PAST PERFORMANCE evaluationpdf.pdf

PDF 35 KB Posted

Attached to
Engineering Solicitation Federal contract opportunity
Solicitation number
19AQMM21R0103
Issued by
Department of State Office of Acquisition Management

About this file

This document includes a federal contract opportunity solicitation and a past performance evaluation template. The solicitation seeks proposals for multiple Indefinite Delivery, Indefinite Quantity engineering contracts with the Department of State for one base year and four option years. Services include architectural, electrical, mechanical, civil, and project control engineering support for diplomatic construction projects worldwide. A partial small business set-aside aims to award at least two contracts to eligible small businesses and at least two to large businesses. Offerors must register in SAM and submit proposals by 3:00 PM EST on April 20, 2021. Questions are due by March 10, 2021 with responses posted as an amendment. The evaluation template appears to collect past performance information on key criteria such as conformance to specifications, adherence to schedule, and general business conduct for an unnamed contractor and contract.

View the file

Other files for this federal contract opportunity

Other files attached to Engineering Solicitation, newest first.
File Type Posted
SF-30 (Amendment of Solicitation Modification of Contract) Engineering A006.pdf.doc DOC document
SF-30 (Amendment of Solicitation Modification of Contract) Engineering A005.pdf PDF
ENGINEERING TPC 19AQMM21R0103 Responses to Questions Part Two.pdf PDF
2021 Small Business Subcontracting Plan.pdf PDF
ENGINEERING TPC SOLICITATION 19AQMM21R0103 FINAL.pdf PDF
SF-30 (Amendment of Solicitation Modification of Contract) Engineering A004.pdf PDF
Engineering Solicitation Questions 19AQMM21R0103 revised.pdf PDF
Engineering TPC DD254.pdf PDF
Engineering Solicitation Questions 19AQMM21R0103.pdf PDF
ENGINEERING TPC SOLICITATION 19AQMM21R0103 FINAL.docx DOCX document
SF-30 (Amendment of Solicitation Modification of Contract) Engineering A003.pdf PDF
ENGINEERING TPC SOLICITATION 19AQMM21R0103 DD254.docx DOCX document
SF-30 (Amendment of Solicitation Modification of Contract) Engineering A002 .doc DOC document
Engineering TPC A001 SF-30.pdf PDF
Engineering Solicitation Respond to questions 3-26.docx DOCX document
ENGINEERING TPC SOLICITATION 19AQMM21R0103 FINAL.docx DOCX document
ENGINEERING TPC SOLICITATION 19AQMM21R0103.pdf PDF
Engineering TPC SF-1449.pdf PDF
Engineering TPC Respond to Synopsis Questions 19AQMM21R0103.pdf PDF
TPC Engineering Synopsis2021.pdf PDF
TPC Engineering Synopsis2021.pdf PDF
TPC Engineering Synopsis2021.pdf PDF
TPC Engineering Synopsis2021.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.1.2

Past Performance Survey

CONTRACT INFORMATION

Please provide the following information to assist us in tracking responses received and resolving any conflicts in the evaluation process if necessary.

1. Contractor: _____________________________________________________

2. Contract Number: _____________________________________________________

3. Contract Type: _____________________________________________________

4. Name of Evaluator: __________________________________

5. Telephone Number: __________________________________

6. E-mail Address: ______________________________________________________

8. Mailing Address: _____________________________________________________

10. Length of involvement with contract: ________________________________________

11. Degree or extent of involvement with contract: _________________________________

Period of Performance: ____________________ to ___________________________

Initial Contract Value: $__________________________

Current or Completed Contract Value: $_________________________

Brief Description of Requirement:

Complexity of effort ( ) Difficult ( ) Routine

Thank you in advance for completing this survey. THIS INFORMATION WILL BE PROTECTED

IN ACCORDANCE WITH FAR 15.1004 (e).

SCORING CRITERIA

EXCEPTIONAL - Indicates the Contractor's performance within the area of evaluation clearly and consistently exceeds contractual requirements.

ACCEPTABLE - Indicates no problem in area of evaluation or has only minor problems for which solutions were satisfactory.

UNACCEPTABLE - Indicates serious problems in the evaluation area. The Contractor is/was in danger of being unable to satisfy contractual requirements and timely recovery is not likely or did not occur.

I. CONFORMANCE TO SPECIFICATIONS AND STANDARDS OF GOOD WORKMANSHIP

1a. Overall ability to pro-actively and aggressively perform contract requirements.

Please circle the appropriate rating below or check if N/A.

0 1 2 3 4 5 6 7 8 9 10

Unacceptable Acceptable Exceptional

1b. Effectiveness and reliability of contractor's Key Personnel.

Unacceptable Acceptable Exceptional

II. ADHERANCE TO CONTRACT SCHEDULE

2a. Overall performance in planning, scheduling, and monitoring.

Unacceptable Acceptable Exceptional

2b. Completion of major milestones on schedule.

Unacceptable Acceptable Exceptional

2c. Timely completion within period of performance.

Unacceptable Acceptable Exceptional

III. GENERAL BUSINESS CONDUCT AND BUSINESS LIKE CONCERN FOR THE

CUSTOMER

3a Responsiveness and flexibility in responding to changes.

Unacceptable Acceptable Exceptional

3b. Responsiveness/capability to respond to surge/short term requirements.

Unacceptable Acceptable Exceptional

3c. Accuracy and completeness of vouchers/invoices.

Unacceptable Acceptable Exceptional

IV. COMPLIANCE WITH THE TERMS AND CONDITIONS OF THE CONTRACT

4a. Quality, completeness, and accuracy of price proposals.

Unacceptable Acceptable Exceptional

4b. Accuracy and timeliness of required reports.

Unacceptable Acceptable Exceptional

4c. Ability to perform within negotiated prices.

Unacceptable Acceptable Exceptional

File details come from the government source that posted it. Updated .