19GE5025R0015 Pre-Proposal Conference Slides.pdf
PDF 1 MB Posted
- Attached to
- Securing of Property Perimeter
- Solicitation number
- 19GE5025R0015
About this file
This is a pre-proposal conference presentation for solicitation 19GE5025R0015, a U.S. Department of State project for securing property at the U.S. Embassy Brussels. The solicitation requires contractors to provide fencing, boarding, and related security measures for a vacated property.
The project has a pre-construction phase of 17 calendar days and requires completion of fencing and temporary gates by March 15, 2025, with final gates installed and project completion by March 31, 2025. Key requirements include submission of two Irrevocable Letters of Credit (ILOCs) each at 20% of contract value, Defense Base Act insurance for U.S. citizens/residents, and VAT handling procedures for Belgium. The solicitation uses Lowest Price Technically Acceptable (LPTA) evaluation criteria. Technical proposals must include performance schedules, key personnel qualifications, management information, past performance, quality management plans, and subcontracting details. Proposals are due by February 4, 2025 at 1500 CET via email to machendd@state.gov, with contract award expected in February 2025. Questions must be submitted by January 22, 2025.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Securing of Property Project U.S. Embassy Brussels
Solicitation No. 19GE50-25-R-0015
Pre-proposal Conference Thursday, January 16, 2025
1/24/2025 1
David Machen – Contract Specialist
Regional Procurement Support Office (RPSO) Giessenerstrasse 30 60435 Frankfurt am Main Germany
Email: machendd@state.gov
1/24/2025 2
WELCOME
mailto:machendd@state.gov
KEY TO SUBMITTING A SUCCESSFUL PROPOSAL
• What Contractors need to consider when preparing proposal documentation
• What the Government needs to receive with your submittal
• How the Government evaluates Contractor proposals
Proposal Submittal
1/24/2025 3
1. RFP Letter
2. Solicitation Document
(SAM.GOV)
1/24/2025 4
Solicitation Documents
L.5.4 SUMMARY OF INSTRUCTIONS
Offers shall consist of the following two physically separate volumes:
Volume Title No. of Copies
1 Price Proposal – See Section L.5.4 Electronic Copy (email only)
Volume Title No. of Copies
2 Technical Proposal – See Section L.5.4
Electronic Copy (email only)
1/24/2025 5
PRICE PROPOSAL
Volume 1
1/24/2025 6
B.2 TYPE OF CONTRACT
This is a firm fixed-price contract payable entirely in the currency indicated by the Contractor in Sub-Section B.3. No additional sums will be payable on account of any escalation in the cost of materials, equipment or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by this contract. Nor will the contract price be adjusted on account of fluctuations in the currency exchange rates. Changes in the contract price or time to complete will be made only due to changes made by the Government in the work to be performed, or by delays caused by the Government (see Sub-Section F.10, Excusable Delays), as determined and approved by the Contracting Officer.
Firm Fixed-Price
1/24/2025 7
1. Scheduling
2. Overall Performance Period
3. Security (Physical and Financial)
4. Value Added Tax and Insurance Premiums
5. Everything you hear at this conference and see at the site that may affect pricing
Pricing Considerations
1/24/2025 8
Contract Award Feb 2025
Timeline Projection
1/24/2025 9
ADMINISTRATIVE SUBMITTALS
Within 14 calendar days after Contract Award:
• Irrevocable Letter of Credit (ILOC) Performance Surety
• Irrevocable Letter of Credit (ILOC) Payment Surety
• General Liability Insurance
• Defense Base Act Insurance (DBA)
1/24/2025 10
ADMINISTRATIVE SUBMITTALS
Approval of Construction Documents:
• Safety Plan (10 calendar days)
• Construction Schedule (7 calendar days)
• Submittal Register (7 calendar days)
• List of Personnel (14 calendar days)
• Quality Management Plan (7 calendar days)
1/24/2025 11
Deliverables Section F.4
1/24/2025 12
1/24/2025 13
Submitting of any shop drawings, product data, samples, etc. 7 calendar days after award
Government review of submittals 3 calendar days
PRE-CONSTRUCTION NOTICE TO PROCEED (PCNTP) issued
Purchase and Shipment of Equipment and Material 7 calendar days (except supply and delivery of gates)
TOTAL PERIOD OF PRECONSTRUCTION PHASE: 17 calendar days
Preconstruction Phase Complete
February 2025
1/24/2025 14
Construction Begins
February 2025
1/24/2025 15
Project Completion:
Fencing and temporary gates (if necessary):
March 15, 2025
Gates installed and project complete: March March 31, 2025
1/24/2025 16
The delay in completing the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include:
• Acts of God or of the public enemy,
• Acts of the Government in either its sovereign or contractual capacity,
• Acts of another Contractor in the performance of a contract with the Government,
• Fires,
• Floods,
• Epidemics,
• Quarantine restrictions,
• Strikes,
• Freight embargoes,
• Unusually severe weather, or
• Delays of subcontractors or suppliers at any tier arising from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and the subcontractors or suppliers
Excusable Delays
1/24/2025 17
F.9 WORKING HOURS
Work can be executed in accordance with local labor law.
