel (Rejaacero) 12 sqm $ $

Anti-Climb Fence with Maguey Spikes on top Railing

– Type

10 sqm $ $

Anti-Climb Fence with Concertina on top – Railing- Type

10 sqm $ $

322 Safety Pin/Lock 10 ea $ $

323 Security Charley Bar 10 m $ $

324 Reinforcement of Bars Frame with a solera/metal angle 12 m $ $

325 Double Alarm Circuit 15 day $ $

326 Scaffold and PPE for Height Work 2 day $ $

327 Emergency Fee 2 Day $ $

Quantity

Unit of Measure Unit Price Estimated

Total

Design plan for each house/apartment:

pattern, color, plan for the grilling ahead of time.

Overall design of the doors/windows/property

1 Service

Sub-Total $

4. RFQ: Section 1 - Subsection 1.12 STATEMENT OF WORK (SOW)

The services described herein shall include but will not be limited to different activities to be performed in four different phases. These phases shall be developed as per the timelines stated in each Task Order.

These phases are defined as follows:

1. Phase I – Preliminary Work: Preliminary work is defined as those activities to be performed to confirm the requirements, measurements, and existing conditions of the property where the upgrades are to be installed. This phase also includes the fabrication stage for those security upgrades that require customized materials as well as the delivery of materials that need to be inspected by the COR before approving the installation and those that will be required after approval of installation. This preliminary work shall be included in CLIN prices and shall not be charged/paid separately.

TO:

The services described herein shall include but will not be limited to different activities to be performed in four different phases. These phases shall be developed as per the timelines stated in each Task Order.

These phases are defined as follows:

1. Phase I – Preliminary Work: Preliminary work is defined as those activities to be performed to confirm the requirements, measurements, and existing conditions of the property where the upgrades are to be installed. This phase also includes the fabrication stage for those security upgrades that require customized materials as well as the delivery of materials that need to be inspected by the COR before approving the installation and those that will be required after approval of installation. This preliminary work shall be included in CLIN prices.

Contractor is required to provide a Design Plan for each house/apartment, such as the pattern, color, plan for the grilling ahead of time with the overall design of the doors/windows/property as per new CLINs 028, 128, 228 and 328 added as part of Section 1.8 Pricing for Base year and option years periods.

5. RFQ: Section 3 - Subsection 3.4.2.1 Experience and Ability to Perform

(g) The offeror´s Strategic Plan for Security Upgrades to include but not limited to:

i. A work plan considering all work elements in Section 1, Statement of Work.

TO:

(g) The offeror´s Strategic Plan for Security Upgrades to include but not limited to:

i. A work plan considering all work elements in Section 1, Statement of Work and including a Design plan for each house/apartment: pattern, color, plan for the grilling ahead of time with the overall design of the doors/windows/property.

Questions & Answers

RFQ 19MX5326Q0016 for Security Upgrades

TECHNICAL QUESTIONS

Q1 In the price list, item 019-119-219-319 indicates stainless steel fencing. This material is not a standard product; that is, it must be custom-made according to the models requested in the SOW. Since this type of material can be 3 to 4 times more expensive than conventional commercial steel fencing, it is important to clarify whether the fencing should be stainless steel or mild steel. Mild steel is the conventional, commercial steel that we have used in some of your projects:

Should the fencing be stainless steel or conventional commercial steel?

A1 Fencing should be conventional commercial steel

Q2 Also, please consider that stainless steel and mild steel, being different, can cause some aesthetic problems when welded together. Stainless steel stains black, and to remove this stain, an acid is used that dulls the stainless steel's shine. On the other hand, stainless steel requires a manufacturing period of at least two or three weeks. Manufacturing is done using laser cutting and waterjet cutting:

Should the perimeter structure of windows, some doors, sliding gates, etc., be made of rectangular tubing (PTR) or profiled tubing?

A2 Yes, perimeter structure should be rectangular or profiled tubing as we need it to be reinforced.

Minutes from Site Visit to 19MX5326Q0016 Security Upgrades on March 19, 2026.