The Contractor shall coordinate the actual construction work hours with the COR prior to commencement of construction services.
Allowable Working Hours
1/24/2025 18
Other Pricing Considerations
Pricing
1/24/2025 19
VAT shall be included as a separate line item on the price proposal and on all invoices.
For services over € 2,500.00 the contractor is required to add VAT to all invoices. The contractor shall insert the following text on all invoices over € 2,500.00:
“VAT Exemption, Article 151, § 1st, a, of the Council Directive 2006/112/EC”. Failure to add all of the required text will result in the return of your invoice for correction.
The contractor will receive a Certificate 151, validated by the Belgian Ministry of Finance. Upon receipt of the Certificate 151, the contractor reimburses the VAT to the U.S. Embassy.
Value Added Tax
1/24/2025 20
B.5 DEFENSE BASE ACT (DBA) INSURANCE
DBA insurance is required for all United States citizens or residents and individuals hired in the United States, regardless of citizenship.
DBA insurance is not required for all Host Country Nationals (HCNs) and Third Country Nationals (TCNs)
The current list of DOL’s approved DBA insurance providers is located at http://www.dol.gov/owcp/dlhwc/lscarrier.htm.
Defense Base Act Insurance (DBA)
1/24/2025 21 http://www.dol.gov/owcp/dlhwc/lscarrier.htm
Irrevocable Letters of Credit (ILOC’s)
Project Surety
1/24/2025 22
H.1 BOND REQUIREMENTS
H.1.1 Bonds Required Pursuant to Far 52.228-15 - "Performance and Payment Bonds – Construction", this is an International contract, Irrevocable Letters of Credit (ILOC’s) are the preferred security for this project. The Contractor shall furnish two ILCO’s, one in the amount 20% of the contract price as a performance surety, and one in the amount of 20% of the contract price as a payment surety. Samples of ILOC sureties acceptable to the Government are shown in sample forms in Section J.
Irrevocable Letter of Credits (ILOC’s)
1/24/2025 23
H.1.4 Duration of Coverage
The required performance and payment securities shall remain in effect in the full amount required one year after the expected final payment.
Irrevocable Letter of Credits (ILOC’s)
1/24/2025 24
FAR 52.204-7 – SYSTEM FOR AWARD MANAGEMENT
SAM registration is be a mandatory requirement for contract award.
System for Award Management (SAM):
https://sam.gov
Registration Requirements
1/24/2025 25 https://sam.gov/
1. Standard Form 1442 (SF-1442)
2. Section B.3
3. Breakdown of Price Proposal
All three submittals shall match i.e. each have an Identical Total Amount.
The Three areas of Pricing Data
1/24/2025 26
Pricing 1: SF-1442 Page 2
1/24/2025 27
Pricing 2: Section B
1/24/2025 28
Letter from Financial Institution - ILOC’s
A letter or similar documentation from a financial institution confirming that, in the event of contract award, the required contract bonding will be provided punctually, and in accordance with the contract requirements at Section H.1.
Ability to Obtaining Required Bonding
1/24/2025 29
Volume 2
1/24/2025 30
TAB A - PERFORMANCE SCHEDULE
TAB B - KEY PERSONNEL
TAB C - MANGEMENT INFORMATION
TAB D - PAST PERFORMANCE AND CONSTRUCTION EXPERIENCE
TAB E - PRELIMINARY QUALITY MANAGEMENT PROGRAM
TAB F - SUBCONTRACTING-PERFORMANCE OF WORK BY CONTRACTOR
TAB G - COMBATTING TRAFFICKING IN PERSONS
L.5.5.3 VOLUME 2: TECHNICAL PROPOSAL
1/24/2025 31
(A) Performance Schedule
The performance schedule shall be presented in the form of a time scaled Network Diagram CPM Schedule or a Gantt chart, clearly showing the critical path, indicating commencement and completion of the entire project within the required contract completion schedule. The schedule shall be in sufficient detail to clearly show each portion of work and its planned commencement and completion dates.
Performance period shall be provided in calendar days. The period shall include all time aspects of the work, including advance ordering of long lead items.
TAB A – PERFORMANCE SCHEDULE
1/24/2025 32
(B) Key Personnel The Government considers the offeror’s:
• Program Manager;
• Project Engineer;
• Field Superintendent for Construction;
to be key personnel under any contract resulting from this solicitation. The offeror shall provide a detailed resume and the experience of these individuals. If these individuals are not current employees provide a letter of intent.
TAB B – KEY PERSONNEL
1/24/2025 33
(C) Management Information
1. Company Profile (Owners, Partners, and Principal Officers)
2. Principal Material Suppliers
3. Equipment Owned / Equipment Available
4. Number of Personnel that will be assigned to the Project
5. Authorization to do business and operate in the Belgium
TAB C – MANAGEMENT INFORMATION
1/24/2025 34
5. Authorization and Performance
In accordance with DOSAR 652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999), Contractor shall be required to have obtained necessary authorization to do business and operate in the Belgium. If the offeror has obtained such authorization, provide a statement confirming this fact. If offeror has not obtained such authorization, provide:
a) a thorough description as to what steps you have taken to investigate all requirements to obtain authorization to perform in the Belgium
b) details of your findings and a description of what your organization will actually be required to undertake to obtain licensing and requisite permit(s), and
c) specific information concerning the period of time you anticipate it will take to obtain appropriate authorization.
Any plan reflecting a protracted period (i.e. more than 15 calendar days after award) in obtaining license(s) and/or permit(s) shall be rejected at the discretion of the Contracting Officer since further delay would otherwise harm the Government.
TAB C – MANAGEMENT INFORMATION
1/24/2025 35
Tab D – Past Performance And Construction Experience.
1. Similar in Magnitude
2. Similar in Construction Features
TAB D – PAST PERFROMANCE AND
CONSTRUCTION EXPERIENCE
1/24/2025 36
Tab E – Preliminary Quality Management Program
In accordance with section E.4 of the solicitation the Contractor shall provide with their offer a Quality Management Program (QMP) which defines and implements a quality system. The quality system is a documented organizational process which describes responsibilities, procedures, and resources for providing quality control and quality assurance on a project.
TAB E – PRELIMINARY QUALITY
MANAGEMENT PROGRAM
1/24/2025 37
Tab F – Subcontracting - Performance Of Work By The Contractor Identify the work, by percentage that will be performed by the contractor with its own work force on site. For sub-contractors, list the percentage of work they will perform, and provide documentation that demonstrates their experience relevant to the works planned to be assigned to them under the respective subcontracts.
See also Section H.24.
TAB F – PERFORMANCE OF WORK BY
THE CONTRACTOR
1/24/2025 38
What is a Third Country National? Yes No United States Citizens and Residents
Citizens and Legal Residents of the Belgium
Other Nationalities
TAB G – COMBATING TRAFFICKING IN PERSONS
1/24/2025 39
• If the offeror is using Third Country nationals, you must submit a Recruitment Plan.
• If the offeror is using Third Country nationals and providing accommodation, submit a Recruitment Plan and Housing Plan.