Attendees:

10 people from 5 prospective offerors attended the Site Visit.

The following staff from the Requesting Office and the Procurement

Section attended the visit.

o Miguel Rojas / Contracting Officer Representative (COR) o Veronica Tecuatl, Contracts & Procurement Supervisor o Jesús González, Contracts Assistant

Introduction

The Contracts team welcomed the participants, introduced the Contracting Officer Representatives and explained the itinerary and the places that will be visited.

Purpose:

The purpose of the site visit was to brief all prospective offerors about the solicitation and to see the locations where the different residential properties where security upgrades have been installed. It was also important to highlight that doing business with the U.S. Government differs from commercial practice because the solicitation and award processes are regulated under Federal Acquisition Regulations (FAR).

Minutes disclosure:

Attendees were notified the Site Visit minutes would be posted on Sam.gov under Contracts Opportunities to ensure other vendors who could not attend the walkthrough are not disadvantaged.

General directions for this site visit:

• This Site Visit was conducted in Spanish and English to ensure all the attendees had a thorough understanding.

• Attendees received instructions not to ask questions individually to any of the Site Visit leads. Instead, all questions were asked aloud so everyone could hear both the question and the answer.

• After the introductions, the site visit was led by the COR.

• Attendees visited 3 residential properties that are considered a general sample of the services that are required, which are described in section 1 of the RFQ.

• The Contracting team explained that questions asked during the Site Visit will be compiled and included in the Question and Answer (Q&A) document, along with questions received via e-mail in accordance with the RFQ instructions which will be also posted on Sam.gov. It was explained that a multiple award IDIQ contract will be awarded.

Attendants’ attention was called to the following:

Statements:

The statements made during the site visit do NOT change the solicitation. All changes would be made by written amendment to the solicitation.

Amendments:

Amendments are intended to clarify or modify the solicitation. They may originate from:

• Issues raised by suppliers during the pre-proposal stage, at the conference, site visit, or at any time;

• To modify the dates on which proposals are received from suppliers;

• To clarify ambiguities, or;

• To change dates, dates of delivery, or specifications.

All amendments will be posted on Contracts Opportunities on sam.gov. The U.S. Government implements the Fair Release of information, in other words, what you tell one, you must tell all.

Questions

Prospective Offerors were requested to submit their questions via email to be compiled and included in the Q&A file.

The Q&A will be posted on Contracts Opportunities in Sam.gov.

Site Visit

Prospective Offerors toured 3 residential properties according to the date and schedule below:

o Thursday, March 19, 2026, 10:00 am

Locations:

1. Bosque de Reforma 295, CDMX, Mexico.

2. Fray Payo de Rivera 130, CDMX, Mexico.

3. Seneca 142, Polanco II Secc, Miguel Hidalgo

Prospective Offerors were reminded about the following:

o Offerors must not contact the Requesting Office for any issue or question related to this process.

o An active SAM registration is required to submit a proposal.

o This is a lowest priced technically acceptable solicitation process that will be based on Section 4, Evaluation Factor, which was reviewed during the Site visit.

o To be acceptable and eligible for evaluation, proposals must be prepared in accordance with Sections 3 and 4 and shall meet all the requirements set forth in the other sections of this solicitation.

o The U.S. Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror’s initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the U.S.

Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary.

Submission deadlines:

1. Questions: Thursday, March 24, 2026, before 13:00 hours, Mexico City time.

2. Proposals: Tuesday, April 15, 2026, before 13:00 hours.

Q&A File:

All questions received via e-mail will be added to the Q&A file.

Conclusion

The Site Visit concluded with thanks to the attendees for their presence and expression of interest in working with the U.S. Government. The meeting was then adjourned.

Sincerely, Morgan L. Osborne Contracting Officer

1.8.2 First Option Year Prices
1.8.3 Second Option Year Prices
1.8.4 6-Month Period as per 52.217-8
1.8.2 First Option Year Prices
1.8.3 Second Option Year Prices
1.8.4 6-Month Period as per 52.217-8

File details come from the government source that posted it. Updated .