TAB G – COMBATING TRAFFICKING IN PERSONS
1/24/2025 40
If the Offered Price is $550,000 or higher, offerors must certify that:
Contractors, contractor employees, and their agents shall not:
• Engage in severe forms of trafficking in persons,
• Procure commercial sex acts,
• Use forced labor,
• Destroy, conceal, confiscate, or deny access to an employee’s passport or other
ID and immigration documents
• Use misleading or fraudulent practices to recruit employees
• Charge employees, or potential employees, recruitment fees
• Fail to provide return transportation upon the end of employment
• Provide housing that fails to meet the host country housing standards
• If required by law, fail to provide an employment contract in writing
TAB C – COMBATING TRAFFICING IN
PERSONS CERTIFICATION
1/24/2025 41
A Compliance Certification and Compliance Plan are required if:
The total price offered is $550,000 or greater (regardless as to whether TCNS are employed)
• See H.25 and provision 52.222-56 for details
• Model compliance plans and other aides can be found at the Responsible Sourcing Tool website (www.responsiblesourcingtool.org)
COMBATING TRAFFICING IN PERSONS
CERTIFICATION (cont.)
1/24/2025 42
L.7 PROPOSAL DUE DATE
The proposal shall be delivered via email marked “PROPOSAL 19GE5025R0015”, no later than 1500 hours Central European Time (CET) on Feb 4, 2025.
NOTE: No proposals will be accepted after the time specified above.
DUE DATE FOR PROPOSALS
1/24/2025 43
By Email:
machendd@state.gov
PROPOSALS SUBMITTED TO
1/24/2025 44
EVALUATION OF PROPOSALS
1/24/2025 45
EVALUATED STRICTLY AGIANST THE CRITERIA SET FORTH IN THE
SOLICITATION.
SECTION L PROVIDES THE INFORMATION REQUIRED TO BE
SUBMITTED.
SECTION M PROVIDES INFORMATION CONCERNING HOW THE
GOVERNMENT WILL EVALAUTE THIS DATA SUBMITTED.
TECHNICAL PROPOSALS
1/24/2025 46
Section L - What the solicitation asked you to submit
Section M - What the solicitation tells you will be evaluated
Evaluation
1/24/2025 47
The award will go to the lowest price offer which is technically acceptable.
AWARD DETERMINATION:
LPTA
1/24/2025 48
Submit questions per email to:
machendd@state.gov
No later than Jan 22, 2025
QUESTIONS AND ANSWERS
1/24/2025 49 mailto:machendd@state.gov
Thank you!
1/24/2025 50
1/24/2025 51
| Securing of Property Project�U.S. Embassy Brussels�Solicitation No. 19GE50-25-R-0015 | |
| David Machen – Contract Specialist��Regional Procurement Support Office (RPSO)�Giessenerstrasse 30�60435 Frankfurt am Main�Germany��Email: | machendd@state.gov |
| Slide Number 3 | |
| � | |
| Slide Number 5 | |
| Slide Number 6 | |
| Slide Number 7 | |
| Slide Number 8 | |
| Slide Number 9 | |
| Slide Number 10 | |
| Slide Number 11 | |
| Slide Number 12 | |
| Slide Number 13 | |
| Slide Number 14 | |
| Slide Number 15 | |
| Slide Number 16 | |
| Slide Number 17 | |
| Slide Number 18 | |
| Slide Number 19 | |
| Slide Number 20 | |
| Slide Number 21 | |
| Slide Number 22 | |
| Slide Number 23 | |
| Slide Number 24 | |
| Slide Number 25 | |
| Slide Number 26 | |
| Slide Number 27 | |
| Slide Number 28 | |
| Slide Number 29 | |
| Slide Number 30 | |
| Slide Number 31 | |
| Slide Number 32 | |
| Slide Number 33 | |
| Slide Number 34 | |
| Slide Number 35 | |
| Slide Number 36 | |
| Slide Number 37 | |
| Slide Number 38 | |
| Slide Number 39 | |
| Slide Number 40 | |
| Slide Number 41 | |
| Slide Number 42 | |
| Slide Number 43 | |
| Slide Number 44 | |
| Slide Number 45 | |
| Slide Number 46 | |
| Slide Number 47 | |
| Slide Number 48 | |
| Slide Number 49 | |
| Slide Number 50 | |
| Slide Number 51 